Abstract
The present technology is generally directed to systems and methods for optimizing the burn profiles for coke ovens, such as horizontal heat recovery ovens. In various embodiments the burn profile is at least partially optimized by controlling air distribution in the coke oven. In some embodiments, the air distribution is controlled according to temperature readings in the coke oven. In particular embodiments, the system monitors the crown temperature of the coke oven. After the crown reaches a particular temperature range the flow of volatile matter is transferred to the sole flue to increase sole flue temperatures throughout the coking cycle. Embodiments of the present technology include an air distribution system having a plurality of crown air inlets positioned above the oven floor.
Description
TECHNICAL FIELD

The present technology is generally directed to coke oven burn profiles and methods and systems of optimizing coke plant operation and output.


BACKGROUND

Coke is a solid carbon fuel and carbon source used to melt and reduce iron ore in the production of steel. In one process, known as the “Thompson Coking Process,” coke is produced by batch feeding pulverized coal to an oven that is sealed and heated to very high temperatures for twenty-four to forty-eight hours under closely-controlled atmospheric conditions. Coking ovens have been used for many years to convert coal into metallurgical coke. During the coking process, finely crushed coal is heated under controlled temperature conditions to devolatilize the coal and form a fused mass of coke having a predetermined porosity and strength. Because the production of coke is a batch process, multiple coke ovens are operated simultaneously.


Coal particles or a blend of coal particles are charged into hot ovens, and the coal is heated in the ovens in order to remove volatile matter (VM) from the resulting coke. Horizontal heat recovery (HHR) ovens operate under negative pressure and are typically constructed of refractory bricks and other materials, creating a substantially airtight environment. The negative pressure ovens draw in air from outside the oven to oxidize the coal's VM and to release the heat of combustion within the oven.


In some arrangements, air is introduced to the oven through damper ports or apertures in the oven sidewall or door. In the crown region above the coal-bed, the air combusts with the VM gases evolving from the pyrolysis of the coal. However, with reference to FIGS. 1-3, the buoyancy effect, acting on the cold air entering the oven chamber, can lead to coal burnout and loss in yield productivity. Specifically, as shown in FIG. 1, the cold, dense air entering the oven falls towards the hot coal surface. Before the air can warm, rise, combust with volatile matter, and/or disperse and mix in the oven, it comes into contact with the surface of the coal bed and combusts, creating “hot spots,” as indicated in FIG. 2. With reference to FIG. 3, these hot spots create a burn loss on the coal surface, as evidenced by the depressions formed in the coal bed surface. Accordingly, there exists a need to improve combustion efficiency in coke ovens.


In many coking operations, the draft of the ovens is at least partially controlled through the opening and closing of uptake dampers. However, traditional coking operations base changes to the uptake damper settings on time. For example, in a forty-eight hour cycle, the uptake damper is typically set to be fully open for approximately the first twenty-four hours of the coking cycle. The dampers are then moved to a first partially restricted position prior to thirty-two hours into the coking cycle. Prior to forty hours into the coking cycle, the dampers are moved to a second, further restricted position. At the end of the forty-eight hour coking cycle, the uptake dampers are substantially closed. This manner of managing the uptake dampers can prove to be inflexible. For example, larger charges, exceeding forty-seven tons, can release too much VM into the oven for the volume of air entering the oven through the wide open uptake damper settings. Combustion of this VM-air mixture over prolonged periods of time can cause the temperatures to rise in excess of the NTE temperatures, which can damage the oven. Accordingly, there exists a need to increase the charge weight of coke ovens without exceeding not to exceed (NTE) temperatures.


Heat generated by the coking process is typically converted into power by heat recovery steam generators (HRSGs) associated with the coke plant. Inefficient burn profile management could result in the VM gases not being burned in the oven and sent to the common tunnel. This wastes heat that could be used by the coking oven for the coking process. Improper management of the burn profile can further lower the coke production rate, as well as the quality of the coke produced by a coke plant. For example, many current methods of managing the uptake in coke ovens limits the sole flue temperature ranges that may be maintained over the coking cycle, which can adversely impact production rate and coke quality. Accordingly, there exists a need to improve the manner in which the burn profiles of the coking ovens are managed in order to optimize coke plant operation and output.





BRIEF DESCRIPTION OF THE DRAWINGS

Non-limiting and non-exhaustive embodiments of the present invention, including the preferred embodiment, are described with reference to the following figures, wherein like reference numerals refer to like parts throughout the various views unless otherwise specified.



FIG. 1 depicts an isometric, partially transparent view of a prior art coke oven having door air inlets at opposite ends of the coke oven and depicts one manner in which air enters the oven and sinks toward the coal surface due to buoyant forces.



FIG. 2 depicts an isometric, partially transparent view of a prior art coke oven and areas of coke bed surface burnout formed by direct contact between streams of air and the coal bed surface.



FIG. 3 depicts a partial end elevation view of a coke oven and depicts examples of dimples that form on a coke bed surface due to direct contact between a stream of air and the surface of the coal bed.



FIG. 4 depicts an isometric, partial cut-away view of a portion of a horizontal heat recovery coke plant configured in accordance with embodiments of the present technology.



FIG. 5 depicts a sectional view of a horizontal heat recovery coke oven configured in accordance with embodiments of the present technology.



FIG. 6 depicts an isometric, partially transparent view of a coke oven having crown air inlets configured in accordance with embodiments of the present technology.



FIG. 7 depicts a partial end view of the coke oven depicted in FIG. 6.



FIG. 8 depicts a top, plan view of an air inlet configured in accordance with embodiments of the present technology.



FIG. 9 depicts a traditional uptake operation table, indicating at what position the uptake is to be placed at particular times throughout a forty-eight hour coking cycle.



FIG. 10 depicts an uptake operation table, in accordance with embodiments of the present technology, indicating at what position the uptake is to be placed at particular coke oven crown temperature ranges throughout a forty-eight hour coking cycle.



FIG. 11 depicts a partial end view of a coke oven containing a coke bed produced in accordance with embodiments of the present technology.



FIG. 12 depicts a graphical comparison of coke oven crown temperatures over time for a traditional burn profile and a burn profile in accordance with embodiments of the present technology.



FIG. 13 depicts a graphical comparison of tonnage, coking time, and coking rate for a traditional burn profile and a burn profile in accordance with embodiments of the present technology.



FIG. 14 depicts a graphical comparison of coke oven crown temperatures over time for a traditional burn profile and a burn profile in accordance with embodiments of the present technology.



FIG. 15 depicts another graphical comparison of coke oven sole flue temperatures over time for a traditional burn profile and a burn profile in accordance with embodiments of the present technology.





DETAILED DESCRIPTION

The present technology is generally directed to systems and methods for optimizing the burn profiles for coke ovens, such as horizontal heat recovery (HHR) ovens. In various embodiments, the burn profile is at least partially optimized by controlling air distribution in the coke oven. In some embodiments, the air distribution is controlled according to temperature readings in the coke oven. In particular embodiments, the system monitors the crown temperature of the coke oven. The transfer of gases between the oven crown and the sole flue is optimized to increase sole flue temperatures throughout the coking cycle. In some embodiments, the present technology allows the charge weight of coke ovens to be increased, without exceeding not to exceed (NTE) temperatures, by transferring and burning more of the VM gases in the sole flue. Embodiments of the present technology include an air distribution system having a plurality of crown air inlets positioned above the oven floor. The crown air inlets are configured to introduce air into the oven chamber in a manner that reduces bed burnout.


Specific details of several embodiments of the technology are described below with reference to FIGS. 4-15. Other details describing well-known structures and systems often associated with coking facilities, and in particular air distribution systems, automated control systems, and coke ovens have not been set forth in the following disclosure to avoid unnecessarily obscuring the description of the various embodiments of the technology. Many of the details, dimensions, angles, and other features shown in the Figures are merely illustrative of particular embodiments of the technology. Accordingly, other embodiments can have other details, dimensions, angles, and features without departing from the spirit or scope of the present technology. A person of ordinary skill in the art, therefore, will accordingly understand that the technology may have other embodiments with additional elements, or the technology may have other embodiments without several of the features shown and described below with reference to FIGS. 4-15.


As will be described in further detail below, in several embodiments, the individual coke ovens 100 can include one or more air inlets configured to allow outside air into the negative pressure oven chamber to combust with the coal's VM. The air inlets can be used with or without one or more air distributors to direct, circulate, and/or distribute air within the oven chamber. The term “air”, as used herein, can include ambient air, oxygen, oxidizers, nitrogen, nitrous oxide, diluents, combustion gases, air mixtures, oxidizer mixtures, flue gas, recycled vent gas, steam, gases having additives, inerts, heat-absorbers, liquid phase materials such as water droplets, multiphase materials such as liquid droplets atomized via a gaseous carrier, aspirated liquid fuels, atomized liquid heptane in a gaseous carrier stream, fuels such as natural gas or hydrogen, cooled gases, other gases, liquids, or solids, or a combination of these materials. In various embodiments, the air inlets and/or distributors can function (i.e., open, close, modify an air distribution pattern, etc.) in response to manual control or automatic advanced control systems. The air inlets and/or air distributors can operate on a dedicated advanced control system or can be controlled by a broader draft control system that adjusts the air inlets and/or distributors as well as uptake dampers, sole flue dampers, and/or other air distribution pathways within coke oven systems.



FIG. 4 depicts a partial cut-away view of a portion of an HHR coke plant configured in accordance with embodiments of the present technology. FIG. 5 depicts a sectional view of an HHR coke oven 100 configured in accordance with embodiments of the present technology. Each oven 100 includes an open cavity defined by an oven floor 102, a pusher side oven door 104, a coke side oven door 106 opposite the pusher side oven door 104, opposite sidewalls 108 that extend upwardly from the floor 102 and between the pusher side oven door 104 and coke side oven door 106, and a crown 110, which forms a top surface of the open cavity of an oven chamber 112. Controlling air flow and pressure inside the oven chamber 112 plays a significant role in the efficient operation of the coking cycle. Accordingly, with reference to FIG. 6 and FIG. 7, embodiments of the present technology include one or more crown air inlets 114 that allow primary combustion air into the oven chamber 112. In some embodiments, multiple crown air inlets 114 penetrate the crown 110 in a manner that selectively places oven chamber 112 in open fluid communication with the ambient environment outside the oven 100. With reference to FIG. 8, an example of an uptake elbow air inlet 115 is depicted as having an air damper 116, which can be positioned at any of a number of positions between fully open and fully closed to vary an amount of air flow through the air inlet. Other oven air inlets, including door air inlets and the crown air inlets 114 include air dampers 116 that operate in a similar manner. The uptake elbow air inlet 115 is positioned to allow air into the common tunnel 128, whereas the door air inlets and the crown air inlets 114 vary an amount of air flow into the oven chamber 112. While embodiments of the present technology may use crown air inlets 114, exclusively, to provide primary combustion air into the oven chamber 112, other types of air inlets, such as the door air inlets, may be used in particular embodiments without departing from aspects of the present technology.


In operation, volatile gases emitted from coal positioned inside the oven chamber 112 collect in the crown and are drawn downstream into downcomer channels 118 formed in one or both sidewalls 108. The downcomer channels 118 fluidly connect the oven chamber 112 with a sole flue 120, which is positioned beneath the oven floor 102. The sole flue 120 forms a circuitous path beneath the oven floor 102. Volatile gases emitted from the coal can be combusted in the sole flue 120, thereby, generating heat to support the reduction of coal into coke. The downcomer channels 118 are fluidly connected to uptake channels 122 formed in one or both sidewalls 108. A secondary air inlet 124 can be provided between the sole flue 120 and atmosphere, and the secondary air inlet 124 can include a secondary air damper 126 that can be positioned at any of a number of positions between fully open and fully closed to vary the amount of secondary air flow into the sole flue 120. The uptake channels 122 are fluidly connected to a common tunnel 128 by one or more uptake ducts 130. A tertiary air inlet 132 can be provided between the uptake duct 130 and atmosphere. The tertiary air inlet 132 can include a tertiary air damper 134, which can be positioned at any of a number of positions between fully open and fully closed to vary the amount of tertiary air flow into the uptake duct 130.


Each uptake duct 130 includes an uptake damper 136 that may be used to control gas flow through the uptake ducts 130 and within the ovens 100. The uptake damper 136 can be positioned at any number of positions between fully open and fully closed to vary the amount of oven draft in the oven 100. The uptake damper 136 can comprise any automatic or manually-controlled flow control or orifice blocking device (e.g., any plate, seal, block, etc.). In at least some embodiments, the uptake damper 136 is set at a flow position between 0 and 2, which represents “closed,” and 14, which represents “fully open.” It is contemplated that even in the “closed” position, the uptake damper 136 may still allow the passage of a small amount of air to pass through the uptake duct 130. Similarly, it is contemplated that a small portion of the uptake damper 136 may be positioned at least partially within a flow of air through the uptake duct 130 when the uptake damper 136 is in the “fully open” position. It will be appreciated that the uptake damper may take a nearly infinite number of positions between 0 and 14. With reference to FIG. 9 and FIG. 10, some exemplary settings for the uptake damper 136, increasing in the amount of flow restriction, include: 12, 10, 8, and 6. In some embodiments, the flow position number simply reflects the use of a fourteen inch uptake duct, and each number represents the amount of the uptake duct 130 that is open, in inches. Otherwise, it will be understood that the flow position number scale of 0-14 can be understood simply as incremental settings between open and closed.


As used herein, “draft” indicates a negative pressure relative to atmosphere. For example a draft of 0.1 inches of water indicates a pressure of 0.1 inches of water below atmospheric pressure. Inches of water is a non-SI unit for pressure and is conventionally used to describe the draft at various locations in a coke plant. In some embodiments, the draft ranges from about 0.12 to about 0.16 inches of water. If a draft is increased or otherwise made larger, the pressure moves further below atmospheric pressure. If a draft is decreased, drops, or is otherwise made smaller or lower, the pressure moves towards atmospheric pressure. By controlling the oven draft with the uptake damper 136, the air flow into the oven 100 from the crown air inlets 114, as well as air leaks into the oven 100, can be controlled. Typically, as shown in FIG. 5, an individual oven 100 includes two uptake ducts 130 and two uptake dampers 136, but the use of two uptake ducts and two uptake dampers is not a necessity; a system can be designed to use just one or more than two uptake ducts and two uptake dampers.


In operation, coke is produced in the ovens 100 by first charging coal into the oven chamber 112, heating the coal in an oxygen depleted environment, driving off the volatile fraction of coal and then oxidizing the VM within the oven 100 to capture and use the heat given off. The coal volatiles are oxidized within the oven 100 over an extended coking cycle and release heat to regeneratively drive the carbonization of the coal to coke. The coking cycle begins when the pusher side oven door 104 is opened and coal is charged onto the oven floor 102 in a manner that defines a coal bed. Heat from the oven (due to the previous coking cycle) starts the carbonization cycle. In many embodiments, no additional fuel other than that produced by the coking process is used. Roughly half of the total heat transfer to the coal bed is radiated down onto the top surface of the coal bed from the luminous flame of the coal bed and the radiant oven crown 110. The remaining half of the heat is transferred to the coal bed by conduction from the oven floor 102 which is convectively heated from the volatilization of gases in the sole flue 120. In this way, a carbonization process “wave” of plastic flow of the coal particles and formation of high strength cohesive coke proceeds from both the top and bottom boundaries of the coal bed.


Typically, each oven 100 is operated at negative pressure so air is drawn into the oven during the reduction process due to the pressure differential between the oven 100 and atmosphere. Primary air for combustion is added to the oven chamber 112 to partially oxidize the coal volatiles, but the amount of this primary air is controlled so that only a portion of the volatiles released from the coal are combusted in the oven chamber 112, thereby, releasing only a fraction of their enthalpy of combustion within the oven chamber 112. In various embodiments, the primary air is introduced into the oven chamber 112 above the coal bed through the crown air inlets 114, with the amount of primary air controlled by the crown air dampers 116. In other embodiments, different types of air inlets may be used without departing from aspects of the present technology. For example, primary air may be introduced to the oven through air inlets, damper ports, and/or apertures in the oven sidewalls or doors. Regardless of the type of air inlet used, the air inlets can be used to maintain the desired operating temperature inside the oven chamber 112. Increasing or decreasing primary air flow into the oven chamber 112 through the use of air inlet dampers will increase or decrease VM combustion in the oven chamber 112 and, hence, temperature.


With reference to FIGS. 6 and 7, a coke oven 100 may be provided with crown air inlets 114 configured, in accordance with embodiments of the present technology, to introduce combustion air through the crown 110 and into the oven chamber 112. In one embodiment, three crown air inlets 114 are positioned between the pusher side oven door 104 and a mid-point of the oven 100, along an oven length. Similarly, three crown air inlets 114 are positioned between the coke side oven door 106 and the mid-point of the oven 100. It is contemplated, however, that one or more crown air inlets 114 may be disposed through the oven crown 110 at various locations along the oven's length. The chosen number and positioning of the crown air inlets depends, at least in part, on the configuration and use of the oven 100. Each crown air inlet 114 can include an air damper 116, which can be positioned at any of a number of positions between fully open and fully closed, to vary the amount of air flow into the oven chamber 112. In some embodiments, the air damper 116 may, in the “fully closed” position, still allow the passage of a small amount of ambient air to pass through the crown air inlet 114 into the oven chamber. Accordingly, with reference to FIG. 8, various embodiments of the crown air inlets 114, uptake elbow air inlet 115, or door air inlet, may include a cap 117 that may be removably secured to an open upper end portion of the particular air inlet. The cap 117 may substantially prevent weather (such as rain and snow), additional ambient air, and other foreign matter from passing through the air inlet. It is contemplated that the coke oven 100 may further include one or more distributors configured to channel/distribute air flow into the oven chamber 112.


In various embodiments, the crown air inlets 114 are operated to introduce ambient air into the oven chamber 112 over the course of the coking cycle much in the way that other air inlets, such as those typically located within the oven doors, are operated. However, use of the crown air inlets 114 provides a more uniform distribution of air throughout the oven crown, which has shown to provide better combustion, higher temperatures in the sole flue 120 and later cross over times. The uniform distribution of the air in the crown 110 of the oven 110 reduces the likelihood that the air will contact the surface of the coal bed and create hot spots that create burn losses on the coal surface, as depicted in FIG. 3. Rather, the crown air inlets 114 substantially reduce the occurrence of such hot spots, creating a uniform coal bed surface 140 as it cokes, such as depicted in FIG. 11. In particular embodiments of use, the air dampers 116 of each of the crown air inlets 114 are set at similar positions with respect to one another. Accordingly, where one air damper 116 is fully open, all of the air dampers 116 should be placed in the fully open position and if one air damper 116 is set at a half open position, all of the air dampers 116 should be set at half open positions. However, in particular embodiments, the air dampers 116 could be changed independently from one another. In various embodiments, the air dampers 116 of the crown air inlets 114 are opened up quickly after the oven 100 is charged or right before the oven 100 is charged. A first adjustment of the air dampers 116 to a ¾ open position is made at a time when a first door hole burning would typically occur. A second adjustment of the air dampers 116 to a ½ open position is made at a time when a second door hole burning would occur. Additional adjustments are made based on operating conditions detected throughout the coke oven 100.


The partially combusted gases pass from the oven chamber 112 through the downcomer channels 118 into the sole flue 120 where secondary air is added to the partially combusted gases. The secondary air is introduced through the secondary air inlet 124. The amount of secondary air that is introduced is controlled by the secondary air damper 126. As the secondary air is introduced, the partially combusted gases are more fully combusted in the sole flue 120, thereby, extracting the remaining enthalpy of combustion which is conveyed through the oven floor 102 to add heat to the oven chamber 112. The fully or nearly-fully combusted exhaust gases exit the sole flue 120 through the uptake channels 122 and then flow into the uptake duct 130. Tertiary air is added to the exhaust gases via the tertiary air inlet 132, where the amount of tertiary air introduced is controlled by the tertiary air damper 134 so that any remaining fraction of non-combusted gases in the exhaust gases are oxidized downstream of the tertiary air inlet 132. At the end of the coking cycle, the coal has coked out and has carbonized to produce coke. The coke is preferably removed from the oven 100 through the coke side oven door 106 utilizing a mechanical extraction system, such as a pusher ram. Finally, the coke is quenched (e.g., wet or dry quenched) and sized before delivery to a user.


As discussed above, control of the draft in the ovens 100 can be implemented by automated or advanced control systems. An advanced draft control system, for example, can automatically control an uptake damper 136 that can be positioned at any one of a number of positions between fully open and fully closed to vary the amount of oven draft in the oven 100. The automatic uptake damper can be controlled in response to operating conditions (e.g., pressure or draft, temperature, oxygen concentration, gas flow rate, downstream levels of hydrocarbons, water, hydrogen, carbon dioxide, or water to carbon dioxide ratio, etc.) detected by at least one sensor. The automatic control system can include one or more sensors relevant to the operating conditions of the coke plant. In some embodiments, an oven draft sensor or oven pressure sensor detects a pressure that is indicative of the oven draft. With reference to FIGS. 4 and 5 together, the oven draft sensor can be located in the oven crown 110 or elsewhere in the oven chamber 112. Alternatively, an oven draft sensor can be located at either of the automatic uptake dampers 136, in the sole flue 120, at either the pusher side oven door 104 or coke side oven door 106, or in the common tunnel 128 near or above the coke oven 100. In one embodiment, the oven draft sensor is located in the top of the oven crown 110. The oven draft sensor can be located flush with the refractory brick lining of the oven crown 110 or could extend into the oven chamber 112 from the oven crown 110. A bypass exhaust stack draft sensor can detect a pressure that is indicative of the draft at the bypass exhaust stack 138 (e.g., at the base of the bypass exhaust stack 138). In some embodiments, a bypass exhaust stack draft sensor is located at the intersection of the common tunnel 128 and a crossover duct. Additional draft sensors can be positioned at other locations in the coke plant 100. For example, a draft sensor in the common tunnel could be used to detect a common tunnel draft indicative of the oven draft in multiple ovens proximate the draft sensor. An intersection draft sensor can detect a pressure that is indicative of the draft at one of the intersections of the common tunnel 128 and one or more crossover ducts.


An oven temperature sensor can detect the oven temperature and can be located in the oven crown 110 or elsewhere in the oven chamber 112. A sole flue temperature sensor can detect the sole flue temperature and is located in the sole flue 120. A common tunnel temperature sensor detects the common tunnel temperature and is located in the common tunnel 128. Additional temperature or pressure sensors can be positioned at other locations in the coke plant 100.


An uptake duct oxygen sensor is positioned to detect the oxygen concentration of the exhaust gases in the uptake duct 130. An HRSG inlet oxygen sensor can be positioned to detect the oxygen concentration of the exhaust gases at the inlet of a HRSG downstream from the common tunnel 128. A main stack oxygen sensor can be positioned to detect the oxygen concentration of the exhaust gases in a main stack and additional oxygen sensors can be positioned at other locations in the coke plant 100 to provide information on the relative oxygen concentration at various locations in the system.


A flow sensor can detect the gas flow rate of the exhaust gases. Flow sensors can be positioned at other locations in the coke plant to provide information on the gas flow rate at various locations in the system. Additionally, one or more draft or pressure sensors, temperature sensors, oxygen sensors, flow sensors, hydrocarbon sensors, and/or other sensors may be used at the air quality control system 130 or other locations downstream of the common tunnel 128. In some embodiments, several sensors or automatic systems are linked to optimize overall coke production and quality and maximize yield. For example, in some systems, one or more of a crown air inlet 114, a crown inlet air damper 116, a sole flue damper (secondary damper 126), and/or an oven uptake damper 136 can all be linked (e.g., in communication with a common controller) and set in their respective positions collectively. In this way, the crown air inlets 114 can be used to adjust the draft as needed to control the amount of air in the oven chamber 112. In further embodiments, other system components can be operated in a complementary manner, or components can be controlled independently.


An actuator can be configured to open and close the various dampers (e.g., uptake dampers 136 or crown air dampers 116). For example, an actuator can be a linear actuator or a rotational actuator. The actuator can allow the dampers to be infinitely controlled between the fully open and the fully closed positions. In some embodiments, different dampers can be opened or closed to different degrees. The actuator can move the dampers amongst these positions in response to the operating condition or operating conditions detected by the sensor or sensors included in an automatic draft control system. The actuator can position the uptake damper 136 based on position instructions received from a controller. The position instructions can be generated in response to the draft, temperature, oxygen concentration, downstream hydrocarbon level, or gas flow rate detected by one or more of the sensors discussed above; control algorithms that include one or more sensor inputs; a pre-set schedule, or other control algorithms. The controller can be a discrete controller associated with a single automatic damper or multiple automatic dampers, a centralized controller (e.g., a distributed control system or a programmable logic control system), or a combination of the two. Accordingly, individual crown air inlets 114 or crown air dampers 116 can be operated individually or in conjunction with other inlets 114 or dampers 116.


The automatic draft control system can, for example, control an automatic uptake damper 136 or crown air inlet damper 116 in response to the oven draft detected by an oven draft sensor. The oven draft sensor can detect the oven draft and output a signal indicative of the oven draft to a controller. The controller can generate a position instruction in response to this sensor input and the actuator can move the uptake damper 136 or crown air inlet damper 116 to the position required by the position instruction. In this way, an automatic control system can be used to maintain a targeted oven draft. Similarly, an automatic draft control system can control automatic uptake dampers, inlet dampers, the HRSG dampers, and/or a draft fan, as needed, to maintain targeted drafts at other locations within the coke plant (e.g., a targeted intersection draft or a targeted common tunnel draft). The automatic draft control system can be placed into a manual mode to allow for manual adjustment of the automatic uptake dampers, the HRSG dampers, and/or the draft fan, as needed. In still further embodiments, an automatic actuator can be used in combination with a manual control to fully open or fully close a flow path. As mentioned above, the crown air inlets 114 can be positioned in various locations on the oven 100 and can, likewise, utilize an advanced control system in this same manner.


With reference to FIG. 9, previously known coking procedures dictate that the uptake damper 136 is adjusted, over the course of a forty-eight hour coking cycle, based on predetermined points in time throughout the coking cycle. This methodology is referred to herein as the “Old Profile,” which is not limited to the exemplary embodiments identified. Rather, the Old Profile simply refers to the practice of uptake damper adjustments, over the course of a coking cycle, based on predetermined points in time. As depicted, it is common practice to begin the coking cycle with the uptake draft 136 in a fully open position (position 14). The uptake draft 136 remains in this position for at least the first twelve to eighteen hours. In some cases, the uptake damper 136 is left fully open for the first twenty-four hours. The uptake damper 136 is typically adjusted to a first partially restricted position (position 12) at eighteen to twenty-five hours into the coking cycle. Next, the uptake damper 136 is adjusted to a second partially restricted position (position 10) at twenty-five to thirty hours into the coking cycle. From thirty to thirty-five hours the uptake damper is adjusted to a third partially restricted position (position 8). The uptake damper is next adjusted to a fourth restricted position (position 6) at thirty-five to forty hours into the coking cycle. Finally, the uptake damper is moved to the fully closed position from forty hours into the coking cycle until the coking process is complete.


In various embodiments of the present technology, the burn profile of the coke oven 100 is optimized by adjusting the uptake damper position according to the crown temperature of the coke oven 100. This methodology is referred to herein as the “New Profile,” which is not limited to the exemplary embodiments identified. Rather, the New Profile simply refers to the practice of uptake damper adjustments, over the course of a coking cycle, based on predetermined oven crown temperatures. With reference to FIG. 10, a forty-eight hour coking cycle begins, at an oven crown temperature of approximately 2200° F., with the uptake draft 136 in a fully open position (position 14). In some embodiments, the uptake draft 136 remains in this position until the oven crown reaches a temperature of 2200° F. to 2300° F. At this temperature, the uptake damper 136 is adjusted to a first partially restricted position (position 12). In particular embodiments, the uptake damper 136 is then adjusted to a second partially restricted position (position 10) at an oven crown temperature of between 2400° F. to 2450° F. In some embodiments, the uptake damper 136 is adjusted to a third partially restricted position (position 8) when the oven crown temperature reaches 2500° F. The uptake damper 136 is next adjusted to a fourth restricted position (position 6) at an oven crown temperature of 2550° F. to 2625° F. At an oven crown temperature of 2650° F., in particular embodiments, the uptake damper 136 is adjusted to a fourth partially restricted position (position 4). Finally, the uptake damper 136 is moved to the fully closed position at an oven crown temperature of approximately 2700° F. until the coking process is complete.


Correlating the uptake damper 136 position with the oven crown temperature, rather than making adjustments based on predetermined time periods, allows closing the uptake damper 136 earlier in the coking cycle. This lowers the VM release rate and reduces oxygen intake, which lessens the maximum oven crown temperature. With reference to FIG. 12, the Old Profile is generally characterized by relatively high oven crown maximum temperatures of between 1460° C. (2660° F.) and 1490° C. (2714° F.). The New Profile exhibited oven crown maximum temperatures of between 1420° C. (2588° F.) and 1465° C. (2669° F.). This decrease in oven crown maximum temperature decreases the probability of the ovens reaching or exceeding NTE levels that could damage the ovens. This increased control over the oven crown temperature allows for greater coal charges in the oven, which provides for a coal processing rate that is greater than a designed coal processing rate for the coking oven. The decrease in oven crown maximum temperature further allows for increased sole flue temperatures throughout the coking cycle, which improves coke quality and the ability to coke larger coal charges over a standard coking cycle. With reference to FIG. 13, testing has demonstrated that the Old Profile coked a charge of 45.51 tons in 41.3 hours, producing an oven crown maximum temperature of approximately 1467° C. (2672° F.). The New Profile, by comparison, coked a charge of 47.85 tons in 41.53 hours, producing an oven crown maximum temperature of approximately 1450° C. (2642° F.). Accordingly, the New Profile has demonstrated the ability to coke larger charges at a reduced oven crown maximum temperature.



FIG. 14 depicts testing data that compares coke oven crown temperatures over a coking cycle for the Old Profile and the New Profile. In particular, the New Profile demonstrated lower oven crown temperatures and lower peak temperatures. FIG. 15 depicts additional testing data that demonstrates that the New Profile exhibits higher sole flue temperatures for longer periods throughout the coking cycle. The New Profile achieves the lower oven crown temperatures and higher sole flue temperatures, in part, because more VM is drawn into the sole flue and combusted, which increases the sole flue temperatures over the coking cycle. The increased sole flue temperatures produced by the New Profile further benefit coke production rate and coke quality.


Embodiments of the present technology that increase the sole flue temperatures are characterized by higher thermal energy storage in the structures associated with the coke oven 100. The increase in thermal energy storage benefits subsequent coking cycles by shortening their effective coking times. In particular embodiments the coking times are reduced due to higher levels of initial heat absorption by the oven floor 102. The duration of the coking time is assumed to be the amount of time required for the minimum temperature of the coal bed to reach approximately 1860° F. Crown and sole flue temperature profiles have been controlled in various embodiments by adjusting the uptake dampers 136 (e.g. to allow for different levels of draft and air) and the quantity of the air flow in the oven chamber 112. Higher heat in the sole flue 120 at the end of the coking cycle results in the absorption of more energy in the coke oven structures, such as the oven floor 102, which can be a significant factor in accelerating the coking process of the following coking cycle. This not only reduces the coking time but the additional preheat can potentially help avoid clinker buildup in the following coking cycle.


In various burn profile optimization embodiments of the present technology coking cycle in the coking oven 100 starts with an average sole flue temperature that is higher than an average designed sole flue temperature for the coking oven. In some embodiments, this is attained by closing off the uptake dampers earlier in the coking cycle. This leads to a higher initial temperature for the next coking cycle, which permits the release of additional VM. In typical coking operations the additional VM would lead to an NTE temperature in the crown of the coking oven 100. However, embodiments of the present technology provide for shifting the extra VM into the next oven, via gas sharing, or into the sole flue 120, which allows for a higher sole flue temperature. Such embodiments are characterized by a ratcheting up of the sole flue and oven crown average coking cycle temperatures while keeping below any instantaneous NTE temperatures. This is done, at least in part, by shifting and using the excess VM in cooler parts of the oven. For example, an excess of VM at the start of the coking cycle may be shifted into the sole flue 120 to make it hotter. If the sole flue temperatures approach an NTE, the system can shift the VM into the next oven, by gas haring, or into the common tunnel 128. In other embodiments where the volume of VM expires (typically around mid-cycle), the uptakes may be closed to minimize air in-leaks that would cool off the coke oven 100. This leads to a higher temperature at the end of the coking cycle, which leads to a higher average temperature for the next cycle. This allows the system to coke out at a higher rate, which allows for the use of higher coal charges.


EXAMPLES

The following Examples are illustrative of several embodiments of the present technology.


1. A method of controlling a horizontal heat recovery coke oven burn profile, the method comprising:

  • charging a bed of coal into an oven chamber of a horizontal heat recovery coke oven; the oven chamber being at least partially defined by an oven floor, opposing oven doors, opposing sidewalls that extend upwardly from the oven floor between the opposing oven doors, and an oven crown positioned above the oven floor;
  • creating a negative pressure draft on the oven chamber so that air is drawn into the oven chamber through at least one air inlet, positioned to place the oven chamber in fluid communication with an environment exterior to the horizontal heat recovery coke oven;
  • initiating a carbonization cycle of the bed of coal such that volatile matter is released from the coal bed, mixes with the air, and at least partially combusts within the oven chamber, generating heat within the oven chamber;
  • the negative pressure draft drawing volatile matter into at least one sole flue, beneath the oven floor; at least a portion of the volatile matter combusting within the sole flue, generating heat within the sole flue that is at least partially transferred through the oven floor to the bed of coal;
  • the negative pressure draft drawing exhaust gases away from the at least one sole flue;
  • detecting a plurality of temperature changes in the oven chamber over the carbonization cycle;
  • reducing the negative pressure draft over a plurality of separate flow reducing steps, based on the plurality of temperature changes in the oven chamber.


2. The method of claim 1 wherein the negative pressure draft draws exhaust gases from the at least one sole flue through at least one uptake channel having an uptake damper; the uptake damper being selectively movable between open and closed positions.


3. The method of claim 2 wherein the negative pressure draft is reduced over a plurality of flow reducing steps by moving the uptake damper through a plurality of increasingly flow restrictive positions over the carbonization cycle, based on the plurality of different temperatures in the oven chamber.


4. The method of claim 1 wherein one of the plurality of flow restrictive positions occurs when a temperature of approximately 2200° F.-2300° F. is detected.


5. The method of claim 1 wherein one of the plurality of flow restrictive positions occurs when a temperature of approximately 2400° F.-2450° F. is detected.


6. The method of claim 1 wherein one of the plurality of flow restrictive positions occurs when a temperature of approximately 2500° F. is detected.


7. The method of claim 1 wherein one of the plurality of flow restrictive positions occurs when a temperature of approximately 2550° F. to 2625° F. is detected.


8. The method of claim 1 wherein one of the plurality of flow restrictive positions occurs when a temperature of approximately 2650° F. is detected.


9. The method of claim 1 wherein one of the plurality of flow restrictive positions occurs when a temperature of approximately 2700° F. is detected.


10. The method of claim 1 wherein:

  • one of the plurality of flow restrictive positions occurring when a temperature of approximately 2200° F. to 2300° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2400° F. to 2450° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2500° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2550° F. to 2625° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2650° F. is detected; and
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2700° F. is detected.


11. The method of claim 1 wherein the at least one air inlet includes at least one crown air inlet positioned in the oven crown above the oven floor.


12. The method of claim 11 wherein the at least one crown air inlet includes an air damper that is selectively movable between open and closed positions to vary a level of fluid flow restriction through the at least one crown air inlet.


13. The method of claim 1 wherein the bed of coal has a weight that exceeds a designed bed charge weight for the horizontal heat recovery coke oven; the oven chamber reaching a maximum crown temperature that is less than a designed not to exceed maximum crown temperature for the horizontal heat recovery coke oven.


14. The method of claim 13 wherein the bed of coal has a weight that is greater than a designed coal charge weight for the coke oven.


15. The method of claim 1 further comprising:

  • increasing a temperature of the at least one sole flue above a designed sole flue operating temperature for the horizontal heat recovery coke oven by reducing the negative pressure draft over a plurality of separate flow reducing steps, based on the plurality of temperature changes in the oven chamber.


16. A system for controlling a horizontal heat recovery coke oven burn profile, the method comprising:

  • a horizontal heat recovery coke oven having an oven chamber being at least partially defined by an oven floor, opposing oven doors, opposing sidewalls that extend upwardly from the oven floor between the opposing oven doors, an oven crown positioned above the oven floor, and at least one sole flue, beneath the oven floor, in fluid communication with the oven chamber;
  • a temperature sensor disposed within the oven chamber;
  • at least one air inlet, positioned to place the oven chamber in fluid communication with an environment exterior to the horizontal heat recovery coke oven;
  • at least one uptake channel having an uptake damper in fluid communication with the at least one sole flue; the uptake damper being selectively movable between open and closed positions;
  • the negative pressure draft is reduced over a plurality of flow reducing steps by; and
  • a controller operatively coupled with the uptake damper and adapted to move the uptake damper through a plurality of increasingly flow restrictive positions over the carbonization cycle, based on the plurality of different temperatures detected by the temperature sensor in the oven chamber.


17. The system of claim 16 wherein the at least one air inlet includes at least one crown air inlet positioned in the oven crown above the oven floor.


18. The system of claim 16 wherein the at least one crown air inlet includes an air damper that is selectively movable between open and closed positions to vary a level of fluid flow restriction through the at least one crown air inlet.


19. The system of claim 16 wherein the controller is further operative to increase a temperature of the at least one sole flue above a designed sole flue operating temperature for the horizontal heat recovery coke oven by moving the uptake damper in a manner that reduces the negative pressure draft over a plurality of separate flow reducing steps, based on the plurality of temperature changes in the oven chamber.


20. The system of claim 16 wherein:

  • one of the plurality of flow restrictive positions occurring when a temperature of approximately 2200° F. to 2300° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2400° F. to 2450° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2500° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2550° F. to 2625° F. is detected;
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2650° F. is detected; and
  • another of the plurality of flow restrictive positions occurring when a temperature of approximately 2700° F. is detected.


21. A method of controlling a horizontal heat recovery coke oven burn profile, the method comprising:

  • initiating a carbonization cycle of a bed of coal within an oven chamber of a horizontal heat recovery coke oven;
  • detecting a plurality of temperature changes in the oven chamber over the carbonization cycle;
  • reducing a negative pressure draft on the horizontal heat recovery coke oven over a plurality of separate flow reducing steps, based on the plurality of temperature changes in the oven chamber.


22. The method of claim 21 wherein the negative pressure draft on the horizontal heat recovery coke oven draws air into the oven chamber through at least one air inlet, positioned to place the oven chamber in fluid communication with an environment exterior to the horizontal heat recovery coke oven.


23. The method of claim 21 wherein the negative pressure draft is reduced by actuation of an uptake damper associated with at least one uptake channel in fluid communication with the oven chamber.


24. The method of claim 23 wherein the negative pressure draft is reduced over a plurality of flow reducing steps by moving the uptake damper through a plurality of increasingly flow restrictive positions over the carbonization cycle, based on the plurality of different temperatures in the oven chamber.


25. The method of claim 21 further comprising:

  • increasing a temperature of at least one sole flue, which is in open fluid communication with the oven chamber, above a designed sole flue operating temperature for the horizontal heat recovery coke oven by reducing the negative pressure draft over a plurality of separate flow reducing steps, based on the plurality of temperature changes in the oven chamber.


26. The method of claim 21 wherein the bed of coal has a weight that exceeds a designed bed charge weight for the horizontal heat recovery coke oven; the oven chamber reaching a maximum crown temperature during the carbonization cycle that is less than a designed not to exceed maximum crown temperature for the horizontal heat recovery coke oven.


27. The method of claim 26 further comprising:

  • increasing a temperature of at least one sole flue, which is in open fluid communication with the oven chamber, above a designed sole flue operating temperature for the horizontal heat recovery coke oven by reducing the negative pressure draft over a plurality of separate flow reducing steps, based on the plurality of temperature changes in the oven chamber.


28. The method of claim 27 wherein the bed of coal has a weight that is greater than a designed coal charge weight for the horizontal heat recovery coke oven, defining a coal processing rate that is greater than a designed coal processing rate for the horizontal heat recovery coke oven.


Although the technology has been described in language that is specific to certain structures, materials, and methodological steps, it is to be understood that the invention defined in the appended claims is not necessarily limited to the specific structures, materials, and/or steps described. Rather, the specific aspects and steps are described as forms of implementing the claimed invention. Further, certain aspects of the new technology described in the context of particular embodiments may be combined or eliminated in other embodiments. Moreover, while advantages associated with certain embodiments of the technology have been described in the context of those embodiments, other embodiments may also exhibit such advantages, and not all embodiments need necessarily exhibit such advantages to fall within the scope of the technology. Accordingly, the disclosure and associated technology can encompass other embodiments not expressly shown or described herein. Thus, the disclosure is not limited except as by the appended claims. Unless otherwise indicated, all numbers or expressions, such as those expressing dimensions, physical characteristics, etc. used in the specification (other than the claims) are understood as modified in all instances by the term “approximately.” At the very least, and not as an attempt to limit the application of the doctrine of equivalents to the claims, each numerical parameter recited in the specification or claims which is modified by the term “approximately” should at least be construed in light of the number of recited significant digits and by applying ordinary rounding techniques. Moreover, all ranges disclosed herein are to be understood to encompass and provide support for claims that recite any and all subranges or any and all individual values subsumed therein. For example, a stated range of 1 to 10 should be considered to include and provide support for claims that recite any and all subranges or individual values that are between and/or inclusive of the minimum value of 1 and the maximum value of 10; that is, all subranges beginning with a minimum value of 1 or more and ending with a maximum value of 10 or less (e.g., 5.5 to 10, 2.34 to 3.56, and so forth) or any values from 1 to 10 (e.g., 3, 5.8, 9.9994, and so forth).

Claims
  • 1. A system for controlling a horizontal heat recovery coke oven burn profile, the system comprising: a horizontal heat recovery coke oven having (i) an oven chamber being at least partially defined by an oven floor, opposing oven doors, opposing sidewalls that extend upwardly from the oven floor between the opposing oven doors, and an oven crown positioned above the oven floor, (ii) at least one air inlet, and (iii) at least one sole flue, beneath the oven floor, in fluid communication with the oven chamber;a temperature sensor disposed within the oven chamber;at least one air inlet, positioned to place the oven chamber in fluid communication with an environment exterior to the horizontal heat recovery coke oven;at least one uptake channel having an uptake damper in fluid communication with the at least one sole flue; the uptake damper being selectively movable between open and closed positions; anda controller operatively coupled with the uptake damper and temperature sensor, the controller being adapted to (i) receive a plurality of successively increasing temperature changes detected by the temperature sensor over a carbonization cycle inside the oven chamber, and (ii) move the uptake damper through a plurality of increasingly flow restrictive positions, until the temperature changes in the oven chamber reach a peak temperature, to gradually reduce a negative pressure draft over the increasingly flow restrictive positions of the uptake damper, whereby a rate at which the oven chamber attains the peak temperature during the carbonization cycle is reduced.
  • 2. The system of claim 1, wherein the at least one air inlet includes at least one crown air inlet positioned in the oven crown above the oven floor.
  • 3. The system of claim 2, wherein the at least one crown air inlet includes an air damper that is selectively movable between open and closed positions to vary a level of fluid flow restriction through the at least one crown air inlet.
  • 4. The system of claim 1, wherein the controller is further operative to increase a temperature of the at least one sole flue above a designed sole flue operating temperature for the horizontal heat recovery coke oven by moving the uptake damper in a manner that reduces the negative pressure draft over a plurality of separate flow reducing steps, based on the plurality of temperature changes in the oven chamber.
  • 5. The system of claim 1, wherein the controller is configured to move the uptake damper to: one of the plurality of flow restrictive positions when a temperature of approximately 2200° F. to 2300° F. is detected;another of the plurality of flow restrictive positions when a temperature of approximately 2400° F. to 2450° F. is detected;another of the plurality of flow restrictive positions when a temperature of approximately 2500° F. is detected;another of the plurality of flow restrictive positions when a temperature of approximately 2550° F. to 2625° F. is detected;another of the plurality of flow restrictive positions when a temperature of approximately 2650° F. is detected; andanother of the plurality of flow restrictive positions when a temperature of approximately 2700° F. is detected.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is a divisional application of U.S. patent application Ser. No. 14/839,551, filed on Aug. 28, 2015, which claims the benefit of priority to U.S. Provisional Patent Application No. 62/043,359, filed Aug. 28, 2014, the disclosure of which are incorporated herein by reference in their entirety.

US Referenced Citations (354)
Number Name Date Kind
425797 Hunt Apr 1890 A
469868 Osbourn Mar 1892 A
845719 Schniewind Feb 1907 A
976580 Krause Jul 1909 A
1140798 Carpenter May 1915 A
1424777 Schondeling Aug 1922 A
1430027 Plantinga Sep 1922 A
1486401 Van Ackeren Mar 1924 A
1530995 Geiger Mar 1925 A
1572391 Klaiber Feb 1926 A
1677973 Marquard Jul 1928 A
1705039 Thornhill Mar 1929 A
1721813 Geipert Jul 1929 A
1757682 Palm May 1930 A
1818370 Wine Aug 1931 A
1818994 Kreisinger Aug 1931 A
1830951 Lovett Nov 1931 A
1848818 Becker Mar 1932 A
1947499 Schrader et al. Feb 1934 A
1955962 Jones Apr 1934 A
2075337 Burnaugh Mar 1937 A
2141035 Daniels Dec 1938 A
2195466 Otto Apr 1940 A
2394173 Harris et al. Feb 1946 A
2424012 Bangham et al. Jul 1947 A
2649978 Such Aug 1953 A
2667185 Beavers Jan 1954 A
2723725 Keiffer Nov 1955 A
2756842 Chamberlin et al. Jul 1956 A
2813708 Frey Nov 1957 A
2827424 Homan Mar 1958 A
2873816 Emil et al. Feb 1959 A
2902991 Whitman Sep 1959 A
2907698 Schulz Oct 1959 A
3015893 McCreary Jan 1962 A
3033764 Hannes May 1962 A
3224805 Clyatt Dec 1965 A
3462345 Kernan Aug 1969 A
3511030 Brown et al. May 1970 A
3542650 Kulakov Nov 1970 A
3545470 Paton Dec 1970 A
3592742 Thompson Jul 1971 A
3616408 Hickam Oct 1971 A
3623511 Levin Nov 1971 A
3630852 Nashan et al. Dec 1971 A
3652403 Knappstein et al. Mar 1972 A
3676305 Cremer Jul 1972 A
3709794 Kinzler et al. Jan 1973 A
3710551 Sved Jan 1973 A
3746626 Morrison, Jr. Jul 1973 A
3748235 Pries Jul 1973 A
3784034 Thompson Jan 1974 A
3806032 Pries Apr 1974 A
3811572 Tatterson May 1974 A
3836161 Pries Oct 1974 A
3839156 Jakobie et al. Oct 1974 A
3844900 Schulte Oct 1974 A
3857758 Mole Dec 1974 A
3875016 Schmidt-Balve Apr 1975 A
3876143 Rossow et al. Apr 1975 A
3876506 Dix et al. Apr 1975 A
3878053 Hyde Apr 1975 A
3894302 Lasater Jul 1975 A
3897312 Armour et al. Jul 1975 A
3906992 Leach Sep 1975 A
3912091 Thompson Oct 1975 A
3917458 Polak Nov 1975 A
3928144 Jakimowicz Dec 1975 A
3930961 Sustarsic et al. Jan 1976 A
3933443 Lohrmann Jan 1976 A
3957591 Riecker May 1976 A
3959084 Price May 1976 A
3963582 Helm et al. Jun 1976 A
3969191 Bollenbach Jul 1976 A
3975148 Fukuda et al. Aug 1976 A
3984289 Sustarsic et al. Oct 1976 A
4004702 Szendroi Jan 1977 A
4004983 Pries Jan 1977 A
4025395 Ekholm et al. May 1977 A
4040910 Knappstein et al. Aug 1977 A
4045299 McDonald Aug 1977 A
4059885 Oldengott Nov 1977 A
4067462 Thompson Jan 1978 A
4083753 Rogers et al. Apr 1978 A
4086231 Ikio Apr 1978 A
4093245 Connor Jun 1978 A
4100033 Holter Jul 1978 A
4111757 Carimboli Sep 1978 A
4124450 MacDonald Nov 1978 A
4135948 Mertens et al. Jan 1979 A
4141796 Clark et al. Feb 1979 A
4145195 Knappstein et al. Mar 1979 A
4147230 Ormond et al. Apr 1979 A
4162546 Shortell et al. Jul 1979 A
4181459 Price Jan 1980 A
4189272 Gregor et al. Feb 1980 A
4194951 Pries Mar 1980 A
4196053 Grohmann Apr 1980 A
4211608 Kwasnoski et al. Jul 1980 A
4211611 Bocsanczy Jul 1980 A
4213489 Cain Jul 1980 A
4213828 Calderon Jul 1980 A
4222748 Argo et al. Sep 1980 A
4222824 Flockenhaus et al. Sep 1980 A
4224109 Flockenhaus et al. Sep 1980 A
4225393 Gregor et al. Sep 1980 A
4235830 Bennett et al. Nov 1980 A
4239602 La Bate Dec 1980 A
4248671 Belding Feb 1981 A
4249997 Schmitz Feb 1981 A
4263099 Porter Apr 1981 A
4268360 Tsuzuki et al. May 1981 A
4271814 Lister Jun 1981 A
4284478 Brommel Aug 1981 A
4285772 Kress Aug 1981 A
4287024 Thompson Sep 1981 A
4289584 Chuss et al. Sep 1981 A
4289585 Wagener et al. Sep 1981 A
4296938 Offermann et al. Oct 1981 A
4299666 Ostmann Nov 1981 A
4302935 Cousimano Dec 1981 A
4303615 Jarmell et al. Dec 1981 A
4307673 Caughey Dec 1981 A
4314787 Kwasnik et al. Feb 1982 A
4330372 Cairns et al. May 1982 A
4334963 Stog Jun 1982 A
4336843 Petty Jun 1982 A
4340445 Kucher et al. Jul 1982 A
4342195 Lo Aug 1982 A
4344820 Thompson Aug 1982 A
4344822 Schwartz et al. Aug 1982 A
4353189 Thiersch et al. Oct 1982 A
4366029 Bixby et al. Dec 1982 A
4373244 Mertens et al. Feb 1983 A
4375388 Hara et al. Mar 1983 A
4391674 Velmin et al. Jul 1983 A
4392824 Struck et al. Jul 1983 A
4394217 Holz et al. Jul 1983 A
4395269 Schuler Jul 1983 A
4396394 Li et al. Aug 1983 A
4396461 Neubaum et al. Aug 1983 A
4431484 Weber et al. Feb 1984 A
4439277 Dix Mar 1984 A
4440098 Adams Apr 1984 A
4445977 Husher May 1984 A
4446018 Cerwick May 1984 A
4448541 Lucas May 1984 A
4452749 Kolvek et al. Jun 1984 A
4459103 Gieskieng Jul 1984 A
4469446 Goodboy Sep 1984 A
4474344 Bennett Oct 1984 A
4487137 Horvat et al. Dec 1984 A
4498786 Ruscheweyh Feb 1985 A
4506025 Kleeb et al. Mar 1985 A
4508539 Nakai Apr 1985 A
4527488 Lindgren Jul 1985 A
4564420 Spindeler et al. Jan 1986 A
4568426 Orlando Feb 1986 A
4570670 Johnson Feb 1986 A
4614567 Stahlherm et al. Sep 1986 A
4643327 Campbell Feb 1987 A
4645513 Kubota et al. Feb 1987 A
4655193 Blacket Apr 1987 A
4655804 Kercheval et al. Apr 1987 A
4666675 Parker et al. May 1987 A
4680167 Orlando Jul 1987 A
4704195 Janicka et al. Nov 1987 A
4720262 Durr et al. Jan 1988 A
4724976 Lee Feb 1988 A
4726465 Kwasnik et al. Feb 1988 A
4793981 Doyle et al. Dec 1988 A
4824614 Jones et al. Apr 1989 A
4889698 Moller et al. Dec 1989 A
4919170 Kallinich et al. Apr 1990 A
4929179 Breidenbach et al. May 1990 A
4941824 Holter et al. Jul 1990 A
5052922 Stokman et al. Oct 1991 A
5062925 Durselen et al. Nov 1991 A
5078822 Hodges et al. Jan 1992 A
5087328 Wegerer et al. Feb 1992 A
5114542 Childress et al. May 1992 A
5213138 Presz May 1993 A
5227106 Kolvek Jul 1993 A
5228955 Westbrook, III Jul 1993 A
5234601 Janke et al. Aug 1993 A
5318671 Pruitt Jun 1994 A
5370218 Johnson et al. Dec 1994 A
5423152 Kolvek Jun 1995 A
5447606 Pruitt Sep 1995 A
5480594 Wilkerson et al. Jan 1996 A
5542650 Abel et al. Aug 1996 A
5622280 Mays et al. Apr 1997 A
5659110 Herden et al. Aug 1997 A
5670025 Baird Sep 1997 A
5687768 Albrecht et al. Nov 1997 A
5715962 McDonnell Feb 1998 A
5752548 Matsumoto et al. May 1998 A
5787821 Bhat et al. Aug 1998 A
5810032 Hong et al. Sep 1998 A
5816210 Yamaguchi Oct 1998 A
5857308 Dismore et al. Jan 1999 A
5913448 Mann et al. Jun 1999 A
5928476 Daniels Jul 1999 A
5968320 Sprague Oct 1999 A
6017214 Sturgulewski Jan 2000 A
6059932 Sturgulewski May 2000 A
6139692 Tamura et al. Oct 2000 A
6152668 Knoch Nov 2000 A
6187148 Sturgulewski Feb 2001 B1
6189819 Racine Feb 2001 B1
6290494 Barkdoll Sep 2001 B1
6412221 Emsbo Jul 2002 B1
6596128 Westbrook Jul 2003 B2
6626984 Taylor Sep 2003 B1
6699035 Brooker Mar 2004 B2
6758875 Reid et al. Jul 2004 B2
6907895 Johnson et al. Jun 2005 B2
6946011 Snyder Sep 2005 B2
6964236 Schucker Nov 2005 B2
7056390 Fratello Jun 2006 B2
7077892 Lee Jul 2006 B2
7314060 Chen et al. Jan 2008 B2
7331298 Barkdoll et al. Feb 2008 B2
7433743 Pistikopoulos et al. Oct 2008 B2
7497930 Barkdoll et al. Mar 2009 B2
7611609 Valia et al. Nov 2009 B1
7644711 Creel Jan 2010 B2
7722843 Srinivasachar May 2010 B1
7727307 Winkler Jun 2010 B2
7785447 Eatough et al. Aug 2010 B2
7803627 Hodges et al. Sep 2010 B2
7823401 Takeuchi et al. Nov 2010 B2
7827689 Crane Nov 2010 B2
7998316 Barkdoll Aug 2011 B2
8071060 Ukai et al. Dec 2011 B2
8079751 Kapila et al. Dec 2011 B2
8080088 Srinivasachar Dec 2011 B1
8152970 Barkdoll et al. Apr 2012 B2
8236142 Westbrook Aug 2012 B2
8266853 Bloom et al. Sep 2012 B2
8398935 Howell et al. Mar 2013 B2
8409405 Kim et al. Apr 2013 B2
8647476 Kim et al. Feb 2014 B2
8800795 Hwang Aug 2014 B2
8956995 Masatsugu et al. Feb 2015 B2
8980063 Kim et al. Mar 2015 B2
9039869 Kim et al. May 2015 B2
9057023 Reichelt et al. Jun 2015 B2
9193915 West et al. Nov 2015 B2
9238778 Quanci et al. Jan 2016 B2
9243186 Quanci et al. Jan 2016 B2
9249357 Quanci et al. Feb 2016 B2
9359554 Quanci et al. Jun 2016 B2
9580656 Quanci et al. Feb 2017 B2
9672499 Quanci et al. Jun 2017 B2
9708542 Quanci et al. Jul 2017 B2
9862888 Quanci et al. Jan 2018 B2
9976089 Quanci et al. May 2018 B2
10016714 Quanci et al. Jul 2018 B2
10041002 Quanci et al. Aug 2018 B2
10047296 Chun et al. Aug 2018 B2
10053627 Sarpen et al. Aug 2018 B2
10233392 Quanci et al. Mar 2019 B2
10308876 Quanci et al. Jun 2019 B2
10323192 Quanci et al. Jun 2019 B2
20020170605 Shiraishi et al. Nov 2002 A1
20030014954 Ronning et al. Jan 2003 A1
20030015809 Carson Jan 2003 A1
20030057083 Eatough et al. Mar 2003 A1
20050087767 Fitzgerald et al. Apr 2005 A1
20060102420 Huber et al. May 2006 A1
20060149407 Markham et al. Jul 2006 A1
20070116619 Taylor et al. May 2007 A1
20070251198 Witter Nov 2007 A1
20080028935 Andersson Feb 2008 A1
20080179165 Chen et al. Jul 2008 A1
20080257236 Green Oct 2008 A1
20080271985 Yamasaki Nov 2008 A1
20080289305 Girondi Nov 2008 A1
20090007785 Kimura et al. Jan 2009 A1
20090152092 Kim et al. Jun 2009 A1
20090162269 Barger et al. Jun 2009 A1
20090217576 Kim et al. Sep 2009 A1
20090283395 Hippe Nov 2009 A1
20100095521 Kartal et al. Apr 2010 A1
20100106310 Grohman Apr 2010 A1
20100113266 Abe et al. May 2010 A1
20100115912 Worley May 2010 A1
20100181297 Whysail Jul 2010 A1
20100196597 Di Loreto Aug 2010 A1
20100276269 Schuecker et al. Nov 2010 A1
20100287871 Bloom et al. Nov 2010 A1
20100300867 Kim et al. Dec 2010 A1
20100314234 Knoch et al. Dec 2010 A1
20110048917 Kim et al. Mar 2011 A1
20110088600 McRae Apr 2011 A1
20110120852 Kim May 2011 A1
20110144406 Masatsugu et al. Jun 2011 A1
20110168482 Merchant et al. Jul 2011 A1
20110174301 Haydock et al. Jul 2011 A1
20110192395 Kim Aug 2011 A1
20110198206 Kim et al. Aug 2011 A1
20110223088 Chang et al. Sep 2011 A1
20110253521 Kim Oct 2011 A1
20110291827 Baldocchi et al. Dec 2011 A1
20110313218 Dana Dec 2011 A1
20110315538 Kim et al. Dec 2011 A1
20120024688 Barkdoll Feb 2012 A1
20120030998 Barkdoll et al. Feb 2012 A1
20120125709 Merchant et al. May 2012 A1
20120152720 Reichelt et al. Jun 2012 A1
20120180133 Ai-Harbi et al. Jul 2012 A1
20120228115 Westbrook Sep 2012 A1
20120247939 Kim et al. Oct 2012 A1
20120305380 Wang et al. Dec 2012 A1
20130020781 Kishikawa Jan 2013 A1
20130045149 Miller Feb 2013 A1
20130216717 Rago et al. Aug 2013 A1
20130220373 Kim Aug 2013 A1
20130306462 Kim et al. Nov 2013 A1
20140033917 Rodgers et al. Feb 2014 A1
20140039833 Sharpe, Jr. et al. Feb 2014 A1
20140061018 Sarpen et al. Mar 2014 A1
20140083836 Quanci et al. Mar 2014 A1
20140182195 Quanci et al. Jul 2014 A1
20140182683 Quanci et al. Jul 2014 A1
20140183023 Quanci et al. Jul 2014 A1
20140208997 Alferyev et al. Jul 2014 A1
20140224123 Walters Aug 2014 A1
20140262139 Choi et al. Sep 2014 A1
20140262726 West et al. Sep 2014 A1
20150122629 Freimuth et al. May 2015 A1
20150219530 Li et al. Aug 2015 A1
20150247092 Quanci et al. Sep 2015 A1
20150361346 West et al. Dec 2015 A1
20150361347 Ball et al. Dec 2015 A1
20160026193 Rhodes et al. Jan 2016 A1
20160048139 Samples et al. Feb 2016 A1
20160149944 Obermeirer et al. May 2016 A1
20160186063 Quanci et al. Jun 2016 A1
20160186064 Quanci et al. Jun 2016 A1
20160186065 Quanci et al. Jun 2016 A1
20160222297 Choi et al. Aug 2016 A1
20160319197 Quanci et al. Nov 2016 A1
20160319198 Quanci et al. Nov 2016 A1
20170015908 Quanci et al. Jan 2017 A1
20170137714 West et al. May 2017 A1
20170183569 Quanci et al. Jun 2017 A1
20170253803 West et al. Sep 2017 A1
20170352243 Quanci et al. Dec 2017 A1
20180340122 Crum et al. Nov 2018 A1
20190099708 Quanci Apr 2019 A1
20190161682 Quanci et al. May 2019 A1
20190169503 Chun et al. Jun 2019 A1
Foreign Referenced Citations (157)
Number Date Country
1172895 Aug 1984 CA
2775992 May 2011 CA
2822841 Jul 2012 CA
2822857 Jul 2012 CA
87212113 Jun 1988 CN
87107195 Jul 1988 CN
2064363 Oct 1990 CN
2139121 Jul 1993 CN
1092457 Sep 1994 CN
1255528 Jun 2000 CN
1270983 Oct 2000 CN
2528771 Feb 2002 CN
1358822 Jul 2002 CN
2521473 Nov 2002 CN
1468364 Jan 2004 CN
1527872 Sep 2004 CN
2668641 Jan 2005 CN
1957204 May 2007 CN
101037603 Sep 2007 CN
101058731 Oct 2007 CN
101157874 Apr 2008 CN
201121178 Sep 2008 CN
101395248 Mar 2009 CN
100510004 Jul 2009 CN
101486017 Jul 2009 CN
201264981 Jul 2009 CN
101497835 Aug 2009 CN
101509427 Aug 2009 CN
102155300 Aug 2011 CN
2509188 Nov 2011 CN
202226816 May 2012 CN
202265541 Jun 2012 CN
102584294 Jul 2012 CN
202415446 Sep 2012 CN
103468289 Dec 2013 CN
105189704 Dec 2015 CN
106661456 May 2017 CN
201729 Sep 1908 DE
212176 Jul 1909 DE
1212037 Mar 1966 DE
3231697 Jan 1984 DE
3328702 Feb 1984 DE
3315738 Mar 1984 DE
3329367 Nov 1984 DE
3407487 Jun 1985 DE
19545736 Jun 1997 DE
19803455 Aug 1999 DE
10122531 Nov 2002 DE
10154785 May 2003 DE
102005015301 Oct 2006 DE
102006004669 Aug 2007 DE
102006026521 Dec 2007 DE
102009031436 Jan 2011 DE
102011052785 Dec 2012 DE
0126399 Nov 1984 EP
0208490 Jan 1987 EP
0903393 Mar 1999 EP
1538503 Jun 2005 EP
2295129 Mar 2011 EP
2339664 Aug 1977 FR
364236 Jan 1932 GB
368649 Mar 1932 GB
441784 Jan 1936 GB
606340 Aug 1948 GB
611524 Nov 1948 GB
725865 Mar 1955 GB
871094 Jun 1961 GB
923205 May 1963 GB
S50148405 Dec 1975 JP
S59019301 Feb 1978 JP
54054101 Apr 1979 JP
S5453103 Apr 1979 JP
57051786 Mar 1982 JP
57051787 Mar 1982 JP
57083585 May 1982 JP
57090092 Jun 1982 JP
58091788 May 1983 JP
59051978 Mar 1984 JP
59053589 Mar 1984 JP
59071388 Apr 1984 JP
59108083 Jun 1984 JP
59145281 Aug 1984 JP
60004588 Jan 1985 JP
61106690 May 1986 JP
62011794 Jan 1987 JP
62285980 Dec 1987 JP
01103694 Apr 1989 JP
01249886 Oct 1989 JP
H0319127 Mar 1991 JP
03197588 Aug 1991 JP
04159392 Jun 1992 JP
H04178494 Jun 1992 JP
H0649450 Feb 1994 JP
H0654753 Jul 1994 JP
H06264062 Sep 1994 JP
07188668 Jul 1995 JP
07216357 Aug 1995 JP
H07204432 Aug 1995 JP
H08104875 Apr 1996 JP
08127778 May 1996 JP
H10273672 Oct 1998 JP
H11-131074 May 1999 JP
2000204373 Jul 2000 JP
2001200258 Jul 2001 JP
2002106941 Apr 2002 JP
2003041258 Feb 2003 JP
2003071313 Mar 2003 JP
2003292968 Oct 2003 JP
2003342581 Dec 2003 JP
2005503448 Feb 2005 JP
2005263983 Sep 2005 JP
2006188608 Jul 2006 JP
2007063420 Mar 2007 JP
4101226 Jun 2008 JP
2008231278 Oct 2008 JP
2009073864 Apr 2009 JP
2009073865 Apr 2009 JP
2009144121 Jul 2009 JP
2010229239 Oct 2010 JP
2010248389 Nov 2010 JP
2012102302 May 2012 JP
2013006957 Jan 2013 JP
2013510910 Mar 2013 JP
2014040502 Mar 2014 JP
1019960008754 Oct 1996 KR
1019990054426 Jul 1999 KR
20000042375 Jul 2000 KR
100296700 Oct 2001 KR
1020050053861 Jun 2005 KR
100737393 Jul 2007 KR
100797852 Jan 2008 KR
20110010452 Feb 2011 KR
101314288 Apr 2011 KR
20130050807 May 2013 KR
101318388 Oct 2013 KR
2083532 Jul 1997 RU
2441898 Feb 2012 RU
1535880 Jan 1990 SU
201241166 Oct 2012 TW
201245431 Nov 2012 TW
50580 Oct 2002 UA
WO9012074 Oct 1990 WO
WO9945083 Sep 1999 WO
WO2005023649 Mar 2005 WO
WO2005115583 Dec 2005 WO
WO2007103649 Sep 2007 WO
WO2008034424 Mar 2008 WO
WO2011000447 Jan 2011 WO
WO2012029979 Mar 2012 WO
WO2012031726 Mar 2012 WO
WO2013023872 Feb 2013 WO
WO2010107513 Sep 2013 WO
WO2014021909 Feb 2014 WO
WO2014043667 Mar 2014 WO
WO2014105064 Jul 2014 WO
WO2014153050 Sep 2014 WO
WO2016004106 Jan 2016 WO
Non-Patent Literature Citations (129)
Entry
U.S. Appl. No. 13/830,971, filed Mar. 14, 2013, now U.S. Pat. No. 10,047,296, titled Non-Perpendicular Connections Between Coke Oven Uptakes and a Hot Common Tunnel, and Associated Systems and Methods, now U.S. Pat. No. 10,047,295.
U.S. Appl. No. 16/026,363, filed Jul. 3, 2018, titled Non-Perpendicular Connections Between Coke Oven Uptakes and a Hot Common Tunnel, and Associated Systems and Methods.
U.S. Appl. No. 13/730,796, filed Dec. 28, 2012, titled Methods and Systems for Improved Coke Quenching.
U.S. Appl. No. 13/730,598, filed Dec. 28, 2012, now U.S. Pat. No. 9,238,778, titled Systems and Methods for Improving Quenched Coke Recovery.
U.S. Appl. No. 14/952,267, filed Nov. 25, 2015, now U.S. Pat. No. 9,862,888, titled Systems and Methods for Improving Quenched Coke Recovery.
U.S. Appl. No. 15/830,320, filed Dec. 4, 2017, titled Systems and Methods for Improving Quenched Coke Recovery.
U.S. Appl. No. 07/587,742, filed Sep. 25, 1990, now U.S. Pat. No. 5,114,542, titled Nonrecovery Coke Oven Battery and Method of Operation.
U.S. Appl. No. 07/878,904, filed May 6, 1992, now U.S. Pat. No. 5,318,671, titled Method of Operation of Nonrecovery Coke Oven Battery.
U.S. Appl. No. 09/783,195, filed Feb. 14, 2001, now U.S. Pat. No. 6,596,128, titled Coke Oven Flue Gas Sharing.
U.S. Appl. No. 07/886,804, filed May 22, 1992, now U.S. Pat. No. 5,228,955, titled High Strength Coke Oven Wall Having Gas Flues Therein.
U.S. Appl. No. 08/059,673, filed May 12, 1993, now U.S. Pat. No. 5,447,606, titled Method of and Apparatus for Capturing Coke Oven Charging Emissions.
U.S. Appl. No. 08/914,140, filed Aug. 19, 1997, now U.S. Pat. No. 5,928,476, titled Nonrecovery Coke Oven Door.
U.S. Appl. No. 09/680,187, filed Oct. 5, 2000, now U.S. Pat. No. 6,290,494, titled Method and Apparatus for Coal Coking.
U.S. Appl. No. 10/933,866, filed Sep. 3, 2004, now U.S. Pat. No. 7,331,298, titled Coke Oven Rotary Wedge Door Latch.
U.S. Appl. No. 11/424,566, filed Jun. 16, 2006, now U.S. Pat. No. 7,497,930, titled Method and Apparatus for Compacting Coal for a Coal Coking Process.
U.S. Appl. No. 12/405,269, filed Mar. 17, 2009, now U.S. Pat. No. 7,998,316, titled Flat Push Coke Wet Quenching Apparatus and Process.
U.S. Appl. No. 13/205,960, filed Aug. 9, 2011, now U.S. Pat. No. 9,321,965, titled Flat Push Coke Wet Quenching Apparatus and Process.
U.S. Appl. No. 11/367,236, filed Mar. 3, 2006, now U.S. Pat. No. 8,152,970, titled Method and Apparatus For Producing Coke.
U.S. Appl. No. 12/403,391, filed Mar. 13, 2009, now U.S. Pat. No. 8,172,930, titled Cleanable In Situ Spark Arrestor.
U.S. Appl. No. 12/849,192, filed Aug. 3, 2010, now U.S. Pat. No. 9,200,225, titled Method and Apparatus for Compacting Coal for a Coal Coking Process.
U.S. Appl. No. 13/631,215, filed Sep. 28, 2012, now U.S. Pat. No. 9,683,740, titled Methods for Handling Coal Processing Emissions and Associated Systems and Devices.
U.S. Appl. No. 13/730,692, filed Dec. 28, 2012, now U.S. Pat. No. 9,193,913, titled Reduced Output Rate Coke Oven Operation With Gas Sharing Providing Extended Process Cycle.
U.S. Appl. No. 14/921,723, filed Oct. 23, 2015, titled Reduced Output Rate Coke Oven Operation With Gas Sharing Providing Extended Process Cycle.
U.S. Appl. No. 14/655,204, filed Jun. 24, 2015, titled Systems and Methods for Removing Mercury From Emissions.
U.S. Appl. No. 16/000,516, filed June 5, 2018, titled Systems and Methods for Removing Mercury From Emissions.
U.S. Appl. No. 15/830,320, filed Dec. 4, 2017, now U.S. Pat. No. 10,323,192, titled Systems and Methods for Improving Quenched Coke Recovery.
U.S. Appl. No. 13/730,735, filed Dec. 28, 2012, now U.S. Pat. No. 9,273,249, titled Systems and Methods for Controlling Air Distribution in a Coke Oven.
U.S. Appl. No. 14/655,013, filed Jun. 23, 2015, titled Vent Stack Lids and Associated Systems and Methods.
U.S. Appl. No. 13/843,166, now U.S. Pat. No. 9,273,250, filed Mar. 15, 2013, titled Methods and Systems for Improved Quench Tower Design.
U.S. Appl. No. 15/014,547, filed Feb. 3, 2016, titled Methods and Systems for Improved Quench Tower Design.
U.S. Appl. No. 14/655,003, filed Jun. 23, 2015, titled Systems and Methods for Maintaining a Hot Car in a Coke Plant.
U.S. Appl. No. 13/829,588, now U.S. Pat. No. 9,193,915, filed Mar. 14, 2013, titled Horizontal Heat Recovery Coke Ovens Having Monolith Crowns.
U.S. Appl. No. 15/322,176, filed Dec. 27, 2016, now U.S. Pat. No. 10,526,541, titled Horizontal Heat Recovery Coke Ovens Having Monolith Crowns.
U.S. Appl. No. 15/511,036, filed Mar. 14, 2017, titled Coke Ovens Having Monolith Component Construction.
U.S. Appl. No. 16/704,689, filed Dec. 5, 2019, titled Horizontal Heat Recovery Coke Ovens Having Monolith Crowns.
U.S. Appl. No. 13/589,009, filed Aug. 17, 2012, titled Automatic Draft Control System for Coke Plants.
U.S. Appl. No. 15/139,568, filed Apr. 27, 2016, titled Automatic Draft Control System for Coke Plants.
U.S. Appl. No. 13/588,996, now U.S. Pat. No. 9,243,186, filed Aug. 17, 2012, titled Coke Plant Including Exhaust Gas Sharing.
U.S. Appl. No. 14/959,450, filed Dec. 4, 2015, now U.S. Pat. No. 10,041,002, titled Coke Plant Including Exhaust Gas Sharing, now U.S. Pat. No. 10,041,002.
U.S. Appl. No. 16/047,198, filed Jul. 27, 2018, titled Coke Plant Including Exhaust Gas Sharing.
U.S. Appl. No. 13/589,004, now U.S. Pat. No. 9,249,357, filed Aug. 17, 2012, titled Method and Apparatus for Volatile Matter Sharing in Stamp-Charged Coke Ovens.
U.S. Appl. No. 13/730,673, filed Dec. 28, 2012, titled Exhaust Flow Modifier, Duct Intersection Incorporating the Same, and Methods Therefor.
U.S. Appl. No. 15/281,891, filed Sep. 30, 2016, titled Exhaust Flow Modifier, Duck Intersection Incorporating the Same, and Methods Therefor.
U.S. Appl. No. 13/598,394, now U.S. Pat. No. 9,169,439, filed Aug. 29, 2012, titled Method and Apparatus for Testing Coal Coking Properties.
U.S. Appl. No. 14/865,581, filed Sep. 25, 2015, now U.S. Pat. No. 10,053,627, titled Method and Apparatus for Testing Coal Coking Properties, now U.S. Pat. No. 10,053,627.
U.S. Appl. No. 14/839,384, filed Aug. 28, 2015, titled Coke Oven Charging System.
U.S. Appl. No. 15/443,246, now U.S. Pat. No. 9,976,089, filed Feb. 27, 2017, titled Coke Oven Charging System.
U.S. Appl. No. 14/587,670, filed Dec. 31, 2014, titled Methods for Decarbonizing Coking Ovens, and Associated Systems and Devices.
U.S. Appl. No. 14/984,489, filed Dec. 30, 2015, titled Multi-Modal Beds of Coking Material.
U.S. Appl. No. 14/983,837, filed Dec. 30, 2015, titled Multi-Modal Beds of Coking Material.
U.S. Appl. No. 14/986,281, filed Dec. 31, 2015, titled Multi-Modal Beds of Coking Material.
U.S. Appl. No. 14/987,625, filed Jan. 4, 2016, titled Integrated Coke Plant Automation and Optimization Using Advanced Control and Optimization Techniques.
U.S. Appl. No. 14/839,493, filed Aug. 28, 2015, now U.S. Pat. No. 10,233,392, titled Method and System for Optimizing Coke Plant Operation and Output.
U.S. Appl. No. 16/251,352, filed Jan. 18, 2019, titled Method and System for Optimizing Coke Plant Operation and Output.
U.S. Appl. No. 14/839,551, filed Aug. 28, 2015, now U.S. Pat. No. 10,308,876, titled Burn Profiles for Coke Operations.
U.S. Appl. No. 14/839,588, filed Aug. 28, 2015, now U.S. Pat. No. 9,708,542, titled Method and System for Optimizing Coke Plant Operation and Output.
U.S. Appl. No. 15/392,942, filed Dec. 28, 2016, now U.S. Pat. No. 10,526,542, titled Method and System for Dynamically Charging a Coke Oven.
U.S. Appl. No. 16/735,103, filed Jan. 6, 2020, titled Method and System for Dynamically Charging a Coke Oven.
U.S. Appl. No. 15/614,525, filed Jun. 5, 2017, titled Methods and Systems for Automatically Generating a Remedial Action in an Industrial Facility.
U.S. Appl. No. 15/987,860, filed May 23, 2018, titled System and Method for Repairing a Coke Oven.
U.S. Appl. No. 16/729,053, filed Dec. 27, 2019, titled Oven Uptakes.
U.S. Appl. No. 16/729,036, filed Dec. 27, 2019, titled Systems and Methods for Treating a Surface of a Coke Plant.
U.S. Appl. No. 16/729,201, filed Dec. 27, 2019, titled Gaseous Tracer Leak Detection.
U.S. Appl. No. 16/729,122, filed Dec. 27, 2019, titled Methods and Systems for Providing Corrosion Resistant Surfaces In Contaminant Treatment Systems.
U.S. Appl. No. 16/729,068, filed Dec. 27, 2019, titled Systems and Methods for Utilizing Flue Gas.
U.S. Appl. No. 16/729,129, filed Dec. 27, 2019, titled Coke Plant Tunnel Repair and Flexible Joints.
U.S. Appl. No. 16/729,170, filed Dec. 27, 2019, titled Coke Plant Tunnel Repair and Anchor Distribution.
U.S. Appl. No. 16/729,157, filed Dec. 27, 2019, titled Particulate Detection for Industrial Facilities, and Associated Systems and Methods.
U.S. Appl. No. 16/729,057, filed Dec. 27, 2019, titled Decarbonization of Coke Ovens and Associated Systems and Methods.
U.S. Appl. No. 16/729,212, filed Dec. 27, 2019, titled Heat Recovery Oven Foundation.
U.S. Appl. No. 16/729,219, filed Dec. 27, 2019, titled Spring-Loaded Heat Recovery Oven System and Method.
U.S. Appl. No. 16/251,352, filed Jan. 18, 2019, Quanci et al.
ASTM D5341-99(2010)e1, Standard Test Method for Measuring Coke Reactivity Index (CRI) and Coke Strength After Reaction (CSR), ASTM International, West Conshohocken, PA, 2010.
Astrom, et al., “Feedback Systems: An Introduction for Scientists and Engineers,” Sep. 16, 2006, available on line at http://people/duke.edu/-hpgavin/SystemID/References/Astrom-Feedback-2006.pdf ; 404 pages.
Basset et al., “Calculation of steady flow pressure loss coefficients for pipe junctions,” Proc Instn Mech Engrs., vol. 215, Part C. IMechIE 2001.
Beckman et al., “Possibilities and limits of cutting back coking plant output,” Stahl Und Eisen, Verlag Stahleisen, Dusseldorf, DE, vol. 130, No. 8, Aug. 16, 2010, pp. 57-67.
Bloom, et al., “Modular cast block—The future of coke oven repairs,” Iron & Steel Technol, AIST, Warrendale, PA, vol. 4, No. 3, Mar. 1, 2007, pp. 61-64.
Boyes, Walt. (2003), Instrumentation Reference Book (3rd Edition)—34.7.4.6 Infrared and Thermal Cameras, Elsevier. Online version available at: https://app.knovel.com/hotlink/pdf/id:kt004QMGV6/instrumentation-reference-2/ditigal-video.
Clean coke process: process development studies by USS Engineers and Consultants, Inc., Wisconsin Tech Search, request date Oct. 5, 2011, 17 pages.
“Conveyor Chain Designer Guild”, Mar. 27, 2014 (date obtained from wayback machine), Renold.com, Section 4, available online at: http://www.renold/com/upload/renoldswitzerland/conveyor_chain_-_designer_guide.pdf.
Costa, et al., “Edge Effects on the Flow Characteristics in a 90 deg Tee Junction,” Transactions of the ASME, Nov. 2006, vol. 128, pp. 1204-1217.
Crelling, et al., “Effects of Weathered Coal on Coking Properties and Coke Quality”, Fuel, 1979, vol. 58, Issue 7, pp. 542-546.
Database WPI, Week 199115, Thomson Scientific, Lond, GB; AN 1991-107552.
Diez, et al., “Coal for Metallurgical Coke Production: Predictions of Coke Quality and Future Requirements for Cokemaking”, International Journal of Coal Geology, 2002, vol. 50, Issue 1-4, pp. 389-412.
Industrial Furnace Design Handbook, Editor-in-Chief: First Design Institute of First Ministry of Machinery Industry, Beijing: Mechanical Industry Press, pp. 180-183, Oct. 1981.
JP 03-197588, Inoue Keizo et al., Method and Equipment For Boring Degassing Hole In Coal Charge In Coke Oven, Japanese Patent (Abstract Only) Aug. 28, 1991.
JP 04-159392, Inoue Keizo et al., Method And Equipment For Opening Hole For Degassing Of Coal Charge In Coke Oven, Japanese Patent (Abstract Only) Jun. 2, 1992.
Kerlin, Thomas (1999), Practical Thermocouple Thermometry—1.1 The Thermocouple. ISA. Online version available at https:app.knovel.com/pdf/id:kt007XPTM3/practical-thermocouple/the-thermocouple.
Kochanski et al., “Overview of Uhde Heat Recovery Cokemaking Technology,” AISTech Iron and Steel Technology Conference Proceedings, Association for Iron and Steel Technology, U.S., vol. 1, Jan. 1, 2005, pp. 25-32.
Madias, et al., “A review on stamped charging of coals” (2013). Available at https://www.researchgate.net/publication/263887759_A_review_on_stamped_charging_of_coals.
Metallurgical Coke MSDS, ArcelorMittal, May 30, 2011, available online at http://dofasco.arcelormittal.com/-/media/Files/A/Arcelormittal-Canada/material-safety/metallurgical-coke.pdf.
“Middletown Coke Company HRSG Maintenance BACT Analysis Option 1—Individual Spray Quenches Sun Heat Recovery Coke Facility Process Flow Diagram Middletown Coke Company 100 Oven Case #1-24.5 VM”, (Sep. 1, 2009), URL: http://web.archive.org/web/20090901042738/http://epa.ohio.gov/portals/27/transfer/ptiApplication/mcc/new/262504.pdf, (Feb. 12, 2016), XP055249803 [X] 1-13 * p. 7 * * pp. 8-11.
Practical Technical Manual of Refractories, Baoyu Hu, etc., Beijing: Metallurgical Industry Press, Chapter 6; 2004, 6-30.
Refractories for Ironmaking and Steelmaking: A History of Battles over High Temperatures; Kyoshi Sugita (Japan, Shaolin Zhang), 1995, p. 160, 2004, 2-29.
Rose, Harold J., “The Selection of Coals for the Manufacture of Coke,” American Institute of Mining and Metallurgical Engineers, Feb. 1926, 8 pages.
Waddell, et al., “Heat-Recovery Cokemaking Presentation,” Jan. 1999, pp. 1-25.
Walker D N et al, “Sun Coke Company's heat recovery cokemaking technology high coke quality and low environmental impact”, Revue De Metallurgie—Cahiers D'Informations Techniques, Revue De Metallurgie. Paris, FR, (Mar. 1, 2003), vol. 100, No. 3, ISSN 0035-1563, p. 23.
Westbrook, “Heat-Recovery Cokemaking at Sun Coke,” AISE Steel Technology, Pittsburg, PA, vol. 76, No. 1, Jan. 1999, pp. 25-28.
“What is dead-band control,” forum post by user “wireaddict” on AllAboutCircuits.com message board, Feb. 8, 2007, accessed Oct. 24, 2018 at https:/forum.allaboutcircuits.com/threads/what-is-dead-band-control.4728/; 8 pages.
Yu et al., “Coke Oven Production Technology,” Lianoning Science and Technology Press, first edition, Apr. 2014, pp. 356-358.
“Resources and Utilization of Coking Coal in China,” Mingxin Shen ed., Chemical Industry Press, first edition, Jan. 2007, pp. 242-243, 247.
Extended European Search Report for European Application No. 15836657.5; dated Feb. 15, 2018; 8 pages.
International Search Report and Written Opinion of International Application No. PCT/US2015/047533; dated Oct. 22, 2015, 17 pages.
Russian Office Action for Russian Application No. 2017110046/05(017702); dated Feb. 19, 2019; 12 pages.
Knoerzer et al. “Jewell-Thompson Non-Recovery Cokemaking”, Steel Times, Fuel & Metallurgical Journals Ltd. London, GB, vol. 221, No. 4, Apr. 1, 1993, pp. 172-173,184.
Brazilian Preliminary Examination Report for Brazilian Application No. BR112017004037-9; dated Aug. 27, 2019; 7 pages.
Japanese Notice of Rejectionfor Japanese Application No. 2017-511645; dated Aug. 13, 2019; 5 pages.
U.S. Appl. No. 16/704,689, filed Dec. 5, 2019, West et al.
U.S. Appl. No. 16/729,036, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,053, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,057, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,068, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,122, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,129, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,157, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,170, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,201, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,212, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,219, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/735,103, filed Jan. 6, 2020, Quanci et al.
Joseph, B., “A tutorial on inferential control and its applications,” Proceedings of the 1999 American Control Conference (Cat. No. 99CH36251), San Diego, CA, 1999, pp. 3106-3118 vol. 5.
Australian Examination Report No. 1 for Australian Application No. 2015308687; dated Nov. 8, 2019; 3 pages.
Ukraine Office Action for Ukraine Application No. a 2017 02656; dated Jan. 22, 2020; 4 pages.
Vietnam Office Action for Vietnam Application No. 1-2017-01008; dated Jan. 21, 2020; 2 pages.
U.S. Appl. No. 16/000,516, filed Jun. 5, 2018, titled Systems and Methods for Removing Mercury From Emissions.
U.S. Appl. No. 15/322,176, filed Dec. 27, 2016, titled Horizontal Heat Recovery Coke Ovens Having Monolith Crowns.
U.S. Appl. No. 15/392,942, filed Dec. 28, 2016, titled Method and System for Dynamically Charging a Coke Oven.
Examination Report for European Application No. 15836657.5; dated Mar. 13, 2019; 6 pages.
India First Examination Report in Application No. 201737007129; dated Jul. 22, 2019; 7 pages.
Related Publications (1)
Number Date Country
20200157430 A1 May 2020 US
Provisional Applications (1)
Number Date Country
62043359 Aug 2014 US
Divisions (1)
Number Date Country
Parent 14839551 Aug 2015 US