This invention relates to a communication apparatus and a communication method which carry out wired transmission using a plurality of sub-carriers.
A transmission system using a plurality of sub-carriers such as an OFDM (Orthogonal Frequency Division Multiplexing) system is utilized for not only wireless communication but also wired communication. A transmission system using a plurality of sub-carriers has such an advantage that high quality communication becomes possible even in a harsh line. However, there is such a case that leakage electric power becomes greater, depending on quality of a transmission line and an influence is exercised on an outside.
In addition, in communication of the OFDM system, it is known a communication system which carries out transmission electric power control on a transmission side on the basis of an electric power measurement result on a reception side (see, Japanese Patent Publication JP-A-2003-152671). A system shown in the publication JP-A-2003-152671 obtains difference information between a reception electric power value of a sub-carrier which was detected on a reception side and a specified reception electric power and notifies it to a transmission side, in multi-carrier wireless communication, and controls transmission electric power of a sub-carrier on a transmission side which received the difference information. In addition, Japanese Patent Publication describes a technology for selecting a subcarrier to be used, depending on a state of a communication error detected on a reception side, in wired transmission of the OFDM system.
However, technologies shown in the Patent Publications JP-A-2003-152671 and JP-A-2003-218831 control transmission signals by utilizing a processing results of a reception signal on a reception side.
Japanese Patent Publication JP-A-2004-140565 describes a balance transmission apparatus which detects a balance component (mutually related with leakage electric power of a transmission line) from a voltage or a current of a conductor on a transmission side or a reception side, and carries out transmission control in such a manner that the detected unbalance component gets smaller.
However, Japanese Patent Publication JP-A-2004-140565 does not describe about a concrete method for transmission control based on an unbalance component.
The invention is made in view of the above-described circumstances, and aims to provide a communication apparatus and a communication method which reduces processing burden for controlling leakage electric power from a power line, and enable effective transmission depending on a state of the power line.
A communication apparatus of the invention is a communication apparatus which transmits a transmission signal using a plurality of sub-carriers through a power line, and is equipped with an unbalanced component detection section which detects an unbalanced component that corresponds to electromagnetic radiation from the above-described power line, and an electric power control judgment section which calculates leakage electric power in a frequency band that corresponds to all or a part of the above-described sub-carriers, on the basis of the unbalanced component detected by the above-described unbalanced component detection section, and compares the calculated leakage electric power value corresponding to at least one sub-carrier with a first threshold value, and compares the calculated leakage electric power value corresponding to at least one sub-carrier with a second threshold value which is lower than the above-described first threshold value, and judges whether electric power control of the above-descried transmission signal is necessary or not, on the basis of these comparison results.
According to the invention, it is possible to reduce processing burden for controlling leakage electric power from a power line, and effective transmission depending on a state of the power line becomes possible. That is, necessity of electric power control is judged on the basis of a comparison result of leakage electric power and the first threshold value and the second threshold value, and electric power control is executed depending on its judgment result, and therefore, it is possible to effectively carry out electric power control for which processing burden is large and which causes lowering of communication efficiency.
a) to 11(c) are views which show an example of a frequency spectrum of leakage electric power which is obtained from a frequency axis conversion section in a transmission apparatus of an embodiment of the invention.
Hereinafter, embodiments of the invention will be descried by use of drawings.
The main IC 201 is configured by CPU (Central Processing Unit) 210A, a PLC MAC (Power Line Communication Media Access Control layer) block 201C, and a PLC PHY (Power Line Communication Physical layer) block 201B. A 32 bit RISC (Reduced Instruction Set Computer) processor is mounted on CPU 201A. The PLC MAC block 201C manages a MAC layer of a transmission signal, and the PLC PHY block 201B manages a PHY layer of the transmission signal. The AFE IC 202 is configured by a DA converter (DAC) 202A, an AD converter (ADC) 202D, and variable amplifiers (VGA) 202B, 202C. The coupler 206 is configured by a coil transformer 206C and coupling capacitors 206A, 206B.
Meanwhile, the transmission signal generation section 1 is realized by the main IC 201 in
In case of utilizing the OFDM system which utilizes wavelet transformation, the transmission signal generation section 1 maps a plurality of bit strings from transmission data onto a signal point of each subcarrier, and carries out wavelet inverse transformation on the basis of the mapped signal point data of each sub-carrier, and carries out analog conversion of time wave form grouping data to which wavelet inverse transform was applied, to generate a transmission signal. On that occasion, a modulation system and transmission electric power with respect to each sub-carrier are set up by a control signal from the transmission signal control section 2.
The transmission signal control section 2 carries out control of transmission electric power with respect to each sub-carrier, and control of transmission signal generation processing including selection of a modulation system, which will be described later. The transmission section 3 outputs a transmission signal coming from the transmission signal generation section 1 to the transmission line 9, and also carries out gain adjustment etc. of an entire transmission signal. Control of transmission electric power by the transmission signal control section 2 is carried out in case that there was notification from the electric power control judgment section.
The leakage electric power detection section 4 is a sample of an unbalanced component detection section. The unbalanced component detection section detects an unbalanced component corresponding to electromagnetic radiation from power line. The unbalanced component means characteristic value indicating degree of the electromagnetic radiation. The unbalanced component includes leakage electric power (unit: dBm) of the electromagnetic radiation. The unbalanced component includes also current (unit: A or voltage (unit: V) detected at a winding of a current transformer.
The leakage electric power detection section 4 directly detects electric power which is leaked from the transmission line 9 among transmission electric power. The leakage electric power detection section 4 is equipped with a loop antenna which was disposed in the vicinity of the transmission line 9 as one example, and outputs a leakage electric power signal which corresponds to sub-carrier frequency of a transmission signal. This leakage electric power signal shows leakage electric power from the transmission line 9. The loop antenna may be disposed in an inside of a housing (not shown in the figure) of a communication apparatus, and may be also disposed separately. In addition, it is also possible to utilize an induction coil in lieu of the loop antenna.
The electric power control judgment section 5 judges necessity of transmission electric power control by the transmission signal control section 2, on the basis of a leakage electric power signal from the leakage electric power detection section 4, and, in case that it was judged that transmission electric power control is necessary, notifies that effect to the transmission signal control section 2. The electric power control judgment section 5 calculates leakage electric power with respect to each of plural frequency bands which correspond to sub-carriers, and compares leakage electric power with respect to each of these frequency bands and a first threshold value and a second threshold value, and judges necessity of transmission electric power control depending on a comparison result.
The first threshold value shows a level for judging such necessity that balancing of the transmission line 9 is not good and transmission electric power is suppressed, and the second threshold value shows a level for judging that balancing of the transmission line 9 was improved, as to a sub-carrier in which an operation of suppressing transmission electric power was carried out. Detail of judgment processing of necessity of electric power control will be described later.
To a pair of transmission lines 91, 92 shown in
Next, transmission electric power control of the communication apparatuses shown in
One example of control of transmission electric power of a sub-carrier is of reduces transmission electric power of a sub-carrier with such frequency that leakage electric power exceeded a predetermined value.
The number of times for lowering is not limited to one time, but it is also all right even if a plurality of times is lowered until leakage electric power becomes the threshold value 401 or less. In addition, it is also all right even if transmission electric power of a sub-carrier in the frequency band F1 in which leakage electric power exceeds the predetermined threshold value 401 is zeroed.
Next, judgment of necessity of electric power control will be described.
The band pass filter 51 removes unnecessary low frequency component and high frequency component that are included in a leakage electric power signal and extracts only a component in a frequency band that is utilized for multi-carrier communication, and a component, which has passed through the band pass filter 51, is converted into a digital signal in the A/D converter 52, and send to the frequency axis conversion section 53. The frequency axis conversion section 53 generates a frequency spectrum of the inputted digital signal. The comparison section 54 compares the generated frequency spectrum with a first threshold value and a second threshold value with respect to each predetermined frequency band (concretely speaking, with respect to each sub-carrier frequency band), and a comparison result is sent to the necessity judgment section 55. Meanwhile, the comparison section 54 of
In a step S101, a leakage electric power signal is obtained from the leakage electric power detection section 4 or 41. Then, by utilizing the band pass filter 51, the A/D converter 52 and the frequency axis conversion section 53, a frequency spectrum is generated (step S102). In the comparison section 54, it is firstly compared with the first threshold value with respect to each sub-carrier (step S103), and it is judged whether there is a sub-carrier which is larger than the first threshold value or not (step S104). In case that there is even one sub-carrier which is larger than the first threshold value, it means that a state of balancing of a transmission line is not good, and therefore, it is notified to the transmission signal control section 2 that electric power control is carried out and brought to completion (step S105).
In case that there is no sub-carrier which is larger than the first threshold value, it is judged whether an electric power control flag is ON or not, and in case that it is no ON, it is brought to completion as it is (step S106). The electric power control flag (not shown in the figure) is a flag which is turned ON and OFF depending on a control state of the transmission signal control section 2, and shows whether electric power of a transmission signal from the transmission signal generation section 1 is in an initial state or not. In the initial state, electric power control is not carried out, and a transmission signal with maximum electric power is outputted from the transmission signal generation section 1, and the electric power control flag is set to OFF. The electric control flag is disposed on, for example, the transmission signal control section 2.
In case that it was judged that the electric control flag is ON, it is compared with the second threshold value with respect to each sub-carrier, in a step S107. Then, it is judged whether leakage electric power of all sub-carriers is smaller than the second threshold value or not (step S108). In case that leakage electric power of all sub-carriers is smaller than the second threshold value, it means that leakage electric power goes low and balancing of a transmission line was improved, and therefore, it is notified to the transmission signal control section 2 that electric power control is carried out and brought to completion (step S109). In case that there remains a sub-carrier which is larger than the second threshold value, it is interpreted that improvement of balancing is insufficient and it is brought to completion as it is.
Next, an operation of the transmission signal control section 2 will be described.
The band pass filter 21 is removes unnecessary low frequency component and high frequency component that are included in a leakage electric power signal and extracts only a component in a frequency band that is utilized for multi-carrier communication, and it is converted into a digital signal in the A/D converter 22, and sent to the frequency axis conversion section 23. The frequency axis conversion section 23 generates a frequency spectrum of the inputted digital signal. The comparison section 24 compares the generated frequency spectrum with a first threshold value and a second threshold value with respect to each predetermined frequency band (concretely speaking, with respect to each sub-carrier frequency band), and outputs a result to the coefficient generation section 25.
The band pass filter 21, the AID converter 22, the frequency axis conversion section 23, and the comparison section 24 have functions which are similar to those of the band pass filter 51, the A/D converter 52, the frequency axis conversion section 53 and the comparison section 54 shown in
The coefficient generation section generates a compensation signal with respect to each sub-carrier, on the basis of an output of the comparison section 24 and phase data from the frequency axis conversion section 23. An output from the coefficient generation section 25 is outputted as a transmission electric power control signal c(n), by converting the compensation signal with respect to each sub-carrier into a serial signal in the P/S conversion section 26. Here, n shows a number of a sub-carrier.
Meanwhile, the transmission signal control section 2 shown in
When notification to carry out electric power control is received, an instruction is given to the transmission signal generation section 1 in a step S201, to transmit a test frame. As the test frame, although ordinary transmission data may be used, it is also all right even if predetermined given data is transmitted. Meanwhile, transmission of the test frame is not indispensable, and it is also all right even if transmission data at the time that notification was received is used.
In a step S202, a leakage electric power signal is obtained from the leakage electric power detection section 4 or 41. Then, by utilizing the band pass filter 21, the A/D converter 22 and the frequency axis conversion section 23, a frequency spectrum is generated (step S203). In the comparison section 24, it is firstly compared with the first threshold value with respect to each sub-carrier (step S204), and it is judged whether there is a sub-carrier which is larger than the first threshold value (step S205). In case that there is even one sub-carrier which is larger than the first threshold value, there is need to carry out electric power control of a transmission signal, and therefore, the transmission electric power control signal c(n) is transmitted to the transmission signal control section 2, together with an electric power control instruction (step S206). Meanwhile, the transmission electric power control signal c(n) is outputted as to a sub-carrier of frequency in which leakage electric power exceeded the first threshold value. In addition, a control signal, which corresponds to an exceeded amount from the first threshold value, may be used, and it may be also changed just by a predetermined value. In this case, there is also such a case that plural times of electric power control become necessary.
In case that there is no sub-carrier which is larger than the first threshold value, it is judged whether an electric power control flag is ON or not, and in case that it is not ON, it is brought to completion as it is (step S207).
In case that it was judged that the electric power control flag is ON, it is compared with the second threshold value with respect to each sub-carrier, in a step S208. Then, it is judged whether leakage electric power of all sub-carriers is smaller than the second threshold value or not (step S209). In case that the leakage electric power of all sub-carrier is smaller than the second threshold value, it means that leakage electric power goes low and balancing of a transmission line was improved, and therefore, the transmission electric power control signal c(n) is transmitted to the transmission signal control section 2, together with an electric power control instruction (step S206). In case that there remains a sub-carrier in which leakage electric power is larger than the second threshold value, it is interpreted that improvement of balancing is insufficient and it is brought to completion as it is. Meanwhile, the transmission electric power control signal c(n) in this case is outputted as to a sub-carrier in which transmission electric power goes lower than an initial value and is less than the second threshold value In addition, it is all right even if the transmission electric power control signal c(n) is increased by just such a portion that leakage electric power is less than the above-described two threshold values, within a scope of not-exceeding transmission electric power in its initial state, or it is also all right even if it is increased just by a predetermined value. In addition, it is also all right even if transmission electric power of all sub-carriers is returned to an initial value.
In case that the transmission electric power control signal c(n) was transmitted together with the electric power control instruction in the step S206, it is judged whether transmission electric power is in an initial state or not, i.e., whether it is maximum electric power or not. Then, in case that it is in the initial state, an electric power control flag is turned OFF (step S211), and in case that it is not in the initial state, the electric power control flag is turned ON (step S212) and it is brought to completion.
In the operation flow of
In a step S304, it is judged whether a sub carrier number I is a maximum sub-carrier number N0 or not, i.e., whether comparison for the electric power control instruction was carried out or not as to all sub-carriers. Meanwhile, the sub-carrier number I is reset to 0 at the time of operation start.
In case that the sub-carrier number I is not N0, it is judged whether leakage electric power M of a sub-carrier which is shown by that sub-carrier number I exceeds the first threshold value or not (step S305), and in case that it exceeds, an electric power control instruction is outputted as to that sub-carrier (step S306). Then, the electric power control flag is turned ON (step S307), and the sub-carrier number I is counted up (step S310) and it goes back to the step S304.
In case that it was judged in the step S305 that the leakage electric power M does not exceed the first threshold value, it is judged whether the leakage electric power M is less than the second threshold value or not (step S308), and in case that it is less than that, an electric power control instruction is outputted as to that subcarrier (step S309). Then, in a step S310, the sub-carrier number I is counted up. In case that the leakage electric power M is not less than the second threshold value, it is moved to the step S310 as it is, to count up the sub-carrier number I.
Since a transmission electric power control signal c(n), which is sent together with the electric power control instruction, is the same as in
The data conversion sections 10a, 10b convert transmission data d(n) on the basis of the transmission electric power control signal c(n) from the transmission signal control section 2 of
If conversion in the data conversion section 10a is represented as A and conversion in the data conversion section 10b is represented as B and conversion in the carrier mapping sections 11a, 11b is represented as F, conversion for satisfying the following (formula 1) through (formula 3) is carried out. As apparent from the (formula 1) and (formula 3), a differential component of transmission data (transmit original data f+(n), f(n)) is generated on the basis of the transmission data d(n), and an in-phase component of conversion data is generated on the basis of the transmission electric power control signal c(n).
[Mathematical Formula 1]
|f+(n)|−|f−(n)|=|F(A(d(n), c(n)))|−|F(B(d(n), c(n)))|=|F(d(n))| (formula 1)
Lf+(n)=LF(A(d(n), c(n)))=Lf−(n)=LF(B(d(n), c(n)))=LF(d(n)) (formula 2)
(|f+(n)|+|f−(n)|)/2=(|F(A(d(n), c(n)))|−|F(B(d(n), c(n)))|)/2=|F(c(n))| (formula 3)
Outputs of the carrier mapping sections 11a, 11b are sent to the time axis conversion sections 12a, 12b, and converted from data on a frequency axis to data on a time axis. The time axis conversion sections 12a, 12b carry out, for example, wavelet inverse transform. Digital data on a time axis, which is outputted from the time axis conversion sections 12a, 12b, is converted into analog data in the D/A converters 13a, 13b, and high frequency components are removed therefrom by the low pass filters 14a, 14b, and thereafter, they are inputted to the amplifiers 15a, 15b. The amplifiers 15a, 15b have amplification degrees of “X”, “−X”, respectively, and output transmission signals to the pair of transmission lines 91, 92 at a predetermined signal level.
In this manner, two system transmission signals for being sent out to each of the pair of transmission lines are generated separately, and those transmission signals are controlled so as to compensate unbalance (which corresponds to a leakage electric power signal) of transmission lines, and therefore, in case that unbalance was detected, respective transmission signals, which were unbalanced intentionally, are transmitted. Therefore, a reception signal, which was received through unbalanced transmission lines, becomes a balanced one as a consequence, and leakage electric power can be reduced.
In the above-described explanation, the first threshold value and the second threshold value, which are threshold values for judging necessity of electric power control, i.e., for judging a state of balancing of transmission lines, were set to predetermined fixed values, but it is all right even if they are changed depending on a state of a transmission line.
As one example, test transmission is carried out with maximum electric power at predetermined timing, for example, at the time of communication start or at determined time everyday, etc., and on the basis of an average value of leakage electric power at that time, it is determined. Concretely speaking, one threshold value among the first threshold value and the second threshold value is determined as a function of an average value of leakage electric power, and the other threshold value is determined as a value which is away from the one threshold value just by a predetermined value.
If the suchlike threshold values are utilized, it is possible to avoid such a matter that electric power control is carried out frequently depending on a state of a transmission line.
In addition, the transmission signal control section 1 utilizes the first threshold value and the second threshold value, which are utilized by the electric power control judgment section 5, as a threshold value for transmission electric power control, but it is all right even if a third threshold value, which is lower than the first threshold value, and a fourth threshold value, which is higher than the second threshold value, are utilized, in lieu of the first threshold value and the second threshold value.
If the suchlike threshold values are utilized, it is possible to avoid such a matter that electric power control is carried out frequently. For example, in case that leakage electric power of a specific sub-carrier exceeded the first threshold value, electric power control is carried out so as to reduce leakage electric power up to the third threshold value which is lower than the first threshold value, and therefore, such a possibility that electric power control becomes insufficient goes down, and such probability that it exceeds the first threshold value again and it is judged that electric power control is necessary is reduced. Much the same is true even in case that leakage electric power of a detail sub-carrier became less than the second threshold value. Therefore, it is possible to suppress processing burden for electric power control.
The invention is useful as a communication apparatus and a communication method etc. which reduce processing burden for controlling leakage electric power from a wired transmission line and enable effective transmission depending on a state of the wired transmission line.
This application is based upon and claims the benefit of priority of Japanese Patent Application No. 2004-378958. filed on Dec. 28, 2004, the contents of which are incorporated herein by reference in its entirety.
Number | Date | Country | Kind |
---|---|---|---|
P. 2004-378958 | Dec 2004 | JP | national |
Number | Name | Date | Kind |
---|---|---|---|
5991269 | Williamson et al. | Nov 1999 | A |
20030156014 | Kodama et al. | Aug 2003 | A1 |
20040120249 | Claret et al. | Jun 2004 | A1 |
20040131123 | Maki et al. | Jul 2004 | A1 |
Number | Date | Country |
---|---|---|
1014640 | Jun 2000 | EP |
1411645 | Apr 2004 | EP |
2003152671 | May 2003 | JP |
2003218831 | Jul 2003 | JP |
2004080441 | Mar 2004 | JP |
2004140565 | May 2004 | JP |
Number | Date | Country | |
---|---|---|---|
20060138862 A1 | Jun 2006 | US |