Claims
- 1. A system for providing workflow monitoring system comprising:
a program manager that divides a project into subprojects and that assigns resources to the subprojects, said program manager having predefined templates by which to model the project.
- 2. The system according to claim 1, wherein the resources include translators.
- 3. The system according to claim 1, wherein the resources include editors.
- 4. The system according to claim 1, wherein the program manager resides on a first computer and
wherein said subprojects are handled on said first computer.
- 5. The system according to claim 1, wherein the program manager resides on a first computer and
wherein said subprojects are handled on a second computer.
- 6. A process for assigning resources to a translation project comprising the steps of:
receiving an electronic version of a file to be translated; determining a characteristic the electronic version of the file to be translated; obtaining a translation rate; estimating a time for translating based on the characteristic and the translation rate; and assigning resources to the project based on the estimate of time for translating.
- 7. The process according to claim 6, wherein the characteristic includes the size of the electronic file.
- 8. The process according to claim 6, wherein the characteristic includes the number of words in the electronic file.
- 9. The process for assigning resources according to claim 6, further comprising the steps of:
inspecting the file to be translated against a translation memory, said inspecting step resulting in an analysis of matches between content of said file and said memory, said matches falling into at least two ranges; obtaining a translation rate for the matches obtained by said analysis; determining an estimated time for range; calculating the time for translating each range; summing the times of said calculating step; assigning resources based on the result of said summing step.
- 10. A user interface for a project manager comprising:
a first display portion showing a project name; a second display portion showing at least one subproject associated with the project; a third display portion showing at least one resource assigned to said subproject for working on said subproject; and, a fourth display portion displaying the status of the work of said resource on said subproject.
- 11. The user interface according to claim 10, wherein said fourth display includes at least one of a graphical representation and a textual representation of the status of said work.
RELATED APPLICATIONS
[0001] This application claims priority to U.S. Provisional Application Serial No. 60/239,929, entitled “Client-Driven Workflow Management,” filed on Oct. 13, 2000, whose contents are incorporated by reference.
[0002] This application is also related to U.S. Ser. No. 09/071,900, filed May 4, 1998, entitled “Machine-Assisted Translation Tools”, and U.S. Ser. Nos. 09/303,499 and 09/317,979, filed Apr. 30, 1999, and May 25, 1999, respectively, both entitled “Workflow Management System”, whose contents are incorporated by reference for any essential subject matter.