Build-up strategy for a crown base of a turbine blade, and turbine blade

Information

  • Patent Grant
  • 10458250
  • Patent Number
    10,458,250
  • Date Filed
    Thursday, October 1, 2015
    9 years ago
  • Date Issued
    Tuesday, October 29, 2019
    5 years ago
Abstract
Applying material along parallel welding lines per welding layer, and changing a direction of extension of the welding tracks by 90° for the next welding layer, is provided.
Description
CROSS-REFERENCE TO RELATED APPLICATIONS

This application claims priority to PCT Application No. PCT/EP2015/072697, having a filing date of Oct. 1, 2015, based off of European application No. DE 102014220483.6 having a filing date of Oct. 9, 2014, the entire contents of which are hereby incorporated by reference.


FIELD OF TECHNOLOGY

The following relates to a build-up strategy during deposition welding of a crown base of a turbine blade and to the thereby produced turbine blade with a feathered edge on the crown base.


BACKGROUND

In particular, the tips of a turbine blade suffer more severe wear and are repaired for re-use, wherein material has to be deposited again in order to restore the original geometry, the so-called feathered edge which constitutes an encompassing wall along the outer contour of the blade airfoil.


Deposition welding methods such as laser deposition welding methods are the prior art.


The restored turbine blade in the region of the crown base has to be free of defects and pores, is to have small macrograins, the welding material is to be applied to the blade airfoil with an allowance, and is also to be produced inexpensively.


In this case, in addition to the laser parameters such as heating, laser power, powder mass flow and feed speed, the corresponding travel strategy of the welding head also plays a role.


SUMMARY

An aspect relates to proposing a build-up strategy by means of which the above-mentioned requirements can be fulfilled.





BRIEF DESCRIPTION

Some of the embodiments will be described in detail, with reference to the following figures, wherein like designations denote like members, wherein:



FIG. 1 shows a top view of a surface of a turbine blade on which material is deposited, in accordance with embodiments of the present invention;



FIG. 2 shows a cross section through an intended geometry of a blade tip, in accordance with embodiments of the present invention;



FIG. 3 shows a procedure of the build-up strategy, in accordance with embodiments of the present invention;



FIG. 4 shows a turbine blade, in accordance with embodiments of the present invention; and



FIG. 5 shows a list of superalloys, in accordance with embodiments of the present invention.





The description and figures represent only exemplary embodiments of the invention.


DETAILED DESCRIPTION

Shown in FIG. 1 is a top view of a surface 4, especially of a blade tip 415 (FIG. 4) of a turbine blade 120, 130, or generally as a component 1.


The surface 4, 415 is preferably planar.


The longitudinal, curved shape or the typical geometry of a blade airfoil 406 (FIG. 4) is to be seen in cross section. In order to achieve an intended geometry in cross section as in FIG. 2, material is to be deposited upon the surface 4, 415 which in particular represents a correspondingly reconditioned surface of an already used turbine blade 120, 130.


The blade airfoil of the turbine blade 120, 130 has an outer contour 7.


In the first step, an outer encompassing welding track 10 is preferably laid along the contour 7 before first welding tracks for weld layers are applied.


If the encompassing wall 13 is deposition welded, an inner encompassing welding track 11 is preferably similarly laid along an inner contour 8, which is to be generated, before first welding tracks are applied for weld layers between the contours 7 and 8.


Shown in FIG. 2 is a cross section through an intended geometry of a crown base 4 with an encompassing wall 13, especially a feathered edge of a turbine blade, and a cavity 6. Material has been deposited onto the surface 4, 415 so that a wall 13 has been formed along the contour 7 so that a top-open cavity 6 is created with the inner contour 8.


It may be preferably necessary to also completely coat or to generate the surface 4, 415 in first steps in a multiplicity of weld layers before an encompassing wall 13 is welded. An inner encompassing welding track 11 is preferably not then first of all implemented.


The wall 13 is at least two welding track widths wide.


In the middle of the surface 4, 415, a top-open cavity 6 is formed with the inner surface 5.



FIG. 3 shows first steps for large-area build-up of material, especially for an encompassing wall 13.


The welding tracks 26 (26′, 26″, . . . ), 29 (29′, 29″ . . . ) are laid parallel to a longitudinal line 20.


The longitudinal line 20 is preferably oriented toward the longitudinal direction of the surface 4, 415. The longitudinal line 20 can especially extend through an end 40 of the surface 4, 415 and constitutes there the almost longest, rectilinear progression on the surface 4, 415.


The weld beads 26, 29 start preferably at one end, especially 26′ of the surface 4, 415, and extend in a straight line. If the welding track leaves the outer contour 7, then the deposition process is shifted to the next welding track which is displaced by a defined distance.


In the regions in which the cavity 6 exists no material is deposited so that the longitudinal line 20 or parallels to it only represent the progression of the relative movement between substrate 120 and welding head (not shown).


In the first weld layer, the surface 4, 415, which is to be coated with material, is created completely with parallel extending welding tracks 26, 29. The welding tracks are shifted, preferably continuously, from one side, in this case 26′, to the other side, in this case 29′.


In a second step, a second weld layer of welding tracks, which are laid parallel to a transverse line 23 (33′, 33″. . . ), is created. The transverse line 23 extends transversely to the longitudinal line 20, especially at an angle of 70° to 110°, rather especially 80° to 110°, to a longitudinal line 20.


The transverse line 23 preferably extends perpendicularly to the longitudinal line 20.


The second weld layer covers the first weld layer.


In this case also, the lines 33′, 33″, . . . only represent the relative movement between the blade tip and the welding head, i.e. when the inner surface 5 is created, no material is deposited there by the material feed in the region being stopped.


The second weld layer preferably begins at one end 40 of the surface 4, 415 and is then subsequently coated by means of welding tracks which are directly adjacent to each other or preferably overlap.


The sequence can also be reversed:


The welding tracks 33 (33′, 33″, . . . ) are laid parallel to a transverse line 23. The transverse line 23 is preferably oriented transversely to the longitudinal direction 20 of the surface 4, 415.


The weld beads 33′, 33″ preferably start at one end, e.g. 40, of the surface 4, 415 and extend in a straight line. If the welding track leaves the outer contour 7, then the deposition process is shifted to the next welding track which is displaced by a defined distance.


In the regions in which the cavity 6 exists, no material is deposited so that the transverse line 23 or parallels to it only represent(s) the progress of the relative movement between substrate 120 and welding head (not shown).


In the first weld layer, the surface 4, 415 which is to be coated with material is created completely with parallel extending welding tracks 33. The welding tracks are shifted, preferably continuously, from one side, in this case 40, 412, to the other side, in this case 409 (FIG. 4).


In a second step, a second weld layer of welding tracks, which are laid parallel to a longitudinal line 20 (26, 29), is created, wherein the longitudinal line 20 extends transversely to the transverse line 23, especially at an angle of 70° to 110°, rather especially 80° to 110°, to the transverse line 23.


The longitudinal line 20 preferably extends perpendicularly to the transverse line 23.


The second weld layer covers the first weld layer.


In this case also, the lines 26, 29, . . . only represent the relative movement between the blade tip and the welding head, i.e. when the inner surface 5 is created, no material is deposited there by the material feed in the region being stopped.


The second weld layer preferably begins on one side of the surface 4, 415 and is then subsequently coated by means of welding tracks which are directly adjacent to each other or preferably overlap.


The desired height of the wall 13 is achieved by the procedure according to FIG. 3 being repeated until the desired height of the wall 13 is achieved.


The turbine blade 120, 130 features a nickel-based or cobalt-base superalloy, especially an alloy according to FIG. 5.


The welding material also constitutes a nickel-based or cobalt-based alloy and preferably differs from the material of the component 1, 120, 130. The difference means that at least one alloy element has a 10% higher or lower proportion of this alloy element.


Although the present invention has been disclosed in the form of preferred embodiments and variations thereon, it will be understood that numerous additional modifications and variations could be made thereto without departing from the scope of the invention.


For the sake of clarity, it is to be understood that the use of “a” or “an” throughout this application does not exclude a plurality, and “comprising” does not exclude other steps or elements.

Claims
  • 1. A method for material deposition onto a surface, in which a free-standing wall or a top-open cavity is created, wherein either a first complete weld layer is created on the surface by means of welding tracks, wherein all the welding tracks are applied parallel to a longitudinal line, wherein the longitudinal line being oriented longitudinally to the surface, and then after a further complete weld layer is created on the surface, wherein for the further complete weld layer all the welding tracks extend parallel to a transverse line, wherein the transverse line extends parallel to the longitudinal line, at an angle of 80° to 100°, or a first complete weld layer is created on the surface by means of welding tracks, wherein all the welding tracks are applied parallel to a transverse line, wherein the transverse line is oriented transversely to a longitudinal line of the surface, and then after the further complete weld layer is created on the surface, wherein for the further complete weld layer all the welding tracks extend parallel to a longitudinal line, wherein the longitudinal line extends transversely to the transverse line, at an angle of 80° to 100°, and wherein the longitudinal line is preferably oriented longitudinally to the surface.
  • 2. The method as claimed in claim 1, wherein an outer encompassing weld track is laid along an outer contour of the surface before applying the first complete weld layer.
  • 3. The method as claimed in claim 1, in wherein an inner encompassing welding track is laid along an inner contour of the surface before applying the first complete weld layer.
  • 4. The method as claimed in claim 1, wherein a relative movement is carried out along the longitudinal line between the surface and a welding head, and no material deposition is carried out where the cavity occurs, by an energy source, and a laser or the plasma, being shut off and/or by the material feed being stopped.
  • 5. The method as claimed in claim 1, wherein laser powder deposition welding is used.
  • 6. The method as claimed in claim 1, wherein the surface is formed flat.
  • 7. The method as claimed in claim 1, wherein the longitudinal line extends through one end of the surface and wherein the longitudinal line in comparison to the transverse line has a higher proportion along the surface, especially at least 20%, rather especially at least 50%, proportion along the surface.
  • 8. The method as claimed in claim 1, wherein the surface is a surface of a turbine blade, and is coated.
  • 9. A turbine rotor blade with a crown base, produced by the method claimed in claim 1, which has a free-standing wall or a top-open cavity, wherein the free-standing wall is formed by weld layers of a plurality of welding tracks, wherein all of the welding tracks of the consecutive welding tracks of a weld layer extend at an angle of 80° to 100° to each other.
  • 10. The blade as claimed in claim 9, wherein an outer encompassing welding track is provided along an outer contour of the surface.
  • 11. The blade as claimed in claim 9, wherein an inner encompassing welding track is provided along an inner contour of the surface.
  • 12. The method as claimed in claim 7, wherein the longitudinal line in comparison to the transverse line has at least 20% proportion along the surface.
  • 13. The method as claimed in claim 7, wherein the longitudinal line in comparison to the transverse line has at least 50%, proportion along the surface.
Priority Claims (1)
Number Date Country Kind
10 2014 220 483 Oct 2014 DE national
PCT Information
Filing Document Filing Date Country Kind
PCT/EP2015/072697 10/1/2015 WO 00
Publishing Document Publishing Date Country Kind
WO2016/055350 4/14/2016 WO A
US Referenced Citations (11)
Number Name Date Kind
5822852 Bewlay et al. Oct 1998 A
6332272 Sinnott Dec 2001 B1
6568077 Hellemann et al. May 2003 B1
6969821 Mika et al. Nov 2005 B2
8206121 Rose Jun 2012 B2
20100224600 Anton Sep 2010 A1
20120000890 Ito Jan 2012 A1
20120103950 Arjakine May 2012 A1
20130232749 Bruck Sep 2013 A1
20140262124 Vilaro et al. Sep 2014 A1
20150377043 Haraguchi et al. Dec 2015 A1
Foreign Referenced Citations (19)
Number Date Country
102448650 May 2012 CN
855348 Nov 1952 DE
3050319 Jun 1988 DE
3942051 Jul 2006 DE
10 2009 016260 Oct 2010 DE
102009016260 Oct 2010 DE
2 311 597 Apr 2011 EP
2311597 Apr 2011 EP
2591876 May 2013 EP
2 719 493 Apr 2014 EP
2719493 Apr 2014 EP
2719493 Apr 2014 EP
2014173582 Sep 2014 JP
99103981 Jan 2001 RU
2377110 Dec 2009 RU
2420610 Jun 2011 RU
01 51772 Jul 2001 WO
WO 0151772 Jul 2001 WO
WO 2013060981 May 2013 WO
Non-Patent Literature Citations (3)
Entry
EP 2719493; Kaiser et al.; Welding Joint used for repairing component; May 16, 2019; EPO English Machine Translation; pp. 1-8.
International Search Report for PCT Application No. PCT/EP2015/072697, dated Dec. 10, 2015.
English Translation of Korean Office Action for Application No. 10-2017-7011847 dated May 20, 2019.
Related Publications (1)
Number Date Country
20170306763 A1 Oct 2017 US