The embodiments of the invention relate to modularly constructed concrete buildings, and more particularly to a modularly constructed concrete building structure having one or more levels with floors formed from a plurality of precast concrete slabs attached to a grid support base.
The construction of buildings formed of poured-in-place concrete and with exterior walls of concrete panels, has been in use for many years. Conventional techniques involve the use of, in general, first of all pouring concrete columns, internally reinforced with rebars, then erecting horizontal form work for pouring a floor slab, and then pouring an entire floor of concrete in situ on the form work at the building site. Usually the construction proceeds by pouring further columns and then pouring floors in situ, to reach the appropriate height of the building. Exterior walls are often erected of precast concrete panels.
Such systems are labor intensive, slow, and expensive. The systems are also wasteful of materials such as form work, and wasteful of concrete and rebars. The form work is usually custom made on site and erected on a large number of internal portable posts. The form work must be laid out and supported accurately so that the pouring of the floor can proceed. The resulting floors are poured in one piece in the majority of cases. Rebars are incorporated throughout such a floor, and the floor is connected to the upper ends of the vertical frames, usually by connecting rebars. The volumes of concrete used in such a system are very considerable. The thickness and weight of the rebars is also considerable. The total weight per floor of the building is therefore made up of relatively massive monolithic slabs of concrete, and large volumes and lengths of heavy rebars. This is wasteful in terms of costs and materials. It also restricts the height of the building since the footings must be designed to carry a certain weight of construction materials when the building is erected and also the occupants of the building and all their equipment.
In addition to all this, the onsite labor costs are considerable. Typically, onsite labor rates will be two or three times the hourly rate paid to employees in the factory. Clearly it is suitable to both reduce the volume of concrete material required and to reduce the weight of the rebars. It is further suitable to reduce the amount of form work which must be erected to support the floors while they are being poured, and cured. It is also suitable to reduce, as far as possible, the onsite labor costs.
It is therefore suitable to manufacture, as far as possible, precast concrete floor components in a factory remote from the building site, and transport such precast floor components to the site and erect them in position. It is also suitable to precast other components including the wall panels, and also the vertical building support columns themselves, and transport them to the site. This will greatly reduce the costs of onsite labor and avoid time spent on erecting formwork, pouring concrete on site, curing time, and removing formwork. It will reduce the time taken to pour concrete on site.
One modular system is disclosed in Russian patent No. 2376424 to Nikolay P. Tikhovskiy. The system disclosed in this patent involves a floor made with the use of pre-cast flat solid concrete slabs, with rebar components extending out from the slabs. The slabs are then supported at floor level, leaving channel spaces between them. In this system, the on-site pouring time and volume of on-site concrete required, and the form-work required is greatly reduced, compared with pouring an entire floor. However, the floor slabs with rebars were still relatively massive.
In another method and system, disclosed in U.S. Pat. No. 8,336,276 issued Dec. 25, 2012 to Nikolay P. Tikhovskiy, the plain flat slabs are replaced with modular precast concrete caissons. The caissons are formed with massive, deep side walls, and a central slab portion of reduced thickness, supported by the side walls. These caissons may be formed in various shapes, typically square or rectangular but may be hexagonal, or even circular or other shapes, to suit the design of the building. The precast caissons are then supported in place at the building site, with their side walls spaced apart being supported by removable posts such as are well known in the art. Between the caisson side walls, channel spaces are defined, which are closed off by form work. Rebars are laid in the channel spaces between the caissons. Concrete beams are then poured on site in the channel spaces between the caissons. The concrete bonds with the side walls of the caissons, thereby forming concrete beams that interconnect and support the caissons. The caissons and the beams thus form a homogenous floor. Such caissons have features capable of interlocking directly with the poured concrete of the beams without the need for interlocking rebars.
The casting of such caissons with relatively complex sidewall features which permit the interlocking is costly, and leads to less flexibility in the design and shape of the perimeter of building floors. Furthermore, the underlying structure and form work required to support the caissons during installation can be cumbersome to create. It would be beneficial to use pre-cast flat concrete slabs as in the Russian patent mentioned above, but to alleviate one or more of the disadvantages described. For example, the ability to use smaller pre-cast flat concrete slabs would be preferred. It would furthermore be beneficial to provide greater support and a strengthened floor surface when compared to the system of the '276 Patent.
In one embodiment, there is disclosed a concrete building structure including a first cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally the length of a floor in the building structure; a second cross-brace section, including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar, extending generally perpendicularly to the first cross-brace section and spanning a width of the floor in the building structure, such that the first cross-brace section and the second cross-brace section form a grid understructure; a plurality of channels encapsulating adjacent blocks from the first cross-brace section and the second cross-brace section within each element in the grid understructure, whereby the grid understructure includes channels running along its entire length and width into which concrete may be poured at a building site; each of the plurality of blocks positioned within respective channels; a plurality of pre-cast concrete slabs resting atop the blocks in the grid understructure; the pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs; and, poured concrete filling within each of the channels and the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
In one aspect of this embodiment, one or both of the first and the second cross-brace sections further includes a top rebar extending along the length of a top surface thereof.
In another aspect of this embodiment, the top rebar is attached to a top surface of each of the blocks within the first and/or second cross-brace section.
In another aspect of this embodiment, each of the pre-cast concrete slabs include at least one main body rebar extending through the concrete slab and extending outwardly from opposite sides of the concrete slab in a direction parallel to a top surface of the slab.
In another aspect of this embodiment, each of the pre-cast concrete slabs further includes at least one corner rebar extending outwardly from a side of the concrete slab, proximate a corner of the slab; wherein the at least one corner rebar extends outwardly in a direction parallel to the top surface of the slab and then downwardly in a direction perpendicular to the top surface of the slab.
In another aspect of this embodiment, the at least one corner rebar hooks around the top rebar.
In another aspect of this embodiment, the channels comprise panels attached to sides of adjacent blocks from each of the first and second cross-brace sections; and a bottom panel attached to the bottom of each of the blocks.
In another aspect of this embodiment, the blocks further comprise one or more rivets extending upwardly away from a top surface of the blocks; and wherein the pre-cast concrete slabs comprise locating holes corresponding with the one or more rivets.
The concrete building structure may include two or more floors, each floor having the grid understructure, the channels and the plurality of pre-cast concrete slabs as herein described.
In another embodiment, there is provided a method for constructing a concrete building structure including arranging a plurality of supports in a grid-like arrangement; the supports generally defining the ceiling height in a floor of the building structure; placing a plurality of first cross-brace sections on the supports; the first cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar; wherein one support is provided for each concrete block such that each concrete block rests on its respective support; placing a plurality of second cross-brace sections perpendicular to the first cross-brace sections such that the first and second cross-brace sections form a grid understructure spanning a floor of the concrete structure; the second cross-brace sections including a plurality of equidistant, pre-cast concrete blocks connected in series by at least one rebar; forming a plurality of channels encapsulating adjacent blocks from the first cross-brace section and the second cross-brace section within each element in the grid understructure such that the grid understructure includes channels running along its entire length and width; positioning a plurality of pre-cast concrete slabs atop the blocks in the grid understructure; the pre-cast concrete slabs spaced apart from each other such that concrete may be poured between adjacent concrete slabs; pouring concrete into each of the channels and into the space between adjacent concrete slabs to complete a generally flat floor of the building structure.
In one aspect of this embodiment, one or both of the first and the second cross-brace sections further includes a top rebar extending along the length of a top surface thereof.
In another aspect of this embodiment, the top rebar is attached to a top surface of each of the blocks within the first and/or second cross-brace section.
In another aspect of this embodiment, each of the pre-cast concrete slabs include at least one main body rebar extending through the concrete slab and extending outwardly from opposite sides of the concrete slab in a direction parallel to a top surface of the slab.
In another aspect of this embodiment, each of the pre-cast concrete slabs further includes at least one corner rebar extending outwardly from a side of the concrete slab, proximate a corner of the slab; wherein the at least one corner rebar extends outwardly in a direction parallel to the top surface of the slab and then downwardly in a direction perpendicular to the top surface of the slab.
In another aspect of this embodiment, the at least one corner rebar hooks around the top rebar.
In another aspect of this embodiment, the channels comprise panels attached to sides of adjacent blocks from each of the first and second cross-brace sections; and a bottom panel attached to the bottom of each of the blocks.
In another aspect of this embodiment, the blocks further comprise one or more rivets extending upwardly away from a top surface of the blocks; and wherein the pre-cast concrete slabs comprise locating holes corresponding with the one or more rivets.
Before the embodiments of the invention are explained in detail, it is to be understood that the invention is not limited to the details of operation or to the details of construction and the arrangement of the components set forth in the following description or illustrated in the drawings. The invention may be implemented in various other embodiments and of being practiced or being carried out in alternative ways not expressly disclosed herein. Also, it is to be understood that the phraseology and terminology used herein are for the purpose of description and should not be regarded as limiting. The use of “including” and “comprising” and variations thereof is meant to encompass the items listed thereafter and equivalents thereof as well as additional items and equivalents thereof. Further, enumeration may be used in the description of various embodiments. Unless otherwise expressly stated, the use of enumeration should not be construed as limiting the invention to any specific order or number of components. Nor should the use of enumeration be construed as excluding from the scope of the invention any additional steps or components that might be combined with or into the enumerated steps or components.
Generally, the structure and method as herein described permits for a substantial portion of the building structure to be pre-cast or otherwise manufactured offsite and prior to beginning construction on a particular building. In addition, the nature of the pre-cast or otherwise pre-constructed elements allows for a variety of building shapes and designs to be produced using standardized and optionally off-the-shelf elements.
The figures illustrate a sequence of steps in the method for assembling the building, and the various required and/or optional elements will be described in additional detail as they are introduced into the description of the assembly.
Referring now to
The supports 15 optionally consist of a pair of tubular pipes 17, 19, one of which has an outer diameter smaller than the internal diameter of the other tubular pipe. A clamping or locking mechanism 21 is provided proximate a midsection of the support 15. This arrangement allows the supports 15 to be height-adjustable to a desired ceiling height for a particular floor in the building structure. Alternate supports may be provided by other arrangements. In particular, prior art scaffolding arrangements or other temporary structures upon which a floor could be built are contemplated. Once the floor above has been built, the supports 15 are removed. The number of supports 15, their general design, layout and strength can be determined based on the application.
Turning now to
The cross-brace segments 25A and 25B, once assembled, form a grid understructure upon which flat, pre-cast concrete elements can be placed. The rebars 35 and 37, while serving to hold and connect the distinct blocks 30A and 30B, respectively, will also assist in maintaining poured concrete (as discussed below) in tension.
The resulting structure following this step is one where a plurality of blocks 30A are connected in series by one, and optionally two, rebars 35, to form a first cross-brace segment 25A, and supported on respective supports 15. A plurality of these cross-brace segments 25A are laid out across the intended floor. Positioned perpendicular to the cross-brace segments 25A are cross-brace segments 25B, consisting of blocks 30B connected in series by one, and optionally two rebars 37. Where two rebars are used, they are optionally positioned parallel to each other, and at the same vertical height above the ground. The cross-brace segments 25B may be supported by their own respective supports 15, which can be height adjusted as described earlier to accommodate the small differential in height above the ground between the cross-brace segments 25A and the cross-brace segments 25B. In addition, or alternatively, the rebars 37 can be supported entirely or in part by the rebars 35. Optionally, one or more rivets 40 may be provided on the blocks 30A and 30B, to aid in the locating of the pre-cast cement slabs.
Next, as shown in
Turning now to
The channels 50 can be sufficiently sealed such that concrete can be poured into the channels, and sufficiently harden without significant leakage. There is no requirement, however, that the channels be water tight. Channels 50 could also be built entirely around, and underneath the blocks 30A, 30B, although this would require longer wall sections, which may be undesirable. Various hardware elements, or additional wood (or other material) supports may be employed to strengthen the channels, connect the channels to the blocks, or otherwise provide the intended function.
On the periphery of the floor, channels are analogously formed so as to complete the understructure forming a grid-pattern of channel, either encompassing the blocks 30A, 30B, or using the sides of the blocks 30A, as sides of the channel.
Next, and as shown in
As shown in
Once the slabs 55 are positioned on the blocks 30A, 30B, as per
Next, as shown in
Various modifications and alternatives may be made to the embodiments described herein. For example, at least one of the cross-brace sections could be provided as an elongated, pre-cast concrete section with rebars running therethrough. In this variation, rather than providing the separated blocks in forming the cross-brace sections, only a single effective block is present which runs the length or width of the building floor. The perpendicular cross brace can then be provided with separated blocks as described above, thereby reducing some of the on-site work needed in completing the channels in the understructure. However, this variation can result in less modularity. Otherwise, different types of materials may be used in forming the channels of the understructure, and indeed these channels may be pre-formed such that they are merely connected to the concrete blocks on-site. For example, sheet metal corner elements could be produced in advance and simply connected on-site to complete the channels around the blocks.
Directional terms, such as “vertical,” “horizontal,” “top,” “bottom,” “upper,” “lower,” “inner,” “inwardly,” “outer” and “outwardly,” are used to assist in describing the invention based on the orientation of the embodiments shown in the illustrations. The use of directional terms should not be interpreted to limit the invention to any specific orientation(s).
The above description is that of current embodiments of the invention. Various alterations and changes can be made without departing from the spirit and broader aspects of the invention as defined in the appended claims, which are to be interpreted in accordance with the principles of patent law including the doctrine of equivalents. This disclosure is presented for illustrative purposes and should not be interpreted as an exhaustive description of all embodiments of the invention or to limit the scope of the claims to the specific elements illustrated or described in connection with these embodiments. For example, and without limitation, any individual element(s) of the described invention may be replaced by alternative elements that provide substantially similar functionality or otherwise provide adequate operation. This includes, for example, presently known alternative elements, such as those that might be currently known to one skilled in the art, and alternative elements that may be developed in the future, such as those that one skilled in the art might, upon development, recognize as an alternative. Further, the disclosed embodiments include a plurality of features that are described in concert and that might cooperatively provide a collection of benefits. The present invention is not limited to only those embodiments that include all of these features or that provide all of the stated benefits, except to the extent otherwise expressly set forth in the issued claims. Any reference to claim elements in the singular, for example, using the articles “a,” “an,” “the” or “said,” is not to be construed as limiting the element to the singular. Any reference to claim elements as “at least one of X, Y and Z” is meant to include any one of X, Y or Z individually, and any combination of X, Y and Z, for example, X, Y, Z; X, Y; X, Z; and Y, Z.
Number | Name | Date | Kind |
---|---|---|---|
938458 | Brockhausen | Nov 1909 | A |
1046117 | Skinner | Dec 1912 | A |
1380324 | Piggins | May 1921 | A |
1496819 | Mitchell | Jun 1924 | A |
3423891 | Burris | Jan 1969 | A |
3464176 | Clements | Sep 1969 | A |
3613325 | Yee | Oct 1971 | A |
3867805 | Mikami | Feb 1975 | A |
3903667 | Zetlin | Sep 1975 | A |
4081935 | Wise | Apr 1978 | A |
4095380 | Dillon | Jun 1978 | A |
4328651 | Gutierrez | May 1982 | A |
4409764 | Wilnau | Oct 1983 | A |
4550536 | Lamoure | Nov 1985 | A |
4669240 | Amormino | Jun 1987 | A |
4945695 | Majurinen | Aug 1990 | A |
5630300 | Chen | May 1997 | A |
5675950 | Schilham | Oct 1997 | A |
5809712 | Simanjuntak | Sep 1998 | A |
6256960 | Babcock et al. | Jul 2001 | B1 |
6293063 | Van Doren | Sep 2001 | B2 |
6698150 | DiLorenzo | Mar 2004 | B1 |
6920728 | Powers | Jul 2005 | B2 |
RE39097 | Schilham | May 2006 | E |
7124545 | Poma et al. | Oct 2006 | B1 |
7185467 | Marty | Mar 2007 | B2 |
8291675 | Tikhovskiy | Oct 2012 | B2 |
8336276 | Tikhovskiy | Dec 2012 | B2 |
20010003234 | Van Doren | Jun 2001 | A1 |
20070193213 | Nanayakkara | Aug 2007 | A1 |
20080263978 | Abou-Saleh | Oct 2008 | A1 |
20120110928 | Liberman | May 2012 | A1 |
20120233945 | Rubel | Sep 2012 | A1 |