The present invention relates generally to post-tension anchorage systems. More particularly, the present invention relates to caps that are used for sealing an exposed end of an anchor having a tendon extending through the anchor.
Structural concrete, though capable of carrying very high compressive loads, is generally weak in carrying tensile loads on its own. Reinforced concrete ameliorates this deficiency by including an internal structure formed from materials capable of withstanding tensile forces within an otherwise solid concrete structure. Metal bars or cables are often used due to their high tensile strength and relative ease of manufacture.
In order to further improve the tensile capacities of reinforced concrete structures, the reinforcement structure may be pre- or post-tensioned. Added structural tension maintains a compression loading on the concrete member, even when tensile stress would otherwise occur (such as in beam-loading). In post-tensioned concrete, the reinforcing structure is tensioned after the concrete has set.
The present disclosure provides for a process. The process includes forming a concrete form including an end wall. The concrete form may be adapted to receive concrete placed thereinto. The process also includes coupling a tensioning end anchor to the end wall. The tensioning end anchor may be adapted to receive a tendon through an interior channel thereof. The process also includes threading the tendon through the tensioning end anchor such that a tensioning end portion of the tendon extends from the tensioning end anchor. The process also includes placing concrete into the concrete form. The process also includes threading the tensioning end portion of the tendon through a cap. The cap may include a generally annular cap body. The cap body may have an inner bore formed therethrough. The process also includes moving the cap along the tensioning end portion of the tendon until the cap abuts the tensioning end anchor. The process also includes inhibiting fluid intrusion into the interior channel of the tensioning end anchor with the cap. The process also includes removing the cap from the tensioning end portion of the tendon.
The present disclosure also provides for a system for anchoring a tendon for use in a post-tensioned concrete member. The system may include a tensioning end anchor adapted to receive the tendon through an interior channel thereof. The tensioning end anchor may include a front extension. The tensioning end anchor may be positioned within the concrete member such that the front extension is generally positioned at an edge of the concrete member. The system may also include a cap. The cap may include a cap body. The cap body may include an inner bore formed therethrough. The cap may be positioned to cover the end of the front extension of the tensioning end anchor.
The present disclosure also provides for a process. The process may include providing a tensioning end anchor positioned in a concrete member. The tensioning end anchor may be adapted to receive a tendon through an interior channel thereof. The process may include threading the tendon through the tensioning end anchor such that a tensioning end portion of the tendon extends from the tensioning end anchor. The process may include positioning a cap around the tendon in abutment with the tensioning end anchor. The cap may include a cap body having an inner bore formed therethrough through which the tendon extends. The process may include inhibiting fluid intrusion into the interior channel of the tensioning end anchor with the cap. The process may include removing the cap from the tendon.
The present disclosure also provides for a system for inhibiting fluid entry into a tendon for use in a post-tensioned concrete member during the construction cycle to protect the tendon from outside elements. The system may include a tensioning end anchor and a cap. The tensioning end anchor may be adapted to receive the tendon through an interior channel thereof. The tensioning end anchor may include a front extension. The tensioning end anchor may be positioned within the concrete member such that the front extension is generally positioned at an edge of the concrete member. The cap may include a cap body. The cap body may have an inner bore formed therethrough. The cap may be adapted to abut and cover the end of the front extension of the tensioning end anchor.
The present disclosure is best understood from the following detailed description when read with the accompanying figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.
It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
In one embodiment of the present disclosure, a series of tension cables wrapped in sheathes are placed within a concrete form, each positioned parallel to the desired tensile pre-loading. The concrete form may be made up of one or more form walls positioned to hold the concrete as it sets and may define the shape of the final concrete member. The tension cables may pass through one of the form walls defining an end wall. The sheath allows each tension cable to move within the surrounding concrete during tensioning. A fixed end anchor may be positioned at one end of the cable and a tensioning anchor placed at the other end.
Prior to placing or pouring the concrete into the concrete form, the fixed end anchor may be positioned in the concrete form and tensioning anchor 10 may be coupled to the end wall. Tendon 50 may be threaded through fixed end anchor and tensioning anchor 10. As shown in
After the concrete is placed into the concrete form and prior to tensioning, tendon 50 may be exposed and therefore open to corrosive fluids such as water at tensioning anchor 10. As depicted in
In some embodiments, as depicted in
In some embodiments, cap 201 may be coupled to front extension 22 of tensioning anchor 10. As depicted in
In some embodiments, cap 201 has an outer diameter substantially the same as the inner diameter of front extension 22 so that cap 201 fits tightly into front extension 22, allowing for, for example, a fluid seal therebetween to impair or prevent fluid intrusion into the interior channel of tensioning anchor 10 or between tension cable 52 and sheath 54 of tendon 50. In some embodiments, cap 201 may further include seal 209 positioned to, for example, further enhance the seal between cap 201 and front extension 22.
In some embodiments, as depicted in
In some embodiments, cap 301 may include internal flange 309. Internal flange 309 may extend into anchor 10 from cap 301 along the outer surface of tendon 50. Internal flange 309 may assist with fluid intrusion the interior channel of tensioning anchor 10 or tendon 50 by, for example, increasing the contact length between cap 301 and tendon 50.
In some embodiments, as depicted in
In some embodiments, cap 401 may be formed as a single unit, but may be slit such that it may likewise be installed about the outer surface of tendon 50 from the side. Although depicted as utilizing bayonet ramps 407, one having ordinary skill in the art with the benefit of this disclosure will understand that the described configurations may each utilize any coupler herein described or known in the art to couple to anchor 10.
In some embodiments, the cap may be formed from a polymer by, for example, injection molding. In some embodiments, although not depicted, the cap may include one or more structural elements positioned to, for example, increase the strength of the cap. Structural elements, as understood in the art, may include ribs, fillets, or stems. In some embodiments, the cap may be split to, for example, allow for easier installation onto the tendon.
In certain embodiments, wedges may be used to hold tendon 50. Prior to wedge installation, temporary cap 101 may be removed. As shown in
Before or after tensioning and wedge installation, but before tendon 50 is cut to length, time may pass when it is possible for contaminating fluids such as water or other corrosive fluids to enter the interior channel of tensioning anchor 10 or the interior of tendon 50 from exposure to the surrounding environment. In these circumstances, temporary cap 101 may be positioned on tendon 50 as described herein above. When it becomes time to cut tendon 50 to length, temporary cap 101 may be removed and tendon 50 cut to length.
Although discussed and depicted as separate embodiments, one having ordinary skill in the art with the benefit of this disclosure will understand that various features of each cap discussed above may be combined in ways other than explicitly described without deviating from the scope of this disclosure. Furthermore, although a specific configuration of anchor is discussed, one having ordinary skill in the art with the benefit of this disclosure will understand that the caps discussed herein may be reconfigured to a different anchor configuration, including shape, diameter, or other feature of the different anchor.
The foregoing outlines features of several embodiments so that a person of ordinary skill in the art may better understand the aspects of the present disclosure. Such features may be replaced by any one of numerous equivalent alternatives, only some of which are disclosed herein. One of ordinary skill in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. One of ordinary skill in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure and that they may make various changes, substitutions, and alterations herein without departing from the spirit and scope of the present disclosure.
This application is a nonprovisional application which claims priority from U.S. provisional application No. 62/000,419, filed May 19, 2014, the entirety of which is hereby incorporated by reference.
Number | Name | Date | Kind |
---|---|---|---|
3049368 | Jansen | Aug 1962 | A |
3676031 | Stinton | Jul 1972 | A |
3762027 | Burtelson | Oct 1973 | A |
3912406 | McGrath | Oct 1975 | A |
4318256 | Boonman | Mar 1982 | A |
4343122 | Wlodkowski | Aug 1982 | A |
4616458 | Davis et al. | Oct 1986 | A |
4719658 | Kriofske | Jan 1988 | A |
4773198 | Reinhardt | Sep 1988 | A |
4821474 | Rodriguez | Apr 1989 | A |
4896470 | Sorkin | Jan 1990 | A |
4918887 | Davis | Apr 1990 | A |
4928451 | Reigstad | May 1990 | A |
5024032 | Rodriguez | Jun 1991 | A |
5058469 | Rodriguez | Oct 1991 | A |
5072558 | Sorkin et al. | Dec 1991 | A |
5079879 | Rodriguez | Jan 1992 | A |
5271199 | Northern | Dec 1993 | A |
5345742 | Rogowsky | Sep 1994 | A |
5347777 | Sudduth | Sep 1994 | A |
5369849 | De France | Dec 1994 | A |
5374135 | Folsom | Dec 1994 | A |
5440842 | Sorkin | Aug 1995 | A |
5630301 | Sieg | May 1997 | A |
5695297 | Geib | Dec 1997 | A |
5701707 | Sorkin | Dec 1997 | A |
5720139 | Sorkin | Feb 1998 | A |
5749185 | Sorkin | May 1998 | A |
5755065 | Sorkin | May 1998 | A |
5770286 | Sorkin | Jun 1998 | A |
5788398 | Sorkin | Aug 1998 | A |
5839235 | Sorkin | Nov 1998 | A |
5897102 | Sorkin | Apr 1999 | A |
6012867 | Sorkin | Jan 2000 | A |
6017165 | Sorkin | Jan 2000 | A |
6023894 | Sorkin | Feb 2000 | A |
6027278 | Sorkin | Feb 2000 | A |
6098356 | Sorkin | Aug 2000 | A |
6151850 | Sorkin | Nov 2000 | A |
6176051 | Sorkin | Jan 2001 | B1 |
6234709 | Sorkin | May 2001 | B1 |
6354596 | Rodriguez | Mar 2002 | B1 |
6381912 | Sorkin | May 2002 | B1 |
6393781 | Sorkin | May 2002 | B1 |
6513287 | Sorkin | Feb 2003 | B1 |
6557317 | Sorkin | May 2003 | B2 |
6560939 | Sorkin | May 2003 | B2 |
6631596 | Sorkin | Oct 2003 | B1 |
6684585 | Campbell | Feb 2004 | B2 |
6761002 | Sorkin | Jul 2004 | B1 |
6817148 | Sorkin | Nov 2004 | B1 |
6883280 | Hayes | Apr 2005 | B2 |
7174685 | Hayes | Feb 2007 | B2 |
7275347 | Hayes | Oct 2007 | B2 |
7424792 | Sorkin | Sep 2008 | B1 |
7676997 | Sorkin | Mar 2010 | B1 |
7726082 | Hayes | Jun 2010 | B2 |
7762029 | Hayes | Jul 2010 | B2 |
7793473 | Sorkin | Sep 2010 | B2 |
7797894 | Sorkin | Sep 2010 | B1 |
7797895 | Sorkin | Sep 2010 | B1 |
7841061 | Sorkin | Nov 2010 | B1 |
7856774 | Sorkin | Dec 2010 | B1 |
7866009 | Sorkin | Jan 2011 | B1 |
7950196 | Sorkin | May 2011 | B1 |
7950197 | Sorkin | May 2011 | B1 |
7963078 | Sorkin | Jun 2011 | B1 |
7967532 | Schmidt | Jun 2011 | B2 |
8015774 | Sorkin | Sep 2011 | B1 |
8065845 | Sorkin | Nov 2011 | B1 |
8087204 | Sorkin | Jan 2012 | B1 |
20020007604 | Wallstein | Jan 2002 | A1 |
20020083659 | Sorkin | Jul 2002 | A1 |
20020178665 | Campbell | Dec 2002 | A1 |
20040148881 | Hayes | Aug 2004 | A1 |
20040148882 | Hayes | Aug 2004 | A1 |
20050210782 | Kadotani | Sep 2005 | A1 |
20060179742 | Mathews | Aug 2006 | A1 |
20100050546 | Maekawa | Mar 2010 | A1 |
Entry |
---|
International Search Report and Written Opinion issued in International Patent Application No. PCT/US2015/031504, dated Aug. 19, 2015 (10 pages). |
Number | Date | Country | |
---|---|---|---|
20150330078 A1 | Nov 2015 | US |
Number | Date | Country | |
---|---|---|---|
62000419 | May 2014 | US |