The present application is a U.S. National Phase Entry of pending International Patent Application No. PCT/NL2011/050589, international filing date Aug. 30, 2011, which claims priority to Dutch Patent Application No. NL2005344, filed Sep. 13, 2010, the contents of which are incorporated by reference in their entireties.
The invention relates to a collapsible freight container comprising a bottom, a roof, two end walls extending between the bottom and the roof, as well as two longitudinal side walls connected to said bottom and said roof, each longitudinal side wall comprising an upper part, a central part and a lower part, which parts are hinged together and to the bottom by means of hinge mechanisms for folding the container from an unfolded position to a collapsed position and conversely, said roof and said upper part being immovably fixed relative to each other, defining a space in which the end walls are present in the collapsed position.
The invention relates to a collapsible freight container comprising a bottom, a roof, two end walls extending between the bottom and the roof, as well as two longitudinal side walls connected to said bottom and said roof, each longitudinal side wall comprising an upper part, a central part and a lower part, which parts are hinged together and to the bottom by means of hinge mechanisms for folding the container from an unfolded position to a collapsed position and for, conversely, unfolding the container from a collapsed position, said roof and said upper part being immovably fixed relative to each other, defining a space in which the end walls are present in the collapsed position.
Such a freight container is known from GB-2214903. The end walls of the known container are configured as a garage door, which must be completely opened in order to gain access to the container, for example for loading and/or unloading the container. In said open position of the end wall, the roof of the container is supported by the longitudinal side walls and the relatively thick corner beams, which are indicated at 210, 220 and 230 in the figures.
A drawback of the known device is that the end wall must be completely opened in order to gain access to the interior of the container. Another drawback is the fact that the freight container is relatively high in the collapsed position on account of the relatively thick corner beams.
It is an object of the present invention to provide an improved collapsible freight container.
This object is accomplished with the freight container according to the present invention in that at least one end wall is provided with a casing that supports the roof, in which casing at least one door which can hinge relative to the casing is mounted, which door can hinge from a closed position to an open position, in which open position access to the container is possible for loading or unloading, whilst the casing, with the door in the closed position, is pivotable about a pivot axis from a first position, in which it supports the roof, to a second position within said space, for collapsing the freight container.
By moving the casing that supports the roof into the space for collapsing the container, the relatively thin side walls can be moved one on top of the other, so that the collapsed container will have relatively compact dimensions, more in particular a relatively small height. This has the advantage that more empty collapsed containers can be transported within a specific transport volume, as for example provided by a truck, which eventually means a reduced burden on the environment for the transportation of empty collapsed containers, of course.
Furthermore, because of the door construction the end wall need not be completely moved to the position within the space in order to gain access to the container, so that, for example, the user-friendliness of the freight container according to the present invention is relatively high.
Preferably, the freight containers have standard dimensions, which are generally referred to as TEU or teu. Teu is the standard designation for the dimension of freight containers. One (1) teu equals a freight container having a length of 20 ft (6.06 m). Another standard dimension is a 40 ft freight container. Furthermore, 10 ft containers, in particular used for storage, and 45 ft (“high cube”) containers, in particular used for land transport, likewise constitute standard dimensions of freight containers.
One embodiment of the freight container according to the present invention is characterised in that the casing can be locked and unlocked by means of a locking mechanism to be operated externally of the container by an operator, in which locked position the casing is fixed to the bottom, whilst in the unlocked position the casing can pivot about the pivot axis.
In this way unintentional pivoting of the casing, without the casing being actively operated by the operator, is prevented in a simple manner.
Another embodiment of the freight container according to the present invention is characterised in that the casing is connected, via at least one cable, preferably two cables, to an arm positioned on the roof, which arm can be connected to a fork-lift truck or the like.
On the one hand the end wall can be made to pivot from the first position to the second whilst in addition the collapsing of the container can be controlled by means of said cables and the fork-lift truck or crane connected to the arm.
Yet another embodiment of the freight container according to the present invention is characterised in that the freight container is provided with a synchronization mechanism located in said bottom and/or in said space, by means of which the angle between the horizontal and the right-hand lower part and/or the right-hand central part of the longitudinal side wall is maintained substantially equal to the angle between the horizontal and the left-hand lower part and/or the left-hand central part of the longitudinal side wall at any moment during the folding or unfolding of the freight container.
By using such a synchronization mechanism, an even folding and unfolding of the freight container is ensured, resulting inter alia in reduced wear on the freight container upon folding and unfolding.
Another embodiment of the freight container according to the present invention is characterised in that the synchronization mechanism can be locked and unlocked by means of a locking mechanism to be operated externally of the freight container by an operator, in which locked position the container is locked against collapsing from an unfolded position to a collapsed position, and in which unlocked position collapsing of the container from an unfolded position to a collapsed position is possible.
Collapsing of the container will only be possible after the synchronization mechanism has been actively unlocked by an operator. In this way a container which is relatively safe in use is provided.
Yet another embodiment of the freight container according to the present invention is characterised in that the freight container is provided with a trigger mechanism by means of which the collapsing of the freight container can be initiated. The trigger mechanism is preferably provided with a spring mechanism, which, upon being activated, will push against or pull at a part of a longitudinal side wall, causing the freight container to collapse.
When such a trigger mechanism is used, the collapsing of the freight container will take place in a predetermined sequence, which enhances the ease of use for the operators. The trigger mechanism will normally be activated by the casing reaching the second position within the space. The spring mechanism is preferably integrated in a synchronization mechanism, wherein a Bowden cable is operated when the casing reaches the second position within the space, by means of which cable the spring mechanism is operated.
The invention will now be explained in more detail with reference to a possible embodiment of the freight container according to the invention which is schematically illustrated in the appended figures.
Like parts are indicated by the same numerals in the various figures.
The collapsible container 1 comprises a bottom 6, a roof 7, the two end walls 2 (only one of which is shown in the figures) extending between the bottom 6 and the roof 7, as well as two longitudinal side walls 9, 11 connected to the bottom 6 and the roof 7. Each longitudinal side wall 9, 11 has an upper part 13, a central part 15 and a lower part 17, which parts are hinged together and to the bottom 6 by means of hinge mechanisms 21, 23, 25 for moving the container 1 from an unfolded position to a collapsed position, and conversely, with the roof 7 and the upper part 13 being immovably fixed, i.e. not being able to hinge, relative to each other, defining a space 30 (see
The doors 4, 5 can hinge relative to the casing 3 from a closed position to an open position as shown in
When the container is to be collapsed, the end walls 2 must be pivoted from a first position shown in
In
In the unlocked position of the locking mechanism 40, the casing 3 with the doors 4, 5 in the closed position can pivot about a pivot axis (not shown) from a first position, in which it supports the roof (as shown in
For pivoting the end wall 2, the freight container 1 is provided with an arm 51 disposed on the roof 7 and with two cables 53 connected to the arm. A guide system comprising rollers 55, as shown in
When the arm 51 is connected to a hook (not shown) of a lifting mechanism, such as a fork-lift truck or a crane, for example, the arm 51 can be moved up in the direction indicated by the arrow P1 together with the cables (
Winding mechanisms 57, by means of which the cable 53 can be wound up after it has been pulled up by means of the arm 51, are available in the space 30 for the cable 53 that has been pulled out above the roof 7 of the container 1 as shown in
The freight container 1 further comprises a synchronization mechanism 60 disposed in the bottom 6 and/or in the space 7. Two embodiments of synchronization mechanisms 60 are shown in
The synchronization mechanisms 60 shown in
In order to make it possible to unfold the container, the container 1 is provided with a second arm 101 disposed beside the first arm 51 on the roof 7, which second arm 101 is only connected to the roof.
In order to make pivoting of the end walls 2 possible, the longitudinal side walls 9, 11 have a special thickness profile. The fact is that the parts of the longitudinal side walls along which the casing pivots are thinner than the thicker, central section 90. The boundary 91 between the central section 90 and the thin part is represented by the transition 91 in
The sequence for collapsing and unfolding of the container 1 can be summarized as follows: the arm 51 is connected to a crane or a fork-lift truck, after which an operator unlocks the casing locking mechanism 40, and possibly also the locking mechanism of the synchronization mechanism, by means of locking arms 75. Said locking arms 75 may also be unlocked at a later stage, after pivoting of the end walls 2. By lifting the arm 51 in the direction indicated by the arrow P1, the two end walls 2 will be pivoted from the first, substantially vertical position to the second, substantially horizontal position. When the locking arms 75 are in the unlocked position, the trigger mechanism will initiate the collapsing process, resulting in the collapsing of the longitudinal side walls. If the container 1 is to be moved from the collapsed position shown in
The synchronization mechanism according to the present invention may also be provided in other types of containers, for example in containers in which the longitudinal side walls do not have a central part but only an upper part and a lower part. Such a collapsible freight container comprises a bottom, a roof as well as two longitudinal side walls connected to the bottom and the roof, each longitudinal side wall comprising a first and a second part, which are hinged together in such a manner that the first part can pivot to the second part of the same longitudinal side wall about a pivot axis extending in the longitudinal direction of the freight container, whilst the freight container is further provided with a synchronization mechanism disposed in the bottom and/or in the roof, by means of which the angle between the horizontal and the right-hand lower part and/or the right-hand upper part of the longitudinal side wall is maintained substantially equal to the angle between the horizontal and the left-hand lower part and/or the left-hand upper part of the longitudinal side wall during collapsing and unfolding.
Number | Date | Country | Kind |
---|---|---|---|
2005344 | Sep 2010 | NL | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/NL2011/050589 | 8/30/2011 | WO | 00 | 5/17/2013 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2012/036544 | 3/22/2012 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
578445 | Cobleigh | Mar 1897 | A |
702237 | McCullough | Jun 1902 | A |
989074 | Stall | Apr 1911 | A |
1114860 | Colombot | Oct 1914 | A |
1496965 | Aldeen | Jun 1924 | A |
1673769 | Graham | Jun 1928 | A |
2224310 | Merrett et al. | Dec 1940 | A |
2439132 | Hatala et al. | Apr 1948 | A |
2520921 | Foster | Sep 1950 | A |
2803084 | Frerking | Aug 1957 | A |
2912237 | Snyder | Nov 1959 | A |
3451718 | Kaufman | Jun 1969 | A |
3527339 | Cipolla | Sep 1970 | A |
3570698 | Dougherty | Mar 1971 | A |
3602388 | Hurkamp | Aug 1971 | A |
3865269 | Coleman | Feb 1975 | A |
4074766 | Orthman | Feb 1978 | A |
4099640 | Nessfield et al. | Jul 1978 | A |
4177907 | Funaioli et al. | Dec 1979 | A |
4214669 | McQuiston | Jul 1980 | A |
4382312 | Liggett et al. | May 1983 | A |
4400994 | Skjaeveland | Aug 1983 | A |
4512416 | Smith | Apr 1985 | A |
4527303 | Civitelli | Jul 1985 | A |
4577772 | Bigliardi | Mar 1986 | A |
4630746 | Fortenberry | Dec 1986 | A |
4775066 | Keppeler | Oct 1988 | A |
4827569 | Mertes | May 1989 | A |
4848618 | Yuan et al. | Jul 1989 | A |
4913301 | Pickler | Apr 1990 | A |
4913302 | Stonier | Apr 1990 | A |
5064068 | Sheng | Nov 1991 | A |
5289933 | Streich et al. | Mar 1994 | A |
5538320 | Hoffman et al. | Jul 1996 | A |
5584530 | Rogers et al. | Dec 1996 | A |
5904262 | Coppi | May 1999 | A |
6308376 | Koshikawa | Oct 2001 | B1 |
6345679 | Sasaki | Feb 2002 | B1 |
6382327 | Mosdal | May 2002 | B1 |
6499189 | Kondo et al. | Dec 2002 | B2 |
6527341 | Martin | Mar 2003 | B1 |
6929321 | Shrock | Aug 2005 | B1 |
7083061 | Spindel et al. | Aug 2006 | B2 |
7100241 | Zetti | Sep 2006 | B2 |
7197790 | Edmondson | Apr 2007 | B1 |
7418766 | Nelson et al. | Sep 2008 | B2 |
7574775 | Zetti | Aug 2009 | B2 |
7681945 | Wiecek et al. | Mar 2010 | B1 |
7698785 | Bennett | Apr 2010 | B2 |
7722101 | Bellehumeur et al. | May 2010 | B2 |
7823739 | Sadkin et al. | Nov 2010 | B2 |
7870970 | Fisk | Jan 2011 | B2 |
7886407 | Resnik et al. | Feb 2011 | B2 |
8011523 | Kochanowski | Sep 2011 | B2 |
8113372 | Bellehumeur et al. | Feb 2012 | B2 |
8251237 | Beaudonnet | Aug 2012 | B2 |
20040177476 | Zetti | Sep 2004 | A1 |
20060130277 | Nelson et al. | Jun 2006 | A1 |
20070006420 | Zetti | Jan 2007 | A1 |
20080000900 | Beaudonnet | Jan 2008 | A1 |
20080011742 | Bellehumeur et al. | Jan 2008 | A1 |
20080029510 | Fisk | Feb 2008 | A1 |
20080135545 | Sadkin et al. | Jun 2008 | A1 |
20100024162 | Walz | Feb 2010 | A1 |
20100102056 | Bellehumeur et al. | Apr 2010 | A1 |
20100133264 | Chawla et al. | Jun 2010 | A1 |
20100292063 | Chawla et al. | Nov 2010 | A1 |
20120138604 | Bellehumeur et al. | Jun 2012 | A1 |
20120248105 | Leong | Oct 2012 | A1 |
Number | Date | Country |
---|---|---|
1007196 | Oct 1965 | GB |
2002264993 | Sep 2002 | JP |
2006024104 | Mar 2006 | WO |
2007081556 | Jul 2007 | WO |
2010075607 | Jul 2010 | WO |
2010085785 | Jul 2010 | WO |
Number | Date | Country | |
---|---|---|---|
20140144907 A1 | May 2014 | US |