This present disclosure relates generally to techniques for performing wellsite operations. More specifically, the present disclosure relates to techniques for preventing blowouts involving, for example, monitoring blowout preventers.
Oilfield operations may be performed to locate and gather valuable downhole fluids. Oil rigs are positioned at wellsites, and downhole tools, such as drilling tools, are deployed into the ground to reach subsurface reservoirs. Once the downhole tools form a wellbore to reach a desired reservoir, casings may be cemented into place within the wellbore, and the wellbore completed to initiate production of fluids from the reservoir. Downhole tubular devices, such as pipes, certain downhole tools, casings, drill pipe, liner, coiled tubing, production tubing, wireline, slickline, or other tubular members positioned in the wellbore, and associated components, such as drill collars, tool joints, drill bits, logging tools, packers, and the like, (referred to as ‘tubulars’ or ‘tubular strings’) may be positioned in the wellbore to enable the passage of subsurface fluids to the surface.
Leakage of subsurface fluids may pose an environmental threat if released from the wellbore. Equipment, such as blow out preventers (BOPs), may be positioned about the wellbore to form a seal about a tubular therein to prevent leakage of fluid as it is brought to the surface. BOPs may have selectively actuatable rams or ram bonnets, such as pipe rams or shear rams, that may be activated to seal and/or sever a tubular in a wellbore. Some examples of BOPs for severing tubulars are provided in U.S. Patent/Application No. 20110000670; U.S. Pat. Nos. 7,814,979; and 7,367,396. In some cases, it may be necessary to maintain the BOP, for example, when the BOP does not perform as desired or when a part fails on a BOP.
In at least one aspect, the disclosure relates to a blowout preventer unit for monitoring a blowout preventer at a wellsite. The blowout preventer is activatable to form a seal to prevent leakage of the fluid produced from subsurface formations. The blowout preventer unit includes a plurality of wellsite databases operatively connectable to the wellsite to receive wellsite data therefrom and having communication links therebetween, at least one control unit operatively connectable to the plurality of wellsite databases to selectively divert the wellsite data therebetween via the communication links and comprising a processor to determine blowout preventer parameters from the diverted wellsite data, and blowout preventer outputs operatively coupled to the plurality of wellsite databases. The blowout preventer outputs are accessible by users and include blowout preventer dashboards to selectively display the blowout preventer parameters whereby blowout preventer conditions are viewable by the users.
The wellsite data may include ram block data, and the blowout preventer parameters comprise ram block parameters, with the blowout preventer dashboards displaying the ram block parameters. The ram block parameters may include force displacement, ram cycle, pressure, temperature, position, fluid flow, equipment, rubber displacement, and/or historical data. The wellsite databases may include a blowout preventer database and a plurality of subdatabases. The wellsite databases may include a blowout preventer database operatively connected to the plurality of subdatabases by the communication links. The subdatabases may include a dashboard database, a force displacement database, a cycle database, an equipment database, and/or a report database.
The dashboards may be operatively connected by the communication links to the dashboard database, the force displacement database, and the cycle database. The blowout preventer outputs may include an equipment output. The equipment output may be operatively connected by the communication links to the dashboard database, the force displacement database, the cycle database, and the equipment database. The blowout preventer outputs may include a report manager, the report manager operatively connected by the communication links to the report database. The users may provide input to wellsite databases. The dashboards may include a high level health and communication tool. The blowout preventer outputs may include at least one of an equipment output and a report output. The dashboards may display indicators comprising pressure, temperature, force displacement, and rubber displacement. The dashboard includes displays of at least one of surface equipment, low marine riser package, stack, readback, flexjoint, common, force displacement, and flow.
In another aspect, the disclosure relates to a monitoring system for at a wellsite. The wellsite produces fluid from subsurface formations. The monitoring system includes blowout preventer activatable to form a seal to prevent leakage of the fluid and a blowout preventer unit operatively connectable to the blowout preventer. The blowout preventer s activatable to form a seal to prevent leakage of the fluid produced from subsurface formations. The blowout preventer unit includes a plurality of wellsite databases operatively connectable to the wellsite to receive wellsite data therefrom and having communication links therebetween, at least one control unit operatively connectable to the plurality of wellsite databases to selectively divert the wellsite data therebetween via the communication links and comprising a processor to determine blowout preventer parameters from the diverted wellsite data, and blowout preventer outputs operatively coupled to the plurality of wellsite databases. The blowout preventer outputs are accessible by users and include blowout preventer dashboards to selectively display the blowout preventer parameters whereby blowout preventer conditions are viewable by the users.
The monitoring system may also include an interface operatively connecting the users to the blowout preventer unit. The interface may include a computer to display the dashboards to the user and to receive input from the user. The monitoring system may also include a communication link between the blowout preventer unit and the blowout preventer, a surface unit at the wellsite, and/or wellsite sensors operatively connected to the blowout preventer to collect data therefrom. The wellsite sensors may be operatively connected to the plurality of databases to pass data therebetween.
Finally, in another aspect, the disclosure relates to a method of monitoring a blowout preventer at a wellsite. The blowout preventer is activatable to form a seal to prevent leakage of the fluid produced from subsurface formations. The method involves operatively connecting a blowout preventer unit to a blowout preventer at the wellsite (the blowout preventer unit comprising a plurality of wellsite databases, at least one control unit, and blowout preventer outputs), selectively passing wellsite data between the wellsite and one or more of the plurality of wellsite databases via communication links, determining blowout preventer parameters from the wellsite data received by the one or more of the plurality of wellsite databases, and providing blowout preventer outputs to users, the blowout preventer outputs comprising blowout preventer dashboards displaying the determined blowout preventer parameters.
The blowout preventer parameters may be ram block parameters and the providing may involve displaying ram block parameters to the user over time such that changes in ram block operation may be determined. The method may also involve collecting the wellsite data from the wellsite, the wellsite data comprising blowout preventer data, determining maintenance schedules based on the blowout preventer parameters, generating reports based on the wellsite data, alerting the user when the blowout preventer parameters are out of range, receiving input from the users and implementing wellsite operations based on the input, analyzing the wellsite data, generating blowout preventer outputs based on the analyzed data, communicating the blowout preventer outputs to users at a plurality of locations in real time, integrating wellsite data from the plurality of locations, updating the blowout preventer outputs based on the integrated data, and/or adjusting blowout preventer operations at the wellsite in real time based on the updated blowout preventer outputs. The determining may involve aggregating and sorting the wellsite data.
A more particular description of the disclosure, briefly summarized above, may be had by reference to the embodiments thereof that are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate example embodiments and are, therefore, not to be considered limiting of its scope. The figures are not necessarily to scale and certain features, and certain views of the figures may be shown exaggerated in scale or in schematic in the interest of clarity and conciseness.
The description that follows includes exemplary apparatus, methods, techniques, and/or instruction sequences that embody techniques of the present subject matter. However, it is understood that the described embodiments may be practiced without these specific details.
Blowout preventers (BOPs) may be positioned about a wellsite to provide a seal thereabout, for example, during a blowout. To detect and/or prevent failures, it may be desirable to monitor various portions of the wellsite and/or BOP. A BOP monitoring system is provided to measure various BOP parameters and detect potential BOP anomalies that may indicate a problem in the operation of the BOP. For example, BOP parameters, such as the amount of rubber in a ram, pressures, forces, time, etc., may be measured and analyzed to determine whether the BOP is performing properly.
The BOP monitoring system may include or be coupled to sensors, processors, controllers, and other devices to measure, analyze, report, adjust and/or otherwise interact with the BOP and/or wellsite. The BOP monitoring system may also communicate with one or more on or offsite locations. Real time monitoring may be provided to allow continuous feedback to control BOP and/or other operations.
The subsea system 104 includes a conduit 112 extending from the platform 108 to a sea floor 114. The subsea system 104 further includes a wellhead 116 with a tubular 118 extending into a wellbore 120, a BOP 122 and a subsea unit 124. The BOP 122 has a ram assembly 126 for shearing and/or sealing to seal the wellbore 120.
The surface system 102 and subsea system 104 may be provided with one or more control units, such as the surface unit 110 and/or the subsea unit 124, located at various locations to control the surface system 102 and/or the subsea systems 104. Communication links 128 may be provided for communication between the units and various parts of the wellsite 100.
The BOP 122 may be coupled to the BOP monitoring system 101 to monitor BOP operations. The BOP monitoring system 101 may be coupled to the BOP 122 and/or other portions of the wellsite 100 and/or offshore locations to collect data, communicate with various locations, measure parameters, analyze results, generate reports and/or adjust operations as will be described more fully herein. The BOP monitoring system 101 may be in communication with the BOP 122, for example, via the units 110, 124 and/or communication links 128. The BOP monitoring system 101 may be located on or off the wellsite 100. While the BOP monitoring system 101 is depicted as being coupled to the BOP 122 via communication link 128, the BOP monitoring system 101 may be incorporated into one or more of the control units 110, 124, the surface system 102, the downhole system 104, and/or other locations. Sensors may optionally be provided as part of the BOP monitoring system 101 or be coupled thereto for providing information.
The rams 232 have seals 238 therein for forming a seal. The seals 238 may be made of a rubber and/or elastomeric material that is movable as the rams 232 move relative to the tubular 118. Sensors, such as seal sensor 240 a and actuator sensor 240b, may be positioned about the BOP 222 for measuring BOP parameters, such as pressure, temperature, position, force displacement, ram cycle, valve pressure, fluid flow, equipment, rubber displacement, historical data, and/or other parameters. These measured parameters may provide information about operation of the BOP 222, such as whether the BOP 222 is functioning properly and/or whether a seal may be properly established about the tubular 118. A BOP monitoring system 201 (which may be the same as the BOP monitoring system 101 of
Sensors 240a may be positioned about the BOP ram 232 to monitor performance of the BOP seal 238. For example, as the rubber of the BOP seal 238 wears, the amount of rubber in the BOP seal 238 may vary. Variations in the amount of rubber may be detected by sensors 240a and monitored by the BOP monitoring system 201 at various intervals to determine, for example, if there is a problem with the system. The rubber in the BOP seal 238 may discharge from the BOP ram 232 in a detectable amount.
Sensors 240b may also be provided about the BOP rams 232 to monitor performance of the BOP ram 232 and actuator 234. For example, the number of cycles or engagements, the amount of force and/or time needed to drive the ram 232 with the rod 233 and cylinder 235 of the actuator may be measured by sensors 240h, and analyzed by the BOP monitoring system 201 to indicate potential failure thereof. A force curve may be plotted to depict the force used to actuator the ram 232 into position about the tubular 118. Changes to the force curve may be examined to determine if wear or failure may occur.
Data may be collected from the BOP monitoring system 501 and saved on a historian that resides at the wellsite. The databases 511a-c may be, for example, a rig side, an equipment (e.g., RIGMS™), and a blackbox database (e.g., BLACKBOX SR™), respectively. The blackbox database may be a hardened memory module that resides on the rig to store data from the BOP monitoring system 501 and/or wellsite 500 for post disaster analysis. The RIGMS™ and BLACKBOX SR™ are commercially available from NATIONAL OILWELL VARCO™ (see: www.nov.com). One or more sensors, control units, databases, processors, computers and other devices may be provided at the wellsite for gathering data concerning the wellsite. Various controllers, transceivers or other devices may be provided about the wellsite to communicate the data and/or control the wellsite operations.
As shown in this view, the BOP monitoring system 501 includes a communication link, such as satellite 548, and a BOP unit 550. The satellite 548 provides communication between the wellsite 500 and the BOP unit 550. The satellite 548 may be used to receive data from the wellsite, such as data collected by the sensors 540a,b and/or the surface unit 510. The BOP unit 550 is depicted as being offsite, but could optionally be partially or wholly onsite or offsite. The BOP unit 550 is also depicted as being linked to the wellsite 500 by the satellite 548, but one or more various communication links may be used.
The BOP unit 550 includes a BOP database 554, BOP subdatabases 556a-e and BOP outputs 558a-c. The BOP database 554 receives data concerning the BOP 522 and/or the wellsite 500. The BOP database 554 may receive measured data from sensors 540a, b, historical data, data entry, and/or other data. Part or all of the data in the database 554 may be diverted to one or more of the BOP subdatabases 556a-e. The BOP subdatabases 556a-e include a dashboard subdatabase 556a, a force displacement subdatabase 556b, a cycle subdatabase 556c, an equipment (or RIGMS™) subdatabase 556d, and a report subdatabase 556e. One or more databases and outputs may be connected to various aspects of the BOP 522 to receive data concerning the BOP 522 and/or to determine if changes or predetermined conditions exist.
Data is selectively diverted between the BOP subdatabases 556a-e and each of the BOP outputs 558a-c. The BOP outputs 558a-c include a dashboard output 558a, an equipment output 558b and a report output 558c. The BOP databases 556a-e receive and manipulate the data and send the data to each of the BOP outputs 558a-c. The databases may selectively divert data to certain databases and/or outputs to manipulate the data. For example, the data may be sorted for combination and analysis. Data may pass between various portions of the BOP monitoring system 501 as indicated by the arrows.
The databases may also have various processors, controllers, communication devices or other devices for performing various functions, such as calculations, analysis, transfers and other data manipulation. For example, the BOP subdatabases 556a-e may each have a BOP control unit 557a-e and/or be operatively connectable to one or more BOP control units 557f to selectively divert, control, analyze, combine and/or otherwise manipulate the data diverted to one or more of the BOP subdatabases 556a-e. One or more of the BOP control units 557a-f may be used to selectively pass the data between the BOP subdatabases 556a-e and/or the BOP outputs 558a-c. The BOP control units 557a-f may also be used to selectively display the data on the BOP outputs 558a-c as desired for use and/or access by the users 551.
The BOP subdatabases 556a-e and/or BOP control units 557a-f may be used to generate information and provide various alarms to alert users of out of tolerance conditions. The alarms may be grouped in logical zones and presented to users 551 via the various outputs 558a-c, such as on the dashboard 558a to help quickly identify the critical nature of any individual component alarm. These interactive databases and screens allow users to see relationships between alarms and events in an effort to determine overall BOP health.
The dashboard subdatabase 556a may be used to collect information about a high level overview of the health of the BOP system, such as pertinent analog data, position data, position history, alarm and event report, and heath straps.
Force displacement subdatabase 556b collects data concerning movement of the BOP rams. This data may include, for example, flow totalizer and pressure transmitter data. Other BOP data may also be included, such as pressure, temperature, position, force displacement, ram cycle, valve pressure, fluid flow, equipment, rubber displacement, historical data, and/or other wellsite data. This data may be used to evaluate the operation of the BOP 522, such as the distance of equipment (e.g., ram piston) travel. This information may be run through a calculation to determine the duration of a given cycle, and to confirm American Petroleum Institute (API) guidelines can be adhered to (e.g., to allow for audit on performance). The energy stored in rubber goods, such as annular elements and ram block seals, may also be determined. Force curves may be generated from the data provided. By measuring the delta in slope for each force curve, a prediction may be made (automatically or manually) concerning potential component failure.
Cycle subdatabase 556c manages cycle counts from each valve in the BOP system. Flow during cycle and pressure during cycle may also be recorded. This cycle data set may be stored and associated with each individual cycle. Cycle subdatabase 556c may also act as a holding area for data for equipment subdatabase 556d.
Equipment subdatabase 556d tracks equipment parameters, such as asset usage. Work orders may be automatically or manually generated based on how they are configured. For example, subdatabases 556a,b,c can feed data into equipment subdatabase 556d with historical, usage, and alarm data. Equipment subdatabase 556d can have predetermined setpoints/limits that instigate a work order to be generated and maintenance performed. Inventory locations and stocking limitation may also be tracked as they interact with the work order.
Report subdatabase 556e allows an end user to access data from subdatabases 556a-d. The accessed data aggregates specific points, and generates daily and instant reports based on alarm and event information. The reports may be used to provide alerts to internal and/or external users. Such reports and/or alerts may indicate that an activity has occurred, or needs to occur. Ad-hoc reports may also be provided.
As shown, dashboard subdatabase 556a, force displacement subdatabase 556b, cycle subdatabase 556c, and equipment subdatabase 556d each exchange information with users 551 via the high level health and communication tool dashboard output 558a and equipment output 558b. The report output 558c exchanges data with BOP database 554 via report subdatabase 556e. The data and inputs may be selectively sorted, presented, analyzed and/or processed by the BOP unit 550. The data may be diverted based on predetermined classifications and/or criteria. The data may be selectively combined using predetermined settings for analysis and/or presentation.
The BOP outputs 558a-c may generate displays from the dashboard output 558a. The outputs 558a-c may include software and/or hardware, such as monitors, inputs (e.g., keyboards, mice, microphones, etc.), processors, computers, communication links (e.g., Ethernet, wireless, cables, wired, etc.) usable by users 551. One or more of the BOP tools may be used to generate outputs 558. The dashboard output 558a may include a high level health and communication tool. The dashboard output 558a may be used to generate displays for the user. The outputs 558 may be used to display various parameters in text and/or graphical form. The displays may be selectively adjusted as needed for user viewing.
The BOP monitoring system 501 provides the outputs 558a-c for receipt by one or more of the users 551 at one or more locations. This information may be used to permit various users onsite and offsite to collaborate on the information being received. The various users 551 may be accessed to provide support, data interpretation, analysis and decision-making. Inputs from the users 551 may be fed into the databases 554, 556a-e and/or the outputs 558a-c to further refine the analysis and the outputs 558a-c.
As shown in
Referring to
The outputs 558a-c may be analyzed by one or more of the users 551. The users 551 may be individual engineers or engineering teams that receive, analyze and adjust the information. For example, the users may select portions of the data as being either highly pertinent for further review or erroneous to be deleted. The users 551 may also input additional data or refined versions of the data to be fed back into the BOP unit 550. In this manner, the BOP unit 550 may continue to update as new information and analysis is received. This feedback may incorporate knowledge and/or data from multiple locations, based on a variety of perspectives and information.
The users 551 and/or other portions of the BOP unit 550 may also be in the form or use processors, controllers, memories, computers and/or other features capable of receiving, processing, manipulating, outputting or otherwise using data for certain purposes or for determining specific BOP characteristics. The outputs 558a-c may work alone or in combination. For example, force displacement may be calculated by the BOP monitoring system. Software, such as eHawk™ commercially available from NATIONAL OILWELL VARCO™ (see: www.nov.com), may be used to generate at least some of the desired calculations. Curve characteristics, such as a degradation model, may be monitored over time to detect patterns that may indicate changes in operation of the BOP. Additional processors and/or other devices may be provided about the BOP unit 550.
If desired, various portions of the display 658 may be interactive, thereby providing one or more users with interaction with the BOP data, analysis and other features of the BOP dashboard 658a. The BOP dashboard gives a consolidated view of the BOP 522 and its control system. Indicators 676 (or health lamps) may be grouped along the image of the BOP 522 by logical zones to display the BOP 522 at a glance. A history of alarms for the last 24 hours is provided. Clicking on an individual zone under alert brings the user a report of all alarms present during that time period. Also, if an alarm is active in one of the zones, the lamp changes from a green circle to a yellow triangle to raise an alert. The user can hover over that triangle to see exactly which fault is present.
The system 501 may be used, for example, to constantly monitor commands, pressures, and flow meters. When an event occurs, the system may review the last interval (e.g., about 5 minutes) of pressure data for that circuit to ensure that no other event is in process or has just occurred. Once satisfied, the system may run an average on the last sixty seconds of data just before the event, and captures an averaged number therefrom. The averaged number may be used later in the calculation to assist in determining the end of the cycle. After the event occurs, pressure in the circuit may immediately drop, and this drop may have a direct relationship to the diameter and length of the conduit. Once mechanical restriction begins on the end component, pressure in the circuit may being to rise again. At the same time, the flow totalizer in the circuit may begin counting up gallons from the moment the cycle begins. The instant directly after the last pressure spike, while counting by a totalizer may be compared to the averaged sample noted above. When the two numbers agree, the cycle is complete.
The BOP dashboard 658a also permits a user to select one or more additional screens for viewing. The user may select various displays detailing features of the various portions of the BOP 522. For example, as shown in
Surface equipment 758a provides a reference for functions associated with the surface equipment. LMRP 758b provides a reference for functions associated with the LMRP. Stack 758c provides a reference for functions associated with the stack. Readback 758d provides a consolidated list of critical pressures to be monitored. This screen may be used in conjunction with a schematic, for example, to troubleshoot hydraulic circuits. Flexjoint 758e provides a reference of stack/riser position in relation to the rig. Common 758f provides topology with an indication of the specific module or zone in fault by changing it to red. This may be used to troubleshoot by allowing the user to identify specific zones in the system that may be experiencing a problem. Force displacement 758f provides a reference for force displacement functions associated with the operation of the ram blocks. Flow 758h displays cyclic information concerning ram operation. As shown in flow 758, graphs 761a,b may be provided to display operational parameters, such as pressure (761a) and stroke displacement (761b) of BOP rams (e.g., rams 232 of
In an example using force displacement as shown in
As shown in
When a new packing element is closed for the first time, maximum force may be achieved very early in the cycle. As the sacrificial area on the inside diameter of the packing element is removed due to wear, the characteristic of that plot begins to change. The maximum force may be achieved later and later in the following cycles. If the packing element is used beyond the recommended duty life, the plot may eventually show no force achieved on the last cycle. This may indicate that no effective seal on a complete shut off, or on pipe.
As shown in
Referring back to
The equipment output 558b may be used to determine whether an equipment failure has occurred from the data collected from the databases 554 and 556a-d. For example, force displacement curves, such as those in
The equipment output 558b may analyze operations using an asset management system, such as RIGMS™ commercially available from NATIONAL OILWELL VARCO™ (see: www.nov.com). This system may be used to house all of the information related to a rig's assets. The information may be provided in real time for access during operations. The system may be used to gives customers the ability to access this information in near real-time from the internet. This may also be used to display how cycles are tracked for each valve. Measurements may be collected and analyzed in real time. The measurements may be transmitted via the communication system to various locations, such as an onshore server. Reports may be sent automatically as desired.
For example, a customer may have a system with 224 valves. This customer may change out 25% of the valves each quarter. The customer may set a goal to eventually transition from 25% per quarter, to 25% per year. This may be done by building a valve use history using this system. When the rig plans to pull the stack, they flag RIGMS™ with that date. On that day, RIGMS™ generates a planned work order. That work order lists the 25% of the valves that were used the most. The technician can now change out those valves first. The technician may then enter a new serial number in to the system. This may be used to generate a cost savings by timing the changes according to the maintenance history. For example: if for 80% of the time the rig repairs a valve with a kit at $320, and 20% of the time with a new valve at $5000, the cost would be roughly $285,622 a year per rig on those valves and kits. To facilitate transition to the requested 25% change out per year, a savings of about $210,000 in parts may be provided.
As also shown in
The various outputs, such as alarms, reports and displays, may interact to generate desired outputs as needed. Emails may be sent as desired (e.g., regular or special emails) to selected recipients for information and/or as an alert to BOP conditions. For example, data may be displayed on a dashboard, alerts sent for out of range conditions, and reports sent concerning equipment and other conditions. The equipment management system may generate maintenance reports. The outputs may also interact to monitor the health of the BOP (e.g., rubber goods on rams and annulars) over time. Automatic alerts may be generated indicating that parts are near the end of life or failure. This may be done by using pressure, fluid temperature, and flow totalizers. Advanced analytics, such as artificial intelligence software used to watch for specific patterns and generate reports, may also be performed.
Multiple sources may receive and process the data and/or reports. Once communicated, the reports and other information may be used to optimize wellsite operations, such as drilling, production, and other operations. One or more locations may collaborate directly or indirectly to collect and/or analyze data, thereby providing synergistic interaction between multiple sources, such as users 551, for generating an overall optimized operation. Such interaction may allow users to see actions of other users, or be done indirectly using the BOP unit 550. Input from the sources may be fed into one or more of the databases to update the information. The process may be repeated as new information becomes available. The communications may be done in real time to provide for decisionmaking as operations are performed. Feedback may be sent to the wellsite in real time to enable automatic and/or manual control of wellsite operations.
Communications may be performed via the internet to permit multiple sources at one or more locations to collaborate on wellsite operations as they occur. Analyzed data may be provided to the sources, and the sources may adjust the information based on knowledge of the source(s). Information and access may be made available at all times via the internet. Data may be presented in a logical way to permit operations teams at the sources to make informed decisions. The constant feedback of new information from the wellsite and the users may be used to provide updates and send commands to the wellsite for changes as needed. Action may be taken at the wellsite to adjust operations, for example by performing maintenance and/or adjusting operational settings and/or equipment.
The BOP monitoring system may provide for management and visibility of multiple sites from on and offsite locations. The BOP monitoring system may provide a centralized management center may be provided to allow technicians to assist BOP operations remotely and in real time. This may be used to provide the ability to remotely see wellsite operations and breaking down communication barriers.
The methods may be performed in any order, or repeated as desired. Various combinations of the methods may also be provided.
It will be appreciated by those skilled in the art that the techniques disclosed herein can be implemented for automated/autonomous applications via software configured with algorithms to perform the desired functions. These aspects can be implemented by programming one or more suitable general-purpose computers having appropriate hardware. The programming may be accomplished through the use of one or more program storage devices readable by the processor(s) and encoding one or more programs of instructions executable by the computer for performing the operations described herein. The program storage device may take the form of, e.g., one or more floppy disks; a CD ROM or other optical disk; a read-only memory chip (ROM); and other forms of the kind well known in the art or subsequently developed. The program of instructions may be “object code,” i.e., in binary form that is executable more-or-less directly by the computer; in “source code” that requires compilation or interpretation before execution; or in some intermediate form such as partially compiled code. The precise forms of the program storage device and of the encoding of instructions are immaterial here. Aspects of the invention may also be configured to perform the described functions (via appropriate hardware/software) solely on site and/or remotely controlled via an extended communication (e.g., wireless, internet, satellite, etc.) network.
While the embodiments are described with reference to various implementations and exploitations, it will be understood that these embodiments are illustrative and that the scope of the inventive subject matter is not limited to them. Many variations, modifications, additions and improvements are possible. For example, one or more databases may be provided to generate one or more outputs to one or more users for selective manipulation of data and/or control of BOP operations at the wellsite.
Plural instances may be provided for components, operations or structures described herein as a single instance. In general, structures and functionality presented as separate components in the exemplary configurations may be implemented as a combined structure or component. Similarly, structures and functionality presented as a single component may be implemented as separate components. These and other variations, modifications, additions, and improvements may fall within the scope of the inventive subject matter.
This patent application claims priority to U.S. Provisional Application No. 61/767,685 filed on Feb. 21, 2013, the entire contents of which are hereby incorporated by reference herein.
Number | Name | Date | Kind |
---|---|---|---|
1161705 | Lloyd et al. | Nov 1915 | A |
2178698 | Penick et al. | Nov 1939 | A |
2231613 | Burke | Feb 1941 | A |
2304793 | Bodine, Jr. | Dec 1942 | A |
2555069 | Verney | May 1951 | A |
2592197 | Schweitzer | Apr 1952 | A |
2596851 | Hansen | May 1952 | A |
2752119 | Allen et al. | Jun 1956 | A |
3040611 | Tournaire | Jun 1956 | A |
2919111 | Nicolson | Dec 1959 | A |
3145462 | Bogner | Aug 1964 | A |
3272222 | Allen et al. | Sep 1966 | A |
3399728 | Taylor | Sep 1968 | A |
3427554 | Lagoe | Feb 1969 | A |
3554278 | Reistle, III et al. | Jan 1971 | A |
3554480 | Rowe | Jan 1971 | A |
3561526 | Williams et al. | Sep 1971 | A |
3647174 | LeRouax | Mar 1972 | A |
3670761 | LeRouax | Jun 1972 | A |
3716068 | Addison | Feb 1973 | A |
3741296 | Murman et al. | Jun 1973 | A |
3744749 | LeRouax | Jul 1973 | A |
3766979 | Petrick | Oct 1973 | A |
3817326 | Meynier, III | Jun 1974 | A |
3863667 | Ward | Feb 1975 | A |
3918478 | LeRouax | Nov 1975 | A |
3922780 | Green | Dec 1975 | A |
3946806 | Meynier, III | Mar 1976 | A |
3955622 | Jones | May 1976 | A |
4007797 | Jeter | Feb 1977 | A |
4015496 | Hill | Apr 1977 | A |
4043389 | Cobb | Aug 1977 | A |
4057887 | Jones et al. | Nov 1977 | A |
4119115 | Carruthers | Oct 1978 | A |
4132265 | Williams, Jr. | Jan 1979 | A |
4132267 | Jones | Jan 1979 | A |
4140041 | Freiau | Feb 1979 | A |
4215749 | Dare et al. | Aug 1980 | A |
4220206 | Van Winkle | Sep 1980 | A |
4240503 | Holt et al. | Dec 1980 | A |
4253638 | Troxell, Jr. | Mar 1981 | A |
4313496 | Childs et al. | Feb 1982 | A |
4341264 | Cox et al. | Jul 1982 | A |
4347898 | Jones | Sep 1982 | A |
4372527 | Rosenbauch et al. | Feb 1983 | A |
4392633 | Van Winkle | Jul 1983 | A |
4416441 | Van Winkle | Nov 1983 | A |
4437643 | Brakhage, Jr. et al. | Mar 1984 | A |
4492359 | Baugh | Jan 1985 | A |
4504037 | Beam et al. | Mar 1985 | A |
4508313 | Jones | Apr 1985 | A |
4516589 | Stupak | May 1985 | A |
4516598 | Stupak | May 1985 | A |
4518144 | Vicic et al. | May 1985 | A |
4519577 | Jones | May 1985 | A |
4523639 | Howard, Jr. | Jun 1985 | A |
4526339 | Miller | Jul 1985 | A |
4537250 | Troxell, Jr. | Aug 1985 | A |
4540046 | Granger et al. | Sep 1985 | A |
4549349 | Harrison | Oct 1985 | A |
4550895 | Shaffer | Nov 1985 | A |
4558842 | Peil et al. | Dec 1985 | A |
4568842 | Peil et al. | Feb 1986 | A |
4612983 | Karr, Jr. | Sep 1986 | A |
4646825 | Van Winkle | Mar 1987 | A |
4647002 | Crutchfield | Mar 1987 | A |
4690033 | Van Winkle | Sep 1987 | A |
4690411 | Van Winkle | Sep 1987 | A |
4699350 | Herve | Oct 1987 | A |
4923005 | Lakey et al. | May 1990 | A |
4923008 | Wachowicz et al. | May 1990 | A |
4943031 | Van Winkle | Jul 1990 | A |
4969390 | Williams, III | Nov 1990 | A |
5002130 | Laky | May 1991 | A |
5013005 | Nance | May 1991 | A |
5025708 | Smith et al. | Jun 1991 | A |
5056418 | Granger et al. | Oct 1991 | A |
5178215 | Yenulis et al. | Jan 1993 | A |
5199493 | Sodder | Apr 1993 | A |
5217073 | Bruns | Jun 1993 | A |
5237899 | Schartinger | Aug 1993 | A |
5360061 | Womble | Nov 1994 | A |
5361832 | Van Winkle | Nov 1994 | A |
5400875 | Whitby et al. | Mar 1995 | A |
5505426 | Whitby et al. | Apr 1996 | A |
5515916 | Haley | May 1996 | A |
5566753 | Van Winkle et al. | Oct 1996 | A |
5575451 | Colvin et al. | Nov 1996 | A |
5575452 | Whitby et al. | Nov 1996 | A |
5588491 | Brugman et al. | Dec 1996 | A |
5590867 | Van Winkle | Jan 1997 | A |
5655745 | Morrill | Aug 1997 | A |
5662171 | Brugman et al. | Sep 1997 | A |
5713581 | Carlson et al. | Feb 1998 | A |
5735918 | Levett et al. | Apr 1998 | A |
5778918 | McLelland | Jul 1998 | A |
5833208 | Lee, Jr. | Nov 1998 | A |
5863022 | Van Winkle | Jan 1999 | A |
5897097 | Brugman et al. | Apr 1999 | A |
5918851 | Whitby | Jul 1999 | A |
5961094 | Van Winkle | Oct 1999 | A |
5969042 | Gaydos | Oct 1999 | A |
5975484 | Brugman et al. | Nov 1999 | A |
6006647 | Van Winkle | Dec 1999 | A |
6012528 | Van Winkle | Jan 2000 | A |
6016880 | Hall et al. | Jan 2000 | A |
6113061 | Van Winkle | Sep 2000 | A |
6158505 | Araujo | Dec 2000 | A |
6164619 | Van Winkle et al. | Dec 2000 | A |
6173770 | Morrill | Jan 2001 | B1 |
6192680 | Brugman et al. | Feb 2001 | B1 |
6244336 | Kachich | Jun 2001 | B1 |
6244560 | Johnson | Jun 2001 | B1 |
6276450 | Seneviratne | Aug 2001 | B1 |
6374925 | Elkins et al. | Apr 2002 | B1 |
6484808 | Jones et al. | Nov 2002 | B2 |
6510897 | Hemphill | Jan 2003 | B2 |
6530432 | Gipson | Mar 2003 | B2 |
6601650 | Sundararajan | Aug 2003 | B2 |
6718860 | Mitsukawa et al. | Apr 2004 | B2 |
6719042 | Johnson et al. | Apr 2004 | B2 |
6742597 | Van Winkle et al. | Jun 2004 | B2 |
6834721 | Suro | Dec 2004 | B2 |
6843463 | McWhorter et al. | Jan 2005 | B1 |
6857634 | Araujo | Feb 2005 | B2 |
6964303 | Mazorow et al. | Nov 2005 | B2 |
6974135 | Melancon et al. | Dec 2005 | B2 |
7011159 | Holland | Mar 2006 | B2 |
7011160 | Boyd | Mar 2006 | B2 |
7044430 | Brugman et al. | May 2006 | B2 |
7051989 | Springett et al. | May 2006 | B2 |
7051990 | Springett et al. | May 2006 | B2 |
7055594 | Springett et al. | Jun 2006 | B1 |
7086467 | Schlegelmilch et al. | Aug 2006 | B2 |
7108081 | Boyadjieff | Sep 2006 | B2 |
7165619 | Fox et al. | Jan 2007 | B2 |
7195224 | Le | Mar 2007 | B2 |
7207382 | Schaeper | Apr 2007 | B2 |
7225873 | Schlegelmilch et al. | Jun 2007 | B2 |
7234530 | Gass | Jun 2007 | B2 |
7243713 | Isaacks et al. | Jul 2007 | B2 |
7270190 | McWhorter et al. | Sep 2007 | B2 |
7287544 | Seneviratne et al. | Oct 2007 | B2 |
7331562 | Springett | Feb 2008 | B2 |
7350587 | Springett et al. | Apr 2008 | B2 |
7354026 | Urrutia | Apr 2008 | B2 |
7360603 | Springett et al. | Apr 2008 | B2 |
7367395 | Springett et al. | May 2008 | B2 |
7367396 | Springett et al. | May 2008 | B2 |
7389817 | Almdahl et al. | Jun 2008 | B2 |
7410003 | Ravensbergen | Aug 2008 | B2 |
7434369 | Uneyama et al. | Oct 2008 | B2 |
7464765 | Isaacks et al. | Dec 2008 | B2 |
7487848 | Wells et al. | Feb 2009 | B2 |
7520129 | Springett | Apr 2009 | B2 |
7523644 | Van Winkle | Apr 2009 | B2 |
7673674 | Lam | Mar 2010 | B2 |
7703739 | Judge et al. | Apr 2010 | B2 |
7726418 | Ayling | Jun 2010 | B2 |
7748473 | Wells et al. | Jul 2010 | B2 |
7798466 | Springett et al. | Sep 2010 | B2 |
7814979 | Springett et al. | Oct 2010 | B2 |
8066070 | Springett et al. | Nov 2011 | B2 |
20030127231 | Schlegelmitch et al. | Jul 2003 | A1 |
20040003919 | Johnson et al. | Jan 2004 | A1 |
20040124380 | Van Winkle | Jul 2004 | A1 |
20050269079 | Franklin | Dec 2005 | A1 |
20060076526 | McWhorter et al. | Apr 2006 | A1 |
20060113501 | Isaacks et al. | Jun 2006 | A1 |
20060137827 | Uneyama et al. | Jun 2006 | A1 |
20070102655 | Springett | May 2007 | A1 |
20070137866 | Ravensbergen et al. | Jun 2007 | A1 |
20070246215 | Springett et al. | Oct 2007 | A1 |
20080040070 | McClanahan | Feb 2008 | A1 |
20080185046 | Springett et al. | Aug 2008 | A1 |
20080185143 | Winters et al. | Aug 2008 | A1 |
20080189954 | Lin | Aug 2008 | A1 |
20080265188 | Springett et al. | Oct 2008 | A1 |
20080267786 | Springett et al. | Oct 2008 | A1 |
20080286534 | Springett et al. | Nov 2008 | A1 |
20090056132 | Foote | Mar 2009 | A1 |
20090205838 | Springett | Aug 2009 | A1 |
20090265395 | Milne | Oct 2009 | A1 |
20100038088 | Springett et al. | Feb 2010 | A1 |
20100152901 | Judge | Jun 2010 | A1 |
20110000670 | Springett et al. | Jan 2011 | A1 |
20120026002 | Vu | Feb 2012 | A1 |
20120193087 | Hall et al. | Aug 2012 | A1 |
20120193556 | Yadav et al. | Aug 2012 | A1 |
20120197527 | McKay et al. | Aug 2012 | A1 |
Entry |
---|
“eHawk Remote BOP Monitor”, National Oilwell Varco, 2012, 1 page. |
International Search Report for PCT Patent Application No. PCT/US2014/017447 dated Feb. 2, 2015, 3 pages. |
Korean Office Action dated Jun. 20, 2016 for Korean Application No. 10-2015-7025443, 19 pages total (9 pages in Korean and 10 pages of English translation). |
Number | Date | Country | |
---|---|---|---|
20140231075 A1 | Aug 2014 | US |
Number | Date | Country | |
---|---|---|---|
61767685 | Feb 2013 | US |