BUILDING AI SMART MANAGEMENT SYSTEM

Information

  • Patent Application
  • 20240402668
  • Publication Number
    20240402668
  • Date Filed
    June 01, 2023
    a year ago
  • Date Published
    December 05, 2024
    17 days ago
Abstract
A building AI smart management system comprises a dashboard management module, a scheduling dashboard module, a statistics dashboard module, a data input report processing module, a data report output module, and a cross-platform link module, which are located on a server or a mobile device, wherein the server or the mobile device is electrically connected to the monitor.
Description
BACKGROUND OF THE INVENTION
Field of the Invention

The invention relates to a system, and more particularly to a system for building AI smart management.


The Prior Arts

In the property management work of the prior art, property events are managed separately through manual reports, and manual management and maintenance of equipment and meters of buildings are performed. It is not processed by the AI program. Unable to display the effect after integration. The property management work of the prior art is that the staff is small and the work is complicated, and the quality of the service often varies from person to person, and presents an unstable state.


SUMMARY OF THE INVENTION

The invention provides a building AI smart management system, which comprises a dashboard management module located on a server, which comprises an organizational management performance index module, a facility management performance index module, both of which combine at least one measurement index with corresponding evaluation methods, and calculate a score based on the execution results, which is displayed on a monitor; and a cloud smart device monitoring module connected to at least one sensor disposed within a building, which transmits at least one monitoring signal to the cloud smart device monitoring module and displays the monitoring signal on the monitor, wherein the organizational management performance index module, the facility management performance index module, and the cloud smart device monitoring module are respectively electrically connected to the monitor.


The building AI smart management system of the invention may further comprise a scheduling dashboard module located on the server, which allows various schedules within the building's annual management plan to be input through at least one scheduling log, so that an AI program is capable of determining the status of the at least one scheduling log, and displaying a warning on the monitor accordingly, wherein the status of the at least one scheduling log to be determined is whether a schedule is approaching its deadline, or whether a schedule has passed without being executed.


The building AI smart management system of the invention may further comprise a statistics dashboard module located on the server, which displays the statistical frequency of various service events within the building on the monitor, including at least one of: the number of public area maintenance items, counseling orders, social work visits, caring meal deliveries, emergency rescues, property management cares, community visits, and package mail receipts and deliveries.


The building AI smart management system of the invention may further comprise a data input report processing module located on the server, which processes AI smart management information, including a first digital data transmitted by the sensor and a first data generated by the server input, wherein the scope of the first data is clearly defined by manual pre-setting, and is entered daily into at least one database in Google Forms, and the AI program performs statistical analysis, status determination, string search, and corresponding AI domain applications on the at least one database.


The building AI smart management system of the invention may further comprise a data report output module located on the server, which creates a daily log database of the building's on-site management; wherein the AI program uses the string search function to search for keywords in the daily log database, collects the necessary data, and performs related statistical and regression analysis; and a cross-platform link module located on the server, which is a cross-platform AI smart management interface that automatically connects at least one management tool module to manage the data generated by the management tool module.


The invention further provides a building AI smart management system, which comprises a dashboard management module located on a mobile device, which comprises an organizational management performance index module, a facility management performance index module, both of which combine at least one measurement index with corresponding evaluation methods, and calculate a score based on the execution results, which is displayed on a monitor; and a cloud smart device monitoring module connected to at least one sensor disposed within a building, which transmits at least one monitoring signal to the cloud smart device monitoring module and displays the monitoring signal on the monitor, wherein the organizational management performance index module, the facility management performance index module, and the cloud smart device monitoring module are respectively electrically connected to the monitor.


The building AI smart management system of the invention may further comprises a scheduling dashboard module located on the mobile device, which allows various schedules within the building's annual management plan to be input through at least one scheduling log, so that an AI program is capable of determining the status of the at least one scheduling log, and displaying a warning on the monitor accordingly, wherein the status of the at least one scheduling log to be determined is whether a schedule is approaching its deadline, or whether a schedule has passed without being executed.


The building AI smart management system of the invention may further comprise a statistics dashboard module located on the mobile device, which displays the statistical frequency of various service events within the building on the monitor, including at least one of: the number of public area maintenance items, counseling orders, social work visits, caring meal deliveries, emergency rescues, property management cares, community visits, and package mail receipts and deliveries.


The building AI smart management system of the invention may further comprise a data input report processing module located on the mobile device, which processes AI smart management information, including a first digital data transmitted by the sensor and a first data generated by the server input, wherein the scope of the first data is clearly defined by manual pre-setting, and is entered daily into at least one database in Google Forms, and the AI program performs statistical analysis, status determination, string search, and corresponding AI domain applications on the at least one database.


The building AI smart management system of the invention may further comprise a data report output module located on the mobile device, which creates a daily log database of the building's on-site management; wherein the AI program uses the string search function to search for keywords in the daily log database, collects the necessary data, and performs related statistical and regression analysis; and a cross-platform link module located on the server, which is a cross-platform AI smart management interface that automatically connects at least one management tool module to manage the data generated by the management tool module.





BRIEF DESCRIPTION OF THE DRAWINGS

The invention will become more readily apparent to those ordinarily skilled in the art after reviewing the following detailed description and accompanying drawings, in which:



FIG. 1 is a schematic diagram of modules of a server of the building AI smart management system of the present invention.



FIG. 2 is a schematic diagram of modules of a mobile device in the building AI smart management system of the present invention.



FIG. 3 is a schematic diagram of the organizational management performance index module of the dashboard management module of the present invention.



FIG. 4 is a schematic diagram of the facility management performance index module of the dashboard management module of the present invention.



FIG. 5A is a schematic diagram of the cloud smart device monitoring module of the dashboard management module of the present invention.



FIG. 5B is a schematic diagram of the digital signal sent back by the sensor of the present invention including the standby status, voltage value, current value, and power value of the sewage pump or wastewater pump.



FIG. 5C is a schematic diagram of the digital signal sent back by the sensor of the present invention including the current depth of the sewage pool and the wastewater pool in Building A.



FIG. 5D is a schematic diagram of the digital signal sent back by the sensor of the present invention including the current, voltage, and power detected by the water pump, sewage pump, and wastewater pump of Building B, as well as the depth of the water pumping pool and the depth of the sewage pool.





DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS

As shown in FIG. 1, the present invention is a building AI smart management system, a schematic diagram of a module in a server 1. It has a dashboard management module 10, a scheduling dashboard module 20, a statistics dashboard module 30, a data input report processing module 40, a data report output module 50, and a cross-platform link module 60 located in the server 1, wherein the server 1 is connected to a monitor 70.


As shown in FIG. 2, the present invention is a building AI smart management system, a schematic diagram of a module on a mobile device 2. It has a dashboard management module 10, a scheduling dashboard module 20, a statistics dashboard module 30, a data input report processing module 40, a data report output module 50, and a cross-platform link module 60 located in the server 1, wherein the server 1 is connected to a monitor 70.


As shown in FIG. 1, the present invention is a building AI smart management system, which comprises: a building AI smart management system, including: a dashboard management module 10 located in a server 1, the dashboard management module 10 has an organizational management performance index module 11 and a facility management performance index module 12, where at least one measurement index is combined with the corresponding evaluation method to make a scoring result based on the number of execution results, and the scoring result displayed on a monitor 70, and a cloud smart device monitoring module 13, connected to at least one sensor of construction equipment in a building, the sensor returns at least one monitoring signal to the cloud smart device monitoring module 13, and the Monitoring signals are displayed on the monitor 70.


As shown in FIG. 3, the present invention is an AI intelligent management system for buildings, in which the organizational management performance index module 11 uses preset indicators to evaluate the actual score to represent the actual execution performance and evaluation content, such as Table 1:















TABLE 1







Evaluation
Execution





Item
Metrics
method
Scenario
Scoring
Scored
Remarks





















1
Number of
Count
Occupational
10

0 occurrence



Occupational
Occupational
Accident


get 10



Accidents
Accident
Occurrence ○


points, one




Occurrence



occurrence


2
Number of
Statistics of
Occurrence of
10

deducts 2



cases of
business
business


points, and



business
misappropriation
misappropriation


the



misappropriation
cases
○ cases


maximum


3
Number of
Count the
Occurrence of
10

10 points.



labor-management
number of
labor-management






disputes
labor-management
disputes ○







disputes






4
Number of
Statistics of
Occurrence of
10





violations of the
the number of
violations of the






Gender Equality
violations of
Gender Equality






Act
the Gender
Act ○







Equality Act






5
Number of
Statistics of
Occurrences of
10





Abnormal
the Number of
Abnormal






Absences Count
Abnormal
Absences ○







Absences






6
On-site
Total
○ points/○
10

10 points for



employee
score/number
copies of


average



satisfaction
of statistically
statistically


satisfaction



survey
returned
returned


above 90, 9




questionnaires
questionnaires =


for 89~85




average
average


84~80 points,




satisfaction
satisfaction


8 points, and




Total



so on.


7
Acquisition rate
protection
Licenses
10

0 points for



of property
Affairs
obtained ○


not reached



management
management
pieces/staff


1, 5 points



professional
personnel, fire
and on-site


for 1, 8



certificates
facility
supervisors ○


points for 2,




managers,



10 points for




equipment



3




safety








management








personnel








(number of








licenses








obtained/total








number of








staff and








on-site








supervisors)






8
Average years
Total years of
Total ○ years of
10

0 points for



of on-site
on-site
on-site


less than 1



supervisors
supervisors/
supervisors/On-


year, 5 points




Number of
site supervisors


for 1-3 years,




on-site



8 points for




supervisors



3-5 years, 10








points for








more than 5








years


9
Year resignation
The number of
the resigned ○
10

Calculated in



rate
resigned
people in the


proportion




employees in
whole year/







the whole
[the ○ people at







year/
the beginning of







[the number at
the period + ½







the beginning
(the new







of the period +
entrants in the







½ (the
whole year)]







number of new








entrants in the








whole year)]






10
Retention rate
1. On-site
number of
5





of on-site
supervisor
people with






personnel
(number of
seniority of







people with
more than 6







seniority of
months in the







more than 6
number of







months in the
people at the







number of
end of the







people at the
period ○/







end of the
number of







period/number
people in 6







of people with
months ago ○







seniority of








more than 6








months in the








beginning of








the period)








2. On-site
the number of
5






administrative
people with







personnel (the
seniority of







number of
more than 6







people with
months in the







seniority of
number of







more than 6
people at the







months in the
end of the







number of
period ○/the







people at the
number of







end of the
people 6 months







period/
ago ○







number of








people in 6








months ago)













Total Score












Wherein, as shown in FIG. 3, Items represent as Number of Occupational Accidents 301, Number of cases of business misappropriation 302, Number of labor-management disputes 303, Number of violations of the Gender Equality Act 304, Number of Abnormal Absences Count 305, On-site employee satisfaction survey 306, Acquisition rate of property management professional certificates 307, Average years of on-site supervisors 308, Year resignation rate 309, Retention rate of on-site personnel 310.


As shown in FIG. 4, the present invention is an AI intelligent management system for buildings, wherein the facility management performance index module 12 uses preset indicators to evaluate the actual score to represent the actual execution performance and evaluation content, such as Table 2:















TABLE 2






Measuring
Evaluation
Execution





Item
Index
Method
Description
Scoring
Scored
Remarks





















1
Qualification
1. Number of
On-site
4





rate of stationed
on-site
supervisors ○






personnel
supervisors,
persons,







administrative
administrative







personnel, and
personnel ○







cleaning
persons,







personnel/
cleaning







number
personnel ○







required by
persons/contract







the contract
requirements








○ persons







2. Number of
Security
4






security
personnel ○







personnel/
persons/Contract







Number of
requirements







contract
○ persons







requirements






2
Correct
1. Number of
Registered ○
4





implementation
registered
pieces/Delivered






rate of
mails/Number
by the post






community
of mails
office ○ pieces






registered
delivered by







letters
the post office








2. Number of
pieces
3

3 points




lost pieces/
lost/number of


are




number of
pieces


awarded




pieces
delivered by


for none,




delivered by
the post office


and 3




the post office
○ pieces


points are








deducted








for one








time.


3
Tenant
Total
Total ○
5





Survey
scores/copies
points/○ copies






Satisfaction
of statistically
of statistically







returned
returned







questionnaires =
questionnaires =







average
average







satisfaction
satisfaction





4
Social housing
Number of
Applicants ○/
4





service cloud
applicants/
total tenants ○






application rate
total number








of tenants






5
Registration of
construction
establishment
4





public property
of property
of ○







inventory
households/







(number of
total number of







established
households ○)







households/








total number








of households)






6
The punctuality
The
Whether the
4





of pre-planning
punctuality of
monthly data is






and
monthly data
delivered on






performance
delivery
time or not






data

yes/no





7
Achievement
1. Elevator
Elevator
4





rate of
maintenance
maintenance ○






scheduled
times/annual
times/annual






maintenance of
scheduled
scheduled






public facilities
maintenance
maintenance ○






and equipment
times
times







2. Generator
Generator
4






maintenance
maintenance ○







times/annual
times/annual







scheduled
scheduled







maintenance
maintenance ○







times
times





8
Qualification
1. Elevator use
The effective
4





rate of public
license
date of the






facilities and

elevator use






equipment

license:






inspection and

(dd/mm)






filing
2. Pass the fire
Yes/No
4






inspection
pass the fire







report
inspection








report







3. Public
Public safety
4






security
inspection







inspection
declaration







declaration is
is/is not







qualified
qualified





9
Evaluating the
electricity
public
3

3 points



effectiveness of
Last year's
Total last


for



energy conservation
public
year's large


positive




kwh-this
public


numbers




year's public
electricity


and 0




electricity kwh
○ kwh-this


points for





year's large


negative





electricity kwh


numbers.








More than








20%








(now-go/go)








should








write a








review








report.


10
Drinking water
Inspection and
Inspection and
3





tower water
test report
test report is/is






quality test
meets the
not in line with







standard value
the standard





11
Achievement
Pool cleaning
Pool cleaning
3





rate of cleaning
times/annual
○ times/annual






and
scheduled
scheduled ○ times






maintenance
times







operations







12
Achievement
Implementation
Implementation ○
3





rate of vector
times/annual
times/annual






control
scheduled
scheduled ○ times







times






13
Incidence rate
1. Count the
Occurrence ○
3

3 points



of theft
number of



for none, 3




occurrences



points for








one time.




2. Abnormal
Abnormal


Each




analysis report
analysis report


report +2




after the theft
after the theft







3. Specific
Specific


Each




improvement
improvement


report +2




measures
measures





14
Fire accident
1. Count the
Occurrence ○
4

4 points



rate
number of



for none, 4




incidents



points for








one time.




2. Abnormality
Abnormality
2

No




analysis report
analysis report


report-2




after fire
after fire







accident
accident







3. Specific
Specific
2

No




improvement
improvement


specific




measures
measures


improvement-2


15
Fire prevention
Drill
Drill ○
3





and escape drill
times/annual
times/annual






rate
scheduled
scheduled ○







times
times





16
Occurrence rate
1. Check the
Yes/No
5





of other
emergency
Emergency






emergencies
handling
handling






(such as:
process
process table






typhoon,
2. Count the
Count the
3

3 points



earthquake,
number of
occurrence


are



elevator failure,
occurrences
of ○times


awarded



power failure,




for none,



gas leakage)




and 3








points are








deducted








for one








time.




3. Abnormal
Abnormal


+2 for




analysis report
analysis report


each report




after
after







emergency
emergency







accident
accident







4. Specific
Specific


Each




improvement
improvement


report +1




measures
measures





17
Agency
Five
Whether it
5

5 points if



Requirements
categories of
meets the


there is no




service work
requirements


missing, 1




results
of work items


point will








be








deducted








for one








item




Cooperate
Delay ○ times
3

No




with contract



missing 3




performance



points, 1




and submit



point




materials on



deduction




time



for 1 delay


18
Good
Cooperate
Number of

In addition




neighborliness
with
times

to the





government


activities





agencies and


stipulated





neighborhood


by the





communities


agency, 1





to handle


point is





activities


awarded for








each








additional








activity








hosted



19
The public
1. Major
Number of
3

3 points



complains
defects
occurrences


for none, 1



about the




point



manufacturer's




deducted



service quality




for one








time.




2. Occurrence
Occurrence
3

3 points




frequency
frequency


for none,








once a








month on








average, 1








point will








be








deducted;








2 times a








month on








average, 2








points will








be








deducted,








and so on




3. Specific
Specific


1 point for




improvement
improvement


each item




measures
measures













Total Score













Wherein, as shown in FIG. 4, Items represent as Qualification rate of stationed personnel 401, Correct implementation rate of community registered letters 402, Tenant Satisfaction Survey 403, Social housing service cloud application rate 404, Registration of public property 405, The punctuality of pre-planning and performance data 406, Achievement rate of scheduled maintenance of public facilities and equipment 407, Qualification rate of public facilities and equipment inspection and filing 408, Evaluating the effectiveness of energy conservation 409, Drinking water tower water quality test 410, Achievement rate of cleaning and maintenance operations 411, Achievement rate of vector control 412, Incidence rate of theft 413, Fire accident rate 414, Fire prevention and escape drill rate 415, Occurrence rate of other emergencies (such as: typhoon, earthquake, elevator failure, power failure, gas leakage) 416, Agency Requirements 417, Good neighborliness 418, The public complains about the manufacturer's service quality 419.


As shown in FIG. 5A, the present invention is an AI intelligent management system for buildings, in which the cloud smart device monitoring module 13 can be connected to the digital signal sent back by the sensor to judge the operation status of the field equipment. As shown in FIG. 5B, for example, the standby status, voltage value, current value, and power value of a sewage pump or wastewater pump in a building. As shown in FIG. 5C, the current depths of the sewage pond and wastewater pond in building A. As shown in FIG. 5D, detected current, voltage, and electric power of the water pumps, sewage pumps, and wastewater pumps in building B. And the depth of the pumping pool and the depth of the sewage pool. As shown in FIG. 5A, Building A 501, Building B 502, WIFI CAMERA 503, LAN CAMERA 504, internet 505, WAN ROUTER 506, intercom 507, Public Switched Telephone Network, PSTN 508, TELEHPON 509, Exchange interface 510, FIBER-OPTIC COMMUNICATION 511.


The present invention is an AI intelligent management system for buildings further comprises a scheduling dashboard module 20, located in the server 1 or the mobile device 2, wherein various schedules in the building site management annual plan are input into the scheduling dashboard module 20 through at least one schedule log, and at least one status of the schedule log can be judged through an AI program, the schedule that is about to expire, or the schedule that is overdue execution of the schedule raises an alert on the monitor 70.


The AI intelligent management system for buildings of the present invention further comprises a statistics dashboard module 30 located on the server 1 or the mobile device 2, wherein the statistics dashboard module 30 displays the statistical frequency of various service events within the building on the monitor 70, including at least one of: the number of public area maintenance items, counseling orders, social work visits, caring meal deliveries, emergency rescues, property management cares, community visits, and package mail receipts and deliveries.


The building AI smart management system of the present invention further comprises a data input report processing module 40, which is located in the server 1 or the mobile device 2, wherein the data input report processing module 40 processes an AI smart management information, including: a first digital data, which is the digital data transmitted by the sensor 80, and a first data, which is the data generated by the input of the server 1, the first data generated by the input of the server 1, wherein the scope of the first data is clearly defined by manual pre-setting, and at least one database is formed by inputting a Google form every day, and the AI program is used to perform statistical analysis of the at least one database, judgment or determination of the status of the at least one database, string search of the at least one database, and corresponding AI domain application.


The building AI smart management system of the present invention further comprises a data report output module 50, located in the server 1 or the mobile device 2, the building A log database is formed from the work logs of the on-site management. Through the word string search function of the AI program, the keywords of the log database are searched, the required data are collected, and relevant statistical analysis and regression analysis are performed.


The building AI smart management system of the present invention further comprises a cross-platform link module 60, located in the server 1 or the mobile device 2, which is a cross-platform AI smart management interface. The platform is connected to at least one management tool module through management automation, so as to manage the data generated by the at least one management tool module.


The above descriptions and descriptions are only descriptions of the preferred embodiments of the present invention. Those who have common knowledge of this technology may make other modifications according to the scope of the patent application defined below and the above descriptions, but these modifications should still be It is for the creative spirit of the present invention and within the scope of rights of the present invention.

Claims
  • 1. A building AI smart management system, comprising: a dashboard management module located on a server, which comprises an organizational management performance index module, a facility management performance index module, both of which combine at least one measurement index with corresponding evaluation methods, and calculate a score based on the execution results, which is displayed on a monitor; and a cloud smart device monitoring module connected to at least one sensor disposed within a building, which transmits at least one monitoring signal to the cloud smart device monitoring module and displays the monitoring signal on the monitor, whereinthe organizational management performance index module, the facility management performance index module, and the cloud smart device monitoring module are respectively electrically connected to the monitor.
  • 2. The building AI smart management system according to claim 1, further comprising: a scheduling dashboard module located on the server, which allows various schedules within the building's annual management plan to be input through at least one scheduling log, so that an AI program is capable of determining the status of the at least one scheduling log, and displaying a warning on the monitor accordingly, wherein the status of the at least one scheduling log to be determined is whether a schedule is approaching its deadline, or whether a schedule has passed without being executed.
  • 3. The building AI smart management system according to claim 2, further comprising: a statistics dashboard module located on the server, which displays the statistical frequency of various service events within the building on the monitor, including at least one of: the number of public area maintenance items, counseling orders, social work visits, caring meal deliveries, emergency rescues, property management cares, community visits, and package mail receipts and deliveries.
  • 4. The building AI smart management system according to claim 3, further comprising: a data input report processing module located on the server, which processes AI smart management information, including a first digital data transmitted by the sensor and a first data generated by the server input, wherein the scope of the first data is clearly defined by manual pre-setting, and is entered daily into at least one database in Google Forms, and the AI program performs statistical analysis, status determination, string search, and corresponding AI domain applications on the at least one database.
  • 5. The building AI smart management system according to claim 4, further comprising: a data report output module located on the server, which creates a daily log database of the building's on-site management; wherein the AI program uses the string search function to search for keywords in the daily log database, collects the necessary data, and performs related statistical and regression analysis; anda cross-platform link module located on the server, which is a cross-platform AI smart management interface that automatically connects at least one management tool module to manage the data generated by the management tool module.
  • 6. A building AI smart management system, comprising: a dashboard management module located on a mobile device, which comprises an organizational management performance index module, a facility management performance index module, both of which combine at least one measurement index with corresponding evaluation methods, and calculate a score based on the execution results, which is displayed on a monitor; and a cloud smart device monitoring module connected to at least one sensor disposed within a building, which transmits at least one monitoring signal to the cloud smart device monitoring module and displays the monitoring signal on the monitor, whereinthe organizational management performance index module, the facility management performance index module, and the cloud smart device monitoring module are respectively electrically connected to the monitor.
  • 7. The building AI smart management system according to claim 6, further comprising: a scheduling dashboard module located on the mobile device, which allows various schedules within the building's annual management plan to be input through at least one scheduling log, so that an AI program is capable of determining the status of the at least one scheduling log, and displaying a warning on the monitor accordingly, wherein the status of the at least one scheduling log to be determined is whether a schedule is approaching its deadline, or whether a schedule has passed without being executed.
  • 8. The building AI smart management system according to claim 7, further comprising: a statistics dashboard module located on the mobile device, which displays the statistical frequency of various service events within the building on the monitor, including at least one of: the number of public area maintenance items, counseling orders, social work visits, caring meal deliveries, emergency rescues, property management cares, community visits, and package mail receipts and deliveries.
  • 9. The building AI smart management system according to claim 8, further comprising: a data input report processing module located on the mobile device, which processes AI smart management information, including a first digital data transmitted by the sensor and a first data generated by the server input, wherein the scope of the first data is clearly defined by manual pre-setting, and is entered daily into at least one database in Google Forms, and the AI program performs statistical analysis, status determination, string search, and corresponding AI domain applications on the at least one database.
  • 10. The building AI smart management system according to claim 9, further comprising: a data report output module located on the mobile device, which creates a daily log database of the building's on-site management; wherein the AI program uses the string search function to search for keywords in the daily log database, collects the necessary data, and performs related statistical and regression analysis; anda cross-platform link module located on the server, which is a cross-platform AI smart management interface that automatically connects at least one management tool module to manage the data generated by the management tool module.