Building Methods

Abstract
A method of building a structure, the method including the steps of: 1. fabricating a generally longitudinal, non-steel sub-structure of the structure with a cable retainer attached to, or forming a part of, the substructure and that extends substantially longitudinally therealong; 2. assembling the sub-structure into the structure; 3. inserting a cable into the cable retainer; 4. after step 2, applying a tensile force to the cable relative to the cable retainer; and 5. after step 4, bonding the cable to the cable retainer.
Description

BRIEF DESCRIPTION OF THE DRAWINGS

Preferred embodiments of the present invention will now be described, by way of examples only, with reference to the accompanying drawings, wherein:



FIGS. 1 to 11 are each schematic cross-sectional drawings of structures utilising an embodiment of the invention;



FIG. 12 is an exploded view of the sub-structures comprising the structure shown in FIG. 11;



FIG. 13 is a cross-sectional end view of an embodiment of an I beam suitable for use in the structures shown in earlier drawings;



FIG. 14 is a cross-sectional end view of another embodiment of an I beam suitable for use in the structures shown in earlier drawings;



FIG. 15 is a cross-sectional end view of a further embodiment of a rectangular beam suitable for use in the structures shown in earlier drawings; and



FIG. 16 is a cross-sectional end view of an embodiment of a truss assembly suitable for use in the structures shown in earlier drawings.





DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS


FIG. 1 shows a (non-steel) portal frame structure 20 formed from a centre span 22, two columns 24 and two foundations 26. Each half of the centre span 22 and each of the columns 24 represent a sub-structure of the steel portal frame structure 20.


The centre span 22 has a first cable retainer 28 attached thereto, by welding in the regions 30 and via the struts 32 in the region 34. Each of the columns 24 also have cable retainers 36 attached thereto by welding.


Cables, represented by double headed arrows 38 and 40, are passed through the cable retainers 28 and 36 respectively. The cables 38, 40 are tensioned relative to the cable retainers 28, 36 respectively then bonded to the cable retainers 28, 36 respectively, prior to releasing the tension in the cables. The tensioning, bonding and releasing steps shall be described in more detail below.


The cable retainers 28, 36 extend generally along the longitudinal direction of their associated centre span (sub-structure) 22 or column (sub-structure) 24. More particularly, the cable retainers 28, 36 are positioned to follow the tensile line of resistance of their associated sub-structure when the structure 20 is subjected to its intended load during use.


For example, the portal frame structure 20 shown in FIG. 1 is designed to be subject to a downward and horizontal load/use and the cable retainers 28, 36 are thus oriented as shown to best resist deflection caused by that load.


The resulting structure is able to better resist deflection under its designed load conditions as the tension applied to the cables relative to their associated sub-structure stores strain energy in the resulting sub-structure. Accordingly, as forces are applied to structure, the counter strain stored in the sub-structure resists the application of that load.


The resulting structure can, within certain boundaries, accept load with reduced strain and thus has an increased load carrying capacity for a given deflection. A 50-100% reduction in deflection can result compared to a similar sized existing structure.


The portal frame structures shown in FIGS. 2-12 each have their components and sub-structures identified with like reference numerals to those used in FIG. 1. However, in each structure, the cable retainers follow a different path compared the columns and centre span so as to suit differing load conditions.


The structure 50 shown in FIG. 2 is designed to resist upward and horizontal load conditions/usage.


The structure 60 shown in FIG. 3 is designed to resist downward and horizontal load conditions/usage.


The structure 70 shown in FIG. 4 is designed to resist upward and horizontal load conditions/usage.


The structure 80 shown in FIG. 5 is designed to resist upward and horizontal load conditions/usage.


The structure 90 shown in FIG. 6 is designed to resist downward and horizontal load conditions/usage.


The structure 100 shown in FIG. 7 is designed to resist upward and horizontal load conditions/usage.


The structure 110 shown in FIG. 8 is designed to resist downward and horizontal load conditions/usage.


The structure 120 shown in FIG. 9 is designed to resist upward and horizontal load conditions/usage.


The structure 130 shown in FIG. 10 is designed to resist downward and horizontal load conditions/usage.


The structure 140 shown in FIG. 11 is designed to resist upward and horizontal load conditions/usage.



FIG. 12 shows the various sub-structures that comprise the structure 140 shown in FIG. 11. As shown, the centre span 22 is formed from three sub-structures 22a, 22b and 22c. The structure 140 is preferably built by assembling all of the sub-structures into the final form shown in FIG. 11, inserting cables through the cable retainers, jacking the cables into a state of tension, bonding the cables to the cable retainers (for example with cementitous grout) and then releasing the jacking load on the cables.


As an alternative, one or more of the sub-structures can be assembled and tensioned according to the method described above, and then subsequently attached to the sub-structures. For example, the centre span sub-structure can be assembled on the ground and, after tensioned cables have been bonded thereto, be raised into its final position and connected to the column sub-structures.


As a further alternative, cable retainers can be added to a pre-existing structure, or a new structure built without them, which are then tensioned and bonded in the manner described above. This finds particular application in improving the strength and/or deflection performance of an existing built structure or structure whose design is complete.



FIGS. 13 and 14 show examples of cable retainers 28, 36, in the form of tubes, being attached to beams 150 and 152, for example by welding, which are suitable for use in the previously described structures (for example, those structures shown in FIGS. 1 to 6).



FIG. 15 shows an alternative beam 154 in which the cable retainer 28, 36 is in the form of an opening or hole or channel through the beam which is suitable for use in a previously described structure (for example, the structure shown in FIG. 10).



FIG. 16 shows an example of cable retainers 28, 36, in the form of tubes, being part of a truss assembly 156, which is suitable for use in the previously described structures (for example, those structures shown in FIGS. 7 to 10).


The structures described above can be designed to meet strength and dynamic requirements, whilst reducing the need to increase the material added to the structure to satisfy deflection requirements. The embodiments described previously advantageously enable the span of a structure to be increased whilst using the same amount of materials to thus provide a larger structure for the same material cost. Conversely, a structure with a like span to an existing structure can be produced using a reduced amount of materials.


The structures described above are also lighter and cheaper than existing comparable structures, particularly when foundation saving are taken into account.


Although the invention has been described with reference to specific embodiments, it would be appreciated by those skilled in the art that the invention can be embodied in many other forms. For example, the cable retainers can be of any shape and any number of cables can be inserted therein.

Claims
  • 1. A method of building a structure, the method including the steps of: 1. fabricating a generally longitudinal, non-steel sub-structure of the structure with a cable retainer attached to, or forming part of, the sub-structure and that extends substantially longitudinally therealong;2. assembling the sub-structure into a structure;3. inserting a cable into the cable retainer;4. after step 2, applying a tensile force to the cable, relative to the cable retainer; and5. after step 4, bonding the cable to the cable retainer.
  • 2. A method of building a structure, the method including the steps of: 1. fabricating a generally longitudinal, non-steel sub-structure of the structure with a cable retainer attached to, or forming part of, the sub-structure and that extends substantially longitudinally therealong;2. inserting cable into the cable retainer;3. after step 2, applying a tensile force to the cable, relative to the cable retainer; and4. after step 3, bonding the cable to the cable retainer; and5. assembling the sub-structure into a structure.
  • 3. A method of strengthening, or reducing the deflection of, a built structure, the method including the steps of: 1. attaching a cable retainer to a generally longitudinal, non-steel sub-structure of the structure with the cable retainer extending substantially longitudinally therealong;2. inserting cable into the cable retainer;3. applying a tensile force to the cable, relative to the cable retainer; and4. after step 3, bonding the cable to the cable retainer.
  • 4. The method as claimed in claim 1, wherein the cable retainers is adapted to follow the tensile line of resistance the sub-structure is subjected when loaded during use.
  • 5. The method as claimed in claim 1, wherein the method includes assembling at least two sub-structures into a the structure.
  • 6. The method as claimed in claim 1, wherein the method includes inserting at least two cables into the cable retainer.
  • 7. The method as claimed in claim 1, wherein the cable is bonded to the cable retainer by welding.
  • 8. The method as claimed in claim 1, wherein the cable is bonded to the cable retainer by gluing.
  • 9. The method as claimed in claim 1, wherein the cable is bonded to the cable retainer by grouting.
  • 10. The method as claimed in claim 1, wherein the cable is bonded to the cable retainer by expanding the cable retainer relative to the cable or shrinking the cable relative to the cable retainer prior to inserting the cable into the cable retainer.
  • 11. The method as claimed in claim 1, wherein the tensile force is applied to the cable by jacking.
  • 12. The method as claimed in claim 1, wherein the structure is a steel portal frame structure.
  • 13. The method as claimed in claim 12, wherein the structure is produced from I or T section beams or from tubular truss assemblies.
  • 14. The method as claimed in claim 13, wherein when the sub-structure is in the form of an I or T section beam, the cable retainer are is attached to the web of the beam.
  • 15. The method as claimed in claim 14, wherein the cable passes through the flange of the beam.
  • 16. The method as claimed in claim 13, wherein when the sub-structure is a truss assembly, the cable retainer is in the form of one of the tubular members integral with the truss.
  • 17. The method as claimed in claim 11, wherein the sub-structure is utilised in the centre span of the structure.
  • 18. The method as claimed in claim 11, wherein the sub-structure is utilised in the columns or walls of the structure.
  • 19. The method as claimed in claim 11, wherein the cable retainer extends within the boundaries of its associated sub-structure.
  • 20. The method as claimed in claim 11, wherein the cable retainer is attached to the sub-structure external the boundaries of the sub-structure.
  • 21. The method as claimed in claim 1, wherein the non-steel sub-structure includes any one of: aluminum and other alloys; carbon fibre; plastics; ceramics; timber; or glass.
Priority Claims (1)
Number Date Country Kind
2004904033 Jul 2004 AU national
PCT Information
Filing Document Filing Date Country Kind 371c Date
PCT/AU05/01078 7/21/2005 WO 00 8/14/2007