Ballast discharge system

Information

  • Patent Grant
  • 6758147
  • Patent Number
    6,758,147
  • Date Filed
    Wednesday, July 25, 2001
    23 years ago
  • Date Issued
    Tuesday, July 6, 2004
    20 years ago
Abstract
A cargo discharge railcar for comprising a generally rectangular base structure, a plurality of walls coupled to the base structure defining an enclosure for carrying cargo, a hopper portion coupled to the base structure, a discharge gate coupled to the hopper portion, a control system coupled to the discharge gate for opening and closing the discharge gate, a central processing unit for controlling the control system, and a global positioning system receiver electrically coupled to the central processing unit for receiving longitude and latitude data from a global positioning system transmitter orbiting the Earth. The discharge gate is adapted to be selectively opened and closed based in part upon the longitude and latitude of the cargo discharge railcar.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates in general to ballast discharge equipment for use in depositing ballast material on a rail bed. In particular, the present invention relates to a computer controlled ballast discharge system.




2. Description of the Prior Art




In the late 1980's, the Burlington Northern Railroad Company initiated the development of a new type of automated ballast railcar. These railcars are operated in unit train groups and have improved the efficiency of ballast unloading by allowing workers to unload a 54-car train with only two employees, and which allowed the ballast discharge operation to be conducted at generally walking speed. The trains could unload in approximately 6 to 9 hours of track time over a period of two days. The automated unit train concept improved the cycle time on the cars (which is the time period from load to reload) dramatically from about 20 days to less than 5 days. Furthermore, it allowed operations to be conducted with fewer employees, which is beneficial from a cost and safety standpoint. By 1997, the successor to the Burlington Northern Railroad Company, the Burlington Northern and Santa Fe Railway Company (“BNSF”) was using automated ballast trains to improve efficiency. This allowed the retiring of old ballast cars from the fleet. There are two types of cars generally used by BNSF. One utilizes an electrical system in which the discharge gates are radio controlled, and the other utilizes a hydraulic system in which the discharge gates are hydraulically controlled. On cars with hydraulic gates, some of the gates may be radio controlled and some may be manually controlled with actuating handles on the side of the car.




Of course, it is always desirable to operate at higher rates and with fewer personnel. The present invention is directed to an improvement to the prior art automated ballast discharge railcars.




SUMMARY OF THE INVENTION




There is a need for an improved railroad ballast discharge system that utilizes global position systems (“GPS”).




It is one objective of the present invention to utilize GPS in combination with an automatic ballast discharge railcar in order to further improve ballast discharge operations by increasing the speed of operations, by reducing the number of personnel required, and by providing for relatively well controlled predictable depositions of ballast.




It is another objective of the present invention to provide an improved ballast discharge system which allows at least one controller and at least one GPS receiver to receive global position data from global position satellites, to read the global position data, to compare the global position data to global position information recorded in program memory, and to open and close discharge gates of a plurality of ballast railcars in a pre-programmed and pre-determined manner in order to deposit ballasts at pre-selected portions of the rail line and to not deposit ballast in other pre-selected portions of the rail line.











BRIEF DESCRIPTION OF THE DRAWINGS




The novel features believed characteristic of the invention are set forth in the appended claims. The invention itself however, as well as a preferred mode of use and further objectives and advantages thereof, will best be understood by reference to the following detailed description of the preferred embodiment when read in conjunction with the accompanying drawings, wherein:





FIG. 1A

is a pictorial representation of an automated ballast rail car according to the present invention;





FIG. 1B

is an enlarged pictorial representation of one of the ballast discharge gates of the automated ballast railcar of

FIG. 1A

;





FIG. 2

is a block diagram representation of the present invention which utilizes a GPS receiver to provide GPS derived location data to a central processing unit;





FIG. 3A

is a schematic representation of a section of rail line;





FIG. 3B

is a detailed view of the section of rail line of

FIG. 3A

, showing pre-selected portions of the rail line in which the ballast is to be deposited or not deposited;





FIG. 4

if a flow-chart representation of the preferred process of determining and recording location and ballast requirements for a portion of rail line;





FIG. 5

is a flow-chart representation of the operation of the computer program to selectively discharge ballast in accordance with pre-selected and pre-programmed location and discharge data;





FIG. 6

is a pictorial representation of a portion of a ballast train according to the present invention; and





FIG. 7

is a tabular representation of operation depicted in FIG.


3


B.











DETAILED DESCRIPTION OF THE INVENTION




Referring to

FIGS. 1A and 1B

in the drawings, pictorial representations of a cargo discharge railcar


11


according to the present invention are illustrated. Railcar


11


includes a generally rectangular base structure


17


, walls


19


coupled to base structure


17


, and hoppers


21


coupled to base structure


17


. A plurality of rail wheel assemblies


23


are coupled to the underneath side of base structure


17


. In the preferred embodiment, the cargo is railroad ballast. Discharge gates


13


may be selectively actuated and moved between an open condition and a closed condition. When in the closed condition, discharge gates


13


prevent the discharge of ballast (not shown) carried within railcar


11


. When in the open condition, discharge gates


13


allow the ballast to be discharged at a pre-selected flow rate through discharge gates


13


and onto a road bed


15


. Discharge gates


13


may actuated by electrical means, hydraulic means, a combination of electrical and hydraulic means, or other means for actuating similar discharge gates.




Referring now to

FIG. 2

in the drawings, a block diagram representation of the present invention is illustrated. As is shown, a plurality of GPS transmitters, including GPS transmitters


101


and


103


are provided in orbit above the Earth and may be utilized in a conventional manner to determine a location in terms of latitude and longitude by the interaction between at least one GPS receiver and the one or more GPS transmitters


101


and


103


. As is shown, at least one GPS receiver


105


is carried by railcar


11


. GPS receiver


105


may be located in one of the ballast railcars or it may be located in some other location, such as the locomotive. GPS receiver


105


communicates GPS data to a central processing unit (CPU)


107


with which is associated conventional supporting electronics, such as RAM memory


109


and ROM memory


111


. RAM memory


109


and ROM memory


111


may be utilized to record program instructions which may be executed by central processing unit


107


in order to generate signals for controlling the discharge of ballast from a series or train of cargo discharge railcars


11


. Typically, a relatively large number of ballast railcars, such as fifty railcars, are utilized to deposit ballast where needed to build up road bed


15


. The requirements of a particular portion of a rail line may vary. A typical ballast discharge operation will require the discharge of from one hundred to six hundred tons of ballast per mile with railcars generally containing one hundred tons of ballast per car. The tonnage that is deposited will depend upon the speed of railcars


11


, the number of railcars


11


used, the number of discharge gates


13


in the open condition, and the size of discharge gates


13


, which determines the flow rate of the ballast through discharge gate


13


. Typically, a ballast railcar


11


carries four discharge gates on the undercarriage. Relatively simple mathematical calculations can be done to determine the number of gates which are required to be in the open condition to discharge a predetermined amount of ballast over a predetermined portion of a rail line at a given velocity. Typically, once the discharge operations begin, a number of cars are unloaded continuously through the discharge gates. For example, it is not uncommon for five cars worth of ballast to be emptied out over one mile of a rail line.




It is important to note that there may be sections of railroad in which little or no discharge is required. For example, there may be sections with turnouts or switches, road crossings, bridges, and/or tunnels which may not require any additional ballast. Accordingly, it is one objective of the present invention to allow for the selective opening and closing of gates in accordance with preprogrammed GPS location data and preprogrammed discharge data in order to deposit the appropriate amount of ballast in only the appropriate locations, and to prevent the discharge of ballast in predetermined locations which do not require additional ballast.




At present it is conventional to merely open or close discharge gates


13


. However, it is possible to utilize the present invention to open and close discharge gates


13


in pre-selected amounts in order to better control or “throttle” the rate of discharge of ballast at particular portions of a rail line. At present, the ballast material is relatively uniform in both size and weight so it is practical to assume that each gate will discharge a comparable amount of ballast. It is typical to have each ballast railcar


11


carry as much as 100 tons of ballast rock.




Returning now to

FIG. 2

in the drawings, as is shown, CPU


107


controls and maintains control valves


113


,


115


, and


117


. Control valves


113


,


115


, and


117


operate to switch discharge gates


13


from the open condition to the closed condition, and vice versa. It should be understood that control valves


113


,


115


, and


117


may be either electrical or hydraulic control valves, or any other suitable control valve. Additionally, the duration of the open and/or closed condition of each gate may be determined by a clock


110


for the speed data received at input


112


, which represents the current speed of the train in units of miles per hour, or any other appropriate measure of velocity. Accordingly, control valves


113


,


115


, and


117


may be opened and closed in accordance with preprogrammed instructions. In other words, the GPS locations at which each discharge gate


13


is opened and closed may be preprogrammed. In this manner, both location and amount of the discharge may be controlled by CPU


107


.




Referring now to

FIGS. 3A and 3B

in the drawings, the operation of discharging the ballast on a particular rail line is depicted schematically. As is shown, a rail line comprising sections


125


,


127


, and


129


extends between Station A represented by reference numeral


121


, and Station B represented by reference numeral


123


. In the operation depicted in

FIG. 3A

, section


125


of the rail line does not require any additional ballast, nor does section


129


. However, section


127


of rail between location L


1


and location LN does require the discharge of a particular amount of ballast.

FIG. 3B

is a detailed schematic depiction of the Section


127


. As is shown, Section


127


begins at location L


1


and ends at location LN. Location L


1


is determined by GPS data in terms of latitude and longitude. Likewise, location LN is determined by a particular latitude and a longitude. As is shown, there are several rail segments,


137


,


139


,


141


,


143


which require additional ballasts in predetermined amounts. For example, segment


137


requires an amount “X” of ballast; segment


139


requires an amount “Y” of ballast; segment


141


requires an amount “X” of ballast; and segment


143


requires an amount “A” of ballast. Each of these ballast amounts may be set forth in tons of ballast per linear mile. For each rate of travel, the operator will know the amount of discharge possible for each ballast rail car


11


in terms of ballast discharge per discharge gate


13


per unit of time. With these variables, the amount of ballast that can be deposited can be determined with some precision.




Continuing with reference to

FIG. 3B

, segment


137


is located between location L


1


and location L


2


. Location L


1


is determined by latitude LAT


1


and longitude LON


1


. Location L


2


is determined by latitude LAT


2


and longitude LON


2


. Segment


139


is located between location L


3


and location L


4


. Location L


3


is determined by latitude LAT


3


and longitude LON


3


. Location L


4


is determined by latitude LAT


4


and longitude LON


4


. Location LN is determined by latitude LATN and longitude LONN. Segment


141


is located between location L


5


and location L


6


. Location L


5


is determined by latitude LAT


5


and longitude LON


5


. Location L


6


is determined by latitude LAT


6


and longitude LON


6


. Segment


143


is located between location L


7


and location LN. Location L


7


is determined by latitude LAT


7


and longitude LON


7


. Location LN is determined by latitude LATN and longitude LONN.




A rail tunnel


131


is located between location L and location L


3


. In the example of

FIG. 3B

, there is no need to deposit a ballast in rail tunnel


131


located between location L


2


and location L


3


. The same is true for a rail crossing


133


located between location L


4


and location L


5


, and turnout


135


located between location L


6


and location L


7


. Each of these locations L


1


, L


2


, L


3


, L


4


, L


5


, L


6


, L


7


, and LN is determined by corresponding GPS data in terms of longitude and latitude.




Referring now to

FIG. 4

in the drawings, a flow chart overview of one preferred implementation of the present invention is provided. The process begins at block


201


. In step


203


, a survey of a section of a rail line is performed, either by railroad personnel, or with the use of GPS survey information from other railroad track maintenance applications. With reference to

FIG. 3A

, the survey would include rail segment


127


which is located between location L


1


and location LN. Next, in accordance with step


205


, the sections which need additional ballast are identified, either by railroad personnel, or with the use of GPS survey information from other railroad track maintenance applications. With reference to the example of

FIG. 3B

, rail tunnel


131


, railroad crossing


133


, and turnout


135


do not require additional ballast. Next, in accordance with step


207


, the GPS system data for each start location is recorded. Likewise, in accordance with step


209


, the GPS data for each stop location is recorded. With reference to the example of

FIG. 3B

, the start locations are location L


1


, location L


3


, location L


5


, and location L


7


. Furthermore, the stop locations are location L


2


, location L


4


, location L


6


, and location LN. In accordance with step


211


, the ballast requirements for each segment are recorded. Again, with reference to the example of

FIG. 3B

, segment


137


which is between locations L


1


and L


2


requires a ballast in the amount of “X.” Segment


139


which is located between location L


3


and location L


4


requires ballast in an amount of “Y.” Segment


141


which is located between location L


5


and location L


6


requires ballast in an amount of “Z.” Segment


143


which is located between location L


7


and location LN requires ballast in the amount of “A.”




Continuing with reference to the flow chart of

FIG. 4

, in accordance with steps


213


and


215


, CPU


107


has been programmed to calculate and record gating requirements based upon various amounts of ballast for each location and at varying speeds of unloading. Then, in accordance with step


217


, programmed CPU


107


associates the GPS location data and the gating requirements data. Essentially, a data base is built which maps out a plan for depositing ballast along predetermined sections of rail which need the ballast. The process ends at step


219


.




Referring now to

FIG. 5

in the drawings, a flow chart representation of the preferred implementation of the present invention is illustrated. The process begins at block


251


and continues at block


253


, wherein, the CPU


107


of

FIG. 2

loads the GPS data and associated ballast amounts and gate requirements data into RAM memory


109


and ROM memory


111


. Then, in accordance with step


255


, CPU


107


reads the GPS signals from GPS receiver


105


. Then, in accordance with step


257


, CPU


107


compares the GPS signal to the GPS signal maintained in the data base. In accordance with blocks


259


and


263


, CPU


107


determines through this comparison whether discharge gates


13


are required to be open or closed if there is a match. If there is a match for an open gate condition, CPU


107


will then signal an appropriate control valve


113


,


115


, or


117


to open corresponding discharge gates


13


in accordance with step


261


. However, if the comparison of the GPS signal with the GPS data in the data base results in a match for a closed gate condition, CPU


107


will then signal an appropriate control valve


113


,


115


, or


117


to close corresponding discharge gates


13


in accordance with step


265


. For the example of

FIG. 3B

, this process is iteratively repeated until section


127


of rail line is traveled in its entirety. In this manner, pre-selected discharge gates


13


are opened and closed at predetermined locations in order to deposit a predetermined amount of ballast to build up the road bed to a desired level.




Referring now to

FIG. 6

in the drawings, a pictorial representation of a portion of a ballast train according to the present invention is illustrated. In a typical operation, five ballast rail cars C


1


, C


2


, C


3


, C


4


, and C


5


may be simultaneously discharging ballast at a predetermined rate over a pre-selected segment of rail line. The system and CPU


107


of the present invention receive and compare GPS data to determine when to open and close discharge gates


13


so as to discharge the predetermined amounts of ballast at the predetermined segments of the rail line. When cars C


1


, C


2


, C


3


, C


4


, and C


5


are empty, CPU


107


cause other cars to begin discharging ballast.




Referring now to

FIG. 7

in the drawings, a tabular representation of the operation depicted in

FIG. 3B

is illustrated. A table


100


shows the correlation between the position intervals of the ballast train relative to locations L


1


, L


2


, L


3


, L


4


, L


5


, L


6


, L


7


, and LN; the amount of ballast discharged during these intervals; and whether discharge gates


13


are in the open condition or the closed condition.




It should be understood that the present invention may be used on ballast discharge railcars of original manufacture, or may be used in retrofit applications on existing ballast discharge railcars. In retrofit applications, the existing control systems for opening and closing the discharge gates of the existing ballast discharge railcars are replaced by the control systems of the present invention, as necessary to utilize the GPS data.




Although the present invention has been described with reference to the preferred embodiment of discharging ballast on railroad beds, it should be understood that the present invention may be utilized in any railroad application in which it is desirable to discharge a selected amount of cargo at selected points or over selected distances.




It should be apparent from the foregoing that an invention having significant advantages has been provided. While the invention is shown in only one of its forms, it is not just limited but is susceptible to various changes and modifications without departing from the spirit thereof. Various modifications of the disclosed embodiments as well as alternative embodiments of the invention will become apparent to persons skilled in the art upon reference to the description of the invention. It is therefore contemplated that any appended claims will cover any such modifications or embodiments that fall within the scope of the invention.



Claims
  • 1. A method of discharging cargo from a railcar at selected locations along a rail line, the method comprising the steps of:identifying selected locations of the rail line at which cargo is to be discharged; providing a cargo discharge railcar having a generally rectangular base structure and a plurality of walls coupled to the base structure, thereby defining an enclosure for carrying cargo, a hopper portion coupled to the base structure, and a discharge gate coupled to the hopper portion; coupling a control system to the discharge gate; electrically coupling a central processing unit to the control system; providing a receiver for receiving longitude and latitude data from a global positioning system orbiting the Earth; electrically coupling the receiver to the central processing unit; moving the railcar along the rail line; receiving the longitude and latitude data; comparing the selected locations of the rail line at which cargo is to be discharged with the longitude and latitude data comprising the steps of: electrically coupling memory modules to the central processing unit; building a data base of the selected locations of the rail line at which the ballast material is to be discharged comprising the steps of: recording a start location for each selected location; recording a stop location for each selected location; and recording ballast discharge requirements for each selected location, wherein the ballast discharge requirements include the amount of ballast material required at each selected location, the rate of discharge of the ballast material from the railcar for selected openings of the discharge gate, and the velocity of the railcar; storing the data base in the memory modules; and comparing the longitude and latitude data with the data stored in the data base; and signaling the control system with the central processing unit to open and close the discharge gate when the railcar is at the selected locations as determined by the longitude and latitude data, thereby discharging the cargo.
  • 2. The method of discharging cargo from a railcar according to claim 1, wherein the step of identifying selected locations of the rail line at which cargo is to be discharged is performed by a manual inspection.
  • 3. The method of discharging cargo from a railcar according to claim 1, wherein the step of identifying selected locations of the rail line at which cargo is to be discharged is performed by using global positioning system survey information from other railroad track maintenance applications.
  • 4. The method of discharging cargo from a railcar according to claim 1, wherein the cargo is discharged during a single continuous opening of the discharge gate.
  • 5. The method of discharging cargo from a railcar according to claim 1, wherein the cargo is discharged over multiple cycles of opening and closing the discharge gate.
  • 6. The method of distributing cargo from a railcar according to claim 1, wherein the cargo is rail bed ballast material.
Parent Case Info

This application claims the benefit of U.S. Provisional Application No. 60/221,068 filed Jul. 27, 2000, titled “Ballast Discharge System.”

US Referenced Citations (12)
Number Name Date Kind
5809448 Gimenez et al. Sep 1998 A
5867404 Bryan Feb 1999 A
5890682 Welk Apr 1999 A
5902341 Wilson May 1999 A
5950967 Montgomery Sep 1999 A
5969643 Curtis Oct 1999 A
6044698 Bryan Apr 2000 A
6059372 McDonald et al. May 2000 A
6073562 Cozine et al. Jun 2000 A
6142372 Wright Nov 2000 A
6227124 Gaydos et al. May 2001 B1
6249215 Dilz et al. Jun 2001 B1
Provisional Applications (1)
Number Date Country
60/221068 Jul 2000 US