Boiler Unit

Abstract
The invention is concerned with an integrated unit comprising a unitary boiler and gas cleaning apparatus. Preferably the integrated unit comprises a boiler unit, and gas cleaning apparatus, the integrated unit has a reaction unit and further comprises a radiant zone connected to the reaction unit, the radiant zone being connected to a convection zone. The integrated unit further comprises a heat exchange means encircling at least one of the radiant zone and the convection zone, and gas cleaning means is preferably provided around at least a part of the heat exchange means. The reaction unit may comprise a fluid bed boiler, gasifier or pyrolytic chamber and wherein fuel is burned completely; burned under pyrolytic conditions; or is gasified. The heat exchange means may comprise an annular heat exchange chamber and the gas cleaning means may be provided in an annular gas cleaning chamber encircling the heat exchange chamber.
Description

This invention relates to a solid fuel fired boiler unit including gasifiers and pyrolisers, and methods and apparatus for cooling and cleaning gas from such units. The method and apparatus can be used in combination with a fluid bed boiler or in combination with a grate style combustion unit or any other solid fuel fired boiler combustion, gasification or pyrolising system.


Boiler, gasifier and pyrolising units such as fluid beds are well known. In such supply units a fluid bed boiler is provided, the fluid bed boiler having a combustion, gasification or pyrolising chamber and fuel is fed to that chamber. Waste gases or syngas pass from the chamber to a radiant chamber then pass to a convector section or chamber to cool the gases. Gases exiting the chamber are typically transferred to a separate cleaner unit. Sorbent is injected into the gas flow prior to entry to the cleaner unit. The cleaner unit typically comprises a bag filter and a baffle system arranged to direct flow of the waste gases into the bag filters. On exit from the cleaning unit gases are transferred by pipes to a chimney.


There is a need for an improved boiler and gas cleaning system.


According to a first aspect of the invention there is provided an integrated unit comprising a unitary boiler and gas cleaning apparatus.


Preferably the boiler is a fluid bed boiler. In other embodiments the boiler may be a combustion grate boiler, gasifier or pyroliser. The boiler may comprise a combustion fluid bed boiler. In other embodiments the boiler may comprise a pyrolysis boiler or a gasification boiler. Desirably a radiant zone and a convection zone are provided within the integrated unit in fluid communication with gas cleaning apparatus within the integrated unit. The radiant zone may be a radiant chamber. The convection zone may be a convection chamber. Preferably the convection chamber is contiguous with the radiant chamber.


Traditionally each section of plant: fluid bed boiler comprising a radiation chamber and a convection chamber; sorbent injector; gas cleaner comprising a filter chamber, and coolant chimney have been separately designed and built. Each section is the responsibility of a separate supplier and the gases are transferred from one section to the next by pipework. Such an arrangement lacks cohesiveness and prevents achievement of a compact and efficient design.


The inventor has realised that designing an integrated unit combining and integrating a boiler unit and gas cleaning apparatus can lead to significant improvements in design and to a compact integrated unit that provides all the functions previously supplied by a number of separate components. The integrated unit comprising a unitary boiler and gas cleaning apparatus provides a single component instead of several separate components and transfer of the gases from one section to another is made efficiently and within a compact footprint. Further advantages and improvements are described below. The integrated unit and improved design provides an advantageous layout and increases the efficiency of extraction of heat energy and reuse of the heat energy in the system or to generate heat energy. Further the integrated unit can be installed on the power generation site as a single unit with a compact footprint, so providing significant advantages over the existing multi-section systems.


Preferably the boiler comprises a reaction unit comprising a chamber in which combustion, gasification or pyrolysis occurs. The reaction unit may comprise a zone such as a combustion zone.


In a preferred embodiment of the invention there is provided an integrated unit comprising a boiler unit having a reaction unit, and gas cleaning apparatus, the integrated unit comprising a radiant zone connected to the reaction zone, the radiant zone being connected to a convection zone, the integrated unit further comprising a heat exchange means encircling at least one of the radiant zone and the convection zone, and gas cleaning means being provided around at least a part of the heat exchange means.


Preferably the reaction unit comprises a combustion zone which may in come embodiments comprise a fluid bed burner, which will be described in more detail below. Typically the fluid bed is arranged to combust or gasify solid fuels such as landfill waste, biomass or coal. The reaction unit is connected to a radiant zone which desirably is in the form of a radiant chamber. Preferably the radiant zone is positioned above the reaction unit. Desirably gases can flow freely from a combustion zone of the reaction unit to the radiant zone. Preferably the radiant zone comprises a radiant chamber acting as a cold black body and absorbing heat from the reaction unit into the boiler fluid. The radiant chamber is preferably arranged to facilitate maintenance of a temperature of the reaction unit at a desired temperature or in a desired temperature range.


Desirably the radiant chamber facilitates maintenance of the temperature in the fluid bed in a desired temperature range by extracting heat into the boiler fluid. In one embodiment the temperature in the fluid bed is held between 600° C. and 1200° C. and more preferably between 700° C. and 1100° C. and most preferably between 800° C. and 1000° C.


Preferably the temperature in the radiant chamber is between 800° C. and 1000° C. Desirably gases passing from the fluid bed are resident in the radiant chamber for a period of time. The gases may be resident in the radiant chamber for between 0.5 seconds and 5 seconds or between 1 and 4 seconds. Preferably the gases are resident in the radiant chamber for at least 1 to 3 seconds. In a particularly preferred embodiment the gases are held at a temperature of at least 850° C. for at least 2 seconds following injection of secondary combustion air. A portion of the time at a temperature of greater than 850° C. may be in the fluid bed and a portion of the time may be in the radiant chamber. Desirably the gases are held at a temperature of greater than 850 C for a period of time long enough to combust products such as hydrocarbons, dioxin and furans. Desirably the period of time is sufficient to comply with legal requirements.


In desirably maintaining the gases at a temperature of greater than 850° C. for at least two seconds overall the system complies with current legal requirements on treatment of waste and so may ensure that waste products are fully combusted such that hydrocarbons, dioxins and furans are destroyed.


In a preferred embodiment the radiant zone is fluidly connected to the convection zone. Desirably the radiant chamber is located above the reaction unit. Preferably the convection zone is fluidly connected to the radiant zone and is desirably distal from the reaction unit. The radiant zone and the convection zone may be freely connected.


Preferably there is not a physical barrier between the radiant zone and the convection zone. In a preferred embodiment the convection zone comprises a convection chamber. In some embodiments the radiant zone and the convection zone may be regarded as separate zones of a single chamber. The skilled person will appreciate that the radiant zone and the convention zone have separate functions that will be well known to and understood by the person skilled in the art.


In a preferred embodiment the radiant chamber comprises a chamber surrounded by a heat exchange means. The heat exchange means may comprise a helically wound heat exchange coil.


In a preferred embodiment the convection chamber comprises a chamber surrounded by a heat exchange means. Preferably the heat exchange means comprises a helically wound heat exchange coil. The heat exchange coil which extends around the convection chamber may be fluidly connected to or continuous with the heat exchange coil surrounding the radiant chamber.


Preferably gases flowing from the fluid bed and into the radiant chamber flow on to the convection chamber and a directing means diverts the flow of the gases to flow through the or each heat exchange means surrounding the convection chamber and the radiant chamber. Desirably the heat exchange means is provided in an annular heat exchange chamber which surrounds the radiant and the convection chambers. In a preferred embodiment a direction of flow of the gases through the heat exchange chamber is substantially downward and substantially parallel to a direction of flow of the gases from the fluid bed to the radiant chamber and the convection chamber.


The gas cleaning means is provided around at least part of the heat exchange means. In a preferred embodiment the gas cleaning means is provided in an annular gas cleaning chamber surrounding the heat exchange chamber. Desirably gases flowing from the heat exchange chamber are directed to flow around a U-turn and into the gas cleaning chamber such that the gases preferably flow upwardly through the gas cleaning chamber parallel to gases flowing downwardly through the heat exchange chamber.


In a preferred embodiment sorbents may be injected into the gas flow as the gases exit from the heat exchanger chamber and are directed into the gas cleaning means in the gas cleaning chamber.


Preferably the gas cleaning means comprises a number of bag filters arranged in the gas cleaning chamber. Desirably the bag filters are arranged in groups around the annular chamber. A number of bag filters may be provided in or along a notional radially extending line which may be considered to be extending from a centre of the convection chamber. Further bag filters may be arranged along additional radially extending lines such that a segment of an arc around the gas cleaning chamber may contain a number of bag filters spaced regularly around an arc of the gas cleaning chamber. In a preferred embodiment the gas cleaning chamber comprises a number of sub-chambers. Each sub-chamber may comprise an arc of the annular chamber. In some embodiments bag filters are provided in each sub-chamber. In another embodiment one or more sub-chambers may not have bag filters. Desirably each sub-chamber is provided with a gas flow control means. In a preferred arrangement the gas flow control means is provided downstream of the bag filters. The gas flow control means may comprise a baffle or alternatively a valve.


Desirably each bag filter comprises a fabric filter fitted around a metal support and arranged to hang within the annular gas cleaning chamber. Suitable bag cleaning filters are well known in the art. In other embodiments the bag filter may be formed from a ceramic material or a metallic materiel for use with higher temperature gases. In some embodiments the bag filter may comprise a metal material. The metal material may be in the form of a metal fibre or thread coiled in a random manner. The metal support may be arranged downstream of the filter material in order to prevent the fabric filter from collapsing. The metal support may be formed from stainless steel. Preferably the fabric filters are arranged to remove particulate material from the gases. The particulate material may be ash. The particulate material may comprise other solid materials. Preferably the filters are arranged to remove any particulate material having a diameter above 0.1 microns.


Desirably as the gas flows towards the bag filters sorbents, typically in powder form, are injected into the gas flow and desirably the sorbents react with components within the gases to remove sulphur, chlorine and other pollutants from the gas flow.


Sorbents typically form compounds with the sulphur, chlorine etc. and these solid components are then collected by the bag filters as the gases pass through the filters. The sorbents may be any suitable sorbent. Typically the sorbent may be one of sodium bicarbonate, activated carbon, or lime. Other suitable sorbents may be used as is well known to the person skilled in the art. The bag filters preferably also remove dust and any other particulate material from the gasses as they pass through the bag filter. There may be a significant amount of particulate material in the gases when the fuel is biomass or landfill waste. The particulate material may typically be ash.


It will be appreciated that as a sorbent is injected into the gases the sorbent material is drawn towards the bag filters. The sorbent material may react with pollutants in the gases prior to reaching the bag filters. It has been appreciated that the sorbent material can desirably collect on the filter material of the bag filters and that the gases can be drawn through the sorbent material and then through the bag filter before passing downstream towards a cooling chimney. It has therefore been appreciated that an increased flow of gases through the sorbent material may increase the amount of sorbent material that is able to react with the pollutants in the gases and desirably locks more pollutants into a solid compound that preferably is not able to pass through the filter material.


This is a particular advantage over existing bag filters in which sorbent is injected prior to entry of the gases into the filter chamber. In the prior art filter chambers a complex series of deflectors have to be provided in order to direct the flow of gases to the bag filters. In such existing filter chamber units sorbent material that does not react quickly with the pollutants in the gases tends to fall to a base of the filter chamber and out of the gas flow and so is no longer readily available for reaction with pollutants in the gases.


It has been appreciated that the arrangement of the heat exchange chamber and the gas cleaning chamber are particularly advantageous. As described before the heat exchange chamber is preferably arranged as an annular chamber around the radiant and/or convection chamber or chambers. Desirably the gas cleaning means is provided in an annular gas cleaning chamber. In a convenient and compact arrangement the gas cleaning chamber may surround the heat exchange chamber. The gases exiting from the heat exchange chamber may be directed by the U turn at the bottom of the heat exchange chamber such that they may flow upwardly around the annular chamber and the direction of flow is desirably arranged to be directly towards the bag filters.


Further it has been appreciated that in the novel apparatus the sorbent material may be directed toward the flow of gases and towards the bag filters such that the sorbent material may be held in the direct path of the gases, in contrast to existing gas cleaning units in which sorbent material tends to fall to the floor of the filter unit due to the complex gas flow path.


It will be appreciated that over time particulate material may build up on the upstream side of the bag filters. This particulate material may be removed from the bag filters using a pulse of compressed air applied to a downstream side of the bag filter and which passes through the bag filter. The compressed air may be arranged to push the bag filter in a reverse direction and force the particulate material off the filter material of the bag filter. The particulate material preferably falls from the bag filters to a floor of the gas cleaning chamber and desirably collects at a base of the gas cleaning chamber. A means for removing the particulate material may be provided and will be described in more detail below. The means for removing the particulate material may comprise a moving floor as will be further described in more detail. It will be appreciated that the described removal means overcomes a particular difficulty with removing particulate material from an annular floor of the chamber. Traditional gas cleaning chambers typically utilise an Archimedes screw arrangement to remove waste particulate material from a hopper and it will be appreciated that such an arrangement cannot be used in an annular chamber.


A downstream side of each of the bag filters is preferably connected to an air pressure source which can be arranged to supply pulse air jets to one or more of the bag filters. A suitable solenoid valve and air supply is preferably provided downstream from the bag filters. The solenoid valve and air supply is desirably controlled by control means which may be connected to a central control means. The bag filters may be cleaned in response to a cleaning schedule or in response to signals from a flow meter.


Desirably bag filters are arranged in groups within the or each sub chamber forming an arc of the gas cleaning chamber. Optionally the valve or baffle or other flow control means may be provided downstream of the or each sub-chamber. In a preferred embodiment pulse air may be provided to a group of bag filters within each sub-chamber of the gas cleaning chamber. Typically pulse air may be supplied to a group of 1 to 50 bag filters, or from 2 to 40 bag filters, or from 5 to 20 or most preferably from 8 to 16 bag filters. The group of bag filters to which air is supplied may be arranged in a radial line or may comprise a number of radial lines such that a portion of an arc is cleaned at a time. The pulsed air may be supplied to all bag filters in a sub-chamber.


Advantageously pulsed air is applied to one sub-chamber at a time. Optionally, the flow control means may be closed before pulse air is supplied to the bag filters. Desirably once the flow control means is closed cooled exhaust air flows through the remaining sub-chambers in gas cleaning chambers. Desirably the flow of gas is diverted away from the closed sub-chamber. In a preferred embodiment the pulsed air applied to the bag filters dislodges the particulate material which readily falls to the moving floor. An advantage of the arrangement is that once the flow control means is closed the flow is diverted away from the closed sub chamber and the air upstream of the bag filter is stagnant. Accordingly the pulsed air flows readily through the bag filters since there is little or no gas flow counter to the pulsed air. Particulate material is readily dislodged from the bag filters.


Gases which pass through the bag filters in normal operation may be deflected and directed to a central outlet point. An induced draught fan is preferably provided in the outlet. The induced draught fan is preferably arranged to draw gases through the bag filters. Desirably the induced draught fan also controls flow of the gases through the outlet and into a chimney.


Preferably the chimney is mounted directly above the integrated unit. In one preferred embodiment the chimney extends centrally above the outlet. It will be appreciated that the overall footprint of the boiler, cleaner and chimney is greatly reduced compared to the existing designs. Furthermore, the flow of gases is controlled within the unit and it is not necessary to transport the gases from one section to another. Extraction of heat energy from the system will be further described in more detail below.


Desirably the exhaust gas is arranged to flow through a measuring device.


In an alternative preferred embodiment the outlet directs the exhaust gas flows through a duct and to a measuring device. The measuring device may be used to measure species in the exhaust gases. Regulations relating to pollution control specify limits to pollution species such as chlorides, hydrochlorides, sulphides, sulphur dioxides; nitrogen oxides and particulate material. Other species may also be monitored.


Testing methods specify that gases should flow a certain distance along a linear path before entering the measuring device. Exhaust gases may enter a chimney or vent that is laterally located or exhaust gases may be returned to a central chimney.


As referred to above particulate material from the upstream side of the bag can be removed from the filter and deposited on the floor of the gas cleaning chamber. Over a period of time particulate material may collect on the floor of the gas cleaning chamber and it would be desirable to remove the particulate material from the gas cleaning chamber. Preferably at least a portion of the floor is arranged to be rotatable. In some embodiments at least a portion of the floor may be arranged to be openable. In a preferred embodiment a rotatable floor is provided which transports particular material to the openable section of the floor. Particulate material can preferably be removed from the floor of the gas cleaning chamber by passing through the openable section of the floor and into a waste hopper. Desirably when the waste hopper is full the waste material can be transported away from the gas cleaning chamber. Typically the waste material may go to landfill.


The rotatable floor of the gas cleaning chamber may comprise a radial conveyor. In one embodiment the radial conveyor may comprise an inner steel plate and an outer steel plate with spacing plates arranged therebetween. A device may be provided to rotate one or more spacing plates at a specified location so allowing particulate material to fall into a waste hopper. A suitable device for rotating the spacing plate back into position is preferably also provided. In a preferred embodiment a single discharge point is provided but it will be appreciated that multiple discharge point could also be utilised. In some embodiments the openable section of the floor is arranged to be held in an open position. The inner and outer steel plates may be arranged to rotate. Paddles may be provided arranged between the inner and outer steel plates. Desirably the paddles are adapted to move particulate material around the rotatable floor and towards opening.


The arrangement of the fluid bed will now be described in more detail so that the invention may be better understood. It will be appreciated that the fluid bed and reaction unit are conventional and will be well understood by the person skilled in the art.


The reaction unit preferably comprises a fluid bed. The bed may typically be formed of sand or malachite and high pressure air may be supplied through sparge tube tubes or nozzles in order to fluidise the bed. Recycled flue gas may be used to support fluidisation of the bed. Recycled flue gas may provide a limited supply of oxygen for combustion but may be advantageous in controlling the temperature of the fluid bed by controlling a rate of combustion occurring in the fluid bed by controlling the an amount of oxygen present in the fluid bed.


Desirably the fluid bed reactor uses a solid fuel. Solid fuel may enter the combustion zone of the reaction unit through a feed chute. The fuel may typically be a biomass fuel, waste material or may be coal. Other solid fuels may be used as well or instead of biomass fuels and waste material.


Combustion is typically in two stages and secondary air may be supplied through a secondary air manifold at an intermediate part of the reaction unit. The secondary air supply may be controlled to provide a desirable mixture of gases and in particular a desirable mix of oxygen within the gas in order to provide complete combustion.


In the case of a gasifier or pyrolyser secondary air may not be introduce and the syngas is transferred to the cleaning unit for combustion thereafter in an engine or gas turbine.


A start-up burner is preferably also provided to initiate combustion. Typically, on initiation of the start-up burner, the bed will achieve a temperature of around 600° C. Once fuel is fed into the bed a working temperature of 800° C. may be achieved. It will be appreciated that other temperature ranges may be used for specific fuels or generated by specific fuels.


In the case of a combustion unit, as previously mentioned, it is desirable that the fuel has a residence time of at least 2 seconds at approximately 800-850° C. after introduction of the secondary air for complete combustion. This residence time is specified under current standards in order to ensure that pollutants are fully combusted and removed from the waste gases. Typically pollutants might comprise hydrocarbons, dioxins and furans. It will be appreciated that the residence time may be partially within the reaction unit and partially within the radiant zone as discussed above.


It will be appreciated that the solid fuels may typically comprise a solid material and that the fuel may be contaminated with other components such as stones, or tramp metal. Contaminants may comprise a material that typically does not burn. The reaction unit is desirably arranged such that contaminants will fall into the fluidised bed and that they will gradually drop to the bottom of the fluidised bed. It will be appreciated that over time a build-up of such contaminants in the fluidised bed will prevent fluidising of the bed. Desirably therefore the boiler is arranged to allow ash drawdown periodically which will remove the contaminant material with the ash. In some arrangements an ash drawdown may be carried out on each shift or once a day. In some embodiments fuel may be fed to the reaction unit at a rate of approximately from 1 to 20 tonnes of fuel per hour.


It will be appreciated that typically approximately 40% combustion of fuel may occur in the fluidised bed at a temperature of approximately 800° C. Typically 60% of the combustion may occur with the secondary air supply, usually above the fluidised bed. In the absence of a radiant chamber the temperature of the secondary combustion zone can reach 1200 C to 1300° C. However, as described above it is desirable that the temperature in the combustion zone is maintained at approximately 900° C. and as described above the radiant zone can act as a cold black body drawing heat from the upper part of the combustion zone.


In other embodiments the boiler may be configured to operate without complete combustion and to operate under pyrolytic conditions.


Alternatively the boiler may be configured to operate in conditions of incomplete combustion such that the boiler operates as a gasifier. The gasifier may be arranged to produce synthetic gas. The synthetic gas may be used as a fuel gas for a gas turbine.


The arrangement of the heat exchanger means will now be described in more detail.


In a preferred embodiment the radiant and the convection chambers are located above the fluidised bed burner. In a particularly preferred embodiment the radiant and the convection chambers extend axially from the fluidised bed burner. In one embodiment the radiant and the convection chambers are defined by helically wound heat exchange tubes. Desirably the heat exchange tubes are water filled. Preferably water flowing in the heat exchange tubes is preheated to a temperature ranging from 100° C. to 530° C. or more preferably from 150° C. to 300° C. or most preferably from 180° C. to 270° C. Desirably water flowing in the heat exchange tubes is also pressurised to a pressure of from 1 to 150 bargauge or more preferably from 1 to 90 bargauge or most preferably from 5 to 70 bargauge.


Desirably an upper portion of the radiant chamber merges with the convection chamber. In a preferred embodiment an upper part of the convection chamber extends to a ducting extending over the axially extending radiant and convection chambers and the ducting preferably directs gases from the convection chamber towards the heat exchange chamber.


In a preferred embodiment the heat exchange chamber is provided as an annular chamber extending around the axially extending radiant and convection chambers. An inner side of the heat exchange chamber is defined by the heat exchange tubes which extend around the radiant and convection chambers and an outer side of the annular heat exchange chamber is preferably defined by a second helically wound heat exchange tube.


Desirably the heat exchange chamber further includes an evaporator comprising a series of heat exchange tubes extending circumferentially around and within the heat exchange chamber. In a particularly preferred embodiment the heat exchange chamber further comprises an economiser comprising a further set of heat exchange tubes which extend circumferentially around and within the annular chamber.


Operation of the boiler and heat exchanger is conventional and will not be further described. It will be appreciated that the heat exchanger is controlled to ensure that the heat exchanger coils are maintained at a temperature that is higher than the dew point. The skilled person will appreciate that the presence of sulphur contaminants in the exhaust gases risks production of sulphuric acid in the event that the exhaust gases move below their dew point.


Water from the heat exchanger may be used to provide hot water to heating systems. In some cases the hot water may be used domestic or industrial or commercial premises. Alternatively the heat exchanger may be arranged to produce process steam. Process steam may be used as an energy source in other industrial processes. In other cases superheated steam may be generated which may be used to generate power.


In a preferred embodiment the heat exchange chamber extends annually around the convection chambers and the radiant heat chamber and gases travel axially upwards through the radiant chamber and then travel downwardly through the convective heat exchange chamber. Desirably as gases reach the bottom of the heat exchange chamber they are deflected by a flow reverser formed by a base section or U section and the direction of travel is reversed so that the gases flow upwardly uniformly from the base section and flow directly towards the bag filters. Desirably sorbent is injected into the gas flow in a zone close to the flow reverser.


According to a second aspect of the invention a method of cleaning gas from a boiler comprises the steps of passing heated gases from the boiler to a convection chamber and a radiation chamber provided above the boiler; providing a heat exchange chamber arranged around and encircling at least one of the radiation chamber and convection chamber and gas cleaning means being provided around at least a part of the heat exchange means.


According to a third aspect of the invention there is provided an integrated gas cleaning apparatus comprising a boiler, a reaction unit, a radiation chamber, and a heat exchange chamber arranged around and encircling at least one of the radiation chamber and convection chamber and gas cleaning means being provided around at least a part of the heat exchange means and wherein the gas cleaning apparatus further comprises a moving floor.


In a preferred embodiment the moving floor is rotatable. Desirably at least a portion of the floor is openable.


In some embodiments the moving floor may comprise a radial conveyor. Optionally the rotating floor comprises an inner steel plate and an outer steel plate. Spacing plates may be arranged therebetween. Desirably one or more spacing plates are provided between the inner plate and the outer plate. In a preferred embodiment at least one spacing plate is arranged to be openable, preferably by rotating. In some embodiments one openable section is provided. In other embodiments a plurality of openable sections are provided.


In a preferred embodiment the moving floor comprises a rotating floor having at least one paddle extending between an inner band and an outer band and wherein the or each paddle is arranged to move waste particulate towards an open section.





The invention will now be described by way of example only with reference to the accompanying figures in which:



FIG. 1 is a perspective view of an integrated boiler and gas cleaning unit in accordance with the inventions;



FIG. 2 is a plan view of the unit of FIG. 1;



FIG. 3 is a sectional view along the line A-A of FIG. 2;



FIG. 4 is a schematic view of a bag filter; and



FIG. 5 is an enlarged view of the area in circle B in FIG. 2



FIG. 6 is a schematic view of an alternative arrangement;



FIG. 7 is a plan view of the embodiment of FIG. 6;



FIG. 8 is a section across the upper portion of the gas cleaning chamber; and



FIG. 9 is a cross-section of a portion of the integrated unit along the line A-A of FIG. 6;






FIG. 1 is a perspective view of an integrated unit 1 comprising a boiler unit 2 and gas cleaning apparatus in accordance with the present invention. The boiler unit 2 comprises a fluid bed boiler 4 providing a reaction unit having a combustion zone 6. A cylindrical assemblage 8 is provided above the fluid bed boiler and contains therein a radiant zone 10 and a convection zone 12 encircled by a heat exchange means 14. A gas cleaning means 16 is provided around the heat exchange means 14 and the whole assemblage is contained within a cylindrical shell 18. An upper portion 20 of the shell tapers inwardly to an outlet 22 which in use is connected to a chimney 24.


A plan view of the integrated unit is shown in FIG. 2. The upper portion 20 of the shell can be seen to be divided into segments 26. The outlet 28 from the upper portion is located over the radiation and convection chambers. Gases flowing into the upper portion of the shell flow out of the outlet 22 into the chimney 24. A substantially even radial distribution of gases flows into the chimney. An access door 30 is also provided in the upper section of the shell.


The integrated unit will now be described further in relation to a cross-section view along the line A-A in FIG. 2.


The integrated unit has a base 32 comprising a fluid bed boiler. The fluid bed comprises a number of sparge tubes 34 which are provided a bed of sand 36. A primary air fan is connected to the sparge tubes. The sparge tubes 36 are arranged to be spaced across the fluidised bed and run substantially parallel to one another. A waste outlet 38 is provided at the bottom of the fluidised bed to allow ash and other waste products to be removed from the fluidised bed periodically. A waste hopper 40 or other means of removing waste material is provided below the waste outlet. Waste is removed from the fluidised bed periodically. The frequency of removal is typically once a shift or once a day. The frequency may be varied according to the quantity of fuel used and the quality of fuel used.


As is the case in a typical fluidised bed burner a burner 42 is provided for initiation of combustion. Typically combustion may be initiated at approximately 600° C. and a working temperature of around 800° C. to 900 C may be achieved.


A feed chute 44 is provided which delivers fuel material to the fluidised bed. The fuel material may be waste material such as landfill or may be a biomass. Alternative fuels may be used such as, for example, coal.


The fuel material is delivered to the fluid bed burner from an outlet 46 above the fluid bed. Fuel falls from the feed chute towards the fluidised bed. Typically around 40% combustion of fuel occurs in the fluidised bed. Pollutants such as tramp metal or inert material that are not combusted fall through the fluidised bed and can be removed from the waste outlet as described above.


Secondary air is delivered to the combustion zone of the reaction unit by means of an air supply connected to a manifold 48. The manifold 48 delivers air to a mid-to upper portion 50 of the combustion zone. The air may comprise a mixture of oxygen and other gases. A composition of the air may be controlled so that the supply of oxygen in the air is optimised such that substantially complete combustion of fuel can occur in the combustion zone. Typically up to 60% of the combustion can occur around the manifold outlets. With significant combustion of fuel occurring in the upper portion of the combustion zone it has been found that the temperature in the upper portion of the combustion zone can reach between 1200° C. and 1300° C. As described below this temperature may be controlled in use to be lower than 1200° C. Typically the temperature in the upper portion of the combustion zone is controlled to be about 900° C.


Gases from the combustion zone 6 of the reaction unit pass upwardly into the cylindrical assemblage 8 which is located above the fluid bed boiler and is sealed thereto. The cylindrical assemblage 8 comprises an axially extending radiant zone 10 and an aligned and axially extending convection zone 12. The radiant zone and the convection zone are mutually aligned and the radiant zone 10 extends continuously into the convection zone 12. The radiant and convection zones are defined by helically wound heat exchange coils 52 which define a radiant chamber and a convection chamber. Gases from the combustion zone can pass freely into the radiant chamber and thence into the convection chamber.


It will be appreciated that the boiler may be operated under pyrolytic conditions. In other embodiments the boiler can be arranged to produce synthetic gas. In some embodiments the boiler may be arranged to operate in a gasification mode.


The radiant zone 10 acts as a cold black body and draws heat from the upper part of the combustion zone 6. The radiant zone controls the temperature in the upper portion of the combustion zone 6. The radiant chamber is defined by helically wound heat exchange coils 52 through which water at a cooler temperature than the gases is passed and heat energy is transferred between gases in the radiant chamber and water in the heat exchange coils.


Gases from the combustion zone may typically reside in the radiant zone 10 for a period of time which is sufficient that the particles are held at a temperature of greater than 850° C. for at least two seconds. Accordingly, the fuel supplied to the combustion zone of the reaction unit is held at a temperature of greater than 850° C. for at least two seconds. The fuel is desirably completely combusted and unwanted pollutants such as hydrocarbons, dioxins and furans are preferably completely combusted and destroyed. Accordingly, the fuel material is completely combusted as required by the waste incineration directive. Gases flow from the radiant chamber into the convection chamber, which as referred to above, is also defined by helically wound heat exchange tubes 52. Cooler water flowing through the heat exchange tubes extracts further heat from the gases flowing through the convection chamber. Typically gases exiting from the convection chamber preferably have a temperature which has been lowered to about 870° C.


An insulating cap 54 is provided across the top of the convection chamber defining a radially extending passage over an upper portion of the helically wound heat exchange tubes. Gases from the convection chamber are deflected by the insulating cap 54 and pass radially outwardly from the radiant chamber before being deflected into the convective heat exchange means, which comprises an annular heat exchange chamber 14 arranged around the radiant and convection chambers. In this embodiment an inner wall 56 of the heat exchange chamber is defined by the helically wound heat exchange tubes 52 which surround the radiant and convection chambers. An outer wall 58 of the annular heat exchange chamber 14 is defined at least in part by further helically wound heat exchange tubes.


The heat exchange chamber comprises an evaporator section 60 and an economiser section 62. The evaporator section 60 contains a number of circumferentially extending heat exchange tubes 64 which contain pressurised water at a pressure of about 22 bargauge.


The economiser section 62 preferably contains a further set of circumferentially extending heat exchange tubes 66. The further set of circumferentially extending heat exchange tubes 66 also contains pressurised water which may typically be at a pressure of from 5 to 70 bargauge.


The hot gases flow around the circumferentially extending heat exchange tubes in the evaporator section 60 and the economiser section 62. The hot waste gases flow downwardly through the heat exchange chamber 14. The hot waste gases typically enter the evaporator section at around 850° C. to 860° C. The waste gases lose heat and energy in the heat exchanger chamber and exit from the economiser section at a temperature of approximately 150° C. Gases exiting from the heat exchange chamber are deflected by a flow reverser 68 formed in a base section such that a direction of flow of the gases is reversed and the gases flow upwardly into a gas cleaning chamber which is provided around the heat exchange means. The base section also comprises an injection means (not shown) arranged to inject sorbent materials into the gas flow. The sorbent material typically comprises at least one of sodium bicarbonate, activated carbon, and lime. Other sorbent materials may be utilised by the skilled person instead of or in addition to the sorbents referred to above. The sorbent materials are used to remove unwanted pollutants such as sulphur and chlorine from the gases. The sorbent materials are selected to react with the unwanted pollutants and to remove pollutants from the gas stream by binding sulphur and chlorine into a powder form.


The base section comprises at least one waste removal means. In this embodiment the waste removal means comprises a rotating floor having an inner band 70 and an outer band 72 which are arranged to be rotatable around the radiant chamber. The inner and outer bands are arranged to rotate around the circumference of the base section. Floor spacing plates 74 are provided between the inner and outer bands. These floor plates can rotate on passing over a waste removal device (not shown). As the floor plates rotate any waste material on the floor plate passes through the operable section and is deposited into a waste hopper located below the waste removal device such as a rotary valve air lock. The waste hopper can be transported from a location below the base section in order to remove waste material via the rotary valve air lock.


A paddle 73 is provided extending between the inner and outer bands. The paddle is arranged to move waste particulate material from below the filter bags and into the openable section such that the waste particulate material is deposition on the waste removal device.


As described above gases exiting from the heat exchange chamber have the direction of flow reversed and pass upwardly into the gas cleaning chamber which is provided in an annular chamber extending around the heat exchange chamber. Bag filters 76 are provided in the gas cleaning chamber and these are arranged to hang vertically in the annular chamber. The bag filters 76 are arranged to be substantially parallel with one another and also arranged such that a number of bag filters extend across from an inner side of the annular chamber to the outer side. A number of bag filters are arranged radially in each segment of the annular chamber. The bag filters are arranged in the gas cleaning chamber such that the flow of gases is directly towards and in line with the bag filters. The gases flow substantially parallel to the orientation of the bag filters.


Each bag filter 76 comprises a fabric material is arranged over a steel cage. Typically each bag filter is about 10 cm in diameter. This is the steel cage supports the fabric material of the bag filter against the flow of gases. Over time particulate material in the gases is removed from the airflow by the bag filters. Such particulate material may comprise ash as a combustion product from the fuel. The particulate material may also comprise sorbent material which has been injected into the gas flow stream. The sorbent material is carried by the gas flow towards the bag filters. As the sorbent material is carried in the gas flow in the gas cleaning chamber sorbent material is able to react with pollutants in the gases. Both sorbent material which has reacted with pollutants and the sorbent material which has not reacted with pollutants is retained on an upstream side of the bag filters. Further gases passing through the bag filters are forced to pass through the sorbent material retained in the upstream side and so further absorption of pollutants can occur.


It will be appreciated that the bag filter may comprise a ceramic fibre. In other embodiments filter can be formed of a wire mesh. The wire mesh can be fine wires meshed together. In some cases the metal may be platinum. Platinum can have an additional benefit of acting as catalyst for the removal of organic compounds from the gas. The platinum wire may assist in the removal of carbon monoxide from the exhaust gases.


Gases passing through the bag filter are clean and do not contain pollutants such as sulphur and chlorine, furans or dioxins etc. and have also been cleaned of any ash or particulate material typically down to 1.0 microns. It has been found that the gasses meet the legal requirements for clean air such as are specified in the Integrated Pollution Prevention Control (IPPC) directive.


Gases exiting from the gas cleaning chamber 16 passed into a radial chamber 78 and are directed radially inwardly. The outlet 22 is placed at the centre of the radial chamber 78 and an induced draught fan 80 is provided in the outlet to draw gases from the radial chamber and to direct them to the chimney 24. The chimney is not shown but is a conventional chimney.


Bag filter cleaning means (not shown) are provided in the upper portion of the shell. The bag filter cleaning means typically comprises a pressurised air supply and the manifold connecting the as supplied to each bag filter. As required in the course of operation, pressurised vessels can be pulsed into the bag filters in a reverse direction, so dislodging any particulate material on the upstream side of the bag filters. Typically the pressurised air supply is at 2 to 5 bargauge and is pulsed in order to dislodge the particulate material from the upstream side of the bag filters. A control means also provided to control the supply of air to the bag filters for cleaning purposes. The pulse air is supplied to bag filters in a section of an arc. Remaining sections of the gas cleaning chamber operate in a normal fashion. Cleaning of the bag filters may operate sporadically or continuously. The section of the gas cleaning apparatus which is being cleaned is rotated around the annulus. A pressurised air supply manifold is provided in the upper portion. Solenoid valves control supply of the pressurised air to the bag filters.


The access door 30 is provided in the upper portion of the shell to allow access to the air supply manifolds and valves and to allow the bag filters to be replaced as required or to be serviced.


In an alternative embodiment illustrated in FIG. 6 the boiler and heat exchange chambers are arranged as before. The gases exit from the gas cleaning chamber in a centrally located outlet 100 and are then directed into a duct 102. The duct 102 is arranged perpendicular to the outlet duct 100. The duct 102 delivers the exhaust gases to a testing and measuring device located within the duct. The measuring device is arranged to measure species in the exhaust gases. Pollution species that may be measured include chlorides, hydrochlorides, sulphides, sulphur dioxides; nitrogen oxides and particulate material. Other species may also be monitored. Regulations specify the amount of pollutant that may be in the gases. According to present requirements the gases are arranged to travel in a straight line in the duct for a specified distance before entering the measuring device. It is understood that flow in a straight line for the specified distance leads to linear flow.


Exhaust gases flow from the measuring device flow to a return duct 105 and to a chimney 107. In alternative arrangements the exhaust gases may be returned to a vent that is laterally located.



FIG. 7 is a plan view of the embodiment of FIG. 6. The upper section 20 is arranged above the bag cleaning chamber and the duct 102 extends from the exhaust outlet 100 from the gas cleaning chamber.


As is best seen in FIG. 8 in the alternative arrangement the gas cleaning chambers 106 is divided into sub-chambers 108. Each sub-chamber 108 comprises an section of the annular gas cleaning chamber 106. Each sub chamber 108 comprises an arc of approximately 60° of the annular chamber 106. A first sub chamber 110 does not contain any bag filters. The remaining five sub-chambers 112 each have a number of rows 114 of bag filters 116. A baffle 118 is provided at a top end of the five sub-chambers 112 and the baffle controls 118 flow of gas from the sub-chambers 112 to the first sub chamber 110 towards the outlet 120 into the duct 102. When the baffle 120 from a sub chamber 112 is closed gases do not flow through the respective sub-chamber 112 and the gases in the respective sub-chamber 112 are stagnant.


Pressurised air is supplied to an outer manifold 122. The pressurised air is fluidly connected to a number of inner manifolds 124 each of which is arranged to be able to supply the pressurised air to the bag filters 116. Valves are provided in each inner manifold to control a flow of pressurised pulse air to the bag filters 116. A controller is arranged to control the supply of air from the outer manifold to the bag filters 116.


The baffle 118 controls a flow of air from an upper chamber above the gas cleaning chamber towards the measuring device and the chimney. Closing the baffle stops flow from the upper portion of the sub chambers towards the first sub chamber and into the outlet and duct to the measuring device. Exhaust gases tend to follow the course of least resistance and the flow of exhaust gases moves to flow through the sub chambers in respect of which the respective baffle remains open.


In the cleaning process one sub-chamber 112 is closed at a time. Once the respective baffle 118 is closed the gases are not drawn through the closed sub chamber and gas flow on the immediately upstream side of the bag filter becomes stagnant. A particular advantage of the arrangement is that the boiler and gas cleaning apparatus can continue to be used while one of the bag cleaning sub-chambers is closed and the bag filters cleaned. The bag filters in the sub-chambers can be cleaned on a sequential arrangement. This contrasts with conventional boilers and gas cleaning arrangements in which the boiler and gas cleaning apparatus have to be suspended while cleaning of the bag filters is carried out.


In the cleaning process the pulsed air is controlled to be suppled from the outer manifold 122 and into the inner manifolds 114. A controller located remotely, is arranged to apply the pulsed air to the bag filters 116. Particulate material collected on the upstream side of the bag filters is displaced by the pulsed air and falls from the bag filter 116 and onto the rotatable floor located at the base of the gas cleaning chamber to be removed.



FIG. 9 is a cross section along the line A-A in FIG. 7. The boiler arrangement and the heat exchange apparatus is the same as in FIG. 3. In this embodiment the gases flow from the boiler 130 and into the radiant chamber 132 and then into the heat exchange chamber 134. Gases from the heat exchange chamber 134 flow to the base 136 of the heat exchange chamber and then upwardly into the annular gas cleaning chamber. Gases flowing through the gas cleaning chamber pass through the bag filters 116. Particulate material collects on the upstream side of the bag filters. When the cleaning process is carried out pulsed air passing through the bag filters dislodges the particulate material which falls to the rotatable moving floor 138.


Downstream of the bag filters 116 the gases flow through the respective baffle 118 into the first sub-chamber 110 through the baffle and into the duct 102. The side ducting 102 carries gases to a testing device 104 which is compatible with standard testing requirements. The testing device is arranged after a section of straight ducting such that the gas flow is considered to be laminar on entry to the testing device. Downstream of the testing device the gases flow through a return valve 105 and is discharged into the chimney 107.


The controller is arranged to clean each of the sub-chambers sequentially. An important aspect is that the bag filters are cleaned while the boiler is operating and that it is not necessary to stop or interrupt the operation of the boiler.

Claims
  • 1. (canceled)
  • 2. An integrated unit comprising a boiler unit, and gas cleaning apparatus, the integrated unit having a reaction unit and further comprising a radiant zone connected to the reaction unit, the radiant zone being connected to a convection zone, the integrated unit further comprising a heat exchange means encircling at least one of the radiant zone and the convection zone, and gas cleaning means being provided around at least a part of the heat exchange means.
  • 3. An integrated unit according to claim 1 wherein the reaction unit comprises a fluid bed boiler, gasifier or pyrolytic chamber and wherein fuel is burned completely; burned under pyrolytic conditions; or is gasified.
  • 4. An integrated unit according to claim 1 wherein the heat exchange means comprises an annular heat exchange chamber.
  • 5. An integrated unit according to claim 4 wherein the gas cleaning means is provided in an annular gas cleaning chamber encircling the heat exchange chamber.
  • 6. An integrated unit according to claim 5 wherein the gas cleaning means comprises an array of bag filters in the gas cleaning chamber and wherein the bag filter comprises at least one of: fabric; ceramic and metal material.
  • 7. An integrated unit according to claim 6 wherein the heat exchange chamber and the gas cleaning chamber are arranged such that the flow of the gases is directly towards and in line with the bag filters and wherein the gas cleaning chamber comprises a number of sub chambers and wherein optionally the sub-chambers are fluidly separated.
  • 8. An integrated unit according to claim 7 wherein a supply of pressurised air can be applied to a downstream side of the bag filters.
  • 9. An integrated unit according to claim 8 arranged to apply pressurised air in a pulse and wherein the pulse is applied to each sub-chamber sequentially and optionally the boiler remains in operation.
  • 10. An integrated unit according to claim 5 wherein a sorbent can be injected into the gas cleaning chamber.
  • 11. An integrated unit according to claim 5 wherein waste material can be removed from a base of the gas cleaning chamber.
  • 12. An integrated unit according to claim 1 wherein the gas cleaning chamber comprises a moving floor.
  • 13. An integrated unit according to claim 12 wherein the moving floor comprises a rotating floor having at least one paddle extending between an inner band and an outer band and wherein the or each paddle is arranged to move waste particulate towards an open section.
  • 14. An integrated unit according to claim 1 wherein the radiant zone is positioned above the reaction unit.
  • 15. An integrated unit according to claim 12 wherein the convection zone is in free fluid communication with the radiant zone.
  • 16. An integrated unit according to claim 5 wherein at least one wall of the annular chamber is formed by at least one helically wound heat exchange tube.
  • 17. An integrated unit according to claim 16 wherein the at least one wall also defines at least a portion of the radiant zone and the convection zone.
  • 18. An integrated unit according to claim 4 wherein the heat exchange chamber comprises an economiser and an evaporator.
  • 19. An integrated unit according to claim 1 wherein a chimney is centrally located above the radiant and convection zones.
  • 20. An integrated unit according to claim 1 having a footprint comprising that of a fluid bed boiler.
  • 21. An integrated unit comprising a boiler unit, and gas cleaning apparatus, the integrated unit comprising a radiant zone connected to the boiler, the radiant zone being connected to a reaction unit, the integrated unit further comprising a heat exchange means encircling at least one of the radiant zone and the convection zone, and gas cleaning means being provided around at least a part of the heat exchange means and wherein the heat exchange chamber and the gas cleaning chamber are arranged such that the flow of the gases is directly towards and in line with gas cleaning means and wherein the gas cleaning chamber comprises a number of sub chambers.
Priority Claims (1)
Number Date Country Kind
1701385.5 Jan 2017 GB national
PCT Information
Filing Document Filing Date Country Kind
PCT/GB2018/050216 1/25/2018 WO 00