The invention relates to the field of flood disaster prevention, in particular to a calculation method for dike breach development process.
Dike, as an important part of flood control project, is widely used all over the world and plays an important role in social and economic development. However, as the flood beyond the prevention standard, the dike fails due to overtopping. The resulted flood will cause serious harm to people's lives and property in the inundation area. The process of dike breach is the interaction between dike materials and the flow through the breach. Quantitative analysis of the development rate of the breach is of great significance for the simulation of the dike breaching process, the prediction of the downstream flood propagation and the decision of the emergency evacuation plan.
At present, the existing techniques for calculating the breach development process are mainly divided into two categories. One is a parameter model based on data statistics, wherein, statistical methods are used to make regression analysis on the historical dike breach data, and empirical formulas are established for some key geometric and physical parameters of the breach, such as the widening rate of the breach, the downcutting rate of the breach, the shape of the breach and the time of the dike breaching. These formulas are relatively simple in structure and can be used to quickly evaluate the development process of the breach. However, the establishment of empirical formula usually needs a large number of measured data. Due to the danger and complexity of the dike breaching, the collected data are extremely limited and the accuracy of the data is poor, so the empirical formula has several limitations, and this kind of model does not involve the actual dike breaching mechanism, so the accuracy is low and the calculation results are unstable.
The other is a mathematical model based on physical mechanism, wherein, methods such as hydrodynamics and sediment transport are mainly used, and differential equations are used to describe the process of breach development and erosion, which can simulate the actual dike breaching process more accurate. However, this method is complicated to solve and contains some parameters that are not easy to be measured in the field, which limits the establishment and wide applicability of the equation.
For example, when studying the development of dike breaching breach, the method of soil mechanics is often used for reference, and the scour width (rate) of soil is expressed by water shear stress, critical shear stress and erosion coefficient, and the parameter expression of breach development process with shear stress as variable is established:
E=k
d
Δt(τ−τc) or Vz=kd(τ−τd);
In addition to using the methods of soil mechanics, there is also a consideration of the effect of hydrodynamic on sediment erosion, and the relationship between the flow rate of breach and the downcutting rate and widening rate with Q as the main variable is established. However, the dike breaching process is a process of interaction between dike materials and breach flow, and the breach size affects the breach flow. In addition, breach flow can not truly reflect the effect of flow on sediment erosion, resulting in different forms and parameters of the expression of breach development rate and breach flow at different stages of dike breaching development; and the law of the relationship between breach development rate and breach flow at different inflow flows is also different.
Previous studies mainly focused on the mechanism, influencing factors and process of dike breaching, but no theoretical calculation model that can reasonably describe the breach development when the dike overflows and breaching has been put forward, and only a few related studies are qualitative analysis, without giving the decisive factors of breach development and the quantitative relationship expression between them.
In view of the above shortcomings in the current technology, the invention provides a calculation method for dike breach development process, and proposes to take the discharge per unit width of the breach qunit as a variable. And the formulas for calculating the discharge per unit width of the breach, the lateral widening rate and the downcutting rate of the breach are established, which are suitable for the whole dike breaching process and the test conditions with different inflow flows.
The invention is realized by adopting the following technical scheme:
A calculation method for dike breach development process, wherein, the discharge per unit width of the breach is taken as the main parameter, and the parameter formula of the breach development process is established, which includes the following steps:
Q=μB√{square root over (2g)}h1.5 (1)
Further, step 3 specifically includes:
Further, step 4 specifically includes:
B
t+Δt
=B
tγB·Δt (4a)
H
t+Δt
=Z
b0
−Z
bt+Δt (4b)
Further, the calculation formula of the lateral width Bt+Δt of breach at t+Δt moment is as follows:
B
t+Δt
=B
t
+a
B
e
b
(μ√{square root over (2g)}(Z−Z
)−q
)
·Δt (6b).
Further, the calculation formula of the vertical depth Ht+Δt of breach at t+Δt moment is as follows:
H
t+Δt
=Z
b0
−Z
bt+Δt
=Z
0
−Z
bt
+a
H
e
b
(μ√{square root over (2g)}(Z−Z
)−q
)
·Δt (6c).
Compared with the current technology, the invention has the following advantages:
In order to make the purpose, technical scheme and advantages of the embodiment of the invention more clear, the technical scheme in the embodiment of the invention will be described clearly and completely with the attached drawings. Obviously, the described embodiment is a part of the embodiment of the invention, but not the whole embodiment. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in the field without creative work belong to the scope of protection of the present invention.
Please refer to
Q=μB√{square root over (2g)}h1.5 (1)
γB=aBeb
γH=aHeb
B
t+Δt
=B
t
+a
B
e
b
(μ√{square root over (2g)}(Z−Z
)−q
)
·Δt (4a)
H
t+Δt
=Z
b0
−Z
bt
+a
H
e
b
(μ√{square root over (2g)}(Z−Z
)q
)
·Δt (4b)
Wherein, the calculation formula of the lateral width Bt+Δt of breach at t+Δt moment is as follows:
B
t+Δt
=B
t
+a
B
e
b
(μ√{square root over (2g)}(Z−Z
)−q
)
·Δt (6b).
The calculation formula of the vertical depth Ht+Δt of breach at t+Δt moment is as follows:
H
t+Δt
=Z
b0
−Z
bt+Δt
=Z
0
−Z
bt
+a
H
e
b
(μ√{square root over (2g)}(Z−Z
)−q
)
·Δt (6c).
Next, the invention will be further explained with a specific application embodiment.
The test system consists of river course, washable lateral dike, non-washable bottom plate and flood storage and detention area. The main river course is 10 m long and 1 m wide, and the washable lateral dike is parallel to the incoming flow direction, the non-washable bottom plate is 4.3 m long and 2.5 m wide. In the test, the water flowing through the dike breach can be freely discharged from the flood plain without affecting the flow of the breach. In all the tests, non-cohesive uniform sandy materials are used for dike construction, that is, uniform coarse sand with median particle size d50=1 mm. Dike length L is 3 m, dike height is 0.3 m, dike top width W is 0.1 m, inner and outer dike slopes is 1:2 and dike bottom width is 1.3 m. In order to ensure the same location of the breaching due to overtopping, in the model, a rectangular initial notch with a depth of 0.02 m and a width of 0.85 m at the top of the dike from the upstream end is excavated.
Firstly, the lateral width B0=0.1 m and the bottom elevation Zb0=0.28 m of the initial breach are determined. The initial moment is the moment when the initial breach of the dike just overflows to zero, that is, t1=0 s. With the water level z rising before the breach, the discharge per width of the breach increases and the breach begins to expand. The dike breach flow Q is calculated according to the broad crested weir flow formula (1):
Q=μB√{square root over (2g)}h1.5 (1)
The discharge per unit width of the breach qunit is calculated by Formula (2):
At tn moment, the discharge per unit width of the breach is greater than the critical discharge per unit width, and the breach begins to expand. At this time, the elevation of the bottom of the breach is higher than the downstream water level, that is, Zstorage≤Zbt
The lateral widening rate of the breach is calculated by Formula (3a):
The lateral widening development process of breach at tn+1 moment is calculated by Formula (4a):
The vertical downcutting development process of the breach is calculated by Formula (4b):
At moment tn, the lateral width and vertical depth of the breach haven't changed, so Bt
Bt
H
t
=0.0004e86.53(μ√{square root over (2g)}(Z−0.28)
After calculation, the size of the breach at moment tn+1 is obtained as the initial breach size calculated in the next step. The above steps are repeated to calculate the size of the breach at moment tn+2. By repeating this step, the development process of the breach can be obtained.
In this embodiment, the lateral width change process of the breach is shown in
Where: DC is the deterministic coefficient; xi is the calculated value of the breach topography, yi is the actually measured value of the breach topography, and
The invention provide a calculation method for dike breach development process, and relates to the field of flood disaster prevention. In this method, the influence of flow force on the development rate of the breach is considered, and the flow rate per width of the breach is taken as the main parameter, and the parameter expression between the flow elements and the development process of the breach is established, and two main development processes, lateral widening and vertical downcutting, are calculated. The calculation method for the development process of the breach provided by the invention has the advantages that: firstly, in the calculation method provided by the invention, the whole development process of the dike breaching of breach can be calculated, and is suitable for different inflow flow test conditions; secondly, the calculation method provided by the invention requires few parameters, and as the main parameter for calculating the development process of the breach, the discharge per unit width of the breach can be directly obtained from the flow formula of the broad crested weir, so that the calculation method has high practicability, good repeatability and scientificity, and the calculation process is simple; thirdly, the discharge per unit width of breach reflects the scouring effect of flow on sediment in breach. Based on the actual development mechanism of breach, the calculation formula established is more in line with the physical mechanism. According to the calculation method for dike breach development process provided by the invention, the relationship between the development rate of non-cohesive dike breach and hydraulic factors is clarified, and a quantitative relationship expression is established, which is of great significance for predicting dike breaching process and flood evolution.
The above is only the specific embodiment of the present invention, but the protection scope of the present invention is not limited to this, and any changes or substitutions that can be easily thought of by those skilled in the field within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the scope of protection of the present invention should be based on the scope of protection of the claims.
Number | Date | Country | Kind |
---|---|---|---|
2022115592073 | Dec 2022 | CN | national |