1. Field of the Invention
This invention relates in general to concrete support foundations constructed in-situ particularly useful for supporting tall, heavy or large towers which may be used to support wind turbines, power lines, street lighting and signals, bridge supports, commercial signs, freeway signs, ski lifts and the like. More specifically, the helical anchor foundation of the present invention is useful in supporting such towers in clays, sands, and other soft materials which can be water-bearing and/or too weak to stand or maintain the excavations formed to receive a concrete foundation. Such soils can be found in the Midwest region and coastal regions of North America.
2. Description of Related Art
My earlier U.S. Pat. No. 5,586,417 for tensionless pier foundation, U.S. Pat. No. 5,826,387 for pier foundation under high unit compression, U.S. Pat. No. 6,672,823 for perimeter weighted foundation, U.S. Pat. No. 7,533,505 for pile anchor foundation, U.S. Pat. No. 7,618,217 for post-tension pile foundation, and U.S. Pat. No. 7,707,797 (the '797 patent) for pile anchor foundation disclose post-tension concrete foundations for tower structures, the disclosures of which are expressly incorporated herein by reference as if fully set forth in their entirety. The prior art cited in these patents may also be relevant to the post-tensioned helical anchor and foundation cap of the present invention.
The foundation disclosed in the '797 patent has a circular post-tensioned concrete cap set on or below ground surface. The foundation supports a tower from the upper surface thereof, which tower is attached to the post-tensioned concrete cap by a series of circumferentially spaced tower anchor bolts. The tower anchor bolts extend upwardly through, and are nutted atop, a circular tower base flange at the bottom of the tower and extend downwardly through, and nutted below, an embedment ring near the bottom of the post-tensioned concrete cap. The tower anchor bolts are also sleeved and shielded so as to prevent the concrete from bonding to the anchor bolts. This structure allows the tower anchor bolts to be elongated and post-stressed between the tower base flange and the embedment ring to alleviate bolt cycling and fatigue and allow the tower anchor bolts to be removed and replaced for bolt remediation, extended fatigue life, and greater bolt strength capacity to allow larger improved structures to be supported by the foundation in the future.
In a conventional helical foundation, the helical anchors are elongated pipes which extend upwardly into and connect to an overlying concrete foundation cap and are both compression and tension resisting foundation extensions which alternate between tension and compression as the foundation moves in a rocking fashion. The helical anchor pipes in such foundations are not connected to tensioning bolts and are not post-tensioned.
The concrete foundation according to the present invention resists supported tower overturn by utilizing a multitude of circumferentially spaced, post-tensioned helical anchors, sometimes more simply referred to herein as helical anchors. Each of the post-tensioned helical anchors is in the nature of an elongated pipe with spaced helical discs assembled around the periphery thereof which allow the lower portion of the helical anchor to be spin-drilled deep into the ground, as is known in the art. The upper end of each post-tensioned helical anchor includes a post-tensioning element, sometimes more simply referred to herein as a tensioning element, which extends upwardly through the concrete foundation cap once poured and cured. The helical anchors are capable of being post-tensioned against the top of the foundation cap after the cap has cured.
To this end, the tensioning element at the upper end of the helical anchor is encased, preferably with a plastic sleeve or the like. The encasing ensures that the tensioning element of the helical anchor does not bond to or bear into the foundation concrete cap, thus allowing the helical anchor to be post-tensioned and pulled upwardly until the helical disc and skin friction resistance of the in-ground helical anchor with the surrounding subsurface soils equals the required tension applied to the helical anchor. The required post-tension applied to the tensioning element should exceed the maximum uplift load determined for each helical anchor. Therefore, unlike conventional helical anchors, the helical anchors of the present invention are post-tensioned anchors resisting overturn uplift.
In another aspect of the present invention, the lower portion of the post-tensioned helical anchor has grout holes in the pipe walls. Thus, once the helical anchor has been positioned into the ground, grout can be injected under pressure into the top of the anchor at the ground surface to fill the pipe and then be forced into the surrounding soil through the grout holes. As such, the post-tensioned helical anchors can be pressure grouted around their perimeter with cementitious material after the post-tensioned helical anchor has been spin-drilled into its desired position in the ground.
Two embodiments of the post-tensioned helical anchors for use in accordance with the present invention are disclosed herein. In both embodiments, the portion of the post-tensioned helical anchor which is spin-drilled and positioned in the ground is referred to herein as the “helical anchor pipe” or simply the “anchor pipe”.
In the first embodiment, each of the helical anchors includes an elongated pipe with spaced helical discs assembled around the perimeter thereof, together with a post-tensioning element, such as a tendon or elongated bolt coupled to the upper end of the elongated pipe by a connecting subassembly. These helical anchors are referred to herein as “bolt helical anchors”. The tensioning element is in the form of a tendon or bolt, referred to generally herein as “anchor tendons” or “anchor bolts” with both terms being intended to be interchangeable. Further, as used herein, the terms “helical anchor bolts” or “helical anchor tendons” are understood to refer to the bolts or tendons in the helical anchors, as the bolts and tendons themselves are not helical.
The helical anchor bolts extend through the foundation cap and are encased in a plastic sleeve to prevent bonding between the tensioning elements and the cementitious material of the cap. The upper end of the tendon or bolt is threaded and equipped with a post-tensioning nut threaded thereon to post-tension the helical anchor after the cementitious material of the concrete foundation cap has cured and hardened. The tension in the upper end of the anchor tendon, preferably embodied as a bolt having a length of less than about 10 feet, can be measured with an ultrasonic device, eliminating the need and expense of periodically retensioning the bolt for possible relaxation.
The elongated pipe section, or helical anchor pipe, of the bolt helical anchors, extends downwardly from about 40 feet to about 100 feet or more into the ground, depending on the type of soil surrounding the foundation, and can be made up of several pipe sections connected end-to-end.
In the second alternative embodiment, each post-tensioned helical anchor comprises a plurality of cylindrical hollow bars or anchor rods that are interconnected end-to-end. These helical anchors are sometimes referred to herein as “hollow bar helical anchors”. The hollow bar helical anchors are made up of externally threaded pipes, typically up to 20 feet in length. In order to form the hollow bar helical anchors, the hollow bars are coupled together longitudinally with an internally threaded coupler on which is externally mounted one or more helical discs which serve to spin-drill the hollow bar helical anchor into the ground. The hollow bar helical anchors do not require separate anchor tendons or bolts as in the first embodiment because the uppermost hollow bar can serve as the tensioning element. The length of the uppermost hollow bar which extends through the foundation cap is sleeved to allow the hollow bar helical anchor to be post-tensioned directly and nutted above the foundation cap. Grout holes are provided in the hollow bar couplers and/or hollow bars so that the hollow bar helical anchors can also be pressure grouted around their perimeter once spin-drilled into the ground.
Accordingly, the foundation of this invention allows pole and tower structure foundation caps to be constructed at or below ground surface in weaker shallow water-bearing soils or materials susceptible to sidewall caving when excavated. The foundation of this invention is intended to resist long term dynamic loading, minimize movement, provide high rotational stiffness, and greater fatigue resistance.
In addition to having tension-only, post-tensioned helical anchors, the present invention also includes post-tensioned helical anchors that can be converted to serve as both tension and load bearing compression anchors, generally referred to herein as convertible helical anchors, to limit the maximum settlement of the concrete foundation cap. Both embodiments of post-tensioned helical anchors disclosed herein, i.e., the bolt helical anchors and the hollow bar helical anchors, may be constructed as convertible helical anchors.
The convertible helical anchors terminate below the concrete foundation cap with a gap, preferably filled with a compressible material such as a disc made of Styrofoam or the like, immediately below the concrete foundation cap, in accordance with the teachings of my aforesaid '797 patent. While the compressible material is generally referred to as a “disc”, other shapes and other compressible materials may be used. The compressible disc allows the concrete cap foundation to be pulled downwardly, compressing and consolidating the underlying soils to the required bearing strengths and allowing the helical anchors to pull upwardly, developing the skin friction resistance equal to the helical anchor post-tension.
The base flange of the tower is set in grout inside a grout trough molded by a template ring around the top surface of the foundation cap. The tower may be plumbed vertically by shim packs positioned in the grout trough below the lower base flange while grout is poured or pumped into the grout trough under the tower base flange and cured.
Electrical, grounding, and communication conduits are positioned in and through, or under, the concrete foundation cap to allow wiring and conductors to be pulled into the tower. Electrical grounding cables connect the above ground supported structure to cables and rods beyond the perimeter of the concrete foundation cap. Internal electrical grounding cables connect to the corrugated metal pipe (described hereinafter) and to the helical anchor pipes.
In addition to having post-tensioned helical anchors which extend generally in a vertical direction, the foundation according to the present invention replaces conventional lateral reinforcement provided by steel rebar bonding to the foundation cap concrete, with nutted and sleeved radial bolts. The radial bolts are positioned to be generally horizontal and to extend laterally between at least an inner corrugated pipe embedded vertically in the foundation cap and an outer vertical corrugated pipe which preferably defines the outer perimeter of the foundation cap. The corrugated pipes provide vertical steel reinforcement around the perimeter of the post-tensioned concrete cap and internally therein.
Two sets of radial bolts extend radially and horizontally through the concrete foundation cap, one set near the top and one set near the bottom of the cap. Both sets of radial bolts are positioned and aligned by holes in the corrugated pipes or the like. The radial bolts or tendons preferably extend horizontally beyond the outer, perimeter-defining corrugated pipe and can be post-tensioned by hydraulic jacks or other torquing devices and are generally held post-tensioned by nuts. Post-tensioning of the horizontal radial bolts or tendons is facilitated by sleeving or otherwise isolating the bolts from the surrounding cementitious material of the concrete cap, in the same manner as previously disclosed for post-tensioned vertical bolts in my aforesaid prior patents.
The post-tensioned radial bolts or tendons compress the foundation concrete laterally, stiffening the foundation to provide greater resistance to cyclic bending forces from the supported dynamic structure and increased fatigue resistance. The radial bolts or tendons can also be removed and replaced for extending fatigue life, remediation, and replacement with bolts of greater strength. Also, when the radial bolts extend horizontally beyond the perimeter of the foundation, the extensions allow coupling on of additional bolt extensions in order to enlarge the diameter of the foundation cap which, in turn, increases the capacity of the foundation support for larger structures with greater loading using the original base foundation.
As already noted above, both embodiments of the post-tensioned helical anchors are preferably provided with grout holes and pressure-grouted around their perimeter with cementitious material after the anchor pipes have been spin drilled to the desired position in the ground. The pressure grouting is completed before the foundation cap is formed in the case of the bolt helical anchors. On the other hand, because the hollow bars of the hollow bar helical anchors extend all the way through the foundation cap, the hollow bar helical anchors can be pressure-grouted either before or after the foundation cap has been formed. In either case, the top of the helical anchor pipe immediately below the bottom of the concrete foundation cap is generally not grouted so as to facilitate the post-tensioning of the helical anchors. By pressure-grouting the helical anchor pipes around their perimeter, the helical anchor pipes can be better stabilized in the ground soil, especially in weaker shallow water-bearing soils or materials.
In another aspect of the present invention, a movable packer can be employed in the helical anchor pipe in order to isolate specific sections of the helical anchor pipe for pressure-grouting around a portion of the pipe perimeter. Typically, the pressure-grouting around the pipe perimeter begins at the lowermost portion of the helical anchor pipe with the desired portion to be pressurized sealed at the top by the movable packer. Once the first lowermost portion of the helical pipe has been pressure-grouted inside and around its perimeter, the movable packer can be moved upwardly to the next portion to be isolated for the pressure-grouting.
In another preferred embodiment of the present invention, energy-dampening grout can be used in the grout trough when stabilizing the tower base flange after leveling. Such grout may include rubber-tire grindings and/or fiber mesh as supplemental aggregate or the like.
In accordance with the foregoing, it is an object of the present invention to provide a vertically and horizontally post-tensioned concrete foundation having a reinforced concrete foundation cap for supporting dynamic tall, heavy, and/or large towers and/or poles which can be constructed in-situ and is especially useful in supporting such towers in clays, sands, soft rocks bearing shallow ground water and other bearing soils that are too weak to stand or maintain dimensions of an excavation formed to receive a concrete foundation.
A further object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding object in which the vertical post-tensioning structure includes a plurality of circumferentially spaced post-tensioned helical anchors, each helical anchor including a helical anchor pipe with external helical discs and a tensioning element extending up through the concrete foundation cap and above the top surface thereof, for post-tensioning the helical anchors and pulling the concrete foundation cap downwardly to compress the underlying bearing soils.
Yet a further object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding objects in which the tensioning element is either a solid bolt or tendon connected to the top of a helical anchor pipe of a bolt helical anchor, or a short length of hollow bar or anchor rod at the top of a hollow bar helical anchor, both of which extend through the concrete foundation cap and above the top surface thereof.
Still a further object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding objects in which the bolts or tendons of the bolt helical anchors, and/or the upper portion of the hollow bar helical anchors, are provided with plastic sleeves or the like to prevent bonding with the concrete in the leveling course and the concrete foundation cap, facilitating post-tensioning of the helical anchors and eliminating stress reversals and fatigue while the bolts or hollow rods are stretched by jacking or torquing during the post-tensioning.
Yet another object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding objects in which the post-tensioned helical anchors are tension anchors but can also be provided with compression anchor capabilities to limit the maximum settlement of the concrete foundation cap by adding a steel plate topped with a crushable material, Styrofoam or the like, which allows the concrete foundation cap to be pulled down so the plate contacts the bottom of the concrete foundation cap, limiting additional concrete foundation cap settlement.
A still further object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding objects in which the horizontal post-tensioning structure includes nutted and sleeved radial bolts that extend horizontally through the concrete foundation cap adjacent its top and bottom surfaces and are post-tensioned after the concrete foundation cap has been poured and cured by tensioning the bolts with a hydraulic jack and torquing the nuts around the perimeter of the concrete foundation cap to secure the tension in the bolts.
Another object of the present invention is to provide corrugated metal pipes both in the interior and around the perimeter of the concrete foundation cap, which corrugated metal pipes provide vertical and circumferential steel reinforcement, a perimeter form for the concrete pour, and holes near the top and bottom that are aligned radially to support and position the radial sleeved bolts for horizontally post-tensioning the concrete foundation cap.
Yet a further object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding objects in which the horizontal radial bolts extend beyond the perimeter of the concrete foundation cap and enable the coupling of bolt extensions in order to form an enlarged foundation with an increased diameter that can accommodate an enlarging of or a larger supported structure.
Still another object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding objects in which fatigue life for the concrete foundation cap is extended by a factor of at least 3 to over 100 years by post-tensioning the horizontal radial sleeved bolts to eliminate stress reversals and cycling of the horizontal steel from dynamic loading by supported wind turbines and the like.
Still a further object of the present invention is to provide a vertically and horizontally post-tensioned concrete supporting foundation in accordance with the preceding objects in which the sleeved helical anchor tendons or bolts and the sleeved horizontal radial bolts may be replaced for any reason including, but not limited to, maintenance and to increase the bolt strength with stronger steel to accommodate an enlarging of or a larger supported structure.
Another object of the present invention is to provide the helical anchor pipes of the post-tensioned helical anchors with external helical discs and pressure-grouting and regrouting capabilities through holes in the helical anchor pipe for ground improvement around the helical anchor pipe, and the helical discs improving the soil strength, increasing the anchor size and improving the bond between the helical anchor pipe and the soil, all to increase the anchor pullout or downward load resistance, thus increasing the foundation loading capacity and stiffness.
A further object of the present invention is to provide a post-tensioned helical anchor in accordance with the preceding object in which the helical anchor pipe has a smooth continuous open annulus to allow a movable packer to be placed therein to isolate certain zones of the helical anchor pipe for pumping measured grout quantities at desired pressures to specific zones around the periphery of the anchor pipe.
Still another object of the present invention is to provide a post-tensioned helical anchor in accordance with the preceding two objects in which the perimeter of the helical anchor pipe is provided with an uneven outer surface to increase grout bonding thereto, the uneven outer surface including threads on the externally threaded pipes of hollow bar helical anchors or spiral and inertia pipe welds around the perimeter of the helical anchor pipe of bolt helical anchors.
Yet another object of the present invention is to provide a helical anchoring system for resisting large supported structure overturning loads which does not require removal of soil and/or subsurface native materials and water by or during construction of such anchor system or require environmental permits for holding ponds or disposal.
A further object of the present invention is to provide a helical anchoring system in accordance with the preceding object in which a smaller foundation is required, thereby reducing the area and materials needed and resulting in a reduced carbon footprint and environmentally conducive advantages.
Yet a further object of the present invention is to provide a tower sway energy-dampening grout in the grout trough and under the tower base flange of a vertically and horizontally post-tensioned concrete foundation, which grout includes rubber tire grindings and/or fiber mesh as supplemental aggregate or the like which is confined in the grout trough by surrounding concrete.
Still a further object the present invention is to provide greater electrical grounding for electrical towers and wind turbines by connecting the tower or wind turbine to the foundation thereto with electrical grounding cables connected internally to the helical anchor pipes and corrugated metal pipes.
Another object of the present foundation is to provide a foundation extending deep into the ground so as to anchor the foundation below the failure of shallow soils, enabling the foundation to withstand such events as storm surges, seismic upset forces, liquefaction, erosion, and flooding.
Other objectives and advantages will become apparent from the following description, taken in connection with the accompanying drawing, within is set forth by way of illustration and example, by embodiments of this invention.
Other objects, features and advantages of the present invention will be apparent to those skilled in the art upon a reading of this specification including the accompanying drawings. While intending to illustrate the invention, the drawings are not necessarily to scale.
Although preferred embodiments of the invention are explained in detail, it is to be understood that the invention is not limited in its scope to the details of construction and arrangement of components of this specific embodiment. The invention is capable of other embodiments and of being practiced or carried out in various ways. Also, in describing the preferred embodiment, specific terminology will be resorted to for the sake of clarity. It is to be understood that each specific term includes all technical equivalents which operate in a similar manner to accomplish a similar purpose.
Referring to the drawings,
The foundation cap 46 preferably includes an outer upstanding corrugated metal pipe (CMP) 20 at its perimeter which may, for example, be 24 feet in diameter and 5 feet in height. The outer CMP 20 is placed atop the ground or in an excavation 29 formed in the ground and resting upon the bottom of the excavation 29 and grout leveling course 1. Referring to
The concrete foundation cap 46 includes a series of tower anchor bolts 13, 14 spaced circumferentially about the central point of the concrete foundation cap 46 (see
Referring to
Post-tensioning helical anchor bolts or tendons 3 are preferably threaded bolts with a nut 28 at the top. The helical anchor bolts 3 are preferably steel rods of grade 75 or 150 and have a diameter on the order of 1.75 inches. The size and grade of the rods may be varied depending upon the load requirements for the foundation.
The helical anchor bolts 3 are connected at their lower end to the helical anchor pipe 23 by a subassembly 4 (see
The helical anchor bolts 3 are sleeved, preferably by PVC tubing 5, through the concrete foundation cap 46 to prevent bonding with the concrete foundation cap 46 and to allow for post-tension stretching. As shown in
The perimeter surface of the helical anchor pipes 23 is preferably deformed by spiral and inertia welds 26 shown in
Pressure grouting of the anchor pipes 23 through the drill holes or grouting ports 48 in the anchor pipes 23 can include the use of a packer 102, as shown in
To grout the anchor pipes 23, the packer 102 is inserted into the hollow annulus 9 (see
More particularly, the packer 102 is first placed above the lowest grouting ports 48. Grout is injected until a specified pumping pressure is reached at which time the grout volume is recorded. The packer 102 is then moved upwardly above the next set of grouting ports and the pressurized grouting process is repeated. After all grouting ports have been grouted, the subassembly 4 is inserted into the helical anchor pipe 23 with the holes 72 in the rod 70 aligned with corresponding holes in the anchor pipe. Bolts are then inserted through the aligned holes and secured with nuts to securely connect the pipe 23 to the rod 70 of the subassembly 4.
As shown in
While
The convertible helical anchors 27 terminate with the subassembly 4 connection to the helical anchor bolts 3 below the leveling course 6 beneath the concrete foundation cap 46. As shown in
Referring to
The radial bolts 34 may be steel rods of grade 75 or less, and may alternatively be embodied as cables, known as strands. The strands are typically about 0.5 inches in diameter, with two to three of such strands being wrapped together depending on the strength needed. When strands are used, a sleeve of PVC or other material is not necessary as the strands are generally provided with a rubber sheath from the manufacturer. Nuts are not used to tighten the cables or strands, but rather a specialized tool known as a wedge that has teeth that bite into the cables as they are stretched during post-tensioning; such a tool is known to persons of skill in the art. A representative multistrand post-tensioning cable system is the DYWIDAG post-tensioning system available from DYWIDAG Systems International (DSI) having locations worldwide.
The helical anchor bolts 3 used in a tension-only bolt helical anchor are generally between about 2 feet and about 5 feet in length, and preferably about 3 feet in length. The helical anchor bolts 3 used in a convertible bolt helical anchor are approximately 6-8 feet in length. The additional length is needed because the anchor bolts 3 need to extend all the way through the foundation cap.
The second embodiment according to the present invention, i.e., the so-called “hollow bar helical anchor”, is shown in
The upper portion of the hollow bar helical anchor 187 includes a short length of hollow bar 185 which serves as a tensioning element, with a sleeve 5 to prevent adhesion to cementitious material of the foundation cap 46. The sleeved length of hollow bar 5 extends through the foundation cap 46 and is post-tensioned on the upper surface of the cap by nuts 28 in the same manner as the anchor bolts 3 of the first embodiment.
The desired number of pipes or hollow bars are assembled end-to-end with internally threaded bolted couplers 188, best shown in
1. At the desired location, excavate the ground for constructing the circular concrete foundation cap to a depth which allows a minimum of 1 ft. of the circular concrete foundation cap to extend above building pad subgrade. Compact the bottom of the excavation 29.
2. Spin drill the desired number of bolt helical anchor assemblies 47 to the desired depth. The number of bolt helical anchor assemblies 47 typically depends upon the number of tower anchor bolts. Helical anchor pipes 23 are sectioned typically in 5 ft. to 20 ft. lengths and bolted together with bolts or studs through bolted couplers 8. The helical anchor discs 25 auger downward into the ground material.
3. Pressure-grout each bolt helical anchor 47 through grout holes or ports 48 in the anchor pipe 23. If desired, the grout can be placed sequentially from the bottom up using a packer 102 (see
4. Allow the grout 24 of the bolt helical anchor to cure a minimum of twelve (12) hours before the subassemblies 4 are placed and used to attach the helical anchor pipe 23 to threaded helical anchor bolts 3.
5. Excavate a trench below the concrete foundation cap excavation 29 for electrical, communication, and grounding conduits 11 (see
6. Install and secure in place the electrical, communication, and grounding conduits (not shown) in trench 11 if under the concrete foundation cap 46. If the electrical, communication, and external grounding conduits are routed between the tower anchor bolts 13 and through the concrete foundation cap 46, place and secure the electrical, communication and external grounding conduits prior to pouring concrete for the concrete foundation cap 46. Place the compression plates 7 atop the subassemblies 4 of the convertible anchors, place the convertible bolt helical anchor compression discs 31 atop the compression anchor plates 7, and place helical anchor bolt PVC pipes 5 or the like atop the discs 31.
7. Place and secure the internal grounding wire 12 to the helical anchor pipes 23. Leave tails for later connection of the internal grounding wire (not shown) to the perimeter corrugated metal pipe 20, the internal corrugated metal pipes 21 and 22, and the supported structural tower base flange 33.
8. Pour the concrete/slurry leveling course 6 and the electrical, communication, and grounding trench 11 if the conduits are routed under the foundation.
9. Assemble the tower anchor bolt cage, generally designated by reference numeral 10 (see
10. Place the perimeter corrugated metal pipe 20 and the internal corrugated metal pipes 21 and 22. Drill holes 32 in the corrugated pipes for passing through the horizontally extending radial bolts 34 if the holes were not pre-drilled. Connect the internal grounding wire to the corrugated metal pipes 20, 21 and 22.
11. Insert the sleeved horizontal radial bolts 34 through the holes 32 in the corrugated metal pipes and between the sleeved tower anchor bolts 13, 14. Place nuts 35 on threaded ends beyond the bolt sleeves inside the innermost internal corrugated metal pipe 22 and outside the perimeter corrugated metal pipe 20.
12. Pour concrete and finish concrete foundation cap 46. Remove the template ring 15 for reuse a minimum of one (1) day after concrete cure.
13. After a minimum of three (3) days of concrete cure, or after concrete cylinder break tests determine a specified concrete strength, tension the horizontally extending radial bolts 34 from outside the perimeter corrugated metal pipe 20.
14. Place and level the helical anchor base plate 17 atop leveling shims (not shown) and a thin layer 40 of cementitious grout (see
15. Install the tower 60 or other structure atop the leveling shims in the grout trough. Pour grout 37 (see
1. At the desired location, excavate the ground for constructing the circular concrete foundation cap to a depth which allows a minimum of 1 ft. of the circular concrete foundation cap to extend above building pad subgrade. Compact the bottom of the excavation 29.
2. Spin drill the desired number of hollow bar helical anchors 187 to the desired depth. The number of hollow bar helical anchor assemblies 187 typically depends upon the number of tower anchor bolts. Hollow bar anchor pipes 184 are sectioned typically in 5 ft. to 20 ft. lengths and bolted together with threaded couplers 188. Helical discs 25 are welded around the pipe and grout ports 48 are drilled through threaded couplers 188.
3. Pressure-grout each hollow bar helical anchor 187 through grout holes or ports 48 in the hollow bar anchor pipe couplers 188. If desired, the grout can be placed sequentially from the bottom up using a packer 102 (see
4. Excavate a trench below the concrete foundation cap excavation 29 for electrical, communication, and grounding conduits 11 (see
5. Install and secure in place the electrical, communication, and grounding conduits (not shown) in trench 11 if under the concrete foundation cap 46. If the electrical, communication, and external grounding conduits are routed between the tower anchor bolts 13 and through the concrete foundation cap 46, place and secure the electrical, communication and external grounding conduits prior to pouring concrete for the concrete foundation cap 46. For convertible hollow bar helical anchors, place the compression plates 7 atop the coupler on the hollow bar end at or about ground level, place the helical anchor compression discs 31 atop the compression anchor plates 7, and place helical anchor bolt PVC pipes 5 or the like atop the discs 31.
6. Place and secure the internal grounding wire 12 to the hollow bar helical anchor pipes 184. Leave tails for later connection of the internal grounding wire (not shown) to the perimeter corrugated metal pipe 20, the internal corrugated metal pipes 21 and 22, and the supported structural tower base flange 33.
7. Pour the concrete/slurry leveling course 6 and the electrical, communication, and grounding trench 11 if the conduits are routed under the foundation.
8. Assemble the tower anchor bolt cage, generally designated by reference numeral 10 (see
9. Place the perimeter corrugated metal pipe 20 and the internal corrugated metal pipes 21 and 22. Drill holes 32 in the corrugated pipes for passing through the horizontally extending radial bolts 34 if the holes were not pre-drilled. Connect the internal grounding wire to the corrugated metal pipes 20, 21 and 22.
10. Insert the sleeved horizontal radial bolts 34 through the holes 32 in the corrugated metal pipes and between the sleeved tower anchor bolts 13, 14. Place nuts 35 on threaded ends beyond the bolt sleeves inside the innermost internal corrugated metal pipe 22 and outside the perimeter corrugated metal pipe 20.
11. Pour concrete and finish concrete foundation cap 46. If grouting was deferred as noted in step 3, pressure-grout each hollow bar helical anchor 187 through grout holes or ports 48 in the anchor pipe 184. If desired, the grout can be placed sequentially from the bottom up using a packer 102. Remove the template ring 15 for reuse a minimum of one (1) day after concrete cure.
12. After a minimum of three (3) days of concrete cure, or after concrete cylinder break tests determine a specified concrete strength, tension the horizontally extending radial bolts 34 from outside the perimeter corrugated metal pipe 20.
13. Place and level the helical anchor base plate 17 atop leveling shims (not shown) and a thin layer 40 of cementitious grout (see
14. Install the tower 60 or other structure atop the leveling shims in the grout trough. Pour grout 37 (see
The helical anchor foundation of the present invention provides significant structural and operational advantages as follows:
1. The concrete foundation cap 46 is constructed at or below ground surface so the top is elevated above the surrounding ground surface and above shallow temporary flooding, and the bottom of the concrete foundation cap 46 is above ground water.
2. The bolt helical anchors 47 and the hollow bar helical anchors 187 of the helical anchor foundation 52 are tension members which pull the concrete foundation cap 46 downwardly, compressing and improving the strength of the underlying bearing soils with such a compression force that the concrete foundation cap 46 is always bearing on the underlying soils even under the greatest overturning and uplift forces transferred to the concrete foundation cap 46 from the tower structure by the tower anchor bolts 13, 14 connected to the concrete foundation cap 46.
3. The tensioning elements of the post-tensioned helical anchors, whether anchor bolts 3 or the short length of hollow bar 185, are shielded from bonding with the reinforced concrete of the concrete foundation cap 46 by sleeves, allowing the tensioning elements to elongate when pulled upward by jacks to the required post-tension. The post-tensioned anchor bolts or tendons 3 are secured in tension by nuts 28 which are threaded atop the helical anchor base plates 17 against the top of the concrete foundation cap 46, thus pulling the cap 46 downwardly with great compression against the underlying soils. Helical anchor bolts or tendons 3 may be retensioned as necessary using thread nuts 28.
4. The pull down/hold down force of the helical anchors 47, 187 results from the post-tensioning of the anchor bolts 3 or the hollow bar length 185 against the helical anchor base plates 17 atop the concrete foundation cap 46. Each helical anchor 47, 187 is pulled upwardly toward the bottom of the concrete foundation cap 46 until the resisting skin friction along the sides of the helical anchor pipe 23, 184 the compression atop the helical anchor discs 25, and the skin friction of the pressure injected grout 24 equals the post-tension on the threaded anchor bolt 3 or hollow bar length 185. The post-tension downward force atop the concrete foundation cap 46 by each helical anchor 47, 187 should exceed the determined maximum uplift of the helical anchor by a factor of 1.33 or greater.
5. The helical anchors 47, 187 can all be tension-only anchors, but preferably approximately 25 to 50% of the anchors are convertible to also act as compression anchors to limit the maximum settlement of the concrete foundation cap 46. The convertible helical anchors 27, 227 that are constructed to provide both tensions and compression capabilities are made to include compressible material 31 placed in spaces that are cast into the bottom of the leveling course 6 above the steel compression plate 7 supported by the subassembly connecting the threaded anchor bolt 3 to the helical anchor pipe 23 or the coupler 188 positioned just below the plate 7. The compressible material 31 (or space gap) allows the concrete cap foundation 46 to be pulled downwardly, compressing and consolidating the underlying soils to the required bearing strengths and allowing the convertible helical anchors 27, 227 to pull upwardly, developing the skin friction resistance equal to the helical anchor post-tension on the tensioning element.
6. Sleeved horizontally extending radial bolts 34 nutted on the ends provide steel reinforcement near the top and bottom of the concrete foundation cap 46. The sleeved radial bolts are post-tensioned to compress the concrete in the concrete foundation cap 46 horizontally. The maximum tensioning forces from bending of the concrete foundation cap 46 eliminate bolt cycling, stress reversals, and fatigue, increasing life expectancy of the foundation. The bolt sleeves of PVC pipe or the like allow the bolts to be replaced to extend fatigue life or to be replaced with greater bolt strength for additions to the supported structure or future replacement with a larger structure. The sleeved radial bolts can extend horizontally beyond the perimeter of the concrete foundation cap and be coupled to extensions of the bolts for increasing the size and load capacity of the foundation.
7. Corrugated metal pipes 20, 21 and 22 are placed in the interior and at the perimeter of the concrete foundation cap 46. The corrugated metal pipes 20, 21, and 22 provide vertical and circumferential steel reinforcement, a perimeter form, and holes therein to support and position the radial sleeved bolts 34 which provide the post-tensioned horizontal steel reinforcement.
8. The helical anchor pipes 23, 184 have holes or grouting ports 48 drilled through the anchor pipe wall to allow pressurized grout or sand cement slurry to be injected into the surrounding soil materials to improve ground conditions and strengths, increasing the skin friction with the helical anchor pipe 23, 184, welds 26 or external threads 127, and helical discs 25, and increasing the size and contact area of the anchor.
9. The bolt helical anchor pipe 23 and the hollow bar helical anchor pipes 184 have a hollow annulus 9 that provides a central vertical void in the helical anchor pipe 23, 184 for high pressure injection of grout 24 through grout holes 48 drilled through the pipe wall. The annulus 9 is filled incrementally using an inflatable packer 102 that plugs the annulus to confine the grouting to zones below the packer. After intended quantities and pressures are reached in a lower zone of the helical anchor pipe 23, 184, the packer is deflated and moved upward to grout a next higher zone.
10. The helical anchor pipes 23 preferably have a deformed outer surface from rough welds 26 that are not ground smooth around the perimeter of the pipe so as to increase friction and bond strength with pressure injected grout 24. The hollow bar helical anchor pipes 184 have an externally threaded surface that increases friction without the need for welds.
11. The constructed helical anchors 47, 187 are designed to allow easy access to determine at any time the residual tension in each helical anchor after relaxation and soil creep by ultrasonic testing. Tension determination demonstrates the helical anchor 47, 187 performance and determines when and which anchors may require maintenance retesting.
12. Installing the bolt helical anchor pipes 23 and/or hollow bar helical anchor pipes 184 is accomplished by spin drilling the anchors with helical discs 25 which auger deep down through the soil or soft rock. No soil or water is removed in connection with the helical anchor assembly 47, 187 installation and therefore environmental permits are not required for dewatering equipment, holding ponds, or disposal sites.
13. The construction of the post-tensioned helical anchors and foundation 52 requires less area and fewer construction materials than shallow foundations which require massive size and material weight to resist supported structural overturn. Therefore, the concrete foundation cap 46 in accordance with the present invention has a much smaller carbon footprint and provides environmentally conducive advantages.
14. The grout 37 poured into and confined by the grout trough 41 (see
15. Electrical, communications, and grounding conduits in trench 11 are placed and secured between the tower anchor bolts 13, 14, and extended vertically through the top of the foundation 46 and horizontally through or under the concrete foundation cap 46.
16. The electrical grounding cables are connected to the supported structure base flange 33 and external grounding cables and rods beyond the perimeter of the concrete foundation cap 46. The grounding cables are also tailed (not shown) to connect internally to the corrugated metal pipes 21 and 22, the bolt helical anchor pipes 23 and/or hollow bar helical anchor pipes 184, and the perimeter corrugated pipe 20.
17. The tower anchor bolts 13, 14 connecting the supported structure to the concrete foundation cap 46 are sleeved with PVC pipe 18 or the like and are secured with nuts 43 atop and nuts 44 below the embedment ring 19 near the bottom of the concrete foundation cap 46. The bolts are replaceable with higher strength bolts of the same size if structure loads are increased in the future as a result of structure modifications or enlargements.
18. The bolt helical anchor pipes 23 and/or hollow bar helical anchor pipes 184 are drilled deep into the ground beyond weaker shallow soils for seating in stronger and denser soil or soft rock. The deep anchoring provides a foundation support system deep into the ground below potential shallow soil failures from such events as storm surges, seismic upset forces, liquefaction, and flooding.
The foregoing is considered as illustrative only of the principles of the invention. Further, since numerous modifications and changes will readily occur to hose skilled in the art, it is not desired to limit the invention to the exact construction and operation shown and described, and, accordingly, all suitable modifications and equivalents may be resorted to, falling within the scope of the invention.
This application is a continuation application of co-pending U.S. application Ser. No. 14/267,397 filed May 1, 2014, and issuing as U.S. Pat. No. 9,096,986 on Aug. 4, 2015, which was a divisional of U.S. application Ser. No. 13/435,527, filed Mar. 30, 2012, which issued as U.S. Pat. No. 8,720,139 on May 13, 2014, and hereby claims the priority thereof to which this application is entitled.
Number | Date | Country | |
---|---|---|---|
Parent | 14267397 | May 2014 | US |
Child | 14812860 | US | |
Parent | 13435527 | Mar 2012 | US |
Child | 14267397 | US |