Embodiments of the invention relate to a process for recovering hydrocarbons with in situ combustion.
In situ combustion (ISC) processes are applied for the purpose of recovering oil from light oil, medium oil, heavy oil and bitumen reservoirs. In the process, oil is heated and displaced to an open production well for recovery. Historically, in situ combustion involves providing spaced apart vertical injection and production wells within a reservoir. Typically, an injection well is located within a pattern of surrounding production wells. An oxidant, such as air, oxygen enriched air or oxygen, is injected through the injection well into a hydrocarbon formation, allowing combustion of a portion of the hydrocarbons in the formation in place, i.e., in situ. The heat of combustion and the hot combustion products warm the portion of the reservoir adjacent to the combustion front and drives (displaces) the hydrocarbons toward offset production wells.
In heavy oil and bitumen reservoirs, the cold hydrocarbons surrounding the production well are so viscous so as to prevent the warmed and displaced hydrocarbons from reaching the production well, and eventually quenching the combustion process. Various implementations of in situ combustion techniques, such as the “toe heel air injection” (THAI™) process, have called for the use of horizontal production wells to provide a conduit for the heated bitumen to flow from the heated region to the production wellhead. However, the THAI™ scheme, for example, relies on the deposition of petroleum coke in the slots of a perforated liner in the horizontal section of the production wellbore behind the combustion front. However, should the coke deposition not take place or not be deposited evenly enough to seal off the liner, the injected oxidant would be able to short-circuit between the injector and producer wells, bypassing the combustion front and unrecovered hydrocarbons. The resulting production of hot, rapidly expanding, combustion gases through a small number of slots could cause a liner failure if the erosional velocity is exceeded, leading to sand production into the horizontal section and eventually a catastrophic production well failure. Therefore, a need exits for an improved method for completing horizontal production wells for in situ combustion processes.
In one embodiment of the present invention, an in situ combustion process in an underground reservoir having hydrocarbons, includes the steps of: (a) providing at least one injection well for injecting an oxidant into the underground reservoir, wherein the injection well is vertically displaced within the underground reservoir; (b) providing at least one production well having a substantially horizontal section and a substantially vertical section, wherein the distal end of the substantially horizontal section extending toward the injection well includes a toe portion at one end of the horizontal section closest to the injection well and a heel portion at the opposite end of the horizontal section, wherein the heel portion connects the horizontal portion to the vertical portion of the production well, wherein the toe portion is closer to the injection well than the heel portion; (c) injecting an obstructing agent into the substantially horizontal section of the production well, wherein the obstructing agent is a highly permeable granular material; (d) injecting the oxidant into the injection well to establish a combustion front of ignited hydrocarbons within the underground reservoir; and (e) propagating the combustion front through the underground reservoir to facilitate in obtaining hydrocarbons.
In another embodiment of the present invention, an in situ combustion process in an underground reservoir having hydrocarbons, includes the steps of: (a) providing at least one injection well for injecting an oxidant into the underground reservoir; (b) providing at least one production well, wherein the production well includes a substantially horizontal section and a substantially vertical section; (c) injecting an obstructing agent into the substantially horizontal section of the production well; (d) injecting the oxidant into the injection well to establish a combustion front of ignited hydrocarbons within the underground reservoir; and (f) propagating the combustion front through the underground reservoir to facilitate in obtaining hydrocarbons.
In another embodiment of the present invention, an in situ combustion process in an underground reservoir having hydrocarbons, comprising the steps of: (a) conducting an in situ combustion in an underground reservoir; (b) recovering hydrocarbons through a production well during the in situ combustion; and (c) controlling the breakthrough of oxidants for the in situ combustion into the production well at locations along the production well, wherein the controlling is provided by an operation performed before the in situ combustion and is independent of the naturally occurring processes during in situ combustion.
The invention, together with further advantages thereof, may best be understood by reference to the following description taken in conjunction with the accompanying drawings in which:
Reference will now be made in detail to embodiments of the present invention, one or more examples of which are illustrated in the accompanying drawings. Each example is provided by way of explanation of the invention, not as a limitation of the invention. It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the scope or spirit of the invention. For instance, features illustrated or described as part of one embodiment can be used in another embodiment to yield a still further embodiment. Thus, it is intended that the present invention cover such modifications and variations that come within the scope of the appended claims and their equivalents.
Referring to
The horizontal section 101 contains a slotted liner 114 horizontally disposed within the horizontal section 101 of the production well 100. The liner 114 contains slotted sections 131-138 at various desired locations along the length of the slotted liner 114. The slots are cut axially in the wall of the liner and are sufficiently narrow to exclude particles greater than a selected size, while allowing fluids to flow into or out of the wellbore.
The production well 100 is generally completed low in the reservoir below the injection well 102, with the toe portion 110 of the horizontal section 101 of the production well 100 being in sufficient proximity to the injection well 102 to ensure fluid communication between the injection well 102 and the production well 100. In particular, the production well 100 evacuates combustion gases or oil in the formation 104 as the oil is heated and becomes mobile. Preheating the formation 104 around the injection well 102 with steam, for example, may facilitate establishing initial communication between the injection well 102 and the production well 100.
In operation, the in situ combustion process beings with the injection of an oxidant 106 through the injection well 102 to initiate combustion. The combustion front 120 is then propagated toward the heel 112 of the horizontal section 101 of the production well 100.
Burnt oil or coke naturally deposits in the pores of the formation as the combustion front passes. This naturally occurring deposit of coke has been theorized to also occur in the slotted liner slots, thereby preventing short-circuiting. However, the short-circuiting can continue to present a problem due to lack of adequate sealing by the deposit of coke alone.
By backfilling the horizontal section 101 with an obstructing agent, the unrestricted short circuit through the horizontal section 101 is eliminated. Filling the horizontal section 101 with an obstructing agent, such as a highly permeable granular material, provides a highly permeable flow path that is not blocked by cold bitumen. In an embodiment, the obstructing agent is coated with a resin or other material that will allow it to be pumped into the horizontal section 101, and then activated by mechanical, chemical, thermal, or other means so as to consolidate, resulting in a highly permeable, consolidated, porous media. Additionally, filling the horizontal section with an obstructing agent provides a uniform porous matrix in which coke can be deposited, much like the formation sand 104 that will not fail catastrophically. In another embodiment, a slotted liner is inserted into the horizontal section of the production well prior to the injection of the obstructing agent. The annulus between the slotted liner, the open hole, and the interior of the slotted liner are completely filled with the highly permeable obstructing agent.
The preferred embodiment of the present invention has been disclosed and illustrated. However, the invention is intended to be as broad as defined in the claims below. Those skilled in the art may be able to study the preferred embodiments and identify other ways to practice the invention that are not exactly as described in the present invention. It is the intent of the inventors that variations and equivalents of the invention are within the scope of the claims below and the description, abstract and drawings not to be used to limit the scope of the invention.
This application claims priority benefit under 35 U.S.C. Section 119(e) to U.S. Provisional Patent Ser. No. 61/255,597 filed on Oct. 28, 2009 the entire disclosure of which is incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
6412557 | Ayasse et al. | Jul 2002 | B1 |
7328743 | Turta et al. | Feb 2008 | B2 |
7404441 | Hocking | Jul 2008 | B2 |
7520325 | Hocking | Apr 2009 | B2 |
20050082057 | Newton et al. | Apr 2005 | A1 |
20100139915 | Dreher et al. | Jun 2010 | A1 |
20100200227 | Satchell et al. | Aug 2010 | A1 |
Number | Date | Country | |
---|---|---|---|
20110094735 A1 | Apr 2011 | US |
Number | Date | Country | |
---|---|---|---|
61255597 | Oct 2009 | US |