The present disclosure relates generally to the erection of concrete structures, such as high-rise buildings, utilizing climbing formworks.
In the prior art, a great variety of formworks has been proposed. Such formworks, also known as shuttering, are temporary retaining structures for defining and supporting a volume to be filled with concrete. As is well known in the prior art, climbing formworks are used for transferring the loads resulting from the present casting step into previously formed casting segments. In this way, concrete-structures such as high-rise buildings can be erected without the need for scaffolding extending the full height of the construction. Such climbing formworks are successively raised and secured to the concrete structure, which procedure is repeated after each casting step.
A climbing formwork was proposed, for example, in U.S. Pat. No. 5,263,835. In this prior art, a building construction system is used for progressively forming a plurality of vertical superimposed concrete segments. A plurality of screw jacks form support columns and carry at their upper ends sub-frames upon which an overlying main frame is positioned. Formworks are suspended from the main frame and are moveable into position for pouring concrete to form the segments. The screw jacks are supported on a horizontal building element preceding a previously constructed horizontal building element and are retractable. The main frame is supported on adjustable struts for repositioning the screw jacks prior to extension to a subsequent segment forming position. It is a drawback of this prior art that temporary supports, namely said adjustable struts, are required for supporting the main frame while repositioning the screw jacks. In this way, the temporary supports may have to be manually transported to the next level for preparation of the subsequent casting step. Furthermore, the attachment of the temporary supports on the sub-frames supporting the main frame is cumbersome.
The object of the disclosure is to provide a method and climbing formwork mitigating the drawbacks of the prior art. The disclosure particularly aims at improving the repositioning of the climbing formwork between two casting steps.
In one embodiment, the present disclosure provides for a method for erecting a concrete structure by successively casting at least a first casting segment with a first floor slab, a second casting segment with a second floor slab and a third casting segment with a third floor slab, said method comprising the steps of:
Thus, the method utilizes a climbing formwork with a generally vertically extending support column, which, in different stages of the climbing operation, is supported either on the first support bracket, namely during extension of the support column between two casting steps, or on the second support bracket, namely during the casting steps and during the retraction of the support column. In this operation, the first and second support bracket are supported on the respective floor slabs, immediately adjacent to through-holes previously been formed therein. It is thus not required to support the frame holding the formworks exclusively by means of temporary supports during retraction of the support column. Of course, additional supports for the frame could be used, depending on the application. It is a further advantage of the method proposed herein that the first and second support bracket is transported upwards together with the support column during repositioning of the climbing formwork. Thus, the method does not require the manual transport of temporary supports for the support column as in the prior art.
In one example, at least during extension of the support column, two first support brackets are attached to the same support column on opposite sides thereof. The two first support brackets may be arranged at the same vertical position on the support column.
In another example, at least during retraction of the support column, two second support brackets are attached to the same support column on opposite sides thereof. The two second support brackets may be arranged at the same vertical position on the support column.
In this method, the first and second support bracket may be supported on the respective floor slab immediately adjacent to the through-hole, i.e. on an edge of the through-hole.
In one embodiment, the first and/or second support bracket, in the first or second support position, respectively, extends radially outwards with respect to the (vertically extending) longitudinal axis of the support column.
In another embodiment, the first and/or second support bracket each has an upper side facing away from the underlying floor slab and a lower side facing the underlying floor slab for support thereon, wherein the radial extension of the upper side of the first and/or second support bracket is less than, for example less than one half of, the radial extension of the lower side of the first or second support bracket, respectively. Thus, in side view, the first and/or second support bracket may have an angular shape widening towards the floor slab. This construction combines low weight with effective load transfer into the floor slab.
The method proposed herein may be used in a number of applications, in which at least one, a plurality of support columns as described herein supports the frame carrying the formworks.
For example, a number of such support columns may be employed outside the core of high-rise buildings for supporting a frame superimposing essentially the full horizontal extension of the construction as built. In this application, additional, for example conventional, climbing formworks may be provided in the core of the building.
In another example, a plurality of such support columns are arranged outside the core of the building for superimposing the core of the building which may then be free from additional climbing formworks.
In yet another example, such support columns are employed for supporting floor slabs between two rows of shafts on either side of the floor slabs. Additional support columns may be arranged outside the core.
In one embodiment, the support column, by means of the second support bracket, is supported on the second floor slab adjacent to the second through-hole during casting of the third casting segment. In this way, the second support bracket is arranged for receiving vertical loads during a casting step. These vertical loads include not only the weight of the support column, the frame and the formworks suspended therefrom but also the weight of the concrete received in the cavity between the formworks (shuttering). On the other hand, the first support bracket is arranged for transferring the vertical loads during lifting of the support column together with the frame and the formworks. The first support bracket on the lower end of the support column may receive lesser vertical loads than the second support bracket.
In another embodiment, the first support bracket is releasably attached to the support column in a first support position for being supported on the first floor slab adjacent to the first through-hole while the support column is transferred from the retracted position to the extended position and wherein the first support bracket is released from the support column and then releasably attached to the support column in a first transport position for being passed through the second through-hole while the support column is transferred from the extended position to the retracted position. In this embodiment, the first support bracket may be manually repositioned from the first support position, which is arranged for transferring vertical loads into the respective floor slab, to the first transport position, which is arranged for allowing passage of the first support bracket through the through-hole in the respective floor slab. The advantage of this embodiment is that the first support bracket need not be carried to the next floor when the climbing formwork is repositioned. In the first transport position, the first support bracket is transported upwards together with the support column. In other words, the support column may be used as an elevator for transporting the first support bracket during a climbing step of the climbing formwork.
In one embodiment, the first support bracket in the first support position and/or in the first transport position is releasably attached to a bearing, the bearing being connected to a lower end of the jack. The support column may comprise a mast with an upper end carrying the frame which may have a number of sub-frames, for example cross-beams from which the formworks are suspended. The jack is operably connected to the mast for extending or retracting the support column (i.e. for increasing or decreasing the distance between the upper end of the mast and the bearing on the lower end of the support column). In one example, a vertical extension of the first support bracket is less than the vertical extension of the bearing. In this way, an optimal load transfer from the bearing at the lower end of the support column via the first support bracket, arranged in the first support position, to the first floor slab is achieved.
In one embodiment, the first support bracket, in the first transport position, is arranged upside-down. In the upside-down transport position, the first support bracket fits through the through-holes in the floor slabs.
In one embodiment, the second support bracket is releasably attached to the support column in a second transport position for being passed through the third through-hole while the support column is transferred from the retracted position to the extended position and wherein the second support bracket is released from the support column and then releasably attached to the support column in a second support position for being supported on the third floor slab adjacent to the third through-hole while the support column is transferred from the extended position to the retracted position. Thus, the second support bracket may be manually transferrable between the second support position, which is arranged for providing vertical support on the respective floor slab, and the second transport position, which is arranged for allowing passage of the second support bracket through the through-hole of the overlying floor slab. The support column may have an attachment member, for example an attachment pin, for securing the second support bracket in the second transport position.
In one example, the second support bracket is identical to the first support bracket. But the overall construction of the support column may be such that only the second support position of the second support bracket, not the first support position of the first support bracket is adapted for the higher vertical loads during the casting steps.
In an embodiment, the second support bracket, in the second support position, is releasably attached to the support column at one of a plurality of vertically spaced attachment locations. This embodiment allows for great adaptability and flexibility, in particular for the construction of buildings with complex geometries.
In an embodiment, the second support bracket, in the second support position, is releasably attached to a flange of the support column, the flange having a plurality of vertically spaced attachment openings for securing the second support bracket thereto. The second support bracket may have apertures corresponding to the attachment openings in the flange. Bolt members, for example, may be used to secure the second support bracket to the flange of the support column.
In an embodiment, the second transport position is perpendicular to the second support position. In this way, the second transport position allows for stowing of the second support bracket for transport to the next level of the concrete structure during extension of the support column.
In an embodiment, a first gravity pawl is used as the first support bracket and/or a second gravity pawl is used as the second support bracket. In this embodiment, the first and/or second gravity pawl is pivotable between a normal position for support on the underlying floor slab and a temporary position for transport through the through-hole of the overlying floor slab. In the normal position, a support area of the first or second gravity pawl may extend generally horizontally. In the temporary position, the support area may be pivoted inwardly. Advantageously, this embodiment dispenses with the requirement of manual repositioning of the first and/or second gravity pawl during a climbing step.
In an embodiment, the first support bracket is supported on the first floor slab via a first floor frame arranged adjacent to the first through-hole.
In an embodiment, the second support bracket is supported on the second floor slab via a second floor frame arranged adjacent to the second through-hole.
In an embodiment, the second support bracket is supported on the third floor slab via a third floor frame arranged adjacent to the third through-hole.
The arrangement of the first, second and/or third floor frame supports the transfer of the vertical loads into the respective floor slab. In one example, the first, second and/or third floor frame is made from a metal material, for example steel.
In an embodiment, the first floor frame and/or the second floor frame and/or the third floor frame comprises two separate frame parts. The two-part construction of the floor frames facilitates removal of the respective floor frame for preparation of a climbing step. This embodiment further allows for easy adaptation to different sizes of the through-holes.
In an embodiment, the two separately removable frame parts are L-shaped in top view. This construction provides a sufficiently large surface for supporting the first or second support bracket thereon. Furthermore, additional components, such as guide elements for the support column, may be arranged on the floor frame.
In an embodiment, the support column, while being transferred from the retracted position to the extended position or vice versa, is guided and horizontally supported. For this purpose, guide elements such as rolls may be arranged on the floor frames that provide support, in particular rolling support, for the support column.
In an embodiment, a climbing formwork for erecting a concrete structure with a plurality of casting segments having floor slabs with through-holes formed therein, comprises:
In another embodiment, a climbing formwork for erecting a concrete structure with a plurality of casting segments having floor slabs with through-holes formed therein, comprises:
Embodiments of the disclosure will be described with reference to the accompanying drawings.
Referring to
For bringing the climbing formwork 1 to the next level, the support column 1 is transferrable between a fully retracted position (shown in
Utilizing this climbing formwork 1, a method for the progressive construction of the concrete structure 12 comprises at least the following successive steps, which may be repeated for formation of a plurality of superimposed casting segments:
First, the third casting segment 15 is formed on top of second casting segment 14 from the previous casting step which itself was formed on top of first casting segment 13, as explained before. During casting of the third casting segment 15, the support column 2, by means of the second support bracket 33, is supported on the second floor slab 18 directly adjacent to the second through-hole 23. The first support bracket 32 may or may not assist the support of the support column 2 during casting of the third casting segment 15 (
In the next step, the support column 2, by means of the first support bracket 32, is supported on the first floor slab 16 adjacent to (i.e. neighboring) the first through-hole 22. At this stage, the second support bracket 33 is located between the second floor slab 18 and the third floor slab 20.
In the next step, jack 29 is activated for transferring the support column 2 from the retracted position to the extended position (see
In the next step, the support column 2, by means of the second support bracket 33, is supported on the third floor slab 20 adjacent to the third through-hole 24. In this position, the formworks 4 and the formwork member 25 may be brought into casting position for casting a fourth casting segment 54 on top of third casting segment 15.
In the next step, jack 29 is activated such that support column 2 is moved from the extended position to the retracted position. During retraction of the support column 2 the first support bracket 32 is passed through the second through-hole 23 in the second floor slab 18.
In this method, the first support bracket 32 and the second support bracket 33 are transported with the support column 2. It is not required to manually carry first support bracket 32 or second support bracket 33 to the next level when the climbing formwork 1 is moved upwards. For this purpose, the first support bracket 32 and the second support bracket 33 may be temporarily re-arranged for being passed through the first through-hole 22, second through-hole 23 and third through-hole 24, as will be explained below with respect to two exemplary embodiments.
In the embodiment shown in
Furthermore, in the embodiment of
For preparing the extension of the support column 2, the second support brackets 2 are releasably attached to the support column 2 in a second transport position which is arranged for fitting the second support brackets 33 through the third through-hole 24 in the third floor slab 20 (see
For transferring the vertical loads from the support column 2, a first floor frame may be arranged adjacent to the first through-hole 22, a second floor frame 41 may be arranged adjacent to the second through-hole 23 and a third floor frame 42 may be arranged adjacent to the third through-hole 24. The first floor frame, second floor frame 41 and third floor frame 42 may be identical. It is possible to use the same floor frame as first floor frame, second floor frame 41 and third floor frame 42. For this purpose, the floor frame may be repositioned in the individual stages of the operation for providing support against the vertical loads from the support column 2. The first floor frame, second floor frame 41 and third floor frame 42 may be made of a metal material. In the shown example, the first floor frame, the second floor frame 41 and the third floor frame 42 each comprises two separate (i.e. individually removable) frame parts 43. The two separately removable frame parts 43 are L-shaped in top view (see
Furthermore, the support column 2, while being transferred from the retracted position to the extended position or vice versa, is guided and horizontally supported. For this purpose, the first floor frame may have a first guide and support member, the second floor frame 41 may have a second guide and support member 44 and the third floor frame 42 may have a third guide and support member 45. In the shown example, said guide and support members each have at least one roll 46 for providing rolling support of the support column 2. Here, each guide and support member has four rolls 46 corresponding to the four sides of the mast 27. In the shown example, adjustment screws 47 are provided for adjusting the position of the guide and support members relative to the mast 27 of the support column 2.
In the second embodiment of
In the construction of buildings 12, a plurality of support columns 2 with first and second support brackets as described above may be used for supporting the frame 3 from which the formworks 4 are suspended. In
According to
In the embodiment of
In the embodiment of
In the embodiment of
The present application is a continuation of U.S. application Ser. No. 15/442,331 entitled “METHOD FOR ERECTING A CONCRETE STRUCTURE AND CLIMBING FORMWORK,” filed on Feb. 24, 2017, the entire contents of the above-identified application is hereby incorporated by reference in its entirety for all purposes.
Number | Name | Date | Kind |
---|---|---|---|
3920780 | Vanderklaauw | Nov 1975 | A |
4076778 | Whitting | Feb 1978 | A |
5263835 | Schmidt | Nov 1993 | A |
5460499 | Franklin | Oct 1995 | A |
6276912 | Röck | Aug 2001 | B1 |
20020030293 | Rock | Mar 2002 | A1 |
20080257644 | Schwoerer | Oct 2008 | A1 |
20140175259 | Baum | Jun 2014 | A1 |
Number | Date | Country |
---|---|---|
871960 | Oct 1951 | DE |
917314 | Feb 1963 | GB |
S5316430 | Feb 1978 | JP |
9009497 | Aug 1990 | WO |
2005042876 | May 2005 | WO |
2007000134 | Jan 2007 | WO |
Entry |
---|
ISA European Patent Office, International Search Report and Written Opinion Issued in Application No. PCT/EP2018/054455, dated May 18, 2018, WIPO, 12 pages. |
Number | Date | Country | |
---|---|---|---|
20180320392 A1 | Nov 2018 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 15442331 | Feb 2017 | US |
Child | 16031838 | US |