Ballroom-style cleanroom assembled from modular buildings

Information

  • Patent Grant
  • 11492795
  • Patent Number
    11,492,795
  • Date Filed
    Monday, August 31, 2020
    3 years ago
  • Date Issued
    Tuesday, November 8, 2022
    a year ago
Abstract
A rapidly deployable cleanroom is constructed from multiple modular building sections that are side-by-side and have similarly sized lengths, as well as user-accessible panels in multiple of them for air, water, power, networking, and other utilities at a similar internal location along their lengths. The utility panels can be standardized such that each panel is substantially identical to one another. The modular building sections can be drawn together using tension cables within lateral hollow extruded structural tubes beneath and/or above the cleanroom, the tension system utilizing jackscrews to pull everything tight. Because the utility panels are at the same longitudinal location in the building sections, the joined structure and resulting open space “ballroom” style cleanroom has the utility panels aligned with each other inside the cleanroom.
Description
CROSS-REFERENCES TO RELATED APPLICATIONS

NOT APPLICABLE


STATEMENT AS TO RIGHTS TO INVENTIONS MADE UNDER FEDERALLY SPONSORED RESEARCH AND DEVELOPMENT

NOT APPLICABLE


BACKGROUND
1. Field of the Invention

Embodiments of the present invention generally relate to chemical or physical laboratory clean room enclosures. Specifically, they relate to modular buildings that are joined together laterally with tension cables to form a large, ballroom-style open area in which utility connections are aligned with one another.


2. Description of the Related Art

U.S. Pat. No. 9,765,980, issued to Holtz et al., discloses a modular, self-contained, mobile clean room, also shortened to “cleanroom.” About the size of a modular building, the cleanroom can be pre-fabricated in a factory and then transported by semitrailer, railcar, or cargo aircraft to a final location. Unlike non-modular buildings, such cleanrooms often employ lightweight construction, aluminum frames with steel and aluminum panels, and lack a substantial amount of heavy drywall.


Such cleanrooms can come complete with their own mechanical rooms that house heating, ventilation, and air conditioning (HVAC) air handling units, plumbing utilities, and circuit breaker panels. Ducts, piping, and electrical conduit run from the mechanical room through the walls to the cleanroom or over its ceiling to where they need to go. Additionally or alternatively, utilities can be provided directly from a surrounding “gray space” building without running through a mechanical room.


Multiple such cleanrooms can be set together in warehouses or other gray space buildings. The clean rooms can provide electricity, chilled and hot water, HVAC (heating ventilation, and air conditioning), clean gases, drainage hookups, and communications wiring. Besides their use as analysis laboratories, the mobile cleanrooms are a relatively quick way to support the manufacture of pharmaceuticals and biopharmaceuticals. Some cleanrooms are certifiable to ISO5 air purity.


Sometimes housed inside the cleanrooms are heavy, bulky laboratory and manufacturing equipment. For example, a cleanroom may contain a centrifuge, tissue culture hood, chemical handling unit, stirrer tank, chromatography column, cell sorter, bioreactor, refrigerator, freezer, incubator, biosafety cabinet, temperature cycler, vacuum, or freeze dryer. Some equipment within the cleanrooms is on heavy duty casters so that it may be repositioned to a new station or otherwise transported by rolling on the cleanroom floor. The advent of single use technology has reduced the size of equipment and reduced the need for hard piping within cleanrooms, which has opened the door for a more modular approach.


There is a need in the art for modern, transportable cleanrooms that are larger and have more flexible space than before while preserving serviceability and maintainability.


BRIEF SUMMARY

Generally, a large, open, ballroom-style of cleanroom is constructed from multiple modular building sections by tying the building sections together with tension cables. The tension wires can be run through extruded tubes under the floor. Each modular building section may have a standardized utility panel on its ceiling, floor, or walls, depending on the amount of equipment housed in it. After the modular building sections are joined together, the utility panels, which are at the same location in each building section, are connected to pipes, electrical conduit, cable raceways, HVAC ductwork, and other utilities that run laterally over the cleanrooms in a shortest distance between them.


During assembly, air bearings beneath the modular building sections are pressurized so that the sections can be aligned and pushed together by hand. The tension cables are fed through the extruded tubes, which provide structural support to the respective section, and then tightened with jackscrews to draw the sections together snugly.


Some embodiments of the present invention are related to a rapid deployment cleanroom system including multiple modular building structures positioned side-by-side with respect to each other, each modular building structure having a longitudinal dimension and a lateral dimension, each modular building structure including a floor, a ceiling, and at least two walls defining an interior, hollow tubes extending laterally across the modular building structure and below the floor of or above the ceiling of the modular building structure, and a utility panel having a set of connections for power outlets, data, pressurized gas, and water, a longitudinal location of the utility panel within the interior of each modular building structure being substantially identical among the modular building structures, and fasteners within the hollow tubes of the modular building structures configured to join the modular building structures together, wherein the joined modular building structures form a large sealable, sterilizable cleanroom, wherein the utility panels of the modular building structures are aligned with one another in the cleanroom interior.


The fasteners can include tension cables extending through the hollow tubes and between opposite sides of the joined modular building structures. Alignment blocks can be placed between the modular building structures. Air bearings can be installed beneath the floor of each modular building structure configured to support the modular building structure on a cushion of air to facilitate joining them together.


A number and type of connections in each set can be substantially identical between utility panels in different modular building structures. The utility panels can be located on ceilings of the modular building structures. Gas pipes can extend laterally over the modular building structures and connecting the pressurized gas connections, and water pipes can be collocated with the gas pipes extending laterally over the modular building structures and connecting the water connections. Electrical conduit can extend laterally across the modular building structures and connect the power outlets, and data cables can extend laterally across the modular building structures and connect the data connections. The electrical conduit can include flexible conduit and junction boxes between the modular building structures.


Each modular building structure can further include an air vent opening to the interior, an air handling duct connected with the air vent, and the cleanroom system can include ductwork extending laterally across the modular building structures and connecting the air vents. The large sealable, sterilizable cleanroom can include an area that is uninterrupted by pillars or structural walls.


Some embodiments include a method of assembling modular building structures into a larger ballroom-style cleanroom. The method can include positioning multiple modular building structures side-by-side with respect to each other, each modular building structure having a longitudinal dimension and a lateral dimension, each modular building structure including a floor, a ceiling, and at least two walls defining an interior, hollow tubes extending laterally across the modular building structure and below the floor of or above the ceiling of the modular building structure, and a utility panel having a set of connections for power outlets, data, pressurized gas, and water, a longitudinal location of the utility panel within the interior of each modular building structure being substantially identical among the modular building structures. The method further includes removing tie down lugs from the hollow tubes, inserting a tension cable through the hollow tubes of the side-by-side modular building structures, tightening the tension cables to join the modular building structures together and form a large sealable, sterilizable cleanroom, and connecting the utility panels of the side-by-side modular building structures, wherein the utility panels of the modular building structures are aligned with one another in the cleanroom interior.


Air bearings beneath the floor of each modular building structure can be pressurized to support the modular building structure on a cushion of air during the tightening.


A number and type of connections in each set of connections can be substantially identical between utility panels in different modular building structures. The utility panels can be located on ceilings of the modular building structures.


The connecting can include connecting the pressurized gas connections with gas pipes extending laterally over the modular building structures, and connecting the water connections with water pipes collocated with the gas pipes extending laterally over the modular building structures. The connecting can include connecting the power outlets with electrical conduit extending laterally across the modular building structures, and connecting the data connections with twisted pair, coax, or other data cables extending laterally across the modular building structures. The electrical conduit can include flexible conduit and junction boxes between the modular building structures.


Each modular building structure can further include an air vent opening to the interior and an air handling duct connected with the air vent, the method further including connecting the air vents with ductwork extending laterally across the modular building structures.


The large sealable, sterilizable cleanroom can include a “ballroom” area that is uninterrupted by pillars or structural walls.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 illustrates an inside perspective view of a ballroom-style cleanroom in accordance with an embodiment.



FIG. 2 illustrates an inside perspective view of a high bay cleanroom in accordance with an embodiment.



FIG. 3 is an isometric view of modular building sections before they are joined into a larger ballroom cleanroom in accordance with an embodiment.



FIG. 4 is an isometric view of the modular building sections of FIG. 3 after they are joined into a larger ballroom cleanroom.



FIG. 5 is a perspective, elevation view of a modular cleanroom section in accordance with an embodiment.



FIG. 6 is a top, side isometric view of interstitial space of an assembled modular building in accordance with an embodiment.



FIG. 7 is a flowchart illustrating an embodiment in accordance with the present invention.





DETAILED DESCRIPTION

Similar-length modular building structures/sections are strapped together with tension cables or other fasteners from end-to-end in order to create a larger, “ballroom-style” open room with few or no pillars or other intervening structures. Utility panels are set in the floor, walls, or ceiling of each or almost each section at the same position. When the structures are joined together, the utility panels line up.


A “ballroom-style cleanroom” includes a large interior room for personnel & equipment that is unbroken by pillars or structural walls, sealable from dust, and whose surfaces are predominantly smooth and sterilizable, or as otherwise known in the art. Such cleanrooms can include double, triple, quadruple, or greater assemblies of modular buildings that avoid major structural side walls between the modular buildings where the ballroom is and mainly have outer perimeter walls.


A “utility panel” includes a fixture on a building to provide two or more utilities, such as electrical power, computer network access, gases such as oxygen, nitrogen, carbon dioxide, and compressed air, liquid chilled water, including its supply and return, and other utilities, or as otherwise known in the art.


Air bearings that can lift each modular building structure on a warehouse floor can be set at its four corners and edges. Some commercially available air bearings are each about 45 centimeters (cm) (18 inches) in diameter and under 6.2 cm (2.4375 inches) tall. When pressurized, they can allow one or two workers to almost effortlessly move and rotate the relatively large mobile building structures


Technical advantages of various embodiments are many. A ballroom-style open cleanroom allows for larger laboratory or manufacturing equipment to be mounted within than rooms that are obstructed with pillars and unmovable internal walls. The open space is flexible, allowing analysis and production items, laboratory benches and desks, to be re-stationed as desired. Tension cable fasteners provide the advantages of being lightweight, extremely strong, and adjustable at the installation location. Along with air bearings, they allow a small team to push together the modular building sections on a flat warehouse/gray space floor and tighten them together from one side. They do not need to be tightened from the inside, thus, preserving the cleanliness of the cleanroom, which may have elements that are factory sealed. The cables are also uninstallable or replaceable if necessary without having to access the inside of the cleanroom. Having the utility panels aligned with one another within the interior not only simplifies the layout for users, but it can minimize the length of pipes, electrical conduit, cable trays, ductwork, and other utilities necessary to connect the building. The same jigs and templates may be used to install the utility panels. Also, users may find that the utility panels are in predictable areas of the inside, simplifying the task of determining where items go and workflow procedures should be performed.



FIG. 1 illustrates an inside perspective view of a ballroom-style cleanroom. System 100 includes at least eight modular building sections joined together, their seams visible in the ceiling and on some of the walls. Each modular building section has longitudinal dimension 116, which runs the long way of each individual section, and lateral dimension 114, which runs the shorter way of each section. The modular building sections are joined side-by-side with respect to each other. Joining them together results in large sealable, sterilizable cleanroom 102.


Cleanroom 102 is defined by floor 104, ceiling 106, and walls 108. In the figure, there are no pillars or internal walls to obstruct the space, much like a ballroom. Thus, it is referred to as a “ballroom” space.


Each modular building section includes utility panel 110 on its ceiling. The utility panels include outlets for electrical power, network connectivity, chilled water for cooling, compressed air, and various purified gases. The positions of the panels are at the same longitudinal position on each of the modular building section's ceilings 106. They are also at the same lateral position on the ceiling of each section.


When the modular building sections were assembled and joined together, the utility panels aligned in line 112 with each other. This makes for a predictable, simple user experience. Wherever a particular utility is needed along the long direction of the entire room, the outlet for the utility is in a common position from the walls, directly overhead.


In the exemplary embodiment, each utility panel is standardized, such that a set of connections for the same utilities may be found on any of the utility panels. For example, there may be two chilled water outlets and two returns on every single panel. In addition, there may be four Ethernet data ports and six electrical outlets on each panel. And there may be two compressed air, one oxygen, one carbon dioxide, and one nitrogen connection. Other utilities can be provided. The number and type of connections in each set of connections are identical between the different utility panels. In other embodiments, different combinations of connections can be presented on the utility panels.


“Substantially identical” numbers or types include having a commonality of 75%, 80%, 85%, 90%, 95%, or more between the total numbers of items and types, or as otherwise known in the art. For example, a first utility panel with ten different connections and a second utility with nine different connections may be substantially identical if eight or all nine of the utilities are the same between the first and second utilities.



FIG. 2 illustrates an inside perspective view of a high bay cleanroom. System 200 includes several modular building sections joined together, each having a high portion as shown. Each modular building section has longitudinal direction 216 and lateral dimension 214. The modular buildings sections are joined together side-by-side to result in large sealable, sterilizable cleanroom 202. The high portion of each modular building section is aligned with the high portion of its neighbor, resulting in a relatively clear high bay area running the length of the room.


Cleanroom 202 has floor 204, low ceiling 206, high ceiling 207, and walls 208. There are four structural pillars in the view, but these still leave empty a large, unobstructed floor in the middle between the two sets of pillars, forming a ballroom with a high bay on one side.


Utility panels 210 are aligned with one another on low ceiling 206 and on high ceiling 207, running along lines 212. High ceiling 207 is the ceiling of the high bay. Like in the previous embodiment, personnel are presented with mostly common panels no matter where they are in the great space. The utility panels feature connections for various compressed cases, compressed air, chilled and hot water and returns, network connections, and power outlets, as well as alarm feeds and such.


Some utility panels can be different due to user needs. For example, in some embodiments, the high bay utility panels are different from the low ceiling utility panels. In other embodiments, several of the utility panels can be the same in a low and high section but then change to simpler or more complex utility panels at other points in the room.



FIG. 3 is an isometric view of modular building sections before they are joined into a larger ballroom cleanroom. Between end modular building sections 320 and 330 are sandwiched four modular building sections 322, 324, 326, and 328 for a total of six modular building structures. In the embodiment, each section is the same (longitudinal) length, (lateral) width, and height. However, their internal constructions and door and window layouts are different.


Five of the modular building sections include similarly sized maintenance/utility rooms, while end section 330 happens to have a smaller utility closet. Several units have external doorways for moving personnel and materials into and out of the cleanroom. Some units are configured so that when the sections are joined, there will be internal walls. Yet among sections 320, 322, and 324 there will be a large, internal ballroom-sized space without intervening posts or walls.


Each modular building section has a set of air bearings 334, like those shown for modular building section 330. There is at least one air bearing in each lower corner. When pressurized, the air bearings lift the modular building section on a thin cushion of air so that it may be moved by just a few installation personnel. The air bearings share a bottom space with structural elements.


Hollow, extruded tubes 332 extend laterally across the bottom of each modular building section, such as those shown for modular building section 330. In some embodiments, hollow tubes are on the top. The hollow tubes have a rounded-corner square cross section but can have other shaped cross sections as well. Being structural, the hollow tubes can house tie down lugs for travel. After unloading at a destination, the tie down lugs are removed and tension cables inserted through the hollow tubes.



FIG. 4 is an isometric view of the modular building sections of FIG. 3 after they are joined into a larger ballroom cleanroom. Between modular building sections 320, 322, 324, 326, 328, and 330 are alignment blocks 442, which are mounted in concave C channels running the perimeter of the bottom of each modular building section. The alignment blocks ensure that the floors of the different modular building sections vertically align with one another and that the wall, doors, and other items also align, horizontally.


Tension cable 436 is run through hollow tube 332. At a far end, tension cable 436 is connected through an all thread rod to dead man's billet 438. At the near end, tension cable is connected to turnbuckle 440. Other tension cables are run through the other hollow tubes 332 with similar attachments.


When turned, turnbuckle 440, and the turnbuckles of the other tension cables, pull the tension cable tight, compressing modular building sections 320, 322, 324, 326, 328, and 330 together.


After the modular building sections are connected together into one big building, utilities connections are laid in place and connected. For example, gas pipes, water pipes, electrical conduit, and data cables are mounted laterally over the modular building sections. Because the utility panels are in the same longitudinal location on each section, less pipe, conduit, and cabling is required than if the utility panels were in different areas. Similarly, HVAC ductwork can also be laid laterally across the modular building structures and connected to air handing ducts and air vents.



FIG. 5 is a perspective, elevation view of a modular cleanroom section in accordance with an embodiment. In assembly 500, modular building section 520 has longitudinal dimension 516, lateral dimension 514, and height dimension 515. In the figure, the dimensions are shown with arrows that define the extent of the section. Besides utility room 552 at one end, modular building section 520 encloses cleanroom 502, whose bottom is defined by floor 504, sides defined by walls 508, and top defined by ceiling 506.


In the interstitial space above the ceiling is air handling duct 550, among other utility lines. Air handling duct connects to air vent 548 within the interior of cleanroom 502, providing filtered, slightly pressurized air to the cleanroom. A slight pressurization minimizes dust and other impurities from seeping in.


An “interstitial volume” or “interstitial space” is an area above a ceiling of a cleanroom and below a roof of a modular building structure surrounding the cleanroom, or as otherwise known in the art.


In ceiling 506 is set utility panel 510. Utility panel 510 hosts a set of utility connections 540, 542, 544, and 546. The connections are power outlets, Ethernet jacks, pressurized gas connections, and water outlets and returns. These four types of connections may be replicated in utility panels of other modular building structures with which modular building structure 520 will be joined.


On the roof of the modular building assembly, walkable floor panels are supported between joists. Each floor panel can be independently removable from its surrounding joists to provide for access by personnel. In the exemplary embodiment, a swath of floor panels extends an entire width and length of the unitary frame of modular building section 520.



FIG. 6 is a top, side isometric view of interstitial space of an assembled modular building. System 600 includes HVAC ductwork 650, which connects with air handling duct 652. Electrical conduit 654 feeds electrical outlets. Conduit 656 carries network and alarm cables. Pipes 658 feed air outlets, and pipes 560 send chilled water to utility panel access points in the cleanroom below. Some pipes convey pressurized gas to the utility panels as well. Some of the various electrical conduit, pipes, ductwork, and wires can travel through the interstitial volume from a mechanical room to their respective ends in the cleanroom. However, laying them laterally over the joined modular building sections can reduce the amount of material needed.



FIG. 7 is a flowchart of a process 700 in accordance with an embodiment. In operation 701, multiple modular building structures are positioned side-by-side with respect to each other, each modular building structure having a longitudinal dimension and a lateral dimension, each modular building structure comprising a floor, a ceiling, and at least two walls defining an interior. Each modular building structure also includes hollow tubes extending laterally across the modular building structure and below the floor of, or above the ceiling of, the modular building structure. They each include a utility panel having a set of connections for power outlets, data, pressurized gas, and water, a longitudinal location of the utility panel within the interior of each modular building structure being substantially identical among the modular building structures. In operation 702, tie down lugs are removed from the hollow tubes. In operation 703, a tension cable is inserted through the hollow tubes of the side-by-side modular building structures. In operation 704, air bearings beneath the floor of each modular building structure are pressurized to support the modular building structure on a cushion of air during the tightening. In operation 705, the tension cables are tightened to join the modular building structures together and form a large sealable, sterilizable cleanroom. In operation 706, the utility panels of the side-by-side modular building structures are connected, wherein the utility panels of the modular building structures are aligned with one another in the cleanroom interior.


It is contemplated that any embodiment discussed in this specification can be implemented with respect to any method, kit, reagent, or composition of the invention, and vice versa. Furthermore, compositions of the invention can be used to achieve methods of the invention.


It will be understood that particular embodiments described herein are shown by way of illustration and not as limitations of the invention. The principal features of this invention can be employed in various embodiments without departing from the scope of the invention. Those skilled in the art will recognize or will be able to ascertain using no more than routine experimentation, numerous equivalents to the specific procedures described herein. Such equivalents are considered to be within the scope of this invention and are covered by the claims.


All publications and patent applications mentioned in the specification are indicative of the level of skill of those skilled in the art to which this invention pertains. All publications and patent applications are herein incorporated by reference to the same extent as if each individual publication or patent application was specifically and individually indicated to be incorporated by reference.


The use of the word “a” or “an” when used in conjunction with the term “comprising” in the claims and/or the specification may mean “one,” but it is also consistent with the meaning of “one or more,” “at least one,” and “one or more than one.” The use of the term “or” in the claims is used to mean “and/or” unless explicitly indicated to refer to alternatives only or the alternatives are mutually exclusive, although the disclosure supports a definition that refers to only alternatives and “and/or.” Throughout this application, the term “about” is used to indicate that a value includes the inherent variation of error for the device, the method being employed to determine the value, or the variation that exists among the study subjects.


As used in this specification and claim(s), the words “comprising” (and any form of comprising, such as “comprise” and “comprises”), “having” (and any form of having, such as “have” and “has”), “including” (and any form of including, such as “includes” and “include”) or “containing” (and any form of containing, such as “contains” and “contain”) are inclusive or open-ended and do not exclude additional, unrecited elements or method steps.


The term “or combinations thereof” as used herein refers to all permutations and combinations of the listed items preceding the term. For example, “A, B, C, or combinations thereof” is intended to include at least one of: A, B, C, AB, AC, BC, or ABC, and if order is important in a particular context, also BA, CA, CB, CBA, BCA, ACB, BAC, or CAB. Continuing with this example, expressly included are combinations that contain repeats of one or more item or term, such as BB, AAA, MB, BBC, AAABCCCC, CBBAAA, CABABB, and so forth. The skilled artisan will understand that typically there is no limit on the number of items or terms in any combination, unless otherwise apparent from the context.


As used herein, words of approximation such as, without limitation, “about”, “substantial” or “substantially” refers to a condition that when so modified is understood to not necessarily be absolute or perfect but would be considered close enough to those of ordinary skill in the art to warrant designating the condition as being present. The extent to which the description may vary will depend on how great a change can be instituted and still have one of ordinary skilled in the art recognize the modified feature as still having the required characteristics and capabilities of the unmodified feature. In general, but subject to the preceding discussion, a numerical value herein that is modified by a word of approximation such as “about” may vary from the stated value by at least ±1, 2, 3, 4, 5, 6, 7, 10, 12 or 15%.


All of the compositions and/or methods disclosed and claimed herein can be made and executed without undue experimentation in light of the present disclosure. While the compositions and methods of this invention have been described in terms of preferred embodiments, it will be apparent to those of skill in the art that variations may be applied to the compositions and/or methods and in the steps or in the sequence of steps of the method described herein without departing from the concept, spirit and scope of the invention. All such similar substitutes and modifications apparent to those skilled in the art are deemed to be within the spirit, scope and concept of the invention as defined by the appended claims.

Claims
  • 1. A rapid deployment cleanroom system comprising: multiple modular building structures positioned side-by-side with respect to each other, each modular building structure having a longitudinal dimension and a lateral dimension, each modular building structure comprising: a floor, a ceiling, and at least two walls defining an interior;hollow tubes extending laterally across and below the floor or above the ceiling; andin two or more of the modular building structures, a utility panel having a set of connections for power outlets, data, pressurized gas, and water, a longitudinal location of the utility panel within the interior of each of the two or more modular building structures being substantially identical among the modular building structures; andfasteners within the hollow tubes of the modular building structures configured to join the modular building structures together, wherein the joined modular building structures form a large sealable, sterilizable cleanroom,wherein the utility panels of the modular building structures are aligned with one another in the cleanroom interior.
  • 2. The cleanroom system of claim 1 wherein the fasteners include tension cables extending through the hollow tubes and between opposite sides of the joined modular building structures.
  • 3. The cleanroom system of claim 2 further comprising: alignment blocks placed between the modular building structures.
  • 4. The cleanroom system of claim 1 further comprising: air bearings beneath the floor of each modular building structure configured to support the modular building structure on a cushion of air to facilitate joining them together.
  • 5. The cleanroom system of claim 1 wherein a number and type of connections in each set are substantially identical between utility panels in different modular building structures.
  • 6. The cleanroom system of claim 1 wherein the utility panels are located on ceilings of the modular building structures.
  • 7. The cleanroom system of claim 1 further comprising: gas pipes extending laterally over the modular building structures and connecting the pressurized gas connections; andwater pipes collocated with the gas pipes extending laterally over the modular building structures and connecting the water connections.
  • 8. The cleanroom system of claim 1 further comprising: electrical conduit extending laterally across the modular building structures and connecting the power outlets; anddata cables extending laterally across the modular building structures and connecting the data connections.
  • 9. The cleanroom system of claim 8 wherein the electrical conduit includes flexible conduit and junction boxes between the modular building structures.
  • 10. The cleanroom system of claim 1 wherein each modular building structure further comprises: an air vent opening to the interior;an air handling duct connected with the air vent; andthe cleanroom system includes ductwork extending laterally across the modular building structures and connecting the air vents.
  • 11. The cleanroom system of claim 1 wherein the large sealable, sterilizable cleanroom includes an area that is uninterrupted by pillars or structural walls.
  • 12. A method of assembling modular building structures into a larger ballroom-style cleanroom, the method comprising: positioning multiple modular building structures side-by-side with respect to each other, each modular building structure having a longitudinal dimension and a lateral dimension, each modular building structure comprising: a floor, a ceiling, and at least two walls defining an interior;hollow tubes extending laterally across and below the floor or above the ceiling; andin two or more of the modular building structures, a utility panel having a set of connections for power outlets, data, pressurized gas, and water, a longitudinal location of the utility panel within the interior of each of the two or more modular building structures being substantially identical among the modular building structures;removing tie down lugs from the hollow tubes;inserting a tension cable through the hollow tubes of the side-by-side modular building structures;tightening the tension cables to join the modular building structures together and form a large sealable, sterilizable cleanroom; andconnecting the utility panels of the side-by-side modular building structures, wherein the utility panels of the modular building structures are aligned with one another in the cleanroom interior.
  • 13. The method of claim 12 further comprising: pressurizing air bearings beneath the floor of each modular building structure to support the modular building structure on a cushion of air during the tightening.
  • 14. The method of claim 12 wherein a number and type of connections in each set are substantially identical between utility panels in different modular building structures.
  • 15. The method of claim 12 wherein the utility panels are located on ceilings of the modular building structures.
  • 16. The method of claim 12 wherein the connecting includes: connecting the pressurized gas connections with gas pipes extending laterally over the modular building structures; andconnecting the water connections with water pipes collocated with the gas pipes extending laterally over the modular building structures.
  • 17. The method of claim 12 wherein the connecting includes: connecting the power outlets with electrical conduit extending laterally across the modular building structures; andconnecting the data connections with data cables extending laterally across the modular building structures.
  • 18. The method of claim 17 wherein the electrical conduit includes flexible conduit and junction boxes between the modular building structures.
  • 19. The method of claim 12 wherein each modular building structure further comprises an air vent opening to the interior and an air handling duct connected with the air vent, the method further comprising: connecting the air vents with ductwork extending laterally across the modular building structures.
  • 20. The method of claim 12 wherein the large sealable, sterilizable cleanroom includes an area that is uninterrupted by pillars or structural walls.
US Referenced Citations (179)
Number Name Date Kind
1967511 Meyer Jul 1934 A
1991536 Austin Feb 1935 A
2098111 Sconce Nov 1937 A
2156859 Lowe May 1939 A
2168725 Whelan Aug 1939 A
3115819 Mahlmeister et al. Dec 1963 A
3378963 Obata Apr 1968 A
3456829 Glassmeyer Jul 1969 A
3470871 Shoen Oct 1969 A
3623283 Abromavage et al. Nov 1971 A
3638404 Moll Feb 1972 A
3638641 Abromavage et al. Feb 1972 A
3678639 Panitz Jul 1972 A
3742932 Greenspan Jul 1973 A
3756342 Burdick Sep 1973 A
3766844 Donnelly et al. Oct 1973 A
4255912 Kovacs Mar 1981 A
4267769 Davis et al. May 1981 A
4304224 Fortney Dec 1981 A
4327529 Bigelow, Jr. et al. May 1982 A
4409889 Burleson Oct 1983 A
4549472 Endo et al. Oct 1985 A
4554766 Ziemer et al. Nov 1985 A
4599829 DiMartino, Sr. et al. Jul 1986 A
4667579 Daw May 1987 A
4667580 Wetzel May 1987 A
4682418 Tuss et al. Jul 1987 A
4693175 Hashimoto Sep 1987 A
4694736 Yamagata et al. Sep 1987 A
4731961 Bona Mar 1988 A
4820931 Dunbar Apr 1989 A
4850268 Saito et al. Jul 1989 A
4869156 Hutton Sep 1989 A
4883512 Griffis Nov 1989 A
4923352 Tamura et al. May 1990 A
5029518 Austin Jul 1991 A
5058491 Wiemer et al. Oct 1991 A
5096477 Shinoda et al. Mar 1992 A
5125203 Daw Jun 1992 A
5128855 Hilber et al. Jul 1992 A
5152814 Nelson Oct 1992 A
5163517 Kozai et al. Nov 1992 A
5195922 Genco Mar 1993 A
5256105 Austin Oct 1993 A
5259812 Kleinsek Nov 1993 A
5279632 Decker et al. Jan 1994 A
5326316 Hashimoto et al. Jul 1994 A
5344365 Scott et al. Sep 1994 A
5350336 Chen et al. Sep 1994 A
5474411 Schoenfeld et al. Dec 1995 A
5511594 Brennan et al. Apr 1996 A
5562539 Hashimoto et al. Oct 1996 A
5626786 Huntington et al. May 1997 A
5641354 Sakauchi et al. Jun 1997 A
5656491 Cassani et al. Aug 1997 A
5706846 Sutton Jan 1998 A
5713791 Long et al. Feb 1998 A
5735639 Payne Apr 1998 A
5752985 Nagafune et al. May 1998 A
5795356 Leveen Aug 1998 A
5941846 Duffy et al. Aug 1999 A
6044596 Driggett Apr 2000 A
6132309 Panelli et al. Oct 2000 A
6179358 Hirayama Jan 2001 B1
6179522 Sanford Jan 2001 B1
6196514 Kienholz Mar 2001 B1
6304005 Aoki et al. Oct 2001 B1
6360494 Emerson Mar 2002 B1
6394523 Yoo et al. May 2002 B1
6397755 Kamler Jun 2002 B1
6450411 Rash et al. Sep 2002 B1
6512384 Lagowski et al. Jan 2003 B1
6602128 Spengler Aug 2003 B1
6602457 Lee et al. Aug 2003 B1
6634149 Cates et al. Oct 2003 B2
6688055 Lindsley Feb 2004 B2
6869457 Nakagawa Mar 2005 B2
6925761 De La Marche Aug 2005 B1
6960236 Tamura et al. Nov 2005 B1
6969102 Orischak et al. Nov 2005 B2
7022009 Kim Apr 2006 B2
7083515 Rapisarda Aug 2006 B2
7160717 Everett Jan 2007 B2
7162833 Faris Jan 2007 B2
7222246 Pomaranski et al. May 2007 B2
7272733 Pomaranski et al. Sep 2007 B2
7323025 Weidner Jan 2008 B2
7326355 Graetz Feb 2008 B2
7472513 Bula Jan 2009 B2
7511960 Hillis et al. Mar 2009 B2
7527664 Jackson May 2009 B2
7586420 Fischer et al. Sep 2009 B2
7707931 Garrett May 2010 B2
7724513 Coglitore et al. May 2010 B2
7827738 Abrams et al. Nov 2010 B2
7861102 Ranganathan et al. Dec 2010 B1
7934124 Bechtolsheim et al. Apr 2011 B2
7985382 Henry et al. Jul 2011 B1
8001730 Wallance Aug 2011 B2
8061080 Loebl et al. Nov 2011 B2
8065560 Patil Nov 2011 B1
8147301 Ghattas Apr 2012 B2
8239340 Hanson Aug 2012 B2
8322086 Weber Dec 2012 B2
8371912 Ozeki Feb 2013 B2
8397441 Wallance Mar 2013 B2
8479038 Patil Jul 2013 B1
8584349 Scannon et al. Nov 2013 B2
8656670 Mouzannar Feb 2014 B2
8826600 Wallance Sep 2014 B2
8854349 Eom Oct 2014 B2
9115504 Wallance Aug 2015 B2
9187894 Zadok et al. Nov 2015 B2
9353543 Lam May 2016 B2
9518748 Holtz et al. Dec 2016 B2
9671798 Hodge et al. Jun 2017 B2
9765980 Holtz et al. Sep 2017 B2
9795957 Holtz Oct 2017 B2
10006218 Marinoni Jun 2018 B2
10161147 Jornitz Dec 2018 B2
10371394 Wernimont Aug 2019 B2
10654036 Holtz et al. May 2020 B2
20020174888 Brown Nov 2002 A1
20030045226 Yokoyama et al. Mar 2003 A1
20030140555 Saether Jul 2003 A1
20040159051 Lam Aug 2004 A1
20040194484 Zou et al. Oct 2004 A1
20050082445 Groves Apr 2005 A1
20050091916 Faris May 2005 A1
20050124010 Short et al. Jun 2005 A1
20050154494 Ahmed Jul 2005 A1
20050193643 Pettus Sep 2005 A1
20060107635 Homan et al. May 2006 A1
20060217056 Gomi et al. Sep 2006 A1
20060234621 Desrochers et al. Oct 2006 A1
20070039260 Haddad Feb 2007 A1
20070089854 Jaisinghani Apr 2007 A1
20070130844 Arts et al. Jun 2007 A1
20070132262 Chui Peng Sun et al. Jun 2007 A1
20070167126 Ghattas Jul 2007 A1
20070228692 Kern et al. Oct 2007 A1
20070251145 Brusatore Nov 2007 A1
20070253831 Lee Nov 2007 A1
20080005976 Montaigne Jan 2008 A1
20080047207 Lam Feb 2008 A1
20080047224 Lam Feb 2008 A1
20080086980 Martin Apr 2008 A1
20080201008 Twelves et al. Aug 2008 A1
20080302004 Lin Dec 2008 A1
20090122533 Brukilacchio May 2009 A1
20090126285 Suh et al. May 2009 A1
20090199470 Capen et al. Aug 2009 A1
20090305626 Hope Dec 2009 A1
20100031564 Loebl et al. Feb 2010 A1
20100112677 Onishi et al. May 2010 A1
20100112926 Ozeki May 2010 A1
20100192493 Nakai Aug 2010 A1
20100251677 Franck Oct 2010 A1
20100304658 Grcevic Dec 2010 A1
20110053486 Holtz Mar 2011 A1
20110217917 Sulva Sep 2011 A1
20110219953 Schreiber Sep 2011 A1
20110258837 Scannon et al. Oct 2011 A1
20120077429 Wernimont Mar 2012 A1
20120099035 Burgess Apr 2012 A1
20120152800 Parzy Jun 2012 A1
20120181869 Chapel et al. Jul 2012 A1
20130109291 Holtz May 2013 A1
20140179216 Walters Jun 2014 A1
20150101264 Jornitz Apr 2015 A1
20150101265 Nyce et al. Apr 2015 A1
20150159127 Guerini et al. Jun 2015 A1
20160010883 Jornitz Jan 2016 A1
20160010884 Holtz et al. Jan 2016 A1
20170030097 Marinoni Feb 2017 A1
20170260763 Fortin et al. Sep 2017 A1
20180043347 Holtz et al. Feb 2018 A1
20190145118 Gauthier May 2019 A1
20200146186 Fotouh May 2020 A1
Foreign Referenced Citations (41)
Number Date Country
1373824 Oct 2002 CN
201281413 Jul 2009 CN
102884256 Jan 2013 CN
105723036 Jun 2016 CN
107002408 Aug 2017 CN
107371371 Nov 2017 CN
108884673 Nov 2018 CN
8913876 Mar 1990 DE
4007740 Sep 1991 DE
0940292 Sep 1999 EP
2098111 Sep 2009 EP
3263789 Jan 2018 EP
3274524 Jan 2018 EP
2819536 Jul 2002 FR
61101733 May 1986 JP
02209526 Aug 1990 JP
06174279 Jun 1994 JP
06183511 Jul 1994 JP
10077711 Mar 1998 JP
11166269 Jun 1999 JP
2000054654 Feb 2000 JP
2000142211 May 2000 JP
2001141274 May 2001 JP
2002221464 Aug 2002 JP
2004033498 Feb 2004 JP
2004233021 Aug 2004 JP
2007107779 Apr 2007 JP
2007107830 Apr 2007 JP
2008304989 Dec 2008 JP
2009002634 Jan 2009 JP
20060130383 Dec 2006 KR
100675682 Feb 2007 KR
200912219 Mar 2009 TW
0002618 Jan 2000 WO
03095765 Nov 2003 WO
2004005170 Jan 2004 WO
2007067656 Jun 2007 WO
2008018671 Feb 2008 WO
2011022325 Feb 2011 WO
2013132086 Sep 2013 WO
2018006184 Jan 2018 WO
Non-Patent Literature Citations (13)
Entry
“Clean-Room Products and Equipment”, Medical Device Technology, vol. 16, Online Available at: http://search.proquest.com/docview/195254246?accountid =142944, Jan.-Feb. 2005, pp. 43-44.
“Fast-Track Clean Room Building”, European Semiconductor, vol. 14, No. 3, Mar. 1992, pp. 43-45.
“Hardwall Cleanroom”, HDW Series, Abtech Incorporated, p. 8.
“Pharmadule Doubles Production Capacity and Acquires Patent for Modular Biotech Plants”, Pharmadule Press Release, Available Online at: http://www.pharmadule.com/pharmaduledoubles-production-capacity, Sep. 26, 2002, 1 page.
“Pneumatic Powered Load Moving Systems—Air Bearing Principle”, Hovair Systems, Available Online at: https//web. archive. o rg/web/20080521 025052/http :/ /www. hovai r. com/air-bearing -info/features-and-benefits. htm, May 21, 2008, 3 pages.
“Starrco Brochure”, Cleanroom Solutions, 4 pages.
“Vanguard Modular Building Systems Brochure”, Astra-Zeneca Pharmaceutical Building, Dec. 9, 2004, 2 pages.
Muth , “Modular Construction: Pros and Cons for the Lab Building”, Laboratory Design, Research and Development Magazine, Jun. 17, 2009, 5 pages.
Oliviera , “Factory in a Clean Room”, Quality Progress, Milwaukee, vol. 23, No. 1, Available Online at: https://search.proquest.com/docview/214764942?accountid=142944, Jan. 1990, pp. 37-39.
Watkins , “Clean Rooms: Their Performance and Design”, Journal of Semi-Custom Integrated Circuits, vol. 2, No. 3, Mar. 1985, pp. 36-41.
PCT/US2021/046271 , “International Search Report and Written Opinion”, dated Nov. 29, 2021, 10 pages.
PCT/US2020/046143 , “International Search Report and Written Opinion”, dated Dec. 2, 2020, 10 pages.
PCT/US2020/046143 , “International Preliminary Report on Patentability”, dated Feb. 24, 2022, 8 pages.
Related Publications (1)
Number Date Country
20220064935 A1 Mar 2022 US