The invention relates to a precast building system and, more specifically, relates to the latest and best aspects of precast technology and incorporate the same in the traditional cast-in-place concrete frame system to produce a reliable, trusted and economical building solution for high speed and high volume production.
Building structures are often built on site in most parts of the world. The problems of site constructions are well documented in past journal articles. The major problems of many site building methods are their high amount of skilled labor requirements and complexity of the building structures. In cases where the building system is too foreign to the local market, system acceptance will be very low. There are certainly many different types of building systems available in the market that compete to reduce cost, provide speed construction, and provide a more energy-efficient envelope at the same time. However, no system can reduce cost sufficiently, increase construction speed, provide more energy-efficient envelope, and have more culturally acceptable features at the same time. The local market, particularly, in the developing countries is enormous because these developing countries are where the majority of the world population growth occurs in the last 35 years.
The precast building industry has been evolving slowly for the last few decades in developed countries including United States and Europe. The core concept of most precast systems is still based mainly on very heavy load-bearing wall components. Load-bearing wall panel is a panel designed to carry the load above the panel and does not rely on a column system to support the load. In contrast, the non-load bearing wall panel is designed to carry load above the panel. However, a typical load-bearing wall system inherently has limitations in application and practice in most developing markets. For example, a typical precast system requires a large amount of capital for heavy equipment to manufacture and handle its panel components, making it a very unattractive investment relative to traditional cast-in-place system which is more easily practiced and implemented without heavy machinery. As a result, traditional cast-in-place concrete system remains widely practiced everywhere, including both developed and developing countries for many generations.
An example of such a traditional cast-in-place concrete superstructure 10 is shown in
Another major advantage of traditional cast-in-place concrete superstructure over traditional load-bearing precast wall systems without columns is its flexibility for future renovations. For example, partition walls can be easily knocked down or moved to accommodate new floor layout or usage of space as space usage changes in time. However, the traditional cast-in-place concrete system, as shown, for example, in
Given the fact that at least 80% of 7 billion world population is living in developing countries and living mostly in traditional concrete frame housing, any precast system that does not resemble what people have been used to for generations and can offer better performance over traditional system will have little chance of acceptance and adoption. In addition to being unfamiliar in the local engineering community and end users, the high level of initial capital investment required for precast systems will make them unviable as a solution. Other non-concrete or non-masonry solutions have the same problem in their adaption as well. When people buy something as significant as their home they will want to buy something they trust and that has better value. A new building solution is desperately needed that has to be cheaper, faster construction time, higher thermal efficient performance to save energy, and has more culturally acceptable features as well.
In any market and in any innovation, end users or consumers will always accept and buy a better mouse trap because of its greater perceived value. The old mouse trap in construction technology can be referred to as traditional reinforced concrete frame with cast-in-place columns, beams, and floor. Typical load-bearing precast system from developed countries will not be perceived by the mass population in developing countries as a better mouse trap because of its lack of resemblances. This explains why most evolved precast building systems of the developed countries have failed in developing markets. The mouse trap—a home—is the most significant purchase in a person's life. As a result, not too many people are willing to buy something that does not perceive as a better mouse trap than the one they grew up in.
In recognizing all factors stated above, there is a need for a better building solution, particularly, in developing countries where developers or general contractors often do not have the excess capital for heavy equipment for traditional load-bearing precast systems.
Accordingly, it is therefore an object of the present invention to provide a new building component system that is low cost and simple for single store to high-rise structure and that has faster construction time, higher thermal performance, and more culturally acceptable features, particularly for developing countries where developers or general contractors often do not have the excess capital for heavy equipment for traditional load-bearing precast systems.
It is also an object of the present invention to provide a lightweight precast component system designed to adopt the traditional cast-in-place concrete superstructure and to reduce construction time, cost of labor and materials, while achieving higher thermal efficiency and durability and familiarity.
It is also an object of the present invention to provide a hybrid building system that integrates both elements of precast and cast-in-place technologies made possible by its precast wall panel design and specifications.
It is further an object of the present invention to provide a precast wall panel component designed to span and connect between traditional concrete columns and beams in the traditional concrete superstructure and designed to be as light as possible (no more than 5 Ton) without concern to its load-bearing capacity.
In accordance with an aspect of the present invention, the hybrid building system combines both precast panel elements and cast-in-place concrete superstructure method. The required precast elements are non-load bearing precast wall panels of certain size, type, design, and weight and any precast floor panel. The cast-in-place elements are columns, beams, and floor system resembling the traditional concrete superstructure frame that everyone recognizes and trusts. Essentially, the hybrid building system according to the present invention is designed to speed up construction speed and provide better performing wall by replacing hundreds of concrete or brick blocks with one or two precast wall panels between columns as cladding walls and partition walls. The system columns and beams in this hybrid building system are of the same traditional construction. The system floor panel can be of any ordinary precast floor panel or cast-in-place slab floor system; however, the preferred floor system disclosed in this application is of an open rib panel design and/or of cast-in-place floor system. This pre-assembled floor panel is made of a light gauge steel frame with a top sheathing. The floor panel system can be either a removable formwork or stay-in-place formwork, which is a temporary or permanent mold in which concrete or similar materials are poured. The light gauge steel frame is made of four main U or C or of both U and C steel sections assembled into a frame with a top sheathing. When the floor panels are assembled over the precast wall panels, cavities for forming floor joists are created. When compared to traditional floor slab, the floor panel system according to the present invention will reduce both concrete and steel content.
In accordance with another aspect of the present invention, the hybrid building system concept is enabled only by non-load bearing precast wall panel design and its specification. As previously discussed, the non-load bearing precast wall panel is designed to carry load above the panel. The panel basic design can be of an open rib or closed sandwich wall panel. The typical wall panel has a maximum width of 8 meter and has a height that stretches between floor beams in the superstructure, so that no more than two panels are connected between concrete columns with a cross-section area more than 7100 square millimeter (11 square inch) and floor beams in the superstructure. The construction of columns and beams of this hybrid building system is the same as traditional cast-in-place frame system. The wall panel weighs no more than 5 tons—so that lighter and cheaper class of equipment can be used in manufacturing, transporting, and erecting it at building site. Both panel types in this system use minimal concrete for their integrity and with enough reinforcement to prevent shrinkage cracks and cracks during its handling. The wall panel has a minimum panel thickness of 90 mm or 3.5 inches. The concrete layer of the open rib and closed sandwich panel has a maximum panel thickness of 2 inch or 50 mm under reveals and is made of concrete that is structural or non-structural class and has a maximum panel weight of 35 lb/ft2 or 170 kg/m2. Most load-bearing wall panels in the industry are heavier than 35 lb/ft2 or 170 kg/m2. The left and right side of each wall panel has protruding edges to reduce water penetration to the inside and help to stabilize the panel position when wet concrete is in column cavity. In this system the main joint connection is made via embedded steel rod or bolt put in place prior to casting concrete columns and floor beams. For large wall panels its side is sprayed with a releasing agent in order to prevent cold bonding between column and panel. In such case, the panel connection relies solely on connection steel bolts or rods. Since concrete panels and columns shrink, expand, or move in micro millimeters under various conditions this design joint system will allow movements and prevent crack in panels. Provision such as covering the micro joint line with a fiberglass mesh and an elastic joint compound can hide the joints completely. Thus, it now can become a joint-less precast system. Cracks and water penetrations are the common problems associated with traditional precast systems. The protruding edge of one side of the wall panel can be longer than the other side of the wall panel in order to save the formwork and reduce labor cost associated with that side. In other case, the wall panel can only have one protruding edge on its left and right side. All wall panels may have another optional extended edge on the top side of the wall panel to save the exterior formwork when casting the concrete floor and the floor beam. This wall panel design with the combination of disclosed features represents a departure from traditional precast panel design in the industry.
In accordance with another aspect of the present invention, the construction process of this hybrid building system is different from traditional building system and is described as follow for constructing a single story to a high-rise building:
Step 1—The wall and floor panels are precast at site or at factory.
Step 2—The wall and floor panels are transported to site and are then erected.
Step 3—One or more rebars are placed in column cavities and then add additional formworks.
Step 4—Place floor panels on wall panels as an option.
Step 5—Concrete is poured for columns and is then set for 24 hrs.
Step 6—Floor panels are placed over the wall panels and steel reinforcements and formworks are put in place if step 4 is not used.
Step 7—Concrete is poured for beams, joists, and top floor slab and is then allowed to set for 24 hrs.
Step 8—Repeat step 2 to step 6 until all floor panels are constructed.
In some cases, the system columns can be cast before wall panel erecting. However, such method is not efficient and would incur higher cost but it is an option.
A better understanding of the present invention will become apparent from the following detailed description of example embodiments and the claims when read in connection with the accompanying drawings, all forming a part of the disclosure of this invention. While the following written and illustrated disclosure focuses on disclosing example embodiments of the invention, it should be clearly understood that the same is by way of illustration and example only and that the invention is not limited thereto. The spirit and scope of the present invention are limited only by the terms of the appended claims. The following represents brief descriptions of the drawings, wherein:
Referring now to
As shown in
Because manufacturing and handling equipment used for heavy precast panels costs a lot more than for panels less than 5.1 Ton, the precast wall panel 20 has a limit weight of 5 Ton. For most high-rise buildings with a large floor area, the panels 20 are limited to 1.5 Ton due to limitations of tower cranes. Each precast wall panel 20 has a thickness equal to or greater than 75 mm or 3 inches and is made of structural concrete or non-structural concrete. The precast wall panel 20 is designed to have a weight under 35 lb/ft2 or 170 kg/m2 and to serve as non-load bearing class wall.
As illustrated in
This hybrid precast system 20 can be adopted to use as a flooring system on the market provided that a thickness of floor planks or panels is sufficient to form the required height of the floor beams. The preferred flooring system of this hybrid component system is based on a floor panel design 30 shown in
The construction steps or method of this hybrid building system according to an embodiment of the present invention is different from both traditional cast-in-place and precast system.
While there have been illustrated and described what are considered to be example embodiments of the present invention, it will be understood by those skilled in the art that various changes and modifications may be made, and equivalents may be substituted for elements thereof without departing from the true scope of the present invention. Therefore, it is intended that the present invention not be limited to the particular embodiment disclosed as the best mode contemplated for carrying out the present invention, but that the present invention includes all embodiments falling within the scope of the appended claims.
This application is a non-provisional application of an earlier U.S. provisional patent application Ser. No. 61/852,398, filed on Mar. 16, 2013.
Number | Date | Country | |
---|---|---|---|
61852398 | Mar 2013 | US |