The present disclosure relates to cell stack management systems.
A conventional cell stack management system that monitors the states, such as the voltage and temperature, of a plurality of power storage cells connected in series is known (see, for example, Patent literature (PTL) 1).
The cell stack management system includes a plurality of cell monitoring units that measure power storage cell voltage and a control circuit that controls the plurality of cell monitoring units. The plurality of cell monitoring units and the control circuit are daisy-chained together.
When such a cell stack management system is used in, for example, an in-vehicle power supply, it is necessary to monitor the cell stack with a cell monitoring unit because anomalies can occur even when the vehicle equipped with the cell stack management system is stopped (i.e., even when the batteries are not charged by regenerative energy). For this reason, there are known techniques to operate the cell monitoring unit in a low-power mode to achieve long-term monitoring without having to recharge the battery.
However, even in the low-power mode, power must still be supplied to the control circuit and the like, so there is a need to further reduce power consumption.
The present disclosure overcomes such a problem and has an object to provide a cell stack management system that can inhibit power consumption.
In order to overcome the above-described problem, a cell stack management system according to one aspect of the present disclosure manages a cell stack including a plurality of power storage cells connected in series or parallel, and includes: a cell monitoring unit that is connected to the plurality of power storage cells and measures an output voltage of at least one of the plurality of power storage cells; a battery management unit that manages the cell stack; and a first communication network that connects the cell monitoring unit and the battery management unit. The battery management unit includes: a first communication circuit connected to the first communication network; a second communication circuit connected to a second communication network for connecting to a higher-level system of the cell stack management system; a control circuit that controls the battery management unit; and a control circuit power supply that supplies power to the control circuit. The cell stack management system includes, as modes of operation, a normal mode and a low-power mode that consumes less power than the normal mode. In the low-power mode, at least one of the control circuit power supply, the control circuit, or the second communication circuit is deactivated. During transition from the low-power mode to the normal mode, the first communication circuit activates at least one of the control circuit power supply, the control circuit, or the second communication circuit.
In order to overcome the above-described problem, a cell stack management system according to another aspect of the present disclosure manages a cell stack including a plurality of power storage cells connected in series or parallel, and includes: a cell monitoring unit that is connected to the plurality of power storage cells and measures an output voltage of at least one of the plurality of power storage cells; a battery management unit that manages the cell stack; and a first communication network that connects the cell monitoring unit and the battery management unit. The battery management unit includes: a first communication circuit connected to the first communication network; a second communication circuit connected to a second communication network for connecting to a higher-level system of the cell stack management system; and a control circuit that controls the battery management unit. The first communication circuit is connected to a third communication network for connecting to the higher-level system.
According to the present disclosure, a cell stack management system that can inhibit power consumption can be provided.
These and other advantages and features will become apparent from the following description thereof taken in conjunction with the accompanying Drawings, by way of non-limiting examples of embodiments disclosed herein.
Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. Each of the following embodiments shows a specific example of the present disclosure. The numerical values, shapes, materials, elements, the arrangement and connection of the elements, etc., indicated in the following embodiments are mere examples, and therefore do not intend to limit the present disclosure.
The figures are schematic illustrations and are not necessarily precise depictions. Accordingly, the figures are not necessarily to scale. Elements that are essentially the same share like reference signs in the figures, and duplicate description is omitted or simplified.
Cell stack management system according to Embodiment 1 will be described.
The overall configuration of the cell stack management system according to the present embodiment will be described with reference to
Higher-level system 2 is a system that controls cell stack management system 1. For example, when cell stack management system 1 is used for in-vehicle power supply, higher-level system 2 is, for example, an electric control unit (ECU).
Cell stack management system 1 is a system that manages cell stack 8 including a plurality of power storage cells 81 connected in series or parallel. Cell stack management system 1 includes, as modes of operation, a normal mode and a low-power mode that consumes less power than the normal mode. As illustrated in
In the present embodiment, cell stack 8 includes a plurality of power storage cells 81 connected in series. Resistor element 82 for current measurement is connected in series with cell stack 8. For example, a lithium-ion battery can be used as power storage cell 81.
The plurality of cell monitoring units 10 are daisy-chained together along with current measurement unit 11. This daisy communication path is first communication network NW1. First communication network NW1 connects the plurality of cell monitoring units 10 and battery management unit 20.
Second communication network NW2 is a communication network for connecting to higher-level system 2. For example, a communication network based on the controller area network (CAN) standard can be used as second communication network NW2.
Each of the plurality of cell monitoring units 10 is a unit that is connected to the plurality of power storage cells 81 and measures the output voltage of at least one of the plurality of power storage cells 81. Cell monitoring units 10 transmit first operation signals indicating states of the plurality of power storage cells 81 to first communication circuit 21 of battery management unit 20. In the low-power mode, when control circuit 23 or second communication circuit 22 is deactivated, the first operation signal transmitted by cell monitoring unit 10 is a repeating pulse signal. The first operation signal functions as a so-called heartbeat signal. Having detected the first operation signal, first communication circuit 21 of battery management unit 20 can detect that cell monitoring unit 10 is operating normally. If cell monitoring unit 10 detects an anomaly in, for example, power storage cell 81, it transmits a first operation signal indicating the anomaly. Details regarding the first operation signal will be described later.
A configuration example of cell monitoring unit 10 will be described with reference to
As illustrated in
Daisy communication units 71 are communication units that performs daisy communication. Daisy communication units 71 are connected to first communication network NW1 via isolation elements such as capacitors and transformers.
Signal generation circuit 72 is a circuit that generates the first operation signal.
ADC 77 is a circuit that measures the voltage of power storage cells 81. ADC 77 converts the measured voltage values into digital signals and outputs them to control logic circuit 73.
Multiplexer 78 is a circuit that switches power storage cells 81 to be measured by ADC 77. Note that the configuration of cell monitoring unit 10 is not limited to this example. For example, cell monitoring unit 10 may include just as many ADCs 77 as there are power storage cells 81, i.e., measurement targets.
Control logic circuit 73 is a circuit that controls cell monitoring unit 10. Control logic circuit 73 monitors power storage cells 81 based on measurement values, etc., input from ADC 77. Control logic circuit 73 also includes error detection unit 74 that detects, for example, an anomaly in power storage cell 81. Control logic circuit 73 causes signal generation circuit 72 to generate a first operation signal indicating the detected anomaly. Control logic circuit 73 transmits and receives signals via daisy communication units 71 and first communication network NW1.
Clock oscillator 76 is an oscillator that outputs a clock signal for operating control logic circuit 73.
Current measurement unit 11 measures the voltage between both ends of resistor element 82 that is connected in series to cell stack 8. Current measurement unit 11 can be realized, for example, by the same configuration as cell monitoring unit 10.
Battery management unit 20 is a unit that manages cell stack 8. Battery management unit 20 includes first communication circuit 21, second communication circuit 22, control circuit 23, first power supply 31, control circuit power supply 33, and power converter 32.
Control circuit 23 is a circuit that controls battery management unit 20. Control circuit 23 can be realized using, for example, a micro-controller unit (MCU). Control circuit 23 controls first communication circuit 21 and the like in the normal mode, and is deactivated in the low-power mode. With this, cell stack management system 1 can inhibit power consumption in the low-power mode.
Control circuit power supply 33 is a power supply that supplies power to control circuit 23. In the present embodiment, control circuit power supply 33 also supplies power to second communication circuit 22. In this way, the element to which control circuit power supply 33 supplies power is not limited to control circuit 23. For example, a low-dropout (LDO) regulator can be used as control circuit power supply 33. In the present embodiment, control circuit power supply 33 is deactivated in the low-power mode. With this, cell stack management system 1 can inhibit power consumption in the low-power mode.
First power supply 31 is a power supply that supplies power to first communication circuit 21. For example, an LDO regulator can be used as first power supply 31.
First communication circuit 21 is a circuit connected to first communication network NW1. First communication circuit 21 receives a first operation signal indicating the state of the plurality of power storage cells 81 from the plurality of cell monitoring units 10 connected to first communication network NW1. First communication circuit 21 is controlled by control circuit 23 in the normal mode. First communication circuit 21 detects the first operation signal from first communication network NW1 in the low-power mode. During the transition from the low-power mode to the normal mode, first communication circuit 21 activates at least one of deactivated control circuit power supply 33, control circuit 23, or second communication circuit 22 based on the first operation signal.
A configuration example of first communication circuit 21 will be described with reference to
Daisy communication units 61 are communication units that perform daisy communication. Daisy communication units 61 may be connected to first communication network NW1 via isolation elements such as capacitors and transformers.
Control logic circuit 60 is a circuit that controls first communication circuit 21. Control logic circuit 60 detects signals from the plurality of cell monitoring units 10 and current measurement unit 11 input from daisy communication units 61, and controls first communication circuit 21. For example, control logic circuit 60 includes signal detection unit 62, error detection unit 63, and activation unit 64. Signal detection unit 62 detects signals from first communication network NW1. For example, signal detection unit 62 detects the first operation signals from cell monitoring units 10.
Error detection unit 63 detects anomalies in power storage cells 81 and the like based on signals detected by signal detection unit 62.
Activation unit 64 activates first communication circuit 21 based on an external activation signal.
Clock oscillator 66 is an oscillator that outputs a clock signal for operating control logic circuit 60.
Second communication circuit 22 is a circuit connected to second communication network NW2 for connecting to higher-level system 2 of cell stack management system 1. For example, second communication circuit 22 includes a CAN interface. In the present embodiment, second communication circuit 22 is supplied with power from control circuit power supply 33. Second communication circuit 22 is also supplied with power from a power supply other than control circuit power supply 33, allowing it to activate and operate even when control circuit power supply 33 is deactivated.
Power converter 32 is a converter that supplies power to first communication circuit 21. Power converter 32 converts signals transmitted in first communication network NW1 to DC power, and supplies the DC power to first communication circuit 21.
Operations performed by cell stack management system 1 according to the present embodiment will be described with reference to
As illustrated in
Next, control circuit 23 switches the mode of operation of cell stack management system 1 to the low-power mode (S12). More specifically, control circuit 23 deactivates second communication circuit 22. Control circuit 23 deactivates second communication circuit 22 by transmitting a deactivation signal to second communication circuit 22. Control circuit 23 also deactivates itself by shutting down control circuit power supply 33, which supplies power to control circuit 23. In this way, in the low-power mode, the power consumption of cell stack management system 1 can be inhibited by not only causing cell monitoring unit 10 perform intermittent measurements, but also by deactivating control circuit 23, control circuit power supply 33 and second communication circuit 22.
Note that the state of first communication circuit 21 may be diagnosed before control circuit 23 is deactivated as described above. In the present embodiment, it is first communication circuit 21 that effectively controls cell stack management system 1 in the low-power mode. Accordingly, if the mode of operation is switched to the low-power mode when there is an anomaly in first communication circuit 21, a serious problem could occur, such as an inability to detect an anomaly in cell stack management system 1. Therefore, diagnosing first communication circuit 21 before control circuit 23 deactivates can reduce the occurrence of problems with cell stack management system 1 in the low-power mode. More specifically, before control circuit 23 deactivates, first communication circuit 21 outputs a control activation signal to control circuit 23 for activating control circuit 23. Control circuit 23 diagnoses the state of first communication circuit 21 based on the control activation signal. Stated differently, it diagnoses whether the output control activation signal is capable of activating control circuit 23.
Since the states of power storage cells 81 must continue to be monitored even in the low-power mode, first communication circuit 21 monitors the states of power storage cells 81 and cell monitoring units 10 using the first operation signal from cell monitoring units 10. Since operations in first communication circuit 21 are limited in the low-power mode, the power supplied by first power supply 31 can be inhibited. Battery management unit 20 includes a function for deactivating first power supply 31 in the low-power mode. For example, control circuit 23 deactivates first power supply 31. When first power supply 31 is deactivated, signals transmitted in first communication network NW1 are converted to DC power and the DC power is supplied to first communication circuit 21. In the present embodiment, power converter 32 converts the first operation signal to DC power.
Thus, by deactivating first power supply 31, the power consumption of cell stack management system 1 in the low-power mode can be further inhibited.
Next, cell monitoring unit 10 measures the voltage of power storage cell 81 (S14).
Next, cell monitoring unit 10 determines whether or not an anomaly has been detected in, for example, power storage cell 81 based on, for example, the measurement result (S16). If cell monitoring unit 10 does not detect an anomaly (No in S16), it transmits a first operation signal indicating normality to first communication network NW1 (S18). However, if cell monitoring unit 10 does detect an anomaly (Yes in S16), it transmits a first operation signal indicating the anomaly to first communication network NW1 (S20). Stated differently, if at least one of control circuit power supply 33, control circuit 23, or second communication circuit 22 is deactivated and cell monitoring unit detects an anomaly, cell monitoring unit 10 outputs a first operation signal indicating an anomaly.
The first operation signal indicating normality or an anomaly will be described with reference to
As illustrated in graph (a) in
Returning to
Next, after waiting for a predetermined period of time, cell monitoring unit 10 returns to step S14.
However, if cell monitoring unit 10 outputs a first operation signal indicating an anomaly in step S20, cell stack management system 1 is switched to the normal mode (S24). This ends the low-power mode.
Here, operations performed by first communication circuit 21 in the low-power mode will be described with reference to
As illustrated in
Next, first communication circuit 21 determines whether or not an anomaly is detected based on the first operation signal (S32). More specifically, first communication circuit 21 determines whether the first operation signal is a signal indicating an anomaly such as those illustrated in
First communication circuit 21 may activate second communication circuit 22, which is deactivated in the low-power mode. When second communication circuit 22 is activated by first communication circuit 21, second communication circuit 22 notifies higher-level system 2, via second communication network NW2, of the activation of second communication circuit 22. Upon receiving the notification, higher-level system 2 may activate control circuit power supply 33 and control circuit 23 via second communication network NW2. In this way, control circuit power supply 33 may be activated by higher-level system 2.
Next, the mode of operation of cell stack management system 1 is switched to the normal mode (S38). More specifically, first communication circuit 21 transmits a command signal to cell monitoring unit 10 (and current measurement unit 11). This switches the mode of operation of cell monitoring unit 10 to the normal mode.
As described above, the mode of operation can be switched in cell stack management system 1. In the present embodiment, since control circuit 23, control circuit power supply 33, first power supply 31, and second communication circuit 22 are deactivated in the low-power mode, power consumption is inhibited. Even in such a low-power mode, power storage cells 81 can be reliably monitored, and if an anomaly is detected, first communication circuit 21 can quickly switch to the normal mode.
A variation of cell stack management system 1 according to the present embodiment will be described with reference to
As illustrated in
Cell stack management system according to Embodiment 2 will be described. The cell stack management system according to the present embodiment differs from cell stack management system 1 according to Embodiment 1 mainly in that the first communication circuit includes a third communication network for connecting to a higher-level system. Hereinafter, the cell stack management system according to the present embodiment will be described focusing on the points of difference from cell stack management system 1 according to Embodiment 1.
The overall configuration of the cell stack management system according to the present embodiment will be described with reference to
Third communication network NW3 is a communication network for connecting to higher-level system 2.
Battery management unit 120 according to the present embodiment includes first communication circuit 121, second communication circuit 22, control circuit 23, first power supply 31, and control circuit power supply 33.
First communication circuit 121 according to the present embodiment is connected to third communication network NW3, which is for connecting to higher-level system 2. When control circuit 23 or second communication circuit 22 cannot communicate, first communication circuit 121 communicates with higher-level system 2 via third communication network NW3.
Here, a configuration example of first communication circuit 121 will be described with reference to
Signal generation circuit 67 is a circuit that generates a second operation signal. Signal generation circuit 67 generates a second operation signal based on a first operation signal detected by signal detection unit 62 of control logic circuit 60, and transmits the second operation signal to third communication network NW3.
In the present embodiment, just as in Embodiment 1, when at least one of control circuit power supply 33, control circuit 23, or second communication circuit 22 is deactivated (i.e., in the low-power mode), cell monitoring unit 10 transmits a first operation signal to first communication circuit 121. First communication circuit 121 transmits, via third communication network NW3, a second operation signal indicating that cell monitoring unit 10 and first communication circuit 121 are in operation. The second operation signal is a signal including the same information as the first operation signal. The time waveform and other aspects of the second operation signal are not particularly limited. The second operation signal may be the same signal as the first operation signal.
In the present embodiment as well, just as in Embodiment 1, if at least one of control circuit power supply 33, control circuit 23, or second communication circuit 22 is deactivated and cell monitoring unit 10 detects an anomaly, cell monitoring unit outputs a first operation signal indicating an anomaly. When first communication circuit 121 receives a first operation signal indicating an anomaly from first communication network NW1, first communication circuit 121 outputs a second operation signal indicating an anomaly.
Note that when control circuit 23 or second communication circuit 22 are deactivated and the first operation signal is stopped, and when control circuit 23 or second communication circuit 22 are deactivated and there is an anomaly in first communication circuit 121, first communication circuit 121 may stop transmitting the second operation signal. This allows higher-level system 2 to detect that there is an anomaly in at least one of the first operation signal or first communication circuit 121. In such a case, control circuit 23 or second communication circuit 22 is activated via second communication network NW2. This allows control circuit 23 to handle anomalies appropriately.
Operations performed by cell stack management system 101 according to the present embodiment will be described with reference to
The operations performed by cell stack management system 101 according to the present embodiment are the same as those of cell stack management system 1 according to Embodiment 1 up until the step where cell monitoring unit 10 outputs the first operation signal (step S22 and step S24 illustrated in
As illustrated in
Next, first communication circuit 121 determines whether or not an anomaly is detected based on the first operation signal (S132). If first communication circuit 121 does not detect an anomaly (No in S132), first communication circuit 121 transmits a second operation signal indicating normality to higher-level system 2 via third communication network NW3 (S134), and returns to step S130.
However, if first communication circuit 121 does detect an anomaly (Yes in S132), first communication circuit 121 transmits a second operation signal indicating the anomaly to higher-level system 2 via third communication network NW3 (S136). Upon receiving this second operation signal, higher-level system 2 causes second communication circuit 22 to activate control circuit 23 or control circuit power supply 33 via second communication network NW2 (S138).
Next, the mode of operation of cell stack management system 101 is switched to the normal mode (S140). More specifically, first communication circuit 121 transmits a command signal to cell monitoring unit 10 (and current measurement unit 11). This switches the mode of operation of cell monitoring unit 10 to the normal mode.
As described above, the mode of operation can be switched in cell stack management system 101. In the present embodiment, since control circuit 23, control circuit power supply 33, and second communication circuit 22 are deactivated in the low-power mode, power consumption is inhibited. Even in such a low-power mode, power storage cells 81 can be reliably monitored, and if an anomaly is detected, first communication circuit 121 can quickly switch to the normal mode.
Cell stack management system according to Embodiment 3 will be described. The cell stack management system according to the present embodiment differs from cell stack management system 101 according to Embodiment 2 mainly in that the first communication circuit transmits a second operation signal not only to higher-level system 2 but also to control circuit 23. Hereinafter, the cell stack management system according to the present embodiment will be described focusing on the points of difference from cell stack management system 101 according to Embodiment 2.
The overall configuration of the cell stack management system according to the present embodiment will be described with reference to
Battery management unit 220 according to the present embodiment includes first communication circuit 121, second communication circuit 22, control circuit 223, first power supply 31, and control circuit power supply 33.
Control circuit 223 receives the second operation signal from first communication circuit 121 via third communication network NW3. Before deactivating, control circuit 223 diagnoses the state of first communication circuit 121 based on the second operation signal.
Operations performed by cell stack management system 201 according to the present embodiment will be described with reference to
As illustrated in
Next, before deactivating, control circuit 223 diagnoses first communication circuit 121 (S212), and determines whether an anomaly is detected in first communication circuit 121 (S214). More specifically, before control circuit 223 deactivates, first communication circuit 121 outputs the second operation signal to control circuit 223 or higher-level system 2 via third communication network NW3. Control circuit 223 or higher-level system 2 diagnoses the state of first communication circuit 121 based on the second operation signal. If no anomaly is detected in first communication circuit 121 as a result of the diagnosis (No in S214), cell stack management system 201 switches the mode of operation to the low-power mode (S216).
However, if an anomaly is detected in first communication circuit 121 as a result of the diagnosis (Yes in S214), cell stack management system 201 returns the mode of operation to the normal mode (S218). More specifically, cell stack management system 201 returns to the normal by, for example, control circuit 223 transmitting a command signal to cell monitoring unit 10.
When the mode of operation of cell stack management system 201 is switched to the low-power mode, cell stack management system 201 performs the same operations as in steps S14 through S24 performed by cell stack management system 1 according to Embodiment 1. The operations for switching from the low-power mode to the normal mode performed by cell stack management system 201 are the same as the operations performed by cell stack management system 101 according to Embodiment 2.
The same effects are achieved in cell stack management system 201 according to the present embodiment as in cell stack management system 101 according to Embodiment 2.
Cell stack management system according to Embodiment 4 will be described. The cell stack management system according to the present embodiment differs from cell stack management system 201 according to Embodiment 3 mainly in that the first communication circuit and the like change aspects of signals generated based on a timer. Hereinafter, the cell stack management system according to the present embodiment will be described focusing on the points of difference from cell stack management system 201 according to Embodiment 3.
The overall configuration of the cell stack management system according to the present embodiment will be described with reference to
Battery management unit 320 according to the present embodiment includes first communication circuit 321, second communication circuit 22, control circuit 223, first power supply 31, and control circuit power supply 33.
Cell monitoring unit 310 according to the present embodiment will be described with reference to
As illustrated in
Power supply control circuit 80 is a circuit that controls the supply of power from the power supply of cell monitoring unit 310.
First timer 79 is a circuit that measures time and causes power supply control circuit 80 to stop supplying power to cell monitoring unit 310 when it detects that a preset first time has elapsed. Stated differently, first timer 79 stops the operation of cell monitoring unit 310 when it detects that a preset first time has elapsed.
Note that current measurement unit 311 has the same configuration as cell monitoring unit 310.
First communication circuit 321 according to the present embodiment will be described with reference to
Second timer 69 is a circuit that measures time and causes signal generation circuit 67 to stop generating the second operation signal when it detects that a preset second time has elapsed.
As described above, in the low-power mode, first timer 79 of cell monitoring unit 310 of cell stack management system 301 according to the present embodiment causes power supply control circuit 80 to stop supplying power to cell monitoring unit 310 when it detects that a first time has elapsed. Stated differently, first timer 79 stops the operation of cell monitoring unit 310 when it detects that a preset first time has elapsed. This stops the output of the first operation signal. First communication circuit 321 therefore detects the stop of the first operation signal and activates control circuit power supply 33 or control circuit 223. This causes cell stack management system 301 to switch to the normal mode.
First communication circuit 321 according to the present embodiment includes second timer 69, and second timer 69 stops outputting the second operation signal when it detects that a preset second time has elapsed. Having detected the stop of the second operation signal, higher-level system 2 activates control circuit power supply 33, control circuit 223, or second communication circuit 22. Stated differently, when second timer 69 detects that a preset second time has elapsed, second timer 69 activates control circuit power supply 33, control circuit 223, or second communication circuit 22, that is, switches to the normal mode.
As described above, in the present embodiment, by forcibly switching to the normal mode on a regular basis, it is possible to detect, without delay, anomalies in the measurement result determination circuit of cell monitoring unit 310, which cannot be detected by intermittent measurement in the low-power mode, as well as failures such as sticking measurement results.
In the configuration example given above, first timer 79 is exemplified as stopping the operation of cell monitoring unit 310, but the configuration of first timer 79 is not limited to this example. For example, first timer 79 may cause signal generation circuit 72 to stop outputting the first operation signal when it detects that the first time has elapsed. First timer 79 may cause signal generation circuit 72 of cell monitoring unit 310 to output a first operation signal indicating an anomaly when it detects that the preset first time has elapsed.
Although second timer 69 is exemplified as stopping the output of the second operation signal in signal generation circuit 67, second timer 69 is not limited to this configuration. For example, second timer 69 may cause signal generation circuit 67 to output a second operation signal indicating an anomaly when it detects that the second time has elapsed.
Although the present disclosure has been described based on the above embodiments, the present disclosure is not limited to the above embodiments.
For example, in each of the above embodiments, cell stack 8 is not an element of the cell stack management system, but cell stack 8 may be included in the elements of the cell stack management system.
In each of the above embodiments, the control circuit power supply, the control circuit, and the second communication circuit are deactivated in the low-power mode, but not necessarily all of them need to be deactivated. For example, in the low-power mode, the control circuit and the second communication circuit may be deactivated and the control circuit power supply may be activated. In another example, in the low-power mode, the control circuit power supply and the control circuit may be deactivated and the second communication circuit may be activated. In the low-power mode, at least one of the control circuit power supply, the control circuit, or the second communication circuit may be stopped.
In the above Embodiment 1, battery management unit 20 includes power converter 32, but battery management unit 20 need not necessarily include power converter 32.
In the above Embodiments 2 through 4, battery management units 120, 220, and 320 do not include power converter 32, but may.
The cell monitoring unit may output first operation information indicating not only voltage anomalies but also temperature anomalies, clock anomalies, etc.
The cell stack management system according to each of the above embodiments may be housed in, for example, a single housing, and, alternatively, may be separated into a plurality of housings.
Some or all of the elements included in the cell stack management system according to the above embodiments may be configured in the form of a single system Large Scale Integration (LSI) chip. A system LSI chip is a super multifunctional LSI chip manufactured by integrating a plurality of elements on a single chip. More specifically, a system LSI chip is, for example, a computer system including a microprocessor, ROM, RAM, etc. The RAM stores a computer program. The functions of the system LSI chip are realized by the microprocessor operating according to the computer program.
Some or all of the elements of the cell stack management system according to each of the above embodiments may be configured in the form of a detachable IC card or a stand-alone module. The IC card or module may be a computer system including a microprocessor, ROM, RAM, etc. The IC card or module may include the above-described super multifunctional LSI circuit. The functions of the IC card or module are realized by the microprocessor operating according to a computer program. The IC card and the module may be tamperproof.
The present disclosure may be realized as a computer system including a microprocessor and memory, the memory may store the above-described computer program, and the microprocessor may operate according to the computer program.
Various modifications of the above embodiments that may be conceived by those skilled in the art, as well as embodiments resulting from arbitrary combinations of elements and functions from different embodiments that do not depart from the essence of the present disclosure are included the present disclosure.
For example, the individual communication lines of cell stack management system 1a of Embodiment 1 may be applied to other embodiments of the cell stack management system.
The cell stack management system according to the present disclosure can be used, for example, as a cell stack management system or the like for an in-vehicle cell stack system.
This is a continuation application of PCT International Application No. PCT/JP2022/009391 filed on Mar. 4, 2022, designating the United States of America, which is based on and claims priority of U.S. Provisional Patent Application No. 63/157,251 filed on Mar. 5, 2021, and U.S. Provisional Patent Application No. 63/244,598 filed on Sep. 15, 2021. The entire disclosures of the above-identified applications, including the specifications, drawings, and claims are incorporated herein by reference in their entirety.
Number | Date | Country | |
---|---|---|---|
63157251 | Mar 2021 | US | |
63244598 | Sep 2021 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/JP2022/009391 | Mar 2022 | US |
Child | 18457113 | US |