The present invention relates to a boom of a crane, and in particular to a boom extension device for a dockside container crane, and an extension method for same.
With the enlargement of container transport ships, the forward extension distance of existing quay cranes of many wharves can no longer meet the loading and unloading requirements. At present, the commonly used boom extension solutions mainly include: 1. the front boom is put to the ground by a floating crane for extension; and 2. the quay crane is pulled to the back, and the front boom is put downwards by large lifting equipment (truck crane or crawler crane) and is reset after extension. The two solutions have high requirements on the lifting equipment and sites, and have long construction period and high cost.
The problem to be solved by the present invention is how to reduce the use of large equipment. The present invention provides a boom extension device for a dockside container crane, and an extension method for same, thereby reducing the use of large equipment.
To solve the above problem, embodiments of the present invention disclose a boom extension device for a dockside container crane. A boom includes a rear boom section and a front boom section. The extension device includes: an extension trolley tool, used to be arranged below the rear boom section and the front boom section during extension operation and including a wheel set, a trolley frame, a construction platform, and a movement track arranged on the construction platform; a first support frame trolley, arranged on the movement track and used to carry a boom extension section and guide the boom extension section to move in a first direction; and a second support frame trolley, arranged on the movement track and used to carry the front boom section and guide the front boom section to move in a second direction perpendicular to the first direction in a first plane.
By adoption of the above technical solution, a quay crane does not need to move, and the use of large equipment is reduced.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, including: a process support, mounted on two sides of a cutting line.
By adoption of the above technical solution, boom bodies at two ends can be prevented from shrinkage or expansion deformation after the boom is cut.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, wherein a process support includes a first process support and a second process support, two ends of the first process support are connected to two inner side walls of the rear boom section, and two ends of the second process support are connected to two inner side walls of the front boom section.
By adoption of the above technical solution, the boom is cut into the front boom section and the rear boom section along the cutting line, the two ends of the first process support are connected to the two inner side walls of the rear boom section, and the two ends of the second process support are connected to the two inner side walls of the front boom section, so that the front boom section and the rear boom section can be prevented from shrinkage or expansion deformation.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, wherein a boom extension section is arranged below the second process support.
By adoption of the above technical solution, after the front boom section provided with the second process support moves in place, the boom extension section may directly move in a first direction to be aligned with the rear boom section, thereby preventing the boom extension section from being singly lifted from the ground to high altitude, and reducing the use of large equipment.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, further including: jacks, arranged below the front boom section and the boom extension section.
By adoption of the above technical solution, the jacks arranged below the front boom section and the boom extension section may adjust the heights of the front boom section and the boom extension section.
According to another specific embodiment of the present invention, an embodiment of the present invention discloses a boom extension device for a dockside container crane, wherein the extension trolley tool further includes: detachable casing handrails, arranged on casings around the trolley frame.
By adoption of the above technical solution, the detachable casing handrails are provided, thereby facilitating disassembly, assembly and transportation, and further ensuring the safety of workers in the operation process.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, wherein a distance between the first process support or/and the second process support and the cutting line is 800 mm.
By adoption of the above technical solution, selecting the arrangement position of the first process support or/and the second process support can effectively prevent the front boom section and the rear boom section from shrinkage or expansion deformation.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, wherein the process support is a round pipe.
By adoption of the above technical solution, the round pipe has high rigidity and strength, and the round pipe, as the process support, can effectively prevent the front boom section and the rear boom section from shrinkage or expansion deformation.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, further including a stop plate, arranged on a head part of the extension trolley tool.
By adoption of the above technical solution, the second support frame trolley can be effectively prevented from separation when carrying the front boom section and guiding the front boom section to move in a second direction perpendicular to the first direction in a first plane to a limiting position, thereby avoiding potential safety hazards.
According to another specific embodiment of the present invention, the embodiment of the present invention disclose a boom extension device for a dockside container crane, further including crossties, arranged on the first support frame trolley and the second support frame trolley.
By adoption of the above technical solution, the crossties and the jacks are used to adjust the height of the boom extension section.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses a boom extension device for a dockside container crane, further including: pull lugs and steel wire ropes, which are arranged in the second direction and are used to move the front boom section.
By adoption of the above technical solution, the front boom section is moved in the second direction through chain blocks and the pull lugs.
An embodiment of the present invention further discloses an extension method for a boom of a dockside container crane, including: arranging an extension trolley tool below a boom; cutting the boom along a cutting line to form a rear boom section and a front boom section; moving the front boom section in place in a second direction and fixing the front boom section; moving a boom extension section to be between the rear boom section and the front boom section and performing mutual alignment; and connecting the boom extension section to the rear boom section and the front boom section.
By adoption of the above technical solution, the use of large equipment can be reduced.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. Before the step of arranging the extension trolley tool below the boom, the method includes: assembling a trolley frame of the extension trolley tool on the ground, and mounting a construction platform.
By adoption of the above technical solution, the trolley frame of the extension trolley tool is assembled on the ground and the construction platform is mounted, so that the aloft workload is reduced.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. After the step of assembling the trolley frame of the extension trolley tool on the ground and mounting the construction platform, the method includes: lifting the trolley frame, and performing aerial docking on the trolley frame and a wheel set lifted on the boom to complete assembly of the extension trolley tool, wherein the extension trolley tool includes the wheel set, the trolley frame, the construction platform, and a movement track arranged on the construction platform.
By adoption of the above technical solution, flanges of upper and lower structures are adjusted by the chain blocks until bolts are assembled completely, thereby completing the assembly of the extension trolley tool.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. Before the step of cutting the boom along the cutting line to form the rear boom section and the front boom section, the method includes: arranging a process support on two sides of the cutting line in a first direction.
By adoption of the above technical solution, boom bodies at two ends can be prevented from shrinkage or expansion deformation after the boom is cut.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. The step of moving the front boom section in place in the second direction and fixing the front boom section includes: arranging pull lugs and steel wire ropes in the second direction for moving the front boom section arranged on a second support frame trolley.
By adoption of the above technical solution, the front boom section is moved in the second direction through chain blocks and the pull lugs.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. The step of moving the front boom section in place in the second direction and fixing the front boom section includes: locking the chain blocks and wheels of the second support frame trolley after the front boom section is in place.
By adoption of the above technical solution, the potential safety hazard caused by sliding of the front boom section can be avoided.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. The step of moving the front boom section in place in the second direction and fixing the front boom section includes: arranging a stop plate on a head part of the extension trolley tool so as to prevent the second support frame trolley from separation after arriving at a limiting position.
By adoption of the technical solution, the second support frame trolley can be effectively prevented from separation when carrying the front boom section and guiding the front boom section to move in the second direction perpendicular to the first direction in a first plane to a limiting position, thereby avoiding potential safety hazards.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. The step of moving the boom extension section to be between the rear boom section and the front boom section and performing mutual alignment includes: moving the boom extension section arranged on the first support frame trolley in the first direction to be between the rear boom section and the front boom section; and moving the boom extension section in a third direction and performing mutual alignment on the boom extension section and the rear boom section in the second direction.
By adoption of the above technical solution, it is ensured that the boom extension section is slightly lower than the rear boom section before the boom extension section is moved, then the height of the boom extension section in the third direction is adjusted by jacks and crossties, which are placed on the second support frame trolley, the boom extension section is docked with the rear boom section firstly based on the rear boom section because the rear boom section is entirely stable and the precision is higher after docking, subsequently, it is also necessary to perform micro-adjustment on the front boom section, and the height of the boom extension section in the third direction is adjusted through the jacks after the boom extension section moves in place in the first direction.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. After the step of completing the assembly of the extension trolley tool, the method includes: moving the extension trolley tool to be below the front boom section by moving a bridge crane trolley.
By adoption of the above technical solution, the extension trolley tool is moved to be below the front boom section by moving the bridge crane trolley, and then the extension trolley tool is fixed to be integrated with the boom.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. After the step of completing the assembly of the extension trolley tool, the method includes: lifting the first support frame trolley, the second support frame trolley, the process support and the boom extension section to the trolley frame and performing fixation.
By adoption of the above technical solution, the first support frame trolley, the second support frame trolley, the process support and the boom extension section are lifted to the trolley frame by using a truck crane and are fixed, thereby preventing the extension trolley tool from slipping after moving.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. After the step of moving the extension trolley tool to be below the front boom section, the method includes: disconnecting the bridge crane trolley and the extension trolley tool.
By adoption of the above technical solution, a connection rod between the bridge crane trolley and the extension trolley tool is removed, the bridge crane trolley runs to a parking space, stops and anchors, and then the steel wire ropes for pulling the trolley are removed.
According to another specific embodiment of the present invention, the embodiment of the present invention discloses an extension method for a boom of a dockside container crane. Before the step of connecting the boom extension section to the rear boom section and the front boom section, the method includes: controlling the docking flatness of a port and welding shrinkage of a splicing seam.
By adoption of the above technical solution, the boom bodies at the two ends and the boom extension section can be further prevented from shrinkage or expansion deformation.
The above accompanying drawings include the following reference numerals:
The implementation manners of the present invention are described below by the specific embodiments. Those skilled in the art may easily understand other advantages and effects of the present invention by the contents disclosed by the specification. Although the description of the present invention will be introduced together with preferred embodiments, it does not mean that the features of the present invention are not limited to the implementation manners. On the contrary, the objective of introducing the present invention with reference to the implementation manner is to cover other options or modifications that may be extended based on the claims of the present invention. To provide the deep understanding of the present invention, many specified details will be included in the following description. The present invention may also be implemented without using these details. In addition, to avoid confusion or obscuring of the focus of the present invention, some specific details will be omitted in the description. It should be noted that the embodiments in the present invention and features in the embodiments may be combined with each other without conflicts.
It should be noted that in the specification, similar reference numerals and letters represent similar items in the accompanying drawings below. Therefore, once an item is defined in one drawing, it does not need to be further defined and described in subsequent drawings.
In the description of the present invention, it should be noted that orientations or position relationships indicated by terms “upper”, “lower”, “inner”, “bottom” and the like are orientation or position relationships shown in the accompanying drawings, or are orientation or position relationships that the product of the present invention is usually placed during use, and these terms are only used to facilitate description of the present invention and simplify the description, but not to indicate or imply that the mentioned apparatus or components must have a specific orientation or must be established and operated in a specific orientation, and thus these terms cannot be understood as a limitation to the present invention.
The terms “first”, “second” and the like are used only for distinguishing the description and cannot be understood as indicating or implying relative importance.
In the description of the embodiments, it should be noted that, unless otherwise specified and limited, the terms “arrange”, “link” and “connect” should be understood in a broad sense, for example, they may be fixed connection, may be detachable connection or integrated connection, may be mechanical connection, may also be electrical connection, may be direction connection, may also be indirect connection through an intermediate medium, and may be communication of two elements. Those of ordinary skill in the art may understand specific meanings of the above-mentioned terms in the embodiments based on the specific situations.
In order to make the objective, technical solutions and advantages of the present invention clearer, the implementation manners of the present invention will be further described in detail in combination with the accompanying drawings.
“First plane” in the present invention refers to a plane where a first direction is perpendicular to a second direction. As shown in
A boom extension device for a dockside container crane is described below according to specific embodiments of the present invention and with reference to
An extension method for a boom of a dockside container crane according to a specific embodiment of the present invention is described with reference to
S1: an extension trolley tool is arranged below a boom;
S2: the boom is cut along a cutting line to form a rear boom section and a front boom section;
S3: the front boom section is moved in place in a second direction and is fixed;
S4: a boom extension section is moved to be between the rear boom section and the front boom section and mutual alignment is performed; and
S5: the boom extension section is connected to the rear boom section and the front boom section.
Specifically,
The technical solution of the embodiment is basically the same as the solution in the embodiment 2, except that the embodiment further includes that the front boom section 12 is moved in place in the second direction B and is fixed includes: pull lugs and steel wire ropes are arranged in the second direction B for moving the front boom section 12 arranged on a second support frame trolley 32. Specifically, the pull lugs and the steel wire ropes are arranged in the second direction B for moving the front boom section 12, and the front boom section 12 is moved by the chain blocks and the pull lugs in the second direction B.
The technical solution of the embodiment is basically the same as the solution in the embodiment 2, except that the embodiment further includes that the step that the front boom section 12 is moved in place in the second direction B and is fixed includes: after the front boom section 12 is in place, the chain blocks and wheels of the second support frame trolley 32 are locked, thereby avoiding potential safety hazards caused by the sliding of the front boom section 12.
The technical solution of the embodiment is basically the same as the solution in the embodiment 2, except that the embodiment further includes that after the step that assembly of the extension trolley tool 2 is completed, the method includes: the extension trolley tool 2 is moved to be below the front boom section 12 by moving a bridge crane trolley, and then the extension trolley tool 2 is fixed to be integrated with the boom.
The technical solution of the embodiment is basically the same as the solution in the embodiment 2, except that that embodiment further includes that after the step that assembly of the extension trolley tool 2 is completed, the method includes: the first support frame trolley 31, the second support frame trolley 32, the process support 5 and the boom extension section 41 are lifted to the trolley frame 22 and are fixed. Specifically, the first support frame trolley 31, the second support frame trolley 32, the process support 5 and the boom extension section 41 are lifted to the trolley frame 22 by a truck crane and are fixed, thereby preventing the extension trolley tool from slipping after moving.
The technical solution of the embodiment is basically the same as the solution in the embodiment 2, except that the embodiment further includes that after the step that the extension trolley tool 2 is moved to be below the front boom section 12, the method includes: the bridge crane trolley and the extension trolley tool 2 are disconnected. Specifically, a connection rod between the bridge crane trolley and the extension trolley tool is removed, the bridge crane trolley runs to a parking space, stops and anchors, and then the steel wire ropes for pulling the trolley are removed.
The technical solution of the embodiment is basically the same as the solution in the embodiment 2, except that the embodiment further includes that before the step that the boom extension section 41 is connected to the rear boom section 11 and the front boom section 12, the method includes: the docking flatness of a port and welding shrinkage of a splicing seam are controlled. Specifically, before the boom extension section 41 is connected to the rear boom section 11 and the front boom section 12, wherein the connection may be welding, the port splicing position is fixed through a fixture, so that the docking flatness of the port and welding shrinkage of the splicing seam are controlled. After the worker confirms that the docking size is correct, spot welding is performed to complete the docking of the boom extension section and the rear boom section; then the docking of the front boom section and the boom extension section is completed according to the above step, and welding starts to be performed after all the spot welding work is completed, after welding, the quality of the welding seam is checked, and subsequent work such as polishing and painting is performed; a tool piece is disassembled, and connection of the steel wire ropes and the accessories is restored; and functions, mainly referring to speed-reducing limitation on the boom, displacement of parking limitation space, extension of an anti-collision system, or the like, required by extension operation, are subjected to restoration or extended restoration.
The present invention may include combinations of various specific embodiments described below.
According to a boom extension device for a dockside container crane provided by an example 1 of the present invention, a boom includes a rear boom section and a front boom section. The boom extension device includes: an extension trolley tool, used to be arranged below the rear boom section and the front boom section during extension operation and including a wheel set, a trolley frame, a construction platform, and a movement track arranged on the construction platform; a first support frame trolley, used to carry a boom extension section and guide the boom extension section to move in a first direction; and a second support frame trolley, arranged on the movement track and used to carry the front boom section and guide the front boom section to move in a second direction perpendicular to the first direction in a first plane.
According to a boom extension device for a dockside container crane provided by an example 2 of the present invention, the boom extension device includes: a process support arranged on two sides of a cutting line.
According to a boom extension device for a dockside container crane provided by an example 3 of the present invention, the process support includes a first process support and a second process support, wherein two ends of the first process support are connected to two inner side walls of the rear boom section, and two ends of the second process support are connected to two inner side walls of the front boom section.
According to a boom extension device for a dockside container crane provided by an example 4 of the present invention, the boom extension section is arranged below the second process support.
According to a boom extension device for a dockside container crane provided by an example 5 of the present invention, the boom extension device further includes: jacks arranged below the front boom section and the boom extension section.
According to a boom extension device for a dockside container crane provided by an example 6 of the present invention, the extension tool trolley further includes: detachable casing handrails arranged on casings around the trolley frame.
According to a boom extension device for a dockside container crane provided by an example 7 of the present invention, a distance between the first process support or/and the second process support and the cutting line is 800 mm.
According to a boom extension device for a dockside container crane provided by an example 8 of the present invention, the process support is a round pipe.
According to a boom extension device for a dockside container crane provided by an example 9 of the present invention, the boom extension device further includes a stop plate arranged on a head part of the extension trolley tool.
According to a boom extension device for a dockside container crane provided by an example 10 of the present invention, the boom extension device further includes crossties arranged on the first support frame trolley and the second support frame trolley.
According to a boom extension device for a dockside container crane provided by an example 11 of the present invention, the boom extension device further includes pull lugs and steel wire ropes which are arranged in the second direction and are used to move the front boom section.
According to an extension method for a boom of a dockside container crane provided by an example 12 of the present invention, the method includes the following steps: an extension trolley tool is arranged between a boom; the boom is cut along a cutting line to form a rear boom section and a front boom section; the front boom section is moved in place in a second direction and is fixed; a boom extension section is moved to be between the rear boom section and the front boom section and mutual alignment is performed; and the boom extension section is connected to the rear boom section and the front boom section.
According to an extension method for a boom of a dockside container crane provided by an example 13 of the present invention, before the step that the extension trolley tool is arranged below the boom, the method includes: a trolley frame of the extension trolley tool is assembled on the ground and a construction platform is mounted.
According to an extension method for a boom of a dockside container crane provided by an example 14 of the present invention, after the step that the trolley frame of the extension trolley tool is assembled on the ground and the construction platform is mounted, the method includes: the trolley frame is lifted to be subjected to aerial docking with a wheel set lifted on the boom to complete assembly of the extension trolley tool, wherein the extension trolley tool includes the wheel set, the trolley frame, the construction platform, and the movement track on the construction platform.
According to an extension method for a boom of a dockside container crane provided by an example 15 of the present invention, before the step that the boom is cut along the cutting line to form the rear boom section and the front boom section, the method includes: the process support is arranged on two sides of the cutting line in the first direction.
According to an extension method for a boom of a dockside container crane provided by an example 16 of the present invention, the step that the front boom section is moved in place in the second direction and is fixed includes: pull lugs and steel wire ropes are arranged in the second direction for moving the front boom section arranged on the second support frame trolley.
According to an extension method for a boom of a dockside container crane provided by an example 17 of the present invention, the step that the front boom section is moved in place along the second direction and is fixed includes: after the front boom section is in place, chain blocks and wheels of the second support frame trolley are locked.
According to an extension method for a boom of a dockside container crane provided by an example 18 of the present invention, the step that the front boom section is moved in place in the second direction and is fixed includes: a stop plate is arranged on a head part of the extension trolley tool, thereby preventing the second support frame trolley from separation after arriving at a limiting position.
According to an extension method for a boom of a dockside container crane provided by an example 19 of the present invention, the step that the boom extension section is moved to be between the rear boom section and the front boom section and mutual alignment is performed includes: the boom extension section arranged on the first support frame trolley is moved to be between the rear boom section and the front boom section in the first direction; and the boom extension section is moved in a third direction, and is subjected to mutual alignment with the rear boom section in the second direction.
According to an extension method for a boom of a dockside container crane provided by an example 20 of the present invention, after the step that assembly of the extension trolley tool is completed, the method includes: the extension trolley tool is moved to be below the front boom section by moving a bridge crane trolley.
According to an extension method for a boom of a dockside container crane provided by an example 21 of the present invention, after the step that assembly of the extension trolley tool is completed, the method includes: the first support frame trolley, the second support frame trolley, the process support and the boom extension section are lifted to the trolley frame and are fixed.
According to an extension method for a boom of a dockside container crane provided by an example 22 of the present invention, after the step that the extension trolley tool is moved to be below the front boom section, the method includes: the bridge crane trolley and the extension trolley tool are disconnected.
According to an extension method for a boom of a dockside container crane provided by an example 23 of the present invention, before the step that the boom extension section is connected to the rear boom section and the front boom section, the method includes: the docking flatness of a port and welding shrinkage of a splicing seam are controlled.
Although the present invention has been illustrated and described with reference to some preferred embodiments of the present invention, those of ordinary skill in the art should understand that the foregoing contents are further detailed illustrations of the present invention in combination with the specific preferred embodiments, and it is not to be determined that the specific embodiments of the present invention are limited to these illustrations. Those skilled in the art may make various changes on forms and details, including several simple deductions or substitutions, without departing from the spirit and scope of the present invention.