The present invention relates to a battery energy storage system used, for example, for suppressing a load variation in a power line.
Together with introduction of a natural energy power generation apparatus which utilizes natural energy such as wind-power generation and solar power generation into a power line, there is the possibility that the power system associated with the apparatus is adversely affected by frequency variation or voltage variation. As one of countermeasures, a method has been proposed in which a power storage apparatus is provided to a natural energy power generation apparatus to suppress the voltage variation of a power line of the natural energy power generation apparatus. For example, a power storage apparatus for compensating for output variation of a natural energy power generation apparatus is disclosed in Patent Document 1. In the power storage apparatus, an assembled battery system which includes a plurality of series battery units of lithium batteries connected in parallel to each other and a control apparatus is configured. The assembled battery system changes over between charge and discharge in response to output variation of the natural energy generation apparatus. Further, each of the series battery units includes a current control element which is controlled in response to a voltage, a temperature or an internal resistance of the battery unit, or these of a battery cell which constitute the battery unit in order to prevent a dispersion of a voltage among each unit.
However, in the assembled battery system disclosed in Patent Document 1, for example, if some unit has a smaller capacity than the other units, then the current control element is controlled so that the load is concentrated on units which have a larger capacity in order to prevent a voltage difference among the units by charge and discharge. If such a usage as just described continues, degradation of the battery may be accelerated and finally the lifetime of the assembled battery system may be shortened.
A representative invention of the present application provides a battery energy storage system which can achieve elongation of the lifetime.
The representative invention of the present application here provides a battery energy storage system which includes a function of controlling charge and discharge power of a plurality of units. Each of the units includes a capacitor and a power converter as one unit and is electrically connected in parallel mutually. After each unit charges or discharges at least one or more times, performance of charge and discharge for the unit is controlled for certain period of pause time.
With the representative invention of the present specification, acceleration of decreasing lifetime caused by degradation of capacitors can be suppressed, thus achieving elongation of the lifetime of the battery energy storage system.
In the following, an embodiment of the present invention is described with reference to the drawings.
An embodiment of the present invention is described below with reference to the drawings.
The configuration of the system controller described above are shown in
The system controller 500 is configured from an output correction section 501, charge and discharge power target value calculation section 502, a pause time calculation section 503, and a charge and discharge command value distribution section 504. The output correction section 501 integrates the difference between required power PST of the power line and supplied power PS to calculate a correction value PSC for the output power PB of the assembled battery system 400. The charge and discharge power target value calculation section 502 subtracts the output power PN of the natural energy power generation apparatus 200 from sum of the required power PST of the power line and the correction value PSC to determine target charge and discharge power PBR of the assembled battery system 400. The pause time calculation section 503 calculates a pause time period BTx after charge or discharge of each unit according to the charge and discharge power PBx of the unit, or the instruction value PBRx for the charge or discharge power. The charge and discharge instruction value distribution section 504 calculates the instruction value PBRx to each unit according to the target charge and discharge power PBR, a charge state SOCx (State of Charge) of each unit, and the pause time period BTx. It is to be noted that the SOC is a ratio of amount of charged electricity with respect to a battery capacity.
Further, a calculation method of a pause time period BTx by the pause time calculation section 503 is described with reference to
It is to be noted that the predetermined value P is determined by following methods, for example, taking errors by sensors of the power, voltage and current into consideration. In particular, the predetermined value P needs to be sufficiently lower than the maximum output of each unit but be higher than the measurement errors by the sensors. However, the predetermined value may be a sufficiently low value given in advance.
In this instance, a value coincident with a period of time of the control cycle in the system controller 500 every control period is integrated from time t2 at which the instruction value PBRx=0 is satisfied. The integrated value is called BTx.
Operation of the charge and discharge instruction value distribution section 504 is described in detail with reference to
(a) of
The charge/discharge instruction value distribution section distributes a discharge maximum output power PBDM of the units based on SOC information of each unit in the descending order of the SOC.
(a) of
Similarly, (b) of
As follows, operation where some unit cannot be used because of its pause time period being short is described with reference to
(a) of
Similarly, (b) of
When the operation time of the unit 410 is short, the unit 410 is decided as unused, and the priority order of the units will be the unit 420, unit 430 and unit 440. Accordingly, PBRx to the unit 420 is PBCM2 while PBRx to the unit 430 has a value obtained by subtracting PBCM2 from PBR. PBRx of the other units and the unit 410 is zero.
After starting (Start) of the system controller 500, at step S701, the system controller 500 measures the line power PS, line required power PST, output power PN of the natural energy power generation apparatus, state of charge SOCx of each unit, and charge and discharge power PBx and charge and discharge maximum output values PBCMx and PBDMx. Further, at step S702, the system controller 500 calculates an output correction value PSC for the assembled battery system, an output target value PBR for the system and a pause time period BTx for each unit. Then, at step S703, the system controller 500 compares the pause time period BTx and a predetermined value LT with each other. If LT is higher than BTx and the condition at step S703 is satisfied (YES at step S703), then the processing advances to step S704. At step S704, the units whose LT is higher than BTx are determined as candidates for an unused unit. If LT is not higher than BTx and the condition at step S703 is not satisfied (NO at step S703), or after the process at step S704 ends, the processing advances to step S705. At step S705, a value obtained by subtracting the sum of the discharge maximum output value PBDM of the units which have become the candidates for an unused unit from the total value of PBDM of all units is compared with the target charge and discharge power PBR. It is to be noted that if no unused unit is found, the total value of PBDM of the unused units is zero. If the condition at step S705 is satisfied, then this signifies that PBR can be distributed to the remaining units after the unused units are excepted. Therefore, at step S706, the units which have been the candidates for an unused unit are determined as unused units. If the condition at step S705 is not satisfied, this signifies that PBR cannot be distributed to all of the remaining units and the output is insufficient. Therefore, it is determined at step S707 that there is “no” unused unit, and the processing advances to step S708. At step S708, the priority order for discharge is determined in the descending order of SOCx. At step S709, a charge/discharge instruction value PBRx is calculated in accordance with the method described hereinabove and then distributed to the units. While the system controller is operating, the processes at the steps from step S701 to step S709 are executed repetitively. It is to be noted that a determination method of LT is hereinafter described.
Similarly,
At step S801, the system controller 500 measures the line power PS, line required power PST, output power PN of the natural energy power generation apparatus 200, state of charge SOCx of each unit, charge and discharge power PBx and charge and discharge maximum output values PBCMx and PBDMx. Further at step S802, the system controller 500 calculates an output correction value PSC for the assembled battery system, natural charge and discharge power PBR of the system and pause time period BTx of each unit. Then at step S803, BTx and the predetermined value LT are compared with each other. If the condition at step S803 is satisfied, then the units which satisfy the condition are determined as candidates for an unused unit at step S804. If the condition at step S803 is not satisfied, or if the process at step S804 ends, then the processing advances to step S805. At step S805, a value obtained by subtracting the sum of PBCM of the units which have been determined as the candidates for an unused unit from the total value of PBCM of all units is compared with PBR. It is to be noted that, if no unused unit is found, then the total value of PBCM of the unused units is zero. If the condition at step S805 is satisfied, then this signifies that it is possible to distribute PBR to the remaining units after the unused unit or units are excepted. Therefore, at step S806, the units which have been the candidates for an unused unit are determined as unused units. If the condition at step S805 is not satisfied, then this signifies that PBR cannot be distributed to all of the remaining units and the output power is insufficient. Therefore, at step S806, it is determined that there is “no” unused unit, and the processing advances to step S808. At step S808, the priority order in discharge is determined in the ascending order of SOCx. Then at step S809, the instruction value PBRx is calculated in accordance with the method described hereinabove and distributed to the units. While the system controller 500 is operating, the processes at steps S801 to S809 are executed repetitively.
For the simplification, a case in which the assembled battery system 400 includes two units (unit 1 and unit 2) is illustrated here. Further, it is assumed that, although the capacities of the two units are equal to each other, the state of charge SOC1 of the unit 1 is a little greater than that of the unit 2.
From certain time T0 to time T1, the graph shows a case when discharge is carried out at a maximum value of the target charge and discharge power PBR. After both the unit 1 and 2 discharge, the state of charge SOC drops as a result. PBR drops from the maximum value to P1 at T1, and when either of the units is able to provide sufficient output power, the discharge of the unit 2 which has smaller SOC stops discharging and the pause time period BT2 of the unit is integrated. Thereafter, only the unit 1 discharges, and at T2 the SOC values of the units become equal to each other. Although the SOC of the unit 1 is smaller than that of the unit 2 after T2, BT of the unit 2 does not reach the predetermined value LT as yet. Therefore, the discharge of the unit 1 continues till T3 at which BT2 reaches LT. After T3 the unit 2 discharges, and even if PBR changes to P2 during this, the discharge only of the unit 2 continues as long as the value remains within the range where it can be provided by the unit 2. Although the SOC values of the unit 1 and 2 are equal at T5, the discharge of the unit 2 continues till T6 at which BT1 of the unit 1 reaches LT.
A determination method of the predetermined value LT is described with reference to
First,
An example of the determination method of a pause time is illustrated in
From the result of
As a result, the calculated pause time is approximately 420 sec with regard to the olivine acid-based material, approximately 360 sec with regard to the lithium cobalt oxide-based and approximately 300 sec with regard to nickel cobalt acid lithium-based material. Thus, it is found that the pause time differs depending on materials.
Further,
In all the cases, a tendency is observed that the SOC of 60% has shorter time until the voltage variation becomes flat by approximately 60 sec.
Hence,
As a result, it is desirable to provide a olivine acid-based lithium battery, a lithium cobalt oxide-based lithium battery, and a nickel cobalt acid lithium-based lithium battery with an approximate period of 240 to 540 sec, 180 to 480 sec, and 120 to 420 sec, respectively, as the predetermined value LT of the pause time period in response to the SOC.
Further, while the value of the cell voltage drop A is set to 80% to determine the pause time period in the present embodiment, the value A differs depending upon the use of battery or the required lifetime of battery. Therefore, when the cell voltage drop A is set to a low value, it is necessary to set the value of the predetermined value LT lower than the value of
Number | Date | Country | Kind |
---|---|---|---|
2011-121223 | May 2011 | JP | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP2012/063377 | 5/24/2012 | WO | 00 | 11/21/2013 |