Claims
- 1. A process for identifying opportunities for improvement in assembly line production, said process comprising the steps of:
(1) collecting data accurately measuring operations in an assembly line; (2) conducting a capability analysis of the data collected in step (1) to identify key opportunities for improving operations; (3) identifying changes in operations based on the analysis in step (2); and (4) implementing changes identified in step (3) into operations to produce improved line performance.
- 2. The process of claim 1, further comprising the step of validating the changed operations of step (4) to identify the extent of improvements in operations and determine where other key opportunities for increasing operations may occur.
- 3. The process of claims 1 or 2, wherein an opportunity for improvement is a defect in an assembly line comprising an operation time that takes longer than an overall process takt time.
- 4. The process of claim 1, wherein identifying changes in step (3) comprises improving those activities that yielded the highest operation data values in any given set of data obtained from step (1) to decrease the standard deviation values and to shift the mean values lower than those originally obtained from step (2).
- 5. The process of claim 1, wherein the capability analysis of step (2) is a function of mean, standard deviation, and CpK values for the measured operations.
- 6. The process of claim 1, wherein the CpK values are determined by the calculation
- 7. The process of claim 1, wherein the capability analysis of step (2) comprises calculating a first set of confidence interval limits based on the original data.
- 8. The process of claim 2, wherein validating changed operations in step (4) comprises calculating a second set of confidence interval limits based on the operation after improvements have been made and comparatively verifying that the first set of confidence interval limits does not overlap the second set of confidence intervals.
- 9. The process of claim 1, wherein the operations measured include the time to complete each operation in the assembly line.
- 10. The process of claim 7, wherein the time to complete each operation in the assembly line is based on the takt time.
- 11. The process of claim 7, wherein the time complete each operation in the assembly line is less than or equal to the takt time designated as the upper specification limit takt time.
- 12. The process of claims 1 or 2, wherein the data measurement validation of step (1) comprises gage R&R analysis.
- 13. The process of claims 1 or 2, wherein the data measurement validation of step (1) comprises short form gage R&R analysis.
- 14. The process of claim 12, wherein the short gage R&R analysis comprises at least one pair of measurers timing at least one operation five times producing a set of ten data points for each operation evaluated.
- 15. The process of claims 1 or 2, wherein the capability analysis of step (2) calculates the capability of the overall assembly process.
- 16. The process of claims 1 or 2, wherein the capability analysis of step (2) evaluates the capability of each individual operation to meet takt time.
- 17. The process of claims 1 or 2, further comprising a control step for validating changes implemented in step (4).
- 18. The process of claim 15, wherein the control for validating changes implemented in step (4) is selected from the group consisting of action item lists, standard operating procedures, and worker cross training matrices, or any combination thereof.
- 19. The process of claims 1 or 2, wherein the assembly line production comprises techniques based on lean production and traditional manufacturing.
- 20. The process of claims 1 or 2, wherein the assembly line comprises at least two operations manufacturing in a sequence.
- 21. The process of claim 18, wherein the assembly line is automated.
- 22. The process of claim 18, wherein the assembly line is non- automated.
- 23. The process of claims 1 or 2, wherein the assembly line comprises at least two operators manufacturing in a sequence.
- 24. The process of claims 1 or 2 wherein the assembly line comprises at least two operations manufacturing in a sequence.
- 25. The process of claim 21, wherein the assembly line automated.
- 26. The process of claim 21, wherein the assembly line is non-automated.
- 27. The process of claims 1 or 2, wherein the changes implemented in step (4) comprises reducing process time variability.
- 28. The process of claim 25, wherein changes reducing process time variability are selected from the group consisting of balancing assembly operations to reduce bottlenecks, improving cell layout, improving process flow, consolidating assembly operations, and redistributing operators, or any combination thereof.
- 29. A process for identifying opportunities for improvement in assembly line production during a Kaizen event, said method comprising the steps of:
(1) selecting an assembly line having at least two operators manufacturing in a sequence; (2) validating time data collected for the overall process and each operation on the assembly line through short gage R&R analysis; (3) conducting a capability analysis of the time data collected in step (2) by calculating the mean, standard deviation, CpK, and a first set of confidence intervals to identify opportunities for improvement in the assembly line; (4) identifying changes in operations based on the analysis of step (3) by eliminating the process time values in any given set of data that are greater than an upper specification takt time obtained from step (2) to decrease the standard deviation values of that operation and to shift the mean values lower than those originally obtained from step (2); (5) reducing process time variation identified in step (3) implementing changes selected from the group consisting of balancing assembly operations to reduce bottlenecks, improving cell layout, improving process flow, work simplification through better material handling, purchasing more equipment, consolidating assembly operations, and redistributing operators, or any combination thereof. (6) validating changes implemented in step (4) by calculating a second set of confidence intervals based on the improved assembly line process to compare with the first set of confidence intervals from step (2), wherein the second set of confidence intervals do not overlap with the first set of confidence intervals; (7) implementing a control means maintaining the changes implemented in step (5); and (8) repeating the process cycle to continually improve the assembly line process.
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application is entitled to the benefit of Provisional Patent Application Serial No. 60/201,467 filed May 3, 2000.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60201467 |
May 2000 |
US |