The invention disclosed in this application is directed generally to the construction of prefabricated concrete structural members, and more particularly to a tubular blockout member inserted into the forms for the concrete structural members to create openings for then passage and support of conduits through the structural members.
The present invention is generally directed to a blockout apparatus for double-tee concrete structural members, such as the concrete panels used in constructing parking garages. In such structures, there is typically a need to provide conduits for supporting electrical wires, water lines, and other utility lines without disrupting the structure of the concrete panels. To accomplish this function, blockout members have been provided to be integrated into the concrete form before pouring the concrete mixture so that once the concrete is hardened, there is an opening available through the “T-section” of the concrete panel for the passage of conduits therethrough.
Various prefabricated structural members formed of concrete or other such materials known in the art are widely used in various applications. As noted above, a typical example of such a prefabricated concrete structural member is the “Double-T” panel used to construct parking garages. These Double-T panels generally include a planar top panel and a pair of integral vertical beams formed underneath the top panel to project vertically downward therefrom, thus giving the structural member the Double-T name. In the construction of parking garages, as an example, a number of these concrete Double-T panels are assembled together so that the planar top panels form a floor for an elevated level over which cars can traverse. The vertical concrete beams become oriented in a row to define supporting joist structures for planar top panels.
A tubular blockout member is incorporated into the T-beams of a Double-T concrete panel in U.S. Pat. No. 9,580,920, granted to Jeffrey Yingling on Feb. 28, 2017. This blockout member includes a transversely extending hanger members inserted into a void formed in the blockout member at each respective end thereof. Mounting devices are supported from the hanger members to hold conduits transversely spaced along the underside of the blockout member across the top portion thereof. With the cutouts in the upper portion of the Yingling blockout member, the opening had to be covered with the hanger members or at least a separate block, which causes difficulties with uncured concrete leaking around the hanger members and into the cavity of the blockout member.
Thus, when the prefabricated concrete Double-T panels are formed, the block out is inserted into the form to create an opening through the T-beam sections once the concrete has cured. Conduits carrying utilities and for other purposes can pass through the openings created by the blockout members, but building codes require the support of such conduits from stable structure. To accomplish this supporting function, contractors would drill holes into the concrete of the Double-T panels to insert fasteners from which mounting devices, such as mechanical hangers, can be installed to support the conduits. The Yingling patent provided an alternative apparatus for supporting conduits, but this apparatus carries challenges with respect to sealing the opening in the blockout member.
Accordingly, it would be desirable to provide a blockout member that provides an improved apparatus for supporting conduits passing through the blockout member after the Double-T panel has been installed and forms a part of a concrete structure.
It is an object of this invention to overcome the difficulties of the prior art by providing a blockout apparatus having integral hanger members for supporting conduits passing through the blockout apparatus.
It is another object of this invention to provide a blockout apparatus used to create openings through concrete structural members during the formation of the concrete structural members in which the blockout apparatus has integrally formed hanger members.
It is a feature of this invention that the hanger members are integrally formed with the molding of the blockout apparatus.
It is an advantage of this invention that the integral formation of the dome portion of the blockout apparatus carrying the hanger members prevents leakage of uncured concrete into the blockout apparatus while the concrete structural member is being formed.
It is another feature of this invention that the dome portion is longitudinally oriented with respect to the major axis of the opening through the blockout apparatus.
It is another advantage of this invention that the dome portion carrying the hanger members has a smaller profile than the known prior art blockout apparatus.
It is still another object of this invention to provide a mechanism associated with a blockout apparatus having integral hanger members to provide support for the passage of conduits through the blockout apparatus installed in a concrete structural member.
It is still another feature of this invention that the hanger members cooperate with a wedge nut to provide support with a mounting device supporting conduits passing through the hanger members.
It is still another advantage of this invention that the wedge nut is installed into the hanger members from below the hanger members by insertion and twisting the wedge nut into position on the hanger members.
It is yet another advantage of this invention that the wedge nut can be installed into the hanger members without disrupting the integrity of the blockout apparatus or the dome portions housing the hanger members.
It is yet another feature of this invention that the wedge nut can be installed into the hanger members of the blockout apparatus before or after the blockout apparatus is installed into the concrete form for making the concrete structural member.
It is still another object of this invention to provide a blockout apparatus with a novel appearance compared to existing blockout apparatus.
It is still another feature of this invention that the hanger members are formed as an integral dome portion oriented longitudinally and located along the transverse center of the blockout apparatus.
It is a further feature of this invention that the blockout apparatus with integral dome portion can be used in the construction of Double-T panels to create a void within the T-beams for the passage of conduits therethrough.
It is a further object of this invention to provide a blockout apparatus for use in the manufacture of prefabricated concrete structural members, which is durable in construction, inexpensive of manufacture, carefree of maintenance, facile in assemblage, and simple and effective in use.
These and other object, features and advantages are accomplished in the instant invention by providing a blockout apparatus for use in creating passageways through prefabricated concrete structural members having at least one hanger members integrally molded with the blockout apparatus as a dome projecting above the body of the blockout member that can be used to support conduits inserted through the passageway. A wedge nut can be inserted into the hanger members and twisted to lock the wedge nut in place. The wedge nut can be installed before the blockout apparatus is positioned within the concrete form for the manufacture of the prefabricated concrete structural member, or after the concrete structural member has been formed. Typical usage of the blockout apparatus is to create passageways through the T-Beam of Double-T panels so that conduits can pass through the void corresponding to the blockout apparatus. Mounting devices that support the conduits can be engaged with the wedge nut and provide support for one or multiple conduits.
The advantages of this invention will become apparent upon consideration of the following detailed disclosure of the invention, especially when taken in conjunction with the accompanying drawings wherein:
Referring to
The blockout apparatus 10 is preferably molded from plastic into a tubular body member 12 with flanges 11 at the opposing ends thereof to mate with the molding form for the prefabricated concrete structural member so that the blockout apparatus 10 becomes an integral part of the prefabricated concrete structural member. The typical use of the blockout apparatus 10 is shown in
To permit the mounting of the conduits 17 by the blockout apparatus 10, the blockout apparatus 10 is formed with dome portions 15 on at least one end of the blockout apparatus 10, and preferably at both opposing ends of the blockout apparatus 10. Each dome portion 15 provides an extended height of the blockout apparatus 10 in order to have sufficient physical structure for forming hanger members 20 in the upper part of the blockout apparatus 10 that can be used to support conduits 17. As best seen in
The hanger members 20 are integrally formed as part of the dome portion 15 during the molding of the blockout apparatus 10. Accordingly, the installation of the wedge nut 25 into the hanger members 20 is all that remains to be accomplished in order to provide the necessary support for a mounting device 30 that can engage and support the conduits 17. The wedge nut 25 is best seen in
The wedge nut 25 is preferably installed after the prefabricated concrete panel 5 has been released from the molding form in which the blockout apparatus 10 had been installed to create a void or passageway through the concrete panel 5. However, the wedge nut 25 can be installed shortly after the blockout apparatus 10 is released from the mold in which the blockout member is formed, so that the wedge nut 25 is included with the blockout apparatus 10 when the blockout apparatus 10 is positioned into the molding form for fabricating the Double-T panel 5. By delaying the installation of the wedge nut 25 until needed to support conduit(s) 17, the installer can select a specific configuration of the wedge nut 25 as desired for the specific use thereof.
To install the wedge nut 25, the wedge nut 25 is inserted into the dome portion 15 in a longitudinal orientation and then twisted into engagement with the hanger members 20 through a rotation of approximately ninety degrees to lock the enlarged head 26 of the wedge nut 25 into engagement with the hanger members 20. At this point in time, the wedge nut 25 is not movable relative to the hanger members 20 and the mounting device 30 can be threaded into the wedge nut 20 for engagement therewith. After the wedge nut 25 is installed, the tapered lower portion 28 can extend slightly into the void formed by the blockout member 10 to facilitate engagement thereof for attachment of the mounting device 30. Once the wedge nut 25 has been installed, removal of the wedge nut 25 from engagement with the hanger members 20 is difficult to achieve because of the square corners of the enlarged head 26 opposite the curved portions 27.
As is best seen in
Referring now to
In operation, the blockout apparatus 10, with the hanger members 20 molded as part of the dome portion 15 projecting above the tubular body portion 12 of the blockout apparatus 10, is placed into the molding form for the construction of the prefabricated Double-T panel 5 before the uncured concrete is placed into the form. The form is filled with uncured concrete flowing around the blockout apparatus 10 so that the blockout apparatus 10 is incorporated into the Double-T panel 5. When the concrete mixture hardens, the blockout member 10 forms a void or passageway through the T-beams 6. The Double-T panel 5 is shipped to the job site and placed according to plan for the construction of a concrete structure, such as a parking garage in which the cars travel over the planar top surface 7 of the Double-T panels 5.
At some point, either prior to placement of the blockout apparatus 10 into the form of the Double-T panel 5, or at any point up to the time when support of a conduit 17 or other device passing through the passageway is needed, a wedge nut 25 is installed on the hanger members 20 by inserting the wedge nut 25 longitudinally into the dome portion 15 and then twisted into engagement with the hanger members 20 so as to have a transverse orientation, which locks the enlarged head portion 26 of the wedge nut 25 into engagement with the hanger members 20. In the second embodiment, the wedge nut 25 is inserted transversely and twisted to have a longitudinal orientation. The wedge nut 25 includes at least one vertically oriented threaded opening 29 facing downwardly toward the passageway so that a mounting device 30 can be affixed to the wedge nut 25. The mounting device 30 is connected to the wedge nut 25 by a fastener 33 threaded into the opening 29. A conduit 17 can be supported on the curved portion 32 of the mounting device 30.
Such installation of mounting members 30 throughout the aligned blockout members 10 along the intended path of the conduit 17 allows the conduit 17 to be supported beneath the Double-T panels 5 in conformance with building codes without requiring holes to be drilled into the concrete structure of the Double-T panel 5. Thus, the installation of mounting devices 30 for the support of conduits 17 can be quickly and easily accomplished, saving labor and material costs. Accordingly, the pre-installation work for supporting conduits 17 is not necessary.
The elevated dome portions 15 in the molding of the blockout apparatus 10 provides a uniform exterior surface for the blockout apparatus 10 so that when the blockout apparatus 10 is installed into the molding form for the fabrication of the Double-T panels 5, the exterior surface of the blockout apparatus 10 is without openings through which uncured concrete could pass into the interior of the blockout apparatus 10. The central positioning of the longitudinally extending dome portions 15 on the longitudinally extending major axis of the blockout apparatus 10 enables the incorporated hanger members 20 to locate mounting devices 30 for support of conduits 17 at essentially any location within the interior passageway of the blockout apparatus 10. The transverse orientation of the transversely extending dome portions 15 in the second embodiment shown in
It will be understood that changes in the details, materials, steps and arrangements of parts, which have been described and illustrated to explain the nature of the invention will occur to and may be made by those skilled in the art upon a reading of this disclosure within the principles of the scope of the invention. The foregoing description illustrates the preferred embodiment of the invention; however, concepts, as based upon the description may be employed in other embodiments without departing from the scope of the invention. Accordingly, the following claims are intended to protect the invention broadly, as well as in the specific form show.
For example, the dome portions could include a single dome portion that is positioned at one end of the body member or the other, or even in the middle. The length of the dome portion can extend from one end of the body member to the opposing end, or be a smaller discrete length.
Number | Name | Date | Kind |
---|---|---|---|
1285202 | Jaques et al. | Nov 1918 | A |
2312338 | Hulme | Mar 1943 | A |
3894368 | Crofoot | Jul 1975 | A |
3908323 | Stout | Sep 1975 | A |
4625940 | Barton | Dec 1986 | A |
5245806 | Baur | Sep 1993 | A |
5623804 | Kelly | Apr 1997 | A |
5625993 | Kelly | May 1997 | A |
8915038 | Whitcomb, Sr. | Dec 2014 | B1 |
9347213 | Zhang | May 2016 | B1 |
9580920 | Yingling | Feb 2017 | B1 |
20040165947 | Herb | Aug 2004 | A1 |
20070039281 | Zambelli | Feb 2007 | A1 |
20110291323 | Grasser | Dec 2011 | A1 |
20140283475 | Zhang | Sep 2014 | A1 |
20150047276 | Gandolfo | Feb 2015 | A1 |
20160017593 | Magee | Jan 2016 | A1 |
20170121963 | Jablonsky | May 2017 | A1 |
20190210316 | Kuhmann | Jul 2019 | A1 |
20200141108 | Mazzola Vernengo | May 2020 | A1 |
Number | Date | Country |
---|---|---|
1498564 | Jan 2005 | EP |
Entry |
---|
Machine translation of foreign reference EP 1498564, obtained from https://worldwide.espacenet.com/patent/search/family/033462283/publication/EP1498564A1?q=ep1498564 (last accessed on Jan. 27, 2021) (Year: 2021). |
Number | Date | Country | |
---|---|---|---|
20210230889 A1 | Jul 2021 | US |