| John R. Keville letter to Lester L. Hewitt; Jan. 14, 1999 (2 p.). |
| Declaration of Sigbjorn Sangesland; Undated; (13 p.). |
| Subsea Production Technology; Oct. 23-27, 1989 and Nov. 20-24, 1989; (3 p.). |
| Subsea 91 International Conference, Delegate & Exhibitor List 1991 (7 p.). |
| Claim Chart for Claim 10; Undated; (3 p.). |
| Technical Opinion by Bruce C. Volkert; Jan. 10, 1999; (11 p.). |
| John R. Keville letter to Lester L. Hewitt; Feb. 5, 1999, (8 p.). |
| Claim Charts for Claims 16, 112, 110, 91; Undated; (8 p.). |
| Annotated Figures 1-3; Undated; (3 p.). |
| Cooper Cameron Admissions 152-153; Undated; (1 p.). |
| Depostion of Norman Brammer; Sep. 18, 1998; (3 p.). |
| Depostion of Peter Scott; Sep. 18, 1998; (5 p.). |
| Claim Charts for Claims 16, 112, 91, (4 p.). |
| Declaration of Sigbjorn Sangesland; Undated; (76 p.). |
| Claim Chart for Claim 110; Undated; (1 p.). |
| Cooper Cameron Admisssions 126-133; Undated; (5 p.). |
| Depostion of Peter Doyle; Jul. 28, 1999; (pp. 131-142, 179-182). |
| Deposition of Norman Brammer; (pp. 159-166). |
| Memorandum and Order; Feb. 19, 1999; (29 p.). |
| Norwegian Petroleum Directorate regulations Table of Contents and Sections 23-27, (4 p.), Jan. 20, 1997. |
| Norwegian Petroleum Directorate guidelines Table of Contents and Sections 2.1.3-2.3.3 and 3.2.2-3.7.1, (7 p.), Feb. 7, 1992. |
| Memorandum of Inventorship Contentions; Dec. 23, 1998; (5 p.). |
| Cooper Oil Tool; Phillips Petroleum Company Ann Subsea Facility; TMH0445, Nov. 1991; (pp. CCH 36064-36223). |
| SISL Subsea Submersible Pumping (S.S.P.), Second Interim Report-Technical Jun. 1991, Project No. TH/03328/89; Projects of Technological Development in the Hydrocarbons Sector (Regulation EEC 3639/85); KAS 10837-10970; Jun. 1991. |
| Vetco Gray; Drawings of Shell Tazerka MSP Production Tree with Tubing Hanger Spool; (1 page); undated. |
| Cooper Cameron; Layout Drawing of Spool Tree Arrangement for Texaco; (1 page); undated. |
| Cooper Cameron; Drawing of ESP Tree Arrangement for Amoco; (1 page); Dec. 18, 1989. |
| Cooper Cameron; Drawings of Production System Assembly--Electrical Submersible Pump for Amoco Orient re: Liuhua 11-1; (2 pages); undated. |
| Framo Engineering; Drawings of ESP Subsea System; (2 pages); undated. |
| National Oilwell Bulletin No. 186; Mudline Subsea Completion Systems; (4 pages); 1991. |
| Cameron Iron Works USA, Inc.; Subsea Completion System with Downhole--ESP Conceptual Design Study; Feb. 1990; (pp. AMO 02992-AMO 03130). |
| Document No. SSP-020-001 and 2; SISL Project Team; Subsea Submersible Pumping Project Task Series 1000 Equipment Evaluations; (p. KAS09939-KAS10023); Undated. |
| Document No. SSP-020-021; Subsea Intervention Systems Ltd.; Subsea Submersible Pumping Project; Final Report vol. 1, 2 and 3; (pp. KAS10024-KAS10694); Jun. 29, 1992. |
| Letter from Kvaerner Oilfield Products dated Jan. 16, 1998 re: Spool Tree Continuation Patent Application. |
| Document No. SSP-020-004; SISL Project Team; Conceptual Design Report Task Series 2000; Jan. 1991. |
| American Petroleum Institute; API Recommendation Practice 17A Second Edition, Sep. 1996 (Effective Date: Dec. 1, 1996); Recommended Practice for Design and Operation of Subsea Production Systems. |
| Division of Petroleum Engineering and Applied Geophysics; NTH. Trondheim; Mar. 1990; A Simplified Subsea System Design; Sigbjorn Sangesland; (pp. 1-18). |
| SPE 23050 Electrical Submersible Pumps in Subsea Completions; Sep. 3-6, 1991; P.A. Scott, M. Bowring, B. Coleman. |
| National Oilwell (UK) Limited; Through Bore Tree System; Jan. 1993; St. Magnus House. |
| Offshore Technology Conference (OTC 5689); The Subsea Systems of the Argyll Area Fields; D.S. Huber, R.C. Burnett; May 2-5, 1988; (pp. 81-90). |
| Offshore Technology Conference (OTC 5885); Detail Design of a Guidelineless Subsea Satellite Completion; H. B. Skeels, J.A. Martins, S.P. Singeethaml; May 1-4, 1989; (pp. 39-50). |
| Offshore Technology Conference (OTC 5887) Deepwater Christmas Tree Development; P. P. Alfano, C.H.N. Barbosa, M.A. Lewis; May 1-4, 1989; (pp. 57-65). |
| Offshore Technology Conference (OTC 6085); High-Performance Metal-Seal System for Subsea Wellhead Equipment; L. J. Milberger, C.F. Boehm; May 1-4, 1989; (pp. 411-422). |
| Offshore Technology Conference (OTC 6388); Subsea Trees and Controls for Australian Bass Strait Development; L. A. Gillette, R.K. Voss Jr., T. Goggans; May 7-10, 1990; (pp. 391-397). |
| Offshore Technology Conference (OTC 7065); A High-Voltage System for Subsea Electrical Submersible Pumping; Neil Duncan, P.A. Scott, E.R. Schweim,; May 4-7, 1992; (pp. 701-705). |
| SPE 16847; Equipment Selection Procedure for Subsea Trees; J. D. Otten, N. Brammer; Sep. 27-30, 1987; (pp. 121-130). |
| SPE 19288; Don A Cost Effective Approach to Subsea Design; B. Stoddard, J.J. Campbell; Sep. 5-8, 1989; (pp. 1-11). |
| American Petroleum Institute; RP 17A; Recommended Practice for Design and Operation of Subsea Production Systems; American Petrolium Institute 1987; (p. 88) In particular See pp. 15-20. |
| The American Society of Mechanical Engineers; The Development of the 7-1/16" Through-Bore Christmas Tree; D.S. Hubner, et al.; (undated); (pp. 99-106). |
| Underwater Technology Conference; Subsea Production Systems: The Search for Cost-Effective Technology; Mar. 19-21, 1990; (p. 15). |
| Division of Petroleum Engineering and Applied Geophysics, NTH; Simplified Subsea System Design; Oct. 23-27, 1989; (pp. 2-32). |
| Subsea Intervention Systems Ltd.; Subsea Applications for Downhole Pumping; M. Bowring, et al; DOT 1991; (pp. 71-78). |
| Design Certification Manuals; Jul. 29, 1986. |
| Subsea Wells; A Viable Development Alternative; Ocean Industry; Nov. 1986 (p. 1). |
| SPE 11176; New Generation 18-3/4-in.-15,000-psi Subsea Wellhead System; Sep. 26-29, 1982; B.F. Baugh, C.R. Gordon, G.C. Weiland. |
| National Supply Company (UK) Limited; Through Bore Tree system and Workover Riser 7-1/16" 5000 psi; Jun. 1985. |
| National Supply Company (UK) Limited; Through Bore Tree system and Workover Riser 7-1/16"-5M; Oct. 1985. |
| OTC 5847; Subsea Template and Trees for Green Canyon Block 29 Development; May 2-5, 1988; M.L. Teers, T.M. Stroud, A.J. Masciopinto. |
| OTC 5809; Critical Points for the Project of Very Deep Subsea Completions; May 2-5, 1988; J.M. Formigli Filho, O.J.S. Ribeiro. |
| Oil & Gas Journal; Completion Techniques Report; B.F. Baugh; 1989. |
| Oil & Gas Journal; Offshore Report; B.F. Baugh; May 1989. |
| Concentric Tubing Hanger Designs for BP's Universal Subsea Wellhead; H.P. Hopper; undated. |
| SPE 23145; Installation of Concentric Subsea Completions From a Jack-Up in the Welland Field: A Case History; Sep. 3-6, 1991; R. O. Sanders (pp. 405-415) (15 sheets drawings). |
| SPE 23045; Snorre Subsea Tree and Completion Equipment; Sep. 3-6 1991; J.D. Williams, S. Ytreland; (pp. 149-157). |
| SPE 16847; Equipment Selection Procedure for Subsea Trees; Sep. 27-30, 1987; J.D. Otten, N. Brammer; (pp. 121-130). |
| Mathias Owe; Div. Of Machine Design; Electrical Submersible Pump for Subsea Completed Wells; Dec. 1991; (p. 2). |
| The Nordic Council of Ministers Program for Petroleum Technology; Electric Submersible Pump for Subsea Completed Wells; Nov. 26-27, 1991; S. Sangesland; (p. 17). |
| Declaration of Roger Moore regarding the Amoco engineering study; 1989. |
| The American Oil & Gas Reporter; Special Report: Offshore & Subsea Technology; Horizontal Tree Gives Access to Subsea; Jun. 1996. |
| SPE 13976 Through Bore Subsea Christmas Trees; Sep. 1985; D.S. Huber, G. F. Simmers and C. S. Johnson. |
| OTC 7063 IUHUA11-1 Field Development; An Innovative Application of Technology; May 1992; A. R. Baillie and Jing Hui Chen. |
| National Well Control Systems--ARMCO National Supply Co.; 1982-83 Composite Catalog. |
| National Subsea Equipment; 1986-87 Composite Catalog. |
| Hydrill Mechanical Products Division; 1986-87 Composite Catalog. |