This patent application discloses devices and methods for use in glass manufacturing, and more particularly, devices to provide fluid cooling for a melter.
Glass manufacturing often occurs at high temperatures that require the equipment used in the glass manufacturing process to withstand harsh conditions. In particular, submerged combustion melting (“SCM”) is a specific type of glass manufacturing, in which an air-fuel or oxygen-fuel mixture is injected directly into a pool of molten glass. As combustion gases forcefully bubble through the molten glass, they create a high-heat transfer rate and turbulent mixing of the molten glass until it achieves a uniform composition. A typical submerged combustion melter has a floor, a vertical burner passage extending through the floor, and a burner positioned within the burner passage and submerged in the molten glass.
In order to withstand the harsh conditions and temperatures within the melter for traditional glass manufacturing or SCM, a portion of the melter's floor, walls, and/or roof that contacts the molten glass can include a refractory material.
The present disclosure embodies a number of aspects that can be implemented separately from or in combination with each other.
A melting furnace panel in accordance with one aspect of the disclosure includes at least one outer wall having an outer surface; and a cast sacrificial layer carried by the outer surface of the at least one outer wall and composed of a mixture of cullet and a binder solution.
In accordance with another aspect of the disclosure, there is provided a melting furnace including the melting furnace having at least one melting furnace panel, the panel including at least one outer wall having an outer surface; and a cast sacrificial layer carried by the outer surface of the at least one outer wall and composed of a mixture of cullet and a binder solution.
In accordance with another aspect of the disclosure, there is provided a method of producing a glass melting furnace panel including the steps of providing at least one outer wall having an outer surface; mixing cullet particulates with a binder solution to produce a cullet and binder mixture; and casting the cullet and binder mixture on the outer surface of the at least one outer wall to produce a cast sacrificial layer carried by the outer surface of the at least one outer wall.
The disclosure, together with additional objects, features, advantages and aspects thereof, will be best understood from the following description, the appended claims and the accompanying drawings, in which:
In accordance with at least one aspect of the disclosure, a furnace panel for a melting furnace is provided that is better able to withstand the harsh conditions of the melting furnace than prior furnace panels and prevents refractory stone issues in the molten material and final product.
Harsh environments within a melting furnace, for example in glass manufacturing and particularly in submerged combustion melting, can lead to wear, cracking, erosion, and/or failure of the furnace floor, walls, and/or roof. The furnace floor, wails, or roof can be constructed of panels that include a steel portion and a refractory material portion coupled to the steel portion, where the refractory material portion may contact a molten material within the melting furnace. Temperatures in the melting furnace can be between approximately 1300-1500 degrees Celsius (° C.) or higher, for example, and the molten material may be corrosive. The refractory material portion can be designed to be resistant to the high temperatures and corrosiveness within the furnace. But due to the harsh conditions and turbulence within the melting furnace, the panels and/or the refractory material portion can be susceptible to the wear, cracking, erosion, and/or failure because of direct contact with the molten material. To slow wear and erosion of the refractory material portion, traditional furnace walls are often constructed of steel, liquid-cooled, and include 1.5-2 inches of a castable refractory on an inside surface of the furnace walls. However, even with this construction, the castable refractory can still erode away over time and cause refractory stone to appear in the molten material and final product.
Accordingly, a melter furnace having at least one furnace panel is disclosed, wherein each furnace panel can be cooled and can include a cast sacrificial layer comprising a binder and cullet. Upon initial heating of the melting furnace, the cast sacrificial layer fuses together providing an insulating layer that reduces heat flux through the furnace panels. Additionally, the cast sacrificial layer can comprise a composition that is the same or similar to the molten material so that when erosion of the cast sacrificial layer occurs, the eroded material will be melted into the surrounding molten material in the melting furnace and will not contribute to refractory stone in a final product.
Referring to
Shown in
Referring to
In the embodiment shown in
Additionally,
In the furnace panel 12, the coolant can flow through a serpentine fluid flow path 66. The baffles 34 function to divide the interior space 56 into a plurality of rows 60, where each respective row 60 can be parallel with the longitudinal axis A and can have a width W. The width W can be between baffles 34 or between one baffle 34 and an adjacent side wall 50, 54. In order to provide a uniform width W for each row 60, the width W between baffles 34 may be the same as the width W between the one baffle 34 and the adjacent side wall 50, 54.
Additionally, each baffle 34 can comprise a pair of longitudinal surfaces including a first longitudinal surface 44 and an opposing second longitudinal surface 68. Each baffle 34 can also include an open transverse surface 46 configured to not be coupled to another component and to be exposed to the interior space 56 and/or coolant.
With conventional technology, a furnace panel would typically be constructed such that baffles were welded, for example stitch welded or intermittently welded, along a joint between a respective baffle and one of the first and second outer walls from within the interior space. These internal welds have been necessary to hold the baffles in place prior to attaching the first and/or second outer walls.
When manufacturing the furnace panel 12, the furnace panel 12 can be formed so that the first openings 22 and the second openings 32 and the first projections 38 and the second projections 42 fit together, respectively, in order to secure the first outer wall 18 and the second outer wall 28 to the baffles 34. In an example, the first and second openings 22, 32 and the projections 38, 42 can be held together by clamps until welds have been made and connected together from outside of the furnace panel 12 so that no interior welds are necessary within the interior space 56 of the furnace panel 12. Once the at least one baffle 34 has been coupled to an outer wall 18, 28, the other of the first and second outer walls 18, 28 can include one or more holes that matches the location of the baffles 34, and the other of the first and second outer walls 18, 28 can be placed on top of the baffles 34 for welding, for example plug welding or a weld at the holes, to couple to the baffles 34. The plug welding can occur from outside of the furnace panel 12. Subsequently, the side walls 48, 50, 52, 54 can be welded, for example fillet welded or welded along a joint between two parts at an angle to each other, to the first and second outer walls 18, 28 to form a fluid-tight furnace panel 12. With the disclosed first and second openings 22, 32 and projections 38, 42, the first and second outer walls 18, 28 and the baffles 34 can be fitted together without needing to internally weld either of the first and second outer walls 18, 28 to the baffles 34 before also fitting the other of the first and second outer walls 18, 28 to the baffles 34, which can save time and cost in construction. This can also reduce the chance for any errors in positioning first and second outer walls 18, 28 and the baffles 34 together. Welds can be made from outside the furnace panel 12 such that liquid-tight joints result. Additionally, the first and second outer walls 18, 28 and the baffles 34 can be more easily cut, including being laser-cut, to the correct geometries.
The cast sacrificial layer 74 shown in FIG, 3C can include a mixture of at least cullet and a binder. The cullet can be a material similar to material being molten by the melting furnace 10. Some examples of cullet can include glass cullet, which may be finely milled in a crushed or a powdered from, or cullet formed from other material, for example a metal. When the cullet includes glass cullet, the cullet particulates may include, for example, a mean particulate size of between 5-100 micrometers, including all ranges, sub-ranges, endpoints, and values in that range. One example of a binder may include sodium silicate (e.g., sodium metasilicate).
For example, the cast sacrificial layer 74 may comprise 65%-85% glass cullet by weight and 15%-35% binder solution by weight, including all ranges, sub-ranges, endpoints, and values in those ranges. The binder solution can include 5%-25% binder by weight mixed with 75%-95% water by weight. It is contemplated that a cullet-to-binder ratio may include other suitable ratios where the binder holds the cullet together and forms the cast sacrificial layer 74. As shown in
The molten material 16 in the melting furnace 10 can typically exist in a liquid or semi-liquid state. In some instances, however, a portion of the molten material 16 that flows closer to at least one furnace panel 12 of the melting furnace 10 may become a solid (or at least a very viscous state) because of its lower temperature, due to a cooling effect from the at least one furnace panel 12 of the melting furnace 10, than a first portion of the molten material 16. The solidified material (e.g., glass) can comprise a solid or frozen material layer 76 that can be coupled to the floors, walls and roof (e.g., at least one furnace panel 12). The frozen material layer 76 can protect the cast sacrificial layer 74 and the furnace panel 12 from the corrosive molten material 16.
Additionally, to assist in holding the cast sacrificial layer 74 on the second outer wall 28, the second outer wall 28 can include a first outer edge 78 disposed and extending about the second perimeter 30 of the second outer wall 28 so that the first outer edge 78 extends about the east sacrificial layer 74, as illustrated in
In
In some implementations, the melting furnace 10 and/or one or more furnace panels 12 may include various temperature sensors. For example, one or more temperature sensors can detect the temperature within the portions of the molten material 16, the frozen material layer 76, a surface of a furnace panel 12, and/or temperature of the coolant. In other implementations, the furnace panel 12 does not include any temperature sensors for directly measuring the temperature within the portions of the molten material 16 nor does it include any temperature sensors for directly measuring the temperature of the coolant. In this implementation, various pipes, conduits, or the like (not shown) that can be adjacent to the furnace panel 12 and that route the coolant may include one or more temperature sensors for detecting and/or measuring the coolant temperature. The temperature measurements within the various pipes, conduits, or the like can provide an indirect temperature measurement of the temperature of the coolant when it is in the furnace panel 12. Of course, it will be appreciated that the furnace panel 12 can also be constructed to include various temperature sensors (e.g., a thermocouple) that directly detect and measure, for example, the temperature of the molten material 16, a surface of the molten material 16, the frozen material layer 76, the furnace panel 12, and/or the temperature of the coolant.
4A is a graphical depiction illustrating heat flux through a furnace panel in the melting furnace 10 upon initial heat-up. In this example, the furnace panel does not include a cast sacrificial layer 74. As shown by this graphical depiction, heat flux rises to about 140 kW/m2 upon initial start-up before reaching a steady state.
Method 100 includes a step 102 of providing at least one outer wall (e.g., second outer wall 28) having an outer surface. Providing the at least one outer wall can include providing at least part of a preassembled furnace panel 12 that is configured to receive and carry the cast sacrificial layer 74. In one instance and as shown in
Method 100 includes a step 104 of mixing cullet particulates with a binder to produce a cullet and binder mixture. In an example, a powdered glass cullet can be mixed with a solution of sodium silicate (e.g., a 10% mixture with water with a pH about 12) to form a slightly wet mortar, which may be able to be molded with force and have the consistency of cement mortar, for example, but not so wet as to flow with gravity. The cullet and binder solution may be mixed in about a 4:1 ratio, for example where the cullet comprises about 65-85% and the binder solution comprises about 15-35% of the mixture, including all ranges, subranges, endpoints, and values in those ranges. The binder solution can include 5%-25% binder by weight mixed with 75%-95% water by weight, including all ranges, subranges, endpoints, and values therein. It will be appreciated that when other binders are used, the cullet-to-binder ratio may be adjusted to provide a suitable cullet and binder mixture.
Step 104 of mixing the cullet particulates with the binder may include determining the amount of cullet and binder needed for the mixture and/or the area of the second outer wall 28 to be covered. For example, about 10 kg of powdered cullet can be used for every 2000 cm2 (22 lbs. powdered cullet/310 in2) of surface area on the second outer wall 28 to achieve a cullet-to-binder ratio of about 4:1, which may result in a cast sacrificial layer 74 between about one and two inches thick. In this example, 2.5 kg (5.5 lbs.) of sodium silicate solution is needed to achieve the cullet-to-binder ratio of about 4:1. The sodium silicate solid may be −18 mesh or smaller for ease of dissolution in water to form a 10% solution. For example, if 3 kg (6.6 lbs.) of 10% sodium silicate solution is needed, then 0.3 kg (0.6 lbs.) of solid sodium silicate can be added to 2.7 kg (6.0 lbs.) of water. The solid sodium silicate can be mixed with the water for about 3-5 minutes or until the sodium silicate is dissolved and the solution is clear and free of solids. Continuing with the above example, 0.25 kg (0.55 lbs.) of solid sodium silicate can be mixed with 2.25 kg (4.96 lbs.) of water for 5 minutes to provide a 10% solution with a pH of about 12.
The measured powdered cullet and sodium silicate solution can then be mixed to incorporate the solution into the cullet. A desired consistency of the mixture should be of a slightly wet mortar so that it can be molded with force but not so wet that it will run out of a hand. To achieve this consistency, only part of the sodium silicate solution may be added to the powdered cullet initially. For example, if there is 10 kg of powdered cullet, 1.25 kg (2.8 lbs.) (or only about half) of the sodium silicate solution may be initially added and mixed with the measured powdered cullet so the solution is well dispersed into the powder. The powdered cullet will begin to granulate and turn into small, wet balls.
After the initial sodium silicate solution is mixed with the powdered cullet, the remaining portion of solution may be added and mixed with the cullet. Continuing with the above example, the remaining 1.25 kg (2.8 lbs.) of sodium silicate solution can be added to and further mixed the mixture 86. In some instances, additional powdered cullet and/or sodium silicate solution may need to be added, in small amounts, to the mixture 86 and further mixed to achieve the desired consistency.
Method 100 may include a step 106 of casting the cullet and binder mixture on the outer surface of the at least one outer wall to produce the cast sacrificial layer 74 carried by the outer surface of the at least one outer wall (e.g., second outer wall 28). Casting the cullet and binder mixture can include placing the cullet and binder mixture 86 prepared in step 104 on at least a portion of the outer surface of the at least one outer wall. For example, the cullet and binder mixture mixed in step 104 can be placed on the outer surface between, for example, 0.5 and 2 inches thick, including all ranges, subranges, endpoints, and values in that range. It will be appreciated that the cullet and binder mixture may be applied to form other suitable thicknesses. One example of casting the cullet and binder mixture is illustrated in
Additionally, after the cullet and binder mixture has been placed, casting the cullet and binder mixture may include removing bubbles from the mixture by further packing/compressing the mixture. Casting the cullet and binder mixture may also include smoothing a surface of the mixture by applying additional sodium silicate solution to the surface.
Subsequent to casting the cullet and binder mixture, the mixture can be allowed to set for a predetermined amount of time (e.g., 24-48 hours) to firm the cast sacrificial layer 74, as illustrated in
In some instances, method 100 may include a step 108 of coupling a plurality of the baffles 34 between the first outer wall 18 and the second outer wall 28 in the interior space 56. Coupling the baffles 34 can include fitting a plurality of the projections 38, 42 on the plurality of baffles 34 into a corresponding plurality of openings 22, 32 in the first outer wall 18 and the second outer wall 28 and connecting (e.g., welding) the projections 38, 42 to the first outer wall 18 and the second outer wall 28 from outside the furnace panel 12 so that the first outer wall 18, the second outer wall 28, and the baffles 34 are fixed together.
Method 100 may also include a step 110 of fixing the sides walls 48, 50, 52, 54 to the first outer wall 18 and the second outer wall 28 so that the furnace panel 12 is fluid-tight. For example, fixing the side walls 48, 50, 52, 54 may include welding the side walls 48, 50, 52, 54 to the first outer wall 18 and/or the second outer wall 28 using, for example, a fillet weld.
In some instances, method 100 may include a step 112 of providing one or more protrusions 72 extending from the at least one outer wall (e.g., second outer wall 28) so that the one or more protrusions 72 embed into the cast sacrificial layer 74 during and after step 106 of casting the cullet and binder mixture. As previously discussed, the one or more protrusions 72 can assist the outer wall(s) in carrying the cast sacrificial layer 74 and/or in protecting the cast sacrificial layer 74 from cracking, chipping, breaking, or otherwise becoming damaged during use of the melting furnace 10. When protrusions 72 are utilized, the cullet and binder mixture can be cast onto the outer surface to a thickness that is greater than a length of the protrusions 72, and the mixture can be formed so that a surface area of the protrusions 72 is substantially contacted by the mixture.
In some instances, method 100 may include a step 114 of providing the first outer edge 78 extending about the perimeter (e.g., second perimeter 30) of the at least one outer wall so that the first outer edge 78 extends about the cast sacrificial layer 74 during and after step 106 of casting the cullet and binder mixture. The first outer edge 78 may be coupled to the at least one outer wall and/or to at least one of the side walls 48, 50, 52, 54 using a permanent method, for example welding, and/or a semi-permanent method, for example using fasteners (e.g., bolts, nuts, and the like). The first outer edge 78 can be used to provide a barrier when casting the cullet and binder mixture and can be configured so that the mixture is formed to a predetermined thickness on the outer surface and within the boundary established by the first outer edge 78. The first outer edge 78 may be removed subsequent to casting the cullet and binder mixture and/or forming the cast sacrificial layer 74. In this way, the first outer edge 78 may not be a permanent part of the furnace panel 12, but rather part of an intermediate structure of the furnace panel 12 to assist in its construction. The first outer edge 78 can also be attached as part of the construction, having any or all of the features discussed herein.
It will be appreciated that the furnace panel 12 can be included in any part of the melting furnace 10, and there can be as many furnace panels 12 as desired. In one aspect, the melting furnace 10 can include ten furnace panels 12 that are identical, for example. Having multiple identical furnace panels 12 allows the advantage of simpler manufacturing of at least a portion of the furnace panels 12 within the melting furnace 10. It will be appreciated that all furnace panels 12 in the melting furnace 10 could be identical to each other. Additionally, the melting furnace 10 can also include more furnace panels 12 that are similar, but not identical, to each other. In one aspect, the melting furnace 10 includes fourteen furnace panels 12 in addition to the ten identical furnace panels 12 that are in accordance with various aspects of this disclosure; however, each of the fourteen furnace panels 12 may be unique to any other furnace panels 12 within the melting furnace 10 in some way. It will be appreciated that all furnace panels 12 in the melting furnace 10 could be similar, but not identical, to each other.
The disclosure has been presented in conjunction with several illustrative embodiments, and additional modifications and variations have been discussed. Other modifications and variations readily will suggest themselves to persons of ordinary skill in the art in view of the foregoing discussion. For example, the subject matter of each of the embodiments is hereby incorporated by reference into each of the other embodiments, for expedience. The drawings are not necessarily shown to scale. The disclosure is intended to embrace all such modifications and variations as fall within the spirit and broad scope of the appended claims.