- 1. A boom curtain section comprising:one or more sheets of flexible material that allow the flow of water therethrough, the one or more sheets of flexible material having an upper edge, a lower edge, and opposed lateral edges; and a first zipper element adjacent a portion of the length of each lateral edge, each of the first zipper elements comprising a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material with the set of zipper teeth recessed from its adjacent lateral edge, whereby upon mating engagement of the zipper teeth on the first zipper element adjacent one lateral edge with a corresponding zipper element adjacent a lateral edge of an adjoining curtain section, the boom curtain section and the adjoining curtain section overlap.
- 2. The boom curtain section according to claim 1 wherein the one or more sheets of flexible material comprise woven or non-woven geotextile materials.
- 3. The boom curtain section according to claim 1 wherein each of the first zipper elements extends substantially the entire length of its adjacent lateral edge.
- 4. The boom curtain section according to claim 1 further comprising:a second zipper element adjacent a portion of the length of each lateral edge, each of the second zipper elements comprising a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material with the set of zipper teeth recessed from its adjacent lateral edge.
- 5. The boom curtain section according to claim 4 wherein at each lateral edge of the boom curtain section, the one or more sheets of flexible material are sandwiched between the first and second zipper elements.
- 6. The boom curtain section according to claim 4 wherein the set of zipper teeth for the first zipper element is recessed a first distance from each lateral edge and the set of zipper teeth for the second zipper element is recessed a second distance from each lateral edge.
- 7. The boom curtain section according to claim 1 further comprising:first link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on one side thereof.
- 8. The boom curtain section according to claim 7 further comprising:second link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on an opposite side thereof.
- 9. The boom curtain section according to claim 1 further comprising a sleeve formed along the upper edge thereof.
- 10. The boom curtain section according to claim 1 further comprising a sleeve formed along the lower edge thereof.
- 11. A boom curtain comprising two or more curtain sections according to claim 1, wherein the zipper element adjacent a lateral edge of each curtain section is engaged with a corresponding zipper element adjacent a lateral edge of an adjoining curtain section.
- 12. The boom curtain according to claim 11 wherein the one or more sheets of flexible material in each curtain section is formed of a material that is the same or different.
- 13. The boom curtain according to claim 12, wherein the one or more sheets of flexible material in each curtain section is formed of a material that is the same and each comprises woven or non-woven geotextile materials.
- 14. The boom curtain according to claim 11 wherein each of the zipper elements for each curtain section extends substantially the entire length of its adjacent lateral edge.
- 15. The boom curtain according to claim 11 further comprising:a terminal curtain section having upper and lower edges and opposed lateral edges, and comprising one or more sheets of flexible material that allow the flow of water therethrough and a zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of only one lateral edge, wherein the zipper element adjacent the one lateral edge is engaged with a corresponding zipper element adjacent a lateral edge of an adjoining curtain section.
- 16. The boom curtain according to claim 15 wherein the zipper element adjacent the one lateral edge of the terminal curtain section extends substantially the entire length of the one lateral edge.
- 17. The boom curtain according to claim 15 where the boom curtain comprises two terminal curtain sections.
- 18. The boom curtain according to claim 11 wherein each of the two or more curtain sections further comprise:a second zipper element adjacent a portion of the length of each lateral edge, each of the second zipper elements comprising a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material with the set of zipper teeth recessed from its adjacent lateral edge wherein the first zipper element from one curtain section is engaged with the second zipper element from the adjacent curtain section.
- 19. The boom curtain according to claim 18 wherein at each lateral edge of each of the two or more boom curtain sections, the one or more sheets of flexible material are sandwiched between the first and second zipper elements.
- 20. The boom curtain according to claim 18 wherein on each of the two or more boom curtain sections, the set of zipper teeth for the first zipper element is recessed a first distance from each lateral edge and the set of zipper teeth for the second zipper element is recessed a second distance from each lateral edge, whereby the first and second zipper elements from one curtain section are positioned for mating engagement with the second and first zipper elements, respectively, from the adjacent curtain section.
- 21. The boom curtain according to claim 11 wherein each of the two or more curtain sections comprises first link elements secured to the one or more sheets of flexible material adjacent both lateral edges of the one or more sheets of flexible material and on one side thereof, and the boom curtain further comprises:first connectors spanning between the first link elements of two adjacent curtain sections.
- 22. The boom curtain according to claim 21 wherein each of the two or more curtain sections comprises second link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof, and the boom curtain further comprises:second connectors spanning between the second link elements of two adjacent curtain sections.
- 23. The boom curtain according to claim 22 wherein the first and second connectors are Q links.
- 24. The boom curtain according to claim 11 further comprising:a tie strap that passes through the one or more sheets of flexible material of two adjacent curtain sections to surround a zipper connection.
- 25. A boom system comprising a boom curtain according to claim 11.
- 26. The boom system according to claim 25 further comprising:a support system which can be positioned in a body of water, wherein the upper edge of the two or more curtain sections are connected to the support system.
- 27. The boom system according to claim 25 further comprising:means, connected to the lower edge of the two or more curtain sections, for maintaining at least the lower edges thereof substantially against the floor of a body of water upon introduction of the boom system into the body of water.
- 28. A method of assembling a boom system comprising:assembling a boom curtain according to claim 11 by connecting together mating zipper elements from adjoining curtain sections; connecting the upper edge of each curtain section to a support system which can be positioned in a body of water; and connecting the lower edge of each curtain section to means for maintaining at least the lower edges thereof substantially against the floor of a body of water upon introduction of the boom system into the body of water.
- 29. The method according to claim 28 wherein each said connecting is carried out prior to said assembling.
- 30. The method according to claim 28 wherein each said connecting is carried out after said assembling.
- 31. The boom curtain section according to claim 1 further comprising a zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of the upper edge.
- 32. The boom curtain section according to claim 31 further comprising a zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of the lower edge.
- 33. The boom curtain section according to claim 1 further comprising a zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of the lower edge.
- 34. A boom curtain section comprising:one or more sheets of flexible material that allow the flow of water therethrough, the one or more sheets of flexible material having an upper edge, a lower edge, and opposed lateral edges, the upper edge being adapted and configured for connection to a support system, and a first zipper element adjacent a portion of the length of each lateral edge and the lower edge, each of the first zipper elements comprising a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material with the set of zipper teeth recessed from its adjacent lateral or lower edge, whereby upon mating engagement of the zipper teeth on the first zipper element with a corresponding zipper element adjacent an edge of an adjoining curtain section, the boom curtain section and the adjoining curtain section overlap.
- 35. The boom curtain section according to claim 34 wherein the one or more sheets of flexible material comprise woven or non-woven geotextile materials.
- 36. The boom curtain section according to claim 34 wherein each of the first zipper elements extends substantially the entire length of its adjacent lateral or lower edge.
- 37. The boom curtain section according to claim 34 further comprising:a second zipper element adjacent a portion of the length of each lateral edge and the lower edge, each of the second zipper elements comprising a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material with the set of zipper teeth recessed from its adjacent lateral or lower edge.
- 38. The boom curtain section according to claim 37 wherein at each lateral edge and the lower edge, the one or more sheets of flexible material are sandwiched between the first and second zipper elements.
- 39. The boom curtain section according to claim 37 wherein the set of zipper teeth for each first zipper element is recessed a first distance from its adjacent lateral edge or lower edge and the set of zipper teeth for each second zipper element is recessed a second distance from its adjacent lateral edge or lower edge.
- 40. The boom curtain section according to claim 34 further comprising:first link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on one side thereof.
- 41. The boom curtain section according to claim 40 further comprising:second link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on an opposite side thereof.
- 42. A boom curtain section comprising:one or more sheets of flexible material that allow the flow of water therethrough, the one or more sheets of flexible material having an upper edge, a lower edge, and opposed lateral edges, the lower edge being adapted and configured for connection to an anchor or ballast; and a first zipper element adjacent a portion of the length of each lateral edge and the upper edge, each of the first zipper elements comprising a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material with the set of zipper teeth recessed from its adjacent lateral or upper edge, whereby upon mating engagement of the zipper teeth on the first zipper elements with a corresponding zipper element adjacent an edge of an adjoining curtain section, the boom curtain section and the adjoining curtain section overlap.
- 43. The boom curtain section according to claim 42 wherein the one or more sheets of flexible material comprise woven or non-woven geotextile materials.
- 44. The boom curtain section according to claim 42 wherein each of the first zipper elements extends substantially the entire length of its adjacent lateral or upper edge.
- 45. The boom curtain section according to claim 42 further comprising:a second zipper element adjacent a portion of the length of each lateral edge and the upper edge, each of the second zipper elements comprising a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material with the set of zipper teeth recessed from its adjacent lateral or upper edge.
- 46. The boom curtain section according to claim 45 wherein at each lateral edge and the upper edge, the one or more sheets of flexible material are sandwiched between the first and second zipper elements.
- 47. The boom curtain section according to claim 45 wherein the set of zipper teeth for each first zipper element is recessed a first distance from its adjacent lateral edge or upper edge and the set of zipper teeth for each second zipper element is recessed a second distance from its adjacent lateral edge or upper edge.
- 48. The boom curtain section according to claim 42 further comprising:first link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on one side thereof.
- 49. The boom curtain section according to claim 42 further comprising:second link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on an opposite side thereof.
- 50. A boom curtain comprising two or more upper curtain sections, two or more lower curtain sections, and two or more main curtain sections connected together to form a boom curtain,each upper curtain section comprising one or more sheets of flexible material that allow the flow of water therethrough, the one or more sheets of flexible material having an upper edge, a lower edge, and opposed lateral edges, the upper edge being adapted and configured for connection to a support system, and a first zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of each lateral edge and the lower edge; each main curtain section comprising one or more sheets of flexible material that allow the flow of water therethrough, the one or more sheets of flexible material having an upper edge, a lower edge, and opposed lateral edges, and a first zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of each lateral edge and the upper and lower edges; and each lower curtain section comprising one or more sheets of flexible material that allow the flow of water therethrough, the one or more sheets of flexible material having an upper edge, a lower edge, and opposed lateral edges, the lower edge being adapted and configured for connection to an anchor or ballast, and a first zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of each lateral edge and the upper edge; wherein zipper elements adjacent the lower edges of the two or more upper curtain sections are connected to zipper elements adjacent the upper edges of adjoining main curtain sections, zipper elements adjacent the lateral edges of the two or more upper curtain sections are connected to zipper elements adjacent the lateral edges of adjoining upper curtain sections, zipper elements adjacent the lateral edges of the two or more main curtain sections are connected to zipper elements adjacent the lateral edges of adjoining main curtain sections, zipper elements adjacent the lower edges of the two or more main curtain sections are connected to zipper elements adjacent the upper edges of the two or more lower curtain sections, and zipper elements adjacent the lateral edges of the two or more lower curtain sections are connected to zipper elements adjacent the lateral edges of adjoining lower curtain sections.
- 51. The boom curtain according to claim 50 wherein the one or more sheets of flexible material are formed of a material that is the same or different for the upper curtain section, the main curtain section, and the lower curtain section.
- 52. The boom curtain according to claim 51 where the one or more sheets of flexible material are formed of a material that is the same for the upper curtain section, the main curtain section, and the lower curtain section, and each is a woven or non-woven geotextile materials.
- 53. The boom curtain according to claim 50 wherein each zipper element extends substantially the entire length of its adjacent edge.
- 54. The boom curtain according to claim 50 wherein each of the upper curtain sections, each of the main curtain sections, and each of the lower curtain sections further comprise second zipper element secured to the one or more sheets of flexible material adjacent a portion of the length of each edge to which a first zipper elements is adjacent.
- 55. The boom curtain according to claim 54 wherein each of the first and second zipper elements includes a set of zipper teeth attached to a strip of material, the strip of material being secured to the one or more sheets of flexible material at a position recessed from its adjacent edge, wherein the one or more sheets of flexible material are sandwiched between the first and second zipper elements.
- 56. The boom curtain according to claim 55 wherein the set of zipper teeth for each first zipper element is recessed a first distance from its adjacent edge and the set of zipper teeth for each second zipper element is recessed a second distance from its adjacent edge, whereby upon mating engagement of the first and second zipper elements from one curtain section with the second and first zipper elements, respectively, from an adjoining curtain section, the one or more sheets of flexible material of the two adjoining curtain sections overlap.
- 57. The boom curtain according to claim 50 wherein each of the two or more upper curtain sections, main curtain sections, and lower curtain sections comprises first link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on one side thereof, and the boom curtain further comprises:first connectors spanning between the first link elements of two adjoining curtain sections.
- 58. The boom curtain according to claim 57 wherein each of the two or more upper curtain sections, main curtain sections, and lower curtain sections comprises second link elements secured to the one or more sheets of flexible material adjacent both lateral edges thereof and on an opposite side thereof, and the boom curtain further comprises:second connectors spanning between the second link elements of two adjoining curtain sections.
- 59. The boom curtain according to claim 58 wherein the first and second connectors are Q links.
- 60. The boom curtain according to claim 50 further comprising:a tie strap that passes through the one or more sheets of flexible material of two adjacent curtain sections to surround a zipper connection.
- 61. A boom system comprising a boom curtain according to claim 50.
- 62. The boom system according to claim 61 further comprising:a support system which can be positioned in a body of water, wherein the two or more upper curtain sections are connected to the support system.
- 63. The boom system according to claim 61 further comprising:means, connected to the two or more lower curtain sections, for maintaining at least the lower edges thereof substantially against the floor of a body of water upon introduction of the boom system into the body of water.
- 64. A method of assembling a boom system comprising:assembling a boom curtain according to claim 50 by connecting together mating zipper elements from adjacent curtain sections; connecting each upper curtain section to a support system which can be positioned in a body of water; and connecting each lower curtain section to means for maintaining the lower edges thereof substantially against the floor of a body of water upon introduction of the boom system into the body of water.
- 65. The method according to claim 64 wherein each said connecting is carried out prior to said assembling.
- 66. The method according to claim 64 wherein each said connecting is carried out after said assembling.
Parent Case Info
This application claims the priority benefit of U.S. Provisional Patent Application Serial No. 60/328,757 filed Oct. 11, 2001, which is hereby incorporated by reference in its entirety.
US Referenced Citations (33)
Foreign Referenced Citations (7)
Number |
Date |
Country |
2195-238 |
Aug 1972 |
FR |
2284-709 |
Sep 1974 |
FR |
2329-808 |
Nov 1975 |
FR |
2579-239 |
Mar 1985 |
FR |
2 246 981 |
Feb 1992 |
GB |
WO 9107546 |
May 1991 |
WO |
WO 9919570 |
Apr 1999 |
WO |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/328757 |
Oct 2001 |
US |