Build-up welding method

Information

  • Patent Grant
  • 11819958
  • Patent Number
    11,819,958
  • Date Filed
    Monday, November 7, 2016
    7 years ago
  • Date Issued
    Tuesday, November 21, 2023
    6 months ago
Abstract
A build-up welding method is disclosed in which a welding torch is guided along a metallic workpiece and at least one melting wire serving as a build-up material is fed at an infeed speed into the arc between at least one non-melting electrode of the welding torch and the workpiece. In order to achieve a build-up welding method with higher build-up speeds in comparison to the prior art, it is proposed for the non-melting electrode positioned normal to the workpiece to be guided along the workpiece and for the fed wire to also be moved back and forth along its infeed direction.
Description
FIELD OF THE INVENTION

The invention relates to a build-up welding method in which a welding torch is guided along a metallic workpiece and at least one melting wire serving as a build-up material is fed at an infeed speed into the arc between at least one non-melting electrode of the welding torch and the workpiece.


BACKGROUND OF THE INVENTION

In the prior art, there are known build-up welding methods carried out in the DIN EN ISO 6947-specified PC welding position (ASME: 2G) in which a welding torch (e.g.: WIG torch) is guided horizontally along a vertically oriented, fixed metallic workpiece (e.g.: a pipe). In this case, a wire (e.g.: hot wire) is fed at a continuous infeed speed into an arc, which is produced by a non-melting electrode (e.g.: tungsten electrode) positioned obliquely to the guidance direction of the welding torch, and is melted in order to achieve a welding build-up on the material. The guidance speed of such build-up welding methods, however, is sharply limited since an increase in the guidance speed results in a breakage of the welding bead. A simultaneous increase in the infeed speed of the wire likewise does not result in an improvement. On the other hand, an increase in the diameter of the non-melting electrode results in a more pronounced melting of the workpiece (a higher penetration depth) and thus in an undesirable mixing between the build-up material and the workpiece, which has a negative impact on the material properties of the build-up material. On the other hand, a guidance speed that is too slow results in the formation of a large molten puddle and accompanying formation of droplets.


SUMMARY OF THE INVENTION

The stated object of the invention is to increase the speed of the build-up welding method while simultaneously achieving a low penetration depth.


The invention attains the stated object in that the non-melting electrode, positioned normal to the workpiece, is guided along the workpiece and the fed wire is additionally moved back and forth along its infeed direction.


If the non-melting electrode, positioned normal to the workpiece, is guided along the workpiece, then it is possible to achieve a particularly homogeneous arc, which enables an improved, namely uniform, melting of the wire. In addition, through the placement of the non-melting electrode normal to the workpiece in a PC welding position, a capillary action on the melt can be achieved, advantageously making it possible to avoid a formation of droplets from the melt. If the fed wire is additionally moved back and forth along its infeed direction, then the penetration depth into the workpiece can be reduced in a controlled fashion. This achieves a reduced melting of the base material of the workpiece in comparison to the prior art, thus enabling particularly favorable prevention of an undesirable mixing of the base material with the build-up material. It is therefore possible to achieve a durable material build-up with a particularly good connection to the base material—with the least possible change in material properties of the build-up material. In addition, by means of the amplitude and frequency of the back-and-forth movement of the wire along its infeed direction, it is possible to regulate the temperature conditions in the melt in such a way that the ideal desired penetration depth is always achieved. The combination of the electrode positioned normal to the workpiece and the back-and-forth movement of the in-fed wire make it surprisingly possible to achieve outstandingly high build-up speeds in comparison to the prior art, with which it is possible to significantly outperform not only known build-up welding methods in the PC welding position, but also those in the PA welding position. In addition, the material properties of the build-up material can be retained despite the high guidance speed of the welding torch. It is thus possible to achieve a quicker, more reproducible build-up welding method.


In general, it should be noted that the build-up welding according to the invention can be particularly suitable for use in the DIN EN ISO 6947-specified PC welding position (ASME: 2G). In this case, the non-melting electrode of the welding torch is guided horizontally relative to a vertical workpiece. The primary guidance direction of the welding torch in this case is horizontal relative to the vertical workpiece. To apply a plurality of layers that are provided one on top of another, a secondary vertical guidance is also provided. In general, it is also noted that a build-up welding method (cladding) is understood to be a method for single-layer or multi-layer material build-up with overlapping welding beads on a workpiece with the aid of a welding torch. For example, a workpiece with a low-alloy base material can have a higher alloy build-up material applied onto it.


If the wire is additionally fed into the arc in advance in the guidance direction of the welding torch, a particularly advantageous capillary action of the melt can be produced—thus making it possible to further increase the above-mentioned advantages.


The process parameters in the build-up welding method can also be further improved to a significant degree if the wire is advanced in continuous fashion. In addition, this can also be useful for a homogenization of the molten puddle in connection with its back-and-forth movement. The material properties of the build-up material can thus be retained despite the high guidance speed of the welding torch, which can be used to achieve a high degree of purity of the build-up on the workpiece.


Particularly advantageous welding conditions can be achieved if the non-melting electrode has a diameter of at least 6.4 mm. The comparatively high electrode diameter relative to the prior art makes it possible to achieve particularly high guidance speeds of the welding torch, thus enabling an even more rapid process sequence. The use of such high electrode diameters is only enabled by the back-and-forth movement of the wire in its infeed direction since large electrode diameters usually necessitate high penetration depths. The movement of the wire according to the invention, however, can keep the penetration depth low even with high electrode diameters.


The build-up welding method according to the invention can particularly excel in its simplicity from a process engineering standpoint if the welding torch is guided along an outer cylindrical surface of a pipe.


It is particularly preferable that the build-up welding method according to the invention is suitable for applications in which the welding torch is guided along the inner cylindrical surface of the pipe.


If the welding torch is guided along the workpiece in a circular or serpentine fashion, then the build-up material can be built up in a plurality of layers situated one on top of another. According to the invention, it is thus possible to durably produce a flat material build-up in a simple way from a process engineering standpoint. The additional back-and-forth movement of the wire along its infeed direction according to the invention can also ensure a controlled production of a low penetration depth in the workpiece during the building up of additional layers—while nevertheless achieving a sufficiently high melting of the vertically underlying layer in order to achieve an advantageous connection between the layers. It is therefore possible to achieve a very homogeneous welding build-up with preferable material properties, thus enabling achievement of a particularly reproducible method.


In order to further increase the durability of the build-up welding method, the non-melting electrode can be embodied as a tungsten electrode.


Preferably, the welding torch is embodied as a WIG torch in order to thus achieve a comparatively high weld metal quality in the welded bead. This can further increase the reproducibility of the method.


If the melting wire is a hot wire, then it is possible to further increase the build-up performance in the method and thus the processing speed. The wire, which has a charge applied to it for example by a hot wire current source, can be thus specifically be fed into the arc in a heated fashion, which results in higher melting rates of the wire.


Preferably, the build-up welding method according to the invention is suitable for use in the PC welding position.





BRIEF DESCRIPTION OF THE DRAWINGS

In the figures, the subject of the invention is shown by way of example in one embodiment variant. In the drawings:



FIG. 1 shows a partially cut-away cross-section through a build-up welding method according to the invention, along the x/y plane,



FIG. 2 shows a top view of the method according to the invention,



FIG. 3 shows a partially cut-away cross-section through a build-up welding method according to the invention on an outer cylindrical surface of a pipe.





DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS


FIG. 1 shows a build-up welding method 100 in the PC welding position. Such a build-up welding method 100 is often also referred to as a vertical build-up welding method. Other welding positions according to DIN EN ISO 6947 are also conceivable, for example PA or also H-LO45 (ASME: 6Gu). In this case, a welding torch 1, namely a WIG torch, is guided along a metallic workpiece 2. In addition to a WIG torch, it is also conceivable to use a MAG torch, etc. The coordinate system 50 shows the orientation of the workpiece 2 in space. Build-up welding is understood to mean that the workpiece is embodied in the y/z plane, i.e. a surface standing vertically in space, and the welding torch 1 is guided along the y axis, i.e. essentially in a horizontal direction. In this case, it is generally conceivable for this movement of the welding torch 1 in the guidance direction 11 to be superposed with an oscillating movement parallel to the workpiece 2, which has not been shown in detail.


Between a non-melting electrode 3, namely a tungsten electrode, of the welding torch 1 and the metallic workpiece 2, an arc 4 is produced, into which is fed a wire 5, namely in the form of a heated hot wire, serving as a build-up material 6 that is to be melted. The wire 5 can also be used in the form of a cold wire. The melted build-up material 6 produces a melt 7 on the workpiece 2 in order to form a welding bead 8. The wire 5 in this case is fed into the arc 4 at a continuous infeed speed. In addition to the continuous infeed speed 9, the wire 5 is moved back and forth along its infeed direction. For example, it is conceivable to use a back-and-forth movement of the wire 5 with a superposition amplitude of 4 to 12 mm.


Usually, a penetration depth 12 occurs primarily as a function of the diameter 13 of the non-melting electrode 3 and the guidance speed of the welding torch 1 relative to the workpiece. The back-and-forth movement 10 of the wire 5 regulates the penetration depth 12 in the workpiece 2 in such a way that with a simultaneous use of a non-melting electrode 3 with a large diameter 13 and a fast guidance speed, the penetration depth 12 remains low. As a result, it is possible to avoid an undesirable mixing of the build-up material 6 with the base material 14 of the workpiece 2. According to the invention, in the build-up welding method 1, the non-melting electrode 3 is positioned normal to the workpiece 2 and continuously moved across the workpiece 2 in the guidance direction 11 of the welding torch 1 in order to build up a spread-out welding bead 8 on the workpiece. In this case, the non-melting electrode 3 positioned normal to the workpiece 2 ensures production of a particularly homogeneous arc and thus a uniform, controlled melting of the wire 5.



FIG. 2 shows a top view of the workpiece 2. It should be noted here that in the build-up welding method 1, a plurality of welding beads 80, 81 are built up on the workpiece 2 one above the other in the vertical direction and in overlapping fashion. The welding torch 1 is guided in serpentine fashion from bottom to top. Initially, the first welding bead 80 is produced, in particular from left to right, and the second welding bead 81 is produced over the first welding bead 80 in the reverse direction. A two-dimensional application can thus be achieved in a simple way from a process engineering standpoint.


As shown in FIG. 1 and FIG. 2, the wire 5 is additionally fed into the arc 4 in advance in the guidance direction 11 of the welding torch. This ensures a continuous and uniform supply of the build-up material 6 into the melt 7.


It has turned out to be particularly advantageous if the diameter 13 of the non-melting electrode 3 is at least 6.4 mm. It is thus specifically possible to achieve a high guidance speed of the welding torch 1 in the guidance direction 11.



FIG. 3 shows a build-up welding method 1 in which the welding torch 1 is guided in circular fashion around the inner cylindrical surface 21 of a vertical pipe 20. In this case, it is particularly possible to produce a closed annular welding bead 82 on the inner cylindrical surface 21. In addition, the welding torch 1 is likewise suitable for producing a welding bead on the outer cylindrical surface 22 of the pipe 20.

Claims
  • 1. A build-up welding method, comprising: guiding a welding torch comprising at least one non-melting electrode along a metallic workpiece, wherein the at least one non-melting electrode is positioned normal to the workpiece; andfeeding at least one melting wire serving as a build-up material at an infeed speed into an arc in advance of the welding torch in a guidance direction of the welding torch between the at least one non-melting electrode of the welding torch and the workpiece, wherein, when feeding the melting wire continuously within the arc, the melting wire is moved back and forth along an infeed direction of the melting wire in a continuous feed to form a plurality of welding beads built up on the workpiece one next to the other and in overlapping fashion.
  • 2. The build-up welding method according to claim 1, wherein the non-melting electrode has a diameter of at least 6.4 mm.
  • 3. The build-up welding method according to claim 1, comprising guiding the welding torch along an outer cylindrical surface of a pipe.
  • 4. The build-up welding method according to claim 3, comprising guiding the welding torch along an inner cylindrical surface of the pipe.
  • 5. The build-up welding method according to claim 1, comprising guiding the welding torch along the workpiece in a circular or serpentine fashion.
  • 6. The build-up welding method according to claim 1, wherein the non-melting electrode is a tungsten electrode.
  • 7. The build-up welding method according to claim 1, wherein the welding torch is a WIG torch.
  • 8. The build-up welding method according to claim 1, wherein the melting wire is a hot wire.
  • 9. The build-up welding method according to claim 1, carried out in a PC welding position in which the workpiece is vertically oriented, and the welding torch is guided horizontally relative to the vertical workpiece.
Priority Claims (1)
Number Date Country Kind
15193560 Nov 2015 EP regional
PCT Information
Filing Document Filing Date Country Kind
PCT/EP2016/076889 11/7/2016 WO
Publishing Document Publishing Date Country Kind
WO2017/077132 5/11/2017 WO A
US Referenced Citations (130)
Number Name Date Kind
3163743 Wroth Dec 1964 A
3209119 Keidel Sep 1965 A
3483354 Saenger, Jr. Dec 1969 A
3496327 Vilkas Feb 1970 A
3573420 Johnson Apr 1971 A
3627974 Normando Dec 1971 A
3735089 Sciaky May 1973 A
3795785 Smith Mar 1974 A
3838244 Petrides Sep 1974 A
4019018 Oishi Apr 1977 A
4053973 Meli Oct 1977 A
4159410 Cooper Jun 1979 A
4179059 Chang Dec 1979 A
4242981 Bernard Jan 1981 A
4296306 Nomura Oct 1981 A
4306134 Slavens Dec 1981 A
4336441 Godai Jun 1982 A
4366362 Ohta Dec 1982 A
4436974 Lebedev Mar 1984 A
4493971 Nawa Jan 1985 A
4531040 Nawa Jul 1985 A
4536634 Nawa Aug 1985 A
4698484 Babcock Oct 1987 A
4801781 Hori Jan 1989 A
4806735 Ditschun Feb 1989 A
4916281 Flasche Apr 1990 A
4920249 McLaughlin Apr 1990 A
5099098 Burgoon Mar 1992 A
5107093 Ekelof Apr 1992 A
5137223 Brandon Aug 1992 A
5166495 Ekelof Nov 1992 A
5361972 Barker Nov 1994 A
5442155 Nihei Aug 1995 A
5535938 Leduc Jul 1996 A
5578227 Rabinovich Nov 1996 A
5583305 Hirsch Dec 1996 A
5669547 Spring Sep 1997 A
5756966 Offer May 1998 A
5796069 Jones Aug 1998 A
5892199 Ahmed Apr 1999 A
5961862 Lewis Oct 1999 A
5996878 LaCount Dec 1999 A
6044769 Oka Apr 2000 A
6060678 Allford May 2000 A
6070784 Holt Jun 2000 A
6084205 Sheaffer Jul 2000 A
6118093 Hong Sep 2000 A
6127651 Burgoon Oct 2000 A
6143378 Harwell Nov 2000 A
6193145 Fournier Feb 2001 B1
6365867 Hooper Apr 2002 B1
6417488 Takeuchi Jul 2002 B1
6429404 Suzuki Aug 2002 B1
6469277 Trube Oct 2002 B1
6570132 Brunner May 2003 B1
6610958 Stricklen Aug 2003 B2
6627839 Luckowski Sep 2003 B1
6637640 Sennett Oct 2003 B1
6834556 Cain Dec 2004 B2
7009139 Sonoda Mar 2006 B2
7011244 Baylot Mar 2006 B2
7012217 Titze Mar 2006 B2
8471173 Miessbacher Jun 2013 B2
8791384 Wang Jul 2014 B2
8963045 Peters Feb 2015 B2
9018563 Yamazaki Apr 2015 B2
9085041 Peters Jul 2015 B2
9095922 Shearin Aug 2015 B1
9193004 Enyedy Nov 2015 B2
9233432 Zhang Jan 2016 B2
9321116 Rose Apr 2016 B2
9339886 Bowers May 2016 B2
9481931 Stempfer Nov 2016 B2
9545684 Dunahoo Jan 2017 B2
9902018 Voice Feb 2018 B2
9962785 Cole May 2018 B2
10035211 Peters Jul 2018 B2
10040141 Rajagopalan Aug 2018 B2
10086465 Peters Oct 2018 B2
20020148113 Forrest Oct 2002 A1
20020158048 Stricklen Oct 2002 A1
20040050832 Mortendorfer Mar 2004 A1
20040195212 Borne Oct 2004 A1
20040200881 Gandy Oct 2004 A1
20040232130 Sonoda Nov 2004 A1
20040238496 Kimura Dec 2004 A1
20050173380 Carbone Aug 2005 A1
20060049153 Cahoon Mar 2006 A1
20070056944 Artelsmair Mar 2007 A1
20070102411 Takano May 2007 A1
20070145028 Artelsmair Jun 2007 A1
20070151964 Artelsmair Jul 2007 A1
20070251927 Miessbacher Nov 2007 A1
20080078812 Peters Apr 2008 A1
20080190900 Zhang Aug 2008 A1
20080193218 Verkuijl Aug 2008 A1
20080210677 Nakamura Sep 2008 A1
20090026188 Schorghuber Jan 2009 A1
20090107971 Ruhrnossl Apr 2009 A1
20090242534 Artelsmair Oct 2009 A1
20090289044 Fujiwara Nov 2009 A1
20100089890 Manning Apr 2010 A1
20100126969 Klangos May 2010 A1
20100159265 Fairchild Jun 2010 A1
20100301030 Zhang Dec 2010 A1
20110114609 Kroiss May 2011 A1
20110132878 Wang Jun 2011 A1
20110259853 Yamazaki Oct 2011 A1
20110272383 Jarvis Nov 2011 A1
20110278274 Rogers Nov 2011 A1
20110297658 Peters Dec 2011 A1
20120298628 Bowers Nov 2012 A1
20120305536 Zhang Dec 2012 A1
20120325791 Ash Dec 2012 A1
20130105450 Waldhoer May 2013 A1
20130146566 Peters Jun 2013 A1
20130253728 Stumpfl Sep 2013 A1
20130299475 Aoki Nov 2013 A1
20140014638 Artelsmair Jan 2014 A1
20140048970 Batchelder Feb 2014 A1
20140263229 Peters Sep 2014 A1
20140263230 Peters Sep 2014 A1
20140326706 Dunahoo Nov 2014 A1
20150041441 Klangos Feb 2015 A1
20150165540 Cole Jun 2015 A1
20150235565 Postlethwaite Aug 2015 A1
20150251275 Denney Sep 2015 A1
20150252631 Miller Sep 2015 A1
20150283641 Kim Oct 2015 A1
20170021442 Denis Jan 2017 A1
Foreign Referenced Citations (5)
Number Date Country
3244774 Jun 1983 DE
0313232 Apr 1989 EP
2644306 Oct 2013 EP
2777858 Sep 2014 EP
3012759 May 2015 FR
Non-Patent Literature Citations (6)
Entry
J.F. Rudy “Development and Application of Dabber Gas Tungsten Arc Welding for Repair of Aircraft Engine, Seal Teeth,” ASME 1982 International Gas Turbine Conference and Exhibit.
H. Lorenz “tigSpeed—Mehr als nur ein TIG schneller,” Schweisstechnik/Soudure, May 2013, pp. 14-17 (with English translation).
Polysaude Nantes France SAS, “Mechanised TIG Cladding for industrial applications,” 2011, pp. 1-48.
J.-P. Barthoux et al., “Focus on Nuclear Power Generation—Polysoude: Cladding in Industrial Applications”, Jan. 2011, pp. 1-4.
Polysaude Nantes France SAS, “Solutions for Automated Cladding Operations, TIG—Cold Wire, Hot Wire used in the manufacturing and maintenance,” Apr. 2014.
H.B. Cary, et al. “Modern Welding Technology,” 2005, pp. 69-77, 630-631, 648-649, 653, 658.
Related Publications (1)
Number Date Country
20190111510 A1 Apr 2019 US