1. Field of the Invention
The present invention relates to coating systems for articles such as vehicle chassis.
2. Description of the Related Art
In an automobile manufacturing plant vehicle chassis are commonly precoated using a coating tank. The coating fluid usually includes paint solids in a fluid carrier such as water. It is common for the vehicle chassis to leave the coating tank with coating fluid accumulated in and trickling down from the chassis' vertical panels.
The coated chassis are then usually directed through an oven along a travel path, during which the coating fluid will commonly flow out and cure as heat is applied. At the same time coating fluid continues to drain and to boil out from recessed areas such as hem flanges and seams leaving an impression of the trickles and drip on the surface of the painted body. As curing and baking of the paint progresses, the impression of any trickles and the built up drips becomes permanent. These drips must be sanded off before subsequent paint layers can be applied. The additional sanding step adds to the cost of painting, and accordingly the overall manufacturing costs of the automobile body.
Moreover, there is a loss in time and efficiency brought about by the need for a closer inspection of the painted surface, and the need for process control and further handling of the automobile body in order to correct flaws in the painted surface which have resulted from such drips.
A possible method for reducing drips would be to extend the drainage time before the coated bodies are transported into the oven, in order to allow more of the drips to naturally fall away from the vehicle bodies before they reach the curing ovens. In order to increase the drainage time on an automated manufacturing line it would be necessary to add additional conveyors to store and transport the bodies between the coating stage and the curing stage. The installation of additional conveyors would result in a large capital expenditure.
It is an object of the present invention to improve the coating process by removing the drips during curing or before curing or both.
In one of its aspects, the present invention provides a coating system for coating a vehicle chassis, comprising a coating station and a curing oven, the coating station being upstream from said curing oven along a travel path, the coating station to deliver a layer of coating material thereon, the chassis having a number of sites, each of which is known or determined to be source for accumulating excess coating to cause unwanted drips thereof during curing, further comprising a plurality of nozzles, each being in a nozzle group of one or more, where each group is arranged to deliver a flow of air sufficient to remove excess coating.
Preferably, each group is arranged to deliver a flow of air to a corresponding one of the sites, though more than one group can, if need be, be trained on the same site.
In one embodiment, a first nozzle group is upstream from a second nozzle group and the first and second nozzle groups sets are both located within the curing oven. Each of the first and second nozzle groups includes an upstream nozzle and a downstream nozzle, or more as needed. The first group of nozzles are positioned at a common elevation to direct the flow of air at an upper excess coating site on the chassis while the third group of nozzles are similarly positioned at a common elevation but to direct the flow of air at a lower excess coating site on the chassis. The first group of nozzles, in this embodiment, are staggered from the second group of nozzles.
Preferably, a third group of nozzles is provided downstream from the first and second nozzle groups and is mounted on a pair of frame portions member extending upwardly from the conveyor path on opposite sides of the chassis, wherein the frame portions are formed on a frame section extending over or under the chassis or both
Alternatively, the first and second nozzle groups may be at the same location relative to the travel path. Alternatively, one or more of the first and second nozzle groups sets may be located either within or outside (and upstream of) the curing oven
In another of its aspects, there is provided a method of curing a coated vehicle chassis in a curing oven, comprising the steps of:
Preferably, the oven is a continuous oven but may also be provided in other forms, such as a batch processing oven.
In still another of its aspects, there is provided a coating system for coating an article, comprising a coating tank and a curing oven, the coating tank being upstream from said curing oven along a travel path, the coating tank for immersing the article to deliver a layer of coating material thereon, the article having a number of sites, each of which is known or determined to be source for accumulating excess coating to cause unwanted drips thereof during curing, further comprising a plurality of nozzles, each being in a nozzle group of one or more, where each group is arranged to deliver a flow of air sufficient to remove the excess coating.
In yet another of its aspects, there is provided a method of curing a coated article in a curing oven, comprising the steps of:
Preferably, the articles are delivered one by one along the travel path, but other arrangements are also contemplated, such as two-by two and the like, provided a sufficient number of nozzles are provided to contact the applicable surfaces of each article in need of treatment according to the present invention. For instance, there may be instances where the surfaces in need of treatment may exist on only one side, or the top, or the bottom, or a combination of one or more thereof.
Preferably, substantially all excess coating sites are determined and excess coating removed therefrom. However, there may be instances where not all of the excess coating sites need to be treated in this manner, such as, for example, those which are at a location behind a piece of molding, trim, a decal or some other covering.
Several preferred embodiments of the present invention will be provided, by way of example only, with reference to the appended drawings, wherein:
a to 3e are sequential views of an article travelling along the coating system, each according to a corresponding one of arrows 3a to 3e in
a, 4b and 4c are, respectively, perspective, plan and front operational schematic views of one location in the coating system of
Referring to the figures, there is provided a coating system shown at 10 for pre-coating a line of vehicle chassis or automobile bodies, one of which is shown at 12 in
The coating station has conventional equipment (not shown) for applying a coating material, such as a paint compound with a rust inhibitor, for example, by an “electro-coating” technique to incoming “white” automobile body parts. However, other coating techniques may also be used, if desired, to deliver the coating to the chassis.
The travel path 24 provides a primary drainage path to facilitate primary draining of excess paint or coating fluid. Paint fluid is the term given to the mixture of solid fine particulate paint, water, and permeate which is applied to the chassis body in the coating tank. As shown in
Referring to
The figures show, for illustration purposes only, the paint or other coating being blown off the site. Though this may occur in some instances, it will be understood that the blast may be of a strength to distribute or spread out the collected material.
It can also be seen that the nozzle group 32 is above, and slightly staggered downstream from, nozzle group 34, though the staggered relationship is not necessary in all cases. In this case, both the first and second nozzle groups include an upstream nozzle and a downstream nozzle. Thus, the nozzles in nozzle group 32 are positioned at a common elevation to direct the flow of air at an upper excess coating site on the chassis and the nozzles of nozzle group 34 are positioned at a common elevation to direct the flow of air at a lower excess coating site on the chassis.
Another nozzle group is provided at 40 as best shown in FIG. 5. The right hand nozzle group is shown in FIG. 6. The nozzles of nozzle group 40 are located or mounted on a pair of frame portions 42, 44 extending upwardly from the conveyor path on opposite sides of the chassis. In this case, the frame portions 42, 44 are included in a frame section extending under the chassis. In this case, the frame portions provide a number of nozzle location sites, two of which are identified at 46a, 46b, for adding additional nozzles as desired, should additional excess coating sites be identified, or as a different vehicle chassis model is placed on the line.
Each of the nozzles is coupled to an air supply line shown generally at 50 in
The general purpose computer may work within a network involving several general purpose computers, for example those sold under the trade names APPLE or IBM, or clones thereof, which are programmed with operating systems known by the trade names WINDOWS, LINUX or other well known or lesser known equivalents of these. The system involves pre-programmed software using a number of possible languages or a custom designed version of a programming software sold under the trade name ACCESS or similar programming software. The computer network may be a wired local area network, or a wide area network such as the Internet, or a combination of the two, without or without added security, authentication protocols, or under “peer-to-peer” or “client-server” or other networking architectures. The network may also be a wireless network or a combination of wired and wireless networks. The wireless network may operate under frequencies such as those dubbed ‘radio frequency’ or “RF” using protocols such as the 802.11, TCP/IP, BLUE TOOTH and the like, or other well known Internet, wireless, satellite or cell packet protocols. The system may, alternatively, be executed on a single custom built computer which is dedicated to the function of the system alone. The controller is thus capable, if desired, of timing the operation of each group of nozzles, which may be done group wise at the same time. Alternatively, one or more groups of nozzles may in fact have only one nozzle, with an independent air supply of air, under the control of the controller.
Referring now to
It is common, though not required, for the conveyor to be inclined on the approach to the oven, which is maintained at a higher level than the coating tank. During this stage, as shown at
The chassis is then conveyed toward the oven while approaching a drying path 70 therein (as shown in FIG. 1). The length of the drying path is selected, having regard to the speed of the conveyor, the temperature maintained in the oven and the time needed to adequately cure the coating material.
As shown in the above figures, it is desirable in some cases to dispose the nozzles in a gantry or portal-like framework of a size large enough to permit passage therethrough of a vehicle chassis, while being conveyed through the oven. This framework advantageously facilitates the mounting of a plurality of nozzles or blow off units at positions around the body 12 to optimize the effectiveness of the pressurized air emitted by the nozzles for blowing off of the excess coating or droplets.
Preferably the air from the air supply is filtered prior to entering the nozzles or blow off units. The air pressure to the blow off units is preferably continuously adjustable and automatically controlled in order that the nozzles will deliver optimum air flow only when a chassis passes by the nozzles. On/Off regulation and air pressure are centrally controlled by the PLC and/or computer 60 to correspond to the speed of conveyor.
It is preferred to mount the nozzles in the oven to allow for longer draining time prior to blowing off and to allow for blowing of droplets of paint fluid which boil out of seams and overlaps in the metal as the coating material flows out and cures when heated in the oven 20. One or more additional downstream nozzle groups, such as those mounted on the frame members 42 and 44 may be useful, in some cases, to permit secondary removal of droplets or other excess coating from an excess coating site, such as that which may take longer to boil out of recessed areas such as hem flanges and seams.
Thus, it is believed that the coating system is useful to reduce or eliminate the negative effects of drips or other flaws as result of excess coating sites on a coated vehicle chassis prior to curing in an oven, all without extending the length of the assembly line or addition conveyors, while also removing the cost of remedial work to correct the flaws. In addition, while discussion hereinabove has been focussed on vehicle chassis, the system may also be useful for other articles such as other vehicle parts. The coating station may coat in other ways, without necessarily immersing the chassis. Some additional air nozzles may be located, if desired, upstream of the oven. The coating system may be used either to provide a “pre-coat” for a later painting step or to provide a final coat of material.
While the present invention has been described for what are presently considered the preferred embodiments, the invention is not so limited. To the contrary, the invention is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. The scope of the following claims is to be accorded the broadest interpretation so as to encompass all such modifications and equivalent structures and functions.
The entire subject matter of U.S. Provisional application Ser. No. 60/315,915 filed Aug. 31, 2001 and entitled COATING TECHNIQUE is incorporated by reference. The applicant claims priority benefit under Title 35, United States Code, Section 119(e) of U.S. Provisional application Ser. No. 60/315,915 filed Aug. 31, 2001 and entitled COATING TECHNIQUE.
Number | Name | Date | Kind |
---|---|---|---|
3602601 | Zenger et al. | Aug 1971 | A |
3923623 | Brown et al. | Dec 1975 | A |
4304822 | Heyl | Dec 1981 | A |
4535936 | Fontaine | Aug 1985 | A |
4541882 | Lassen | Sep 1985 | A |
4723480 | Yagi et al. | Feb 1988 | A |
4871588 | Cuddy et al. | Oct 1989 | A |
5245777 | Neuman et al. | Sep 1993 | A |
5476689 | Stone et al. | Dec 1995 | A |
5686145 | Akasaka | Nov 1997 | A |
5786036 | Pannenbecker et al. | Jul 1998 | A |
5876139 | De Laforcade | Mar 1999 | A |
6062850 | Ino et al. | May 2000 | A |
6082919 | De Laforcade | Jul 2000 | A |
6113992 | Corbett | Sep 2000 | A |
6217949 | Corbett | Apr 2001 | B1 |
6231928 | McGahern | May 2001 | B1 |
6428851 | Friedersdorf et al. | Aug 2002 | B1 |
Number | Date | Country |
---|---|---|
9-103730 | Apr 1997 | JP |
11-188303 | Jul 1999 | JP |
Number | Date | Country | |
---|---|---|---|
20030059539 A1 | Mar 2003 | US |
Number | Date | Country | |
---|---|---|---|
60315915 | Aug 2001 | US |