The present invention relates to a boiler system for both heating and hot water, and more particularly, to a boiler system for both heating and hot water, in which a conventional circulation pump is usable for both heating and preheating of hot water without additionally installing a separate hot water circulation pump for preheating and circulating hot water.
In general, boilers for both heating and hot water are devices that combust oil or a gas as fuel, heat water using heat generated in such a combustion process, and perform heating by circulating the heated water along a heating pipe or supply hot water using the heated water for a heat exchange with the hot water.
As an example of the related arts related to the boilers for both heating and hot water,
According to such a configuration, the hot water stored in the hot water return pipe 9a may be preheated, thereby immediately supplying the hot water to the user without a waiting time for the initial use of the hot water.
However, in such a conventional hot water supply device, the circulation pump 17 for circulating the heating water and the second circulation pump 19 for preheating and circulating the hot water should be separately installed, thereby resulting in an increase in purchase cost of a pump and a reduction in ease of installation.
The present invention is directed to a boiler system for both heating and hot water capable of performing heating and preheating hot water using one pump for both heating and hot water without separately providing a circulation pump for heating and a circulation pump for preheating of hot water.
According to an embodiment of the present invention, a boiler system for both heating and hot water includes a heat exchange unit, a heating water channel connected between the heat exchange unit and a heating destination, a tap water supply pipe through which tap water is supplied to the heat exchange unit, a hot water supply pipe through which heating water is supplied from the heat exchange unit to a hot water destination, a hot water recirculation channel connected to the hot water supply pipe at a first branch point at which the hot water recirculation channel is branched from one side of the heating water channel, a hot water bypass channel connected to the tap water supply pipe at a second branch point at which the hot water bypass channel is branched from the other side of the heating water channel, and a circulation pump disposed between the first branch point and the second branch point.
In an embodiment, the heat exchange unit may include a hot water storage type heat exchanger configured to store the heating water supplied to the heating destination therein and heat the heating water using a heat source.
In another embodiment, the heat exchange unit may include a main heat exchanger configured to heat the heating water supplied for heating or supplied for exchanging heat by using combustion heat and a hot water heat exchanger configured to generate the hot water through a heat exchange between the heating water heated in the main heat exchanger and tap water.
The heating water channel may be connected between the main heat exchanger and the heating destination, and the tap water supply pipe and the hot water supply pipe may be connected to the hot water heat exchanger.
In an embodiment, a first three-way valve may be provided at the first branch point, and a second three-way valve may be provided at the second branch point.
In another embodiment, a first three-way valve may be provided at the first branch point, and a check valve may be provided in the hot water bypass channel to restrict a flow path so that preheated hot water flows in only one direction toward the tap water supply pipe.
The heating water channel between the first branch point and the second branch point may be used as a common channel through which the heating water and preheated hot water selectively flow.
When a hot water preheating function is selected in a room controller, the circulation pump may be operated for a certain time such that the hot water preheating function is operated.
When a hot water function is selected in the room controller during the operation of the hot water preheating function, the circulation pump may be additionally operated for the certain time such that the hot water preheating function is operated.
When hot water is used in the hot water destination during the operation of the hot water preheating function, the operation of the circulation pump may be stopped, and the hot water supply function may be operated.
According to a boiler system for both heating and hot water according to the present invention, a circulation pump is installed on a heating water return pipe, a hot water recirculation pipe and a hot water bypass pipe are connected to both sides of the circulation pump of the heating water return pipe, a first three-way valve is installed at a branch point of the heating water return pipe and the hot water recirculation pipe, and a heating water or hot water circulation flow path is formed through a flow path conversion of the first three-way valve, and thus heating and preheating of hot water can be performed using one circulation pump for both of heating and preheating, thereby reducing purchase costs of a circulation pump and improving ease of installation.
In addition, a second three-way valve is installed at a branch point of the heating water return pipe and the hot water bypass pipe to form a flow path of heating water or hot water through a flow path conversion, or a check valve is installed in a flow path of the hot water bypass pipe to restrict the flow path such that preheated hot water passing through the hot water bypass pipe flows in one only direction toward a tap water bypass pipe, thereby preventing a backflow phenomenon of tap water to allow hot water to be smoothly preheated and circulated.
Furthermore, the present invention may be universally applied to various types of boilers, such as gas boilers, in addition to hot water storage type boilers without limitation.
Hereinafter, the configurations and operations of exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the drawings, solid arrows refer to a flow path of heating water, and hollow arrows refer to a flow path of hot water or tap water.
Referring to
A heating water supply pipe 101 and a heating water return pipe 102 are connected between the hot water storage type heat exchanger 110 and the heating destination 120 to form a heating water channel.
A tap water pipe 103 and a hot water supply pipe 105 are connected to a hot water destination 130.
A tap water supply pipe 104 is branched from the tap water pipe 103 and is connected to pass through the inside of the hot water storage type heat exchanger 110. The tap water supply pipe 104 inside the hot water storage type heat exchanger 110 is connected to the hot water supply pipe 105. Tap water, which passes through the tap water supply pipe 104 passing through the inside of the hot water storage type heat exchanger 110, is heated through a heat exchange with the heated heating water stored in the hot water storage type heat exchanger 110 and is generated into hot water to be supplied to the hot water supply pipe 105.
A circulation pump 140 is installed on the heating water return pipe 102 to pump heating water or preheated hot water.
One end of a hot water bypass channel 106 is connected to the heating water return pipe 102 positioned at an outlet side of the circulation pump 140, and the other end of the hot water bypass channel 106 is connected to the tap water supply pipe 104.
One end of a hot water recirculation channel 107 is connected to the heating water return pipe 102 positioned at an inlet side of the circulation pump 140, and the other end of the hot water recirculation channel 107 is connected to the hot water supply pipe 105.
A first three-way valve 150 configured to convert a flow path is provided at a first branch point at which the heating water return pipe 102 and the hot water recirculation channel 107 are connected. A second three-way valve 160 configured to convert a flow path is provided at a second branch point at which the heating water return pipe 102 and the hot water bypass channel 106 are connected.
Referring to
Thus, as indicated by arrows in
Referring to
Therefore, as indicated by arrows in
Referring to
After the preheated hot water present in the hot water preheating circulation channel is supplied to the hot water destination 130, tap water introduced through the tap water pipe 103 is supplied into the hot water storage type heat exchanger 110 through the tap water supply pipe 104, is heated through a heat exchange with the heating water, and then is supplied to the hot water destination 130 through the hot water supply pipe 105.
As described above, since the preheated hot water remaining in the hot water preheating circulation channel is supplied to a user for the initial use of the hot water, water having a warm temperature desired by the user may be immediately supplied.
Meanwhile, as shown in
As described above, since heating water may be mixed into hot water in a section which is used for both of a channel for the heating water and a channel for the preheated hot water, in order to minimize a flow rate at which the heating water is mixed into the hot water, a distance between the branch point of the heating water return pipe 102 and the hot water recirculation channel 107 and the branch point of the heating water return pipe 102 and the hot water bypass channel 106 may be designed to be minimized, which will be equally applied to the following embodiments.
Hereinafter, the configurations and operations of a boiler system 100-2 for both heating and hot water according to a second embodiment of the present invention will be described with reference to
The boiler system 100-2 for both heating and hot water according to the second embodiment of the present invention is different from that of the first embodiment in that a second three-way valve 160 is omitted and a check valve 170 is further provided in a hot water bypass channel 106 to allow preheated hot water passing through the hot water bypass channel 106 to flow in only one direction toward a tap water supply pipe 104 and restrict a flow path such that the preheated hot water is blocked from flowing in a direction opposite to the one direction, and other components thereof may be the same as those of the first embodiment.
Referring to
Thus, as indicated by arrows in
In this case, since the first three-way valve 150 is in a state in which the flow path toward the hot water recirculation channel 107 is closed, heating water passing through the circulation pump 140 is prevented from being supplied to a channel in which the hot water bypass channel 106, a hot water supply pipe 105, and the hot water recirculation channel 107 are connected.
Referring to
Therefore, as indicated by arrows in
In this case, since the first three-way valve 150 is in a state in which the flow path toward the heating destination 120 is closed, preheated hot water passing through the circulation pump 140 is prevented from being supplied to a channel in which the hot water storage type heat exchanger 110, the heating water supply pipe 101, and the heating destination 120 are connected.
In addition, a backflow phenomenon of tap water may be prevented by the check valve 170 installed on the hot water bypass channel 106, and thus, hot water may be smoothly preheated and circulated.
Referring to
After the preheated hot water present in the hot water preheating circulation channel is supplied to the hot water destination 130, as shown by arrows, tap water introduced through a tap water pipe 103 is supplied into the hot water storage type heat exchanger 110 through the tap water supply pipe 104, is heated through a heat exchange with the heating water, and then is supplied to the hot water destination 130 through the hot water supply pipe 105.
The above-described first and second embodiments are embodiments of a case in which the present invention is applied to a hot water storage type boiler system. Hereinafter, third and fourth embodiments of a case in which the present invention is applied to a gas boiler system will be described.
Referring to
A heating water supply pipe 201 and a heating water return pipe 202 are connected between the main heat exchanger 210 and a heating destination 230 to form a heating water channel.
A heating water bypass pipe 203 is connected to the heating water supply pipe 201 such that heating water supplied from the main heat exchanger 210 flows toward the heating water return pipe 202 via the hot water heat exchanger 220. A three-way valve 250 configured to selectively convert a flow path of heating water toward the heating destination 230 or the hot water heat exchanger 220 is provided at a branch point of the heating water supply pipe 201 and the heating water bypass pipe 203.
A tap water pipe 204 and a hot water supply pipe 206 are connected to a hot water destination 240.
A tap water supply pipe 205 is branched from the tap water pipe 204 and is connected to pass through the inside of the hot water heat exchanger 220. The tap water supply pipe 205 inside the hot water heat exchanger 220 is connected to the hot water supply pipe 206. Tap water, which passes through the tap water supply pipe 205 passing through the inside of the hot water heat exchanger 220, is heated through a heat exchange with heating water passing through the inside of the heating water bypass pipe 203 passing through the hot water heat exchanger 220 and is supplied to the hot water supply pipe 206.
A circulation pump 260 is installed on the heating water return pipe 202 to pump heating water or preheated hot water.
One end of a hot water bypass channel 207 is branched and connected to the heating water return pipe 202 positioned at an outlet side of the circulation pump 260, and the other end of the hot water bypass channel 207 is connected to the tap water supply pipe 205.
One end of a hot water recirculation channel 208 is branched and connected to the heating water return pipe 202 positioned at an inlet side of the circulation pump 260, and the other end of the hot water recirculation channel 208 is connected to the hot water supply pipe 206.
A first three-way valve 270 configured to convert a flow path is provided at a first branch point at which the heating water return pipe 202 and the hot water recirculation channel 208 are connected. A second three-way valve 280 configured to convert a flow path is provided at a second branch point at which the heating water return pipe 202 and the hot water bypass channel 207 are connected.
Referring to
In addition, the three-way valve 250 forms flow paths such that the flow path toward the heating destination 230 is opened and a flow path toward the heating water bypass pipe 203 is closed.
Thus, as indicated by arrows in
Referring to
Thus, heating water heated in the main heat exchanger 210 passes through the hot water heat exchanger 220 via the heating water supply pipe 201 and the heating water bypass pipe 203 and then is returned to the main heat exchanger 210 through the heating water return pipe 202 and circulated.
When heat is stored in the heating water in the hot water heat exchanger 220, as shown in
Therefore, as indicated by arrows in
During preheating of hot water, operations of
Referring to
After the preheated hot water present in the hot water preheating circulation channel is supplied to the hot water destination 240, as shown by arrows, tap water introduced through the tap water pipe 204 is supplied into the hot water heat exchanger 220 through the tap water supply pipe 205, is heated through a heat exchange with the heated heating water passing through the hot water heat exchanger 220 as shown and described with reference to
As described above, since the preheated hot water remaining in the hot water preheating circulation channel is supplied to a user for the initial use of the hot water, water having a warm temperature desired by the user may be immediately supplied.
Hereinafter, the configurations and operations of a boiler system 200-2 for both heating and hot water according to the fourth embodiment of the present invention will be described with reference to
The boiler system 200-2 for both heating and hot water according to the fourth embodiment of the present invention is different from that of the third embodiment in that a second three-way valve 280 is omitted and a check valve 290 is further provided in a hot water bypass channel 207 to allow preheated hot water passing through the hot water bypass channel 207 to flow in only one direction toward a tap water supply pipe 205 and restrict a flow path such that the preheated hot water is blocked from flowing in a direction opposite to the one direction, and other components thereof may be the same as those of the third embodiment.
Referring to
In addition, a three-way valve 250 forms flow paths such that the flow path toward the heating destination 230 is opened and a flow path toward a heating water bypass pipe 203 is closed.
Thus, as indicated by arrows in
In this case, since the first three-way valve 270 is in a state in which the flow path toward the hot water recirculation channel 208 is closed, heating water passing through the circulation pump 260 is prevented from being supplied to a channel connected in which the hot water bypass channel 207, the tap water supply pipe 205, a hot water supply pipe 206, and a hot water recirculation channel 208 are connected.
Referring to
Thus, heating water heated in the main heat exchanger 210 passes through the hot water heat exchanger 220 through the heating water supply pipe 201 and the heating water bypass pipe 203 and then is returned to the main heat exchanger 210 through the heating water return pipe 202 and circulated.
When heat is stored in the heating water in the hot water heat exchanger 220, as shown in
Therefore, as indicated by arrows in
In this case, since the first three-way valve 270 is in a state in which the flow path toward the heating destination 230 is closed, preheated hot water passing through the circulation pump 260 is prevented from being supplied to a channel in which the main heat exchanger 210, the heating water supply pipe 201, and the heating destination 230 are connected.
In addition, a backflow phenomenon of tap water may be prevented by the check valve 290 installed on the hot water bypass channel 207, and thus, hot water may be smoothly preheated and circulated.
During preheating of hot water, operations of
Referring to
After the preheated hot water present in the hot water preheating circulation channel is supplied to the hot water destination 240, as shown by arrows, tap water introduced through the tap water pipe 204 is supplied into the hot water heat exchanger 220 through the tap water supply pipe 205, is heated through a heat exchange with the heated heating water passing through the hot water heat exchanger 220 as shown and described with reference to
When the user presses and selects one of the heating button 310, the water preheating button 320, and the hot water button 330 provided in the room controller 300, a selected signal is sent to a control unit 400, and the control unit 400 controls operations of the circulation pump 140 or 260, the first three-way valve 150 or 270, and the second three-way valve 160 or 280 to perform a selected function.
When the user presses the water preheating button 320 to select the hot water preheating function, the control unit 400 may perform a control to operate the circulation pump 140 or 260 for a certain time (for example, 60 seconds) such that the hot water preheating function is operated.
During the operation of the hot water preheating function, when the user presses the hot water button 330 to select the hot water function, the control unit 400 may perform a control to additionally operate the circulation pump 140 or 260 for a certain time (for example, 60 seconds) such that the hot water preheating function is operated.
During the operation of the hot water preheating function, when hot water is used in the hot water destination 130 or 240, the control unit 400 may perform a control to stop the operation of the circulation pump 140 or 260 such that hot water supplying function is continuously operated. The control unit 400 may determine whether the hot water is used in the hot water destination 130 or 240 based on a signal sensed by a flow sensor (not shown) provided on the tap water pipe 103 or 204 to sense a flow of tap water.
On the other hand, in the present specification, it has been described that the circulation pump 140 or 260 transports a fluid in only one direction, but the circulation pump 140 or 260 may be configured to transport the fluid in both directions. In this case, even when the arrangement order of the first and second branch points is reversed from that shown in the drawings, a hot water preheating function may be performed.
In addition, the hot water recirculation channel 107 or 208 and the hot water bypass channel 106 or 207 may be disposed inside the boiler or may be disposed outside the boiler (in a piping of a house).
As described above, the present invention is not limited to the described embodiments, and it should be construed that modifications can be apparently devised by those skilled in the art without departing from the technical spirit of the present invention defined by the appended claims, and also such modifications will fall within the scope of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
10-2017-0093295 | Jul 2017 | KR | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/KR2018/006406 | 6/5/2018 | WO | 00 |