Claims
- 1. A closed single level loop process for manufacturing and handling large, heavy reinforced concrete pipe comprising moving intermittently a reinforcing cage from a starting station on a single level to a molding station on the same level, freshly molding a reinforced concrete pipe around said reinforcing cage, while holding the freshly molded concrete pipe only by ends of the pipe, curing said held freshly molded pipe by intermittently moving said pipe through a curing station on the same level as said molding station, intermittently moving said cured held pipe to said starting station from said curing station, releasing the pipe and repeating the cycle.
Parent Case Info
This application is a continuation of application Ser. No. 853,205 filed Apr. 17, 1986, now abandoned.