Claims
- 1. A clearing chain for excavating bulk material from a ballast bed supporting a track and for conveying the excavated bulk material, the chain being mounted on a frame of a mobile track working machine and comprisinga) a plurality of shovel-type clearing members sequentially arranged in direction of elongation of the clearing chain for gathering and removing the bulk material; b) intermediate chain elements positioned between two adjacent clearing members for forming an endless chain, each said intermediate chain element including two chain joints spaced from one another in the direction of elongation of the clearing chain, each chain joint having a joint axis; and c) hinge pins for hingedly connecting the clearing members and intermediate chain elements to one another at each chain joint, each said hinge pin being releasably fastened to the clearing member and articulatedly mounted in the chain joint, wherein each said chain joint is a pivot joint bearing designed as a spherical bearing, and includes a knuckle eye and a ball race which is universally movably mounted in the knuckle eye and surrounds the hinge pin extending in the direction of the joint axis.
- 2. The clearing chain of claim 1, wherein the intermediate chain element includes a main portion, which is positioned in a plane extending perpendicularly to the joint axis and connected to the two joint bearings, and two stabilizing noses, which are positioned centrally between the two joint bearings and arranged on an upper and lower side of the main portion with regard to the direction of the joint axis.
- 3. The clearing chain of claim 2, wherein each clearing member includes two joint plates arranged in the region of a said joint bearing and spaced from one another in the direction of the joint axis, thereby defining a recess, each joint plate having a bore for receiving a said hinge pin.
- 4. The clearing chain of claim 3, wherein each joint plate includes an indentation for receiving the stabilizing nose of the adjoining intermediate chain element.
- 5. The clearing chain of claim 2, wherein each intermediate chain element includes a stabilizing web arranged centrally with regard to the stabilizing noses and extending perpendicularly to the direction of elongation of the chain.
Priority Claims (1)
Number |
Date |
Country |
Kind |
243/01 U |
Apr 2001 |
AT |
|
CROSS-REFERENCES TO RELATED APPLICATIONS
This application claims the priority of Austrian utility model document GM 24312001, filed Apr. 2, 2001, pursuant to 35 U.S.C. 119(a)-(d), the subject matter of which is incorporated herein by reference.
US Referenced Citations (16)
Foreign Referenced Citations (1)
Number |
Date |
Country |
378025 |
Dec 1989 |
EP |