The various embodiments herein relate to systems and devices (including hoists) used in building concrete walls, including concrete walls of buildings and similar structures, and in particular to a wall climbing form system for handling form units in the construction of concrete wall structures for multi-story buildings.
In the construction of a multi-story building, such as an office building, apartment building or the like, the building may have thirty or more floors. Where concrete is used in the construction of the outside or inside walls, it is necessary in known processes to provide cranes in the setting up and then stripping of the forms from a set wall panel for reuse in continuing the completion of the wall. In such known approaches, unless a crane is available as required in the setting up and stripping of the forms, the wall not only becomes costly, but additional cost increases are incurred by lost time on other operations that must be performed in a synchronized time schedule with the wall forming operation. In addition, the required use of the crane for setting up and stripping the form panels for concrete construction (also referred to herein as “concrete forms” or “concrete form panels” or “form panels”) means that the crane is unavailable for use on other jobs at the building site, thereby resulting in further loss of time and increased costs. Where open crane time for timely handling of the form units is not available, construction usually proceeds behind schedule with resultant monetary losses. In addition, the size and/or configuration of the construction site can also make it impossible to use a crane for handling the concrete forms. For example, in some instances, the size of the building being constructed relative to the building site may preclude the use of a crane due to space constraints adjacent to the building.
A known system for constructing concrete walls about two stories high is shown in U.S. Pat. No. 2,516,318; and for multi-story buildings, in U.S. Pat. Nos. 4,043,087; and 2,118,374. Self-lifting form systems now in use are generally cumbersome and, although inconvenient to manipulate during both a wall climbing operation and a form handling operation, have been found to be generally satisfactory in comparison to other available technologies. U.S. Pat. No. 3,628,223 discloses a climbing form hoist that includes a telescopic mast comprised of a pair of vertical lower mast sections for telescopically receiving associated upper mast sections which are extended and retracted by a common reversible electric motor. The upper mast sections carry an outer form unit. With the mast retracted and attached at its lower end to a completed lower wall section, the inner and outer form units are braced or tied together in any well-known manner after which a new lift or wall section is poured. When the new pour has set, the outer form unit, after being stripped from the wall structure, is elevated by the extension of the upper mast sections to a new pour position wherein its lower end is attachable to the previously poured wall section. The lower mast sections are then released from the wall, the upper mast section is retracted and the lower mast section again connected to the wall. The inner form unit is then repositioned for another lift to be poured.
U.S. Pat. No. 4,290,576 discloses a climbing scaffolding which utilizes a guiding rail only as a vertical guide, but not to support the load resulting from the weight of the scaffolding in the vertical direction. The '576 patent requires its operators to manually fix the scaffolding in its lifted position by inserting pins into cutouts or by placing wedges underneath to support the load. U.S. Pat. No. 5,000,287 discloses a displaceable platform which is movable section-wise on a wall, comprising support shoes, carrying rails, and a bracketing arrangement to support the platform. The thrust of the '287 patent is the correction of non-uniform upward travel of its displacement elements through very small advancements on a toothed displacement rack and a common drive and controller apparatus that prohibits further upward displacement until all linear drives have completed the preceding working step or one of the proceeding working steps. While the ratcheting mechanism of the '287 patent's tooth displacement rack may provide for fewer incidents of jamming (therefore minimizing related down time due to mechanical failures), the need to correct for non-uniform upward travel across different elements can require additional time and system mechanisms that add time and expense.
U.S. Pat. No. 5,630,482 discloses a self-climbing device which utilizes two types of scaffolding shoes: one for guiding and one for guiding and exhibiting attachment devices; two types climbing heads: a lower head with a pivotable member supported by a sidewall enclosure, and an upper head with a pivotable member supported by two additional housing walls provided between the outer housing walls of the sidewall enclosure; and two types of protuberances extending from a guide rail which provide, in a plurality of steps, a locking and loosening means by which a platform may be lifted or lowered along the length of a mounting rail. One disadvantage of the self-climbing device of the '482 patent is the complexity of the device and the number of different components that must function together for successful operation of the device.
U.S. Pat. No. 8,020,271 discloses a self-raising form control system that may be used to form elevator shafts and other vertical building structures. A lift apparatus having a plurality of hydraulic cylinders is provided for lifting form elements. The lift apparatus comprises a measurement device for measuring the position of said lift apparatus relative to a fixed point. A control unit is provided for controlling the lift apparatus. The control unit is signal connected to the measurement device and is signal connected to the lift apparatus and stops one or more of the hydraulic cylinders during a lift to maintain alignment of the self-raising form during a raise.
U.S. Pat. No. 6,557,817 disclose a self-climbing device having a platform that is alternatingly supported on a climbing mast and on a wall mount. In order for the system to climb to the next level, the formwork panels are stripped away from the surface an appreciable distance to provide clearance so that a climbing mast can be raised and releasably secured to the upper area of the freshly poured concrete wall. At that point, sufficient time must then be allowed for the freshly-poured concrete to mature to an adequate strength before any load can be applied. Thus, one disadvantage is the delay necessary to wait for the concrete to mature before additional work can be performed.
There is a need in the art for an improved wall-climbing system and device for handling form units in the construction of concrete wall structures for multi-story buildings.
Discussed herein are various wall-climbing concrete form lifting systems and devices.
The various wall climbing form hoist embodiments herein provide for an appreciable reduction both in the amount of labor and crane time required in the construction of multistory outside or inside concrete walls (including, for example, interior core shafts like stairwells and elevator shafts). The embodiments are efficient in operation to handle both the inside and the outside form units for the pouring and setting of successive lifts or horizontal wall sections and are readily adapted for handling form gangs. Various implementations are hydraulically operated and remotely controlled and include a platform or scaffold upon which workmen can be safely carried. Further, in these embodiments, a base or supporting frame carries the platform and the outer form unit. In addition, a plurality of extendable cylinders for raising the hoist are each surrounded by a tower mast.
In use, according to one embodiment, with the first two stories of the concrete wall structure previously constructed in any suitable manner, a plurality of support brackets are secured to the poured wall sections and the hoist is lifted in position by a crane or suitable alternative means to provide for the securement of the form hoist to the wall and the setting of the outer form unit and an inner form unit for a new pour. When the new pour has been completed and has set, the support frame is supported on jack support brackets and the extendable cylinders are used to move the hoist upwardly a story height. According to certain embodiments, the extendable cylinders move continuously during a raise and are controlled to accelerate or decelerate the movement of each extendable cylinder, as needed, to maintain alignment of the hoist throughout the raise. Once the support frame is raised to the next pour position, the upper support brackets are releasably secured to the freshly poured concrete wall and work can immediately commence to prepare for the next pour. Concurrently, once the freshly poured concrete has achieved the required strength, the jack brackets are released from the previously poured wall. The jack support brackets are then moved upwardly relative to the hoist by retracting the extendable cylinders and are subsequently secured to the freshly poured concrete. Once the formwork is ready, a new pour is then made and the cycle of operations repeated until a desired height of the wall structure is attained. In another embodiment of the invention, a crane is utilized to lower the climbing form hoist to the ground.
In Example 1, a self-climbing concrete wall form hoist for forming a concrete wall section atop a previously formed wall section comprises upper and lower wall mountings releasably secureable to the previously formed wall section, at least one moveable vertical mast, an extendable cylinder moveably coupled with the at least one mast, and a platform alternatively supported on the upper and lower wall mountings. The cylinder comprises a retracted position wherein the cylinder is disposed within the at least one mast and an extended position wherein the cylinder is extended from the at least one mast. The form hoist is cycleable between a platform raising position wherein the extendable cylinder is supported on the lower wall mounting, wherein the extendable cylinder is extendable into the extended position, whereby the platform is raised in relation to the concrete wall section, and a mast lower wall mounting raising position wherein the platform is supported on the upper wall mounting, wherein the extendable cylinder is retractable into the retracted position, whereby the lower wall mounting is raised in relation to the platform. Example 2 relates to the self-climbing concrete wall form hoist according to Example 1, further comprising a power unit coupled to the at least one moveable vertical mast, wherein the power unit is operably coupled to the extendable cylinder, wherein the power unit urges the extendable cylinder between the retracted and extended positions.
Example 3 relates to the self-climbing concrete wall form hoist according to Example 1, further comprising a control system operably coupled to the power unit, wherein the control system is configured to control operation of the power unit.
Example 4 relates to the self-climbing concrete wall form hoist according to Example 1, wherein the at least one moveable vertical mast comprises at least two moveable vertical masts, and the extendable cylinder moveably coupled with the at least one moveable vertical mast comprises at least two extendable cylinders, wherein a first of the at least two extendable cylinders is coupled to a first of the at least two vertical masts and a second of the at least two extendable cylinders is coupled to a second of the at least two vertical masts.
Example 5 relates to the self-climbing concrete wall form hoist according to Example 4, further comprising a first power unit coupled to a first of the at least two moveable vertical masts, wherein the first power unit is operably coupled to the first of the at least two extendable cylinders, wherein the first power unit urges the first extendable cylinder between the retracted and extended positions, and a second power unit coupled to a second of the at least two moveable vertical masts, wherein the second power unit is operably coupled to the second of the at least two extendable cylinders, wherein the second power unit urges the second extendable cylinder between the retracted and extended positions.
Example 6 relates to the self-climbing concrete wall form hoist according to Example 5, further comprising a control system operably coupled to at least the first and second power units, wherein the control system is configured to control operation of at least the first and second power units such that the control system causes at least the first and second power units to accelerate or decelerate to maintain a level alignment of the hoist platform throughout movement between the extended and retracted positions of the at least two extendable cylinders.
Example 7 relates to the self-climbing concrete wall form hoist according to Example 6, wherein each of the at least two extendable cylinders comprises a position sensor, wherein the control system is operably coupled to the position sensor such that the control system is configured to determine the necessary power for cylinder extension or retraction, wherein the control system is configured to control the at least two power units based on the necessary power.
Example 8 relates to the self-climbing concrete wall form hoist according to Example 6, wherein the control system is configured to synchronize operation of at least the first and second power units.
Example 9 relates to the self-climbing concrete wall form hoist according to Example 3, further comprising a controller unit in communication with the control system.
In Example 10, a self-climbing concrete wall form hoist comprises at least two extendable masts. Each of the at least two masts comprises a mast body comprising an interior cavity, an extendable cylinder moveably coupled to the mast body, a retracted position wherein the extendable cylinder is disposed within the interior cavity, and an extended position wherein the extendable cylinder is extended a predetermined length out of the mast body. The hoist also comprises a lower removable attachment mechanism releasably attachable to a previously formed concrete wall section, wherein the lower removable attachment mechanism is fixedly coupled to the extendable cylinder, an upper removable attachment mechanism releasably attachable to the previously formed concrete wall section, wherein the upper removable attachment mechanism is fixedly coupled to the mast body, a platform moveably attached to the at least one extendable mast, wherein the platform is disposed above the lower and upper removable attachment mechanisms, a platform raising position, wherein the lower removable attachment mechanism is attached to the previously formed concrete wall section, wherein the at least one extendable mast is extendable into the extended position such that the platform is raised in relation to the concrete wall section, a lower removable attachment mechanism mast raising position, wherein the upper removable attachment mechanism is attached to the previously formed concrete wall section, wherein the extendable cylinder is retractable into the retracted position such that the lower removable attachment mechanism is raised in relation to the platform, and a controller operably coupled to the at least two extendable masts, wherein the controller is configured to synchronize and control operation of the at least two extendable masts such that the controller causes the extendable cylinder of each of the at least two extendable masts to accelerate or decelerate to maintain a level alignment of the platform throughout movement between the extended and retracted positions.
Example 11 relates to the self-climbing concrete wall form hoist according to Example 10, wherein the extendable cylinder comprises a position sensor, wherein the position sensor is operably coupled to the controller.
Example 12 relates to the self-climbing concrete wall form hoist according to Example 10, wherein the extendable cylinder is a hydraulic cylinder.
Example 13 relates to the self-climbing concrete wall form hoist according to Example 12, wherein each of the at least two extendable masts comprises a hydraulic power unit operably coupled to the hydraulic cylinder, wherein the hydraulic power unit urges the hydraulic cylinder between the retracted and extended positions
Example 14 relates to the self-climbing concrete wall form hoist according to Example 13, further comprising a central power hub operably coupled to the hydraulic power unit of each of the at least two extendable masts.
Example 15 relates to the self-climbing concrete wall form hoist according to Example 10, wherein the controller causes the extendable cylinder of each of the at least two extendable masts to accelerate or decelerate without stopping to maintain the level alignment of the platform throughout movement between the extended and retracted positions.
In Example 16, a method of building a multi-story concrete structure comprises positioning a hoist system on a previously formed first concrete wall section. The hoist system comprises a first extendable mast comprising a first mast body and a first extendable cylinder moveably coupled to the first mast body, a second extendable mast comprising a second mast body and a second extendable cylinder moveably coupled to the second mast body, a platform moveably attached to the first and second extendable masts, a first lower removable attachment mechanism fixedly coupled to the first extendable cylinder, a second lower removable attachment mechanism fixedly coupled to the second extendable cylinder, a first upper removable attachment mechanism fixedly coupled to the first mast body, and a second upper removable attachment mechanism fixedly coupled to the second mast body. The method also comprises attaching the first and second upper removable attachment mechanisms to the first concrete wall section, forming a desired profile with formwork and pouring concrete into the formwork to add a second concrete wall section, attaching the first and second lower removable attachment mechanisms to the first concrete wall section, detaching the first and second upper removable attachment mechanisms from the first concrete wall section, extending the first and second extendable cylinders such that the first and second extendable masts and the first and second upper removable attachment mechanisms are extended upward a predetermined distance, attaching the first and second upper removable attachment mechanisms to the second concrete wall section, forming the desired profile with the formwork and pouring concrete into the formwork to add a third concrete wall section, detaching the first and second lower removable attachment mechanisms from the first concrete wall section, retracting the first and second extendable cylinders such that the first and second lower removable attachment mechanisms are raised upward until the first and second extendable cylinders are fully retracted, and attaching the first and second lower removable attachment mechanisms to the second concrete wall section.
Example 17 relates to the method according to Example 16, wherein the extending the first and second extendable cylinders comprises accelerating or decelerating the first and second extendable cylinders without stopping the first and second extendable cylinders, and the retracting the first and second extendable cylinders comprises accelerating or decelerating the first and second extendable cylinders without stopping the first and second extendable cylinders.
Example 18 relates to the method according to Example 16, further comprising maintaining a level alignment of the platform.
Example 19 relates to the method according to Example 18, wherein the maintaining the level alignment of the platform comprises actuating the first and second extendable cylinders with a controller to accelerate or decelerate to maintain the level alignment.
Example 20 relates to the method according to Example 18, wherein the maintaining the level alignment of the platform comprises monitoring with position sensors the extension length of the first and second extendable cylinders.
While multiple embodiments are disclosed, still other embodiments of the present invention will become apparent to those skilled in the art from the following detailed description, which shows and describes illustrative embodiments of the invention. As will be realized, the invention is capable of modifications in various obvious aspects, all without departing from the spirit and scope of the present invention. Accordingly, the drawings and detailed description are to be regarded as illustrative in nature and not restrictive.
The various implementations set forth herein relate to wall-climbing concrete form hoisting systems and devices for use in building concrete walls for various types of building structures, including, for example, multi-story buildings and similar structures.
As best shown in
The second deck 30 is referred to as the working deck 30 because much of the work performed during use of the hoist 10 to position and cycle the form panels used to construct the concrete structure 16 is performed by workers standing or otherwise positioned on the working deck 30. That is, the deck 30 provides easy access to the form panels 18 for preparing the panels 18 for pouring concrete and then disassembling or otherwise preparing the panels 18 for moving after the concrete has been poured. Further, a central power hub 40 is positioned on the working deck 30 and is coupled to the actuation pumps 52 coupled with the masts 14, as will be described in additional detail below. Alternatively, it is understood that the central power hub 40 need not be positioned on the working deck 30 and instead can be positioned on any deck level (including, for example, the lower deck 32 or the top deck 12).
According to the specific exemplary embodiment of
While this exemplary embodiment has two deck sections 44, 46, it is understood that, in various implementations in which the building structure 16 has no horizontal concrete slabs (or other structures) disposed through the interior thereof, there is no need for separate deck sections. As such, in those embodiments, the hoist 10 can have one working deck and one lower deck, both of which extend around and are disposed against all four interior walls of the structure.
The hoist 10 operates by being coupled to the concrete walls of the building structure 16 that is being constructed via the working deck 30 and the lower deck 32. More specifically, the hoist 10 is supported by two different sets of brackets that are systematically and alternately attached (as will be described in additional detail below) to the interior surface of the structure 16 walls (in this specific example, walls 16B and 16D, as discussed above) of the concrete structure 16 being constructed: support brackets 34 (supporting the working deck 30) and jack (or “lift”) support brackets 36 (supporting the lower deck 32), as best shown in
As mentioned above, each mast 14 has a lift cylinder 50 coupled thereto. That is, as best shown in
In certain embodiments, any lift cylinder 50 herein is a hydraulic cylinder 50 that operates hydraulically. Alternatively, rather than hydraulic actuation, the lift cylinder 50 can be operate via any form of actuation.
As best shown in
In accordance with certain embodiments, each lift cylinder 50 has a position sensor (not shown) disposed within the cylinder 50. The position sensor (not shown) is configured to track the position of cylinder 50 in relation to the mast 14 such that the length of any extension of the cylinder 50 from the mast 14 can be monitored. The sensor (not shown) is also operably coupled to a microcontroller in the associated power unit 52 (coupled to the mast 14 in which the cylinder 50 is disposed). According to one implementation, the sensor is a magnetostrictive, absolute, non-contact linear position sensor. Alternatively, the sensor can be any known position sensor that can operate as described herein.
Control of the power units 52 can be provided via any one of at least four different devices or methods. That is, according to various different embodiments, a user can control the units 52 via any of the following different controllers. One controller is a handheld controller (also referred to herein as a “pendant”) 60, as best shown in
In one embodiment, the controller 62 is operably coupled to the power units 52 (in some implementations via the central power hub 40) and thus to the microprocessors therein that are in communication with the position sensors described above. Alternatively, the controller 62 is operably coupled directly to the position sensors. Regardless, either the controller 62 in conjunction with the power units 52 and the sensors (not shown) or the power units 52 in conjunction with the sensors (not shown) can utilize information from the sensors (not shown) to speed up or slow down the relevant cylinders 50 and thereby maintain a level lift. It is understood that the central power hub 40 can also play a role in this process. In accordance with certain implementations, the combination of components herein can allow for more than just the function of maintaining the hoist 10 in a level disposition. That is, the controller 62 in conjunction with the power units 52 can also provide auto-levelling, increasing or decreasing the speed of the entire system, providing the same functionality in retract mode as extend mode, and allowing for multiple control options, and other such functionality. Thus, according to certain embodiments, the controller 62 and/or the central power hub 40 can function to not only control, but also synchronize, the operation of the two or more power units 52 to ensure that the hoist 10 has a level disposition while stationary and while being raised.
The hoist 10, in various embodiments, can have an automatic safety stop incorporated into the system. More specifically, the controller 62 is operably coupled to various sensors on the hoist 10 that can track individual loads, oil temperature, low oil reservoir, system pressure, damaging low voltage, and any other known parameters that can be sensed or tracked by sensors or other similar components. In such implementations, the controller 62 can be configured to trigger an automatic stop of the entire hoist 10 if any of the tracked parameters (such as those listed above) exceed or drop below a predetermined threshold. This automatic safety stop can reduce the risk of catastrophic failure and potential injury to workers on or around the hoist 10.
Returning to
In accordance with certain alternative embodiments as best shown in
In the specific exemplary embodiment herein as best shown in
As will be discussed in further detail below, the support brackets 34 are secured to the concrete structure 16 to support the hoist 10 (and more specifically, the working deck 30) when it is not being used to cycle the equipment to the next lift. That is, when the hoist 10 has been positioned as desired such that the working deck 30 is disposed adjacent to the form panels 18 and the panels 18 are at the appropriate height for pouring the concrete for the next section of the walls, the support brackets 34 are attached to the walls, thereby stabilizing and supporting the working deck 30.
In the implementation as depicted in
In use, the hoist 10 is used to construct a concrete building structure (like structure 16, for example) in the following manner. As an initial matter, prior to attachment of the hoist 10 to the structure 16, the first story of the concrete walls 16A, 16B, 16C, 16D is poured in any known conventional fashion. The first story of the structure 16 is poured first so that the walls 16A, 16B, 16C, 16D can receive the hoist 10 (that is, so that the hoist 10 can be attached thereto). (As an aside, it should be noted at this point that in
At this point, the support brackets 34 are releasably attached to the structure 16, thereby attaching the hoist 10 to the walls. That is, the support brackets 34 of the working deck 30 of the first deck section 44 are attached to the wall 16B, and the support brackets 34 of the working deck 30 of the second deck section 46 are attached to the wall 16D. At the same time, the top deck 12 is secured to the four masts 14. Once the brackets 34 have been secured to the walls and the top deck 12 has been secured to the masts 14 such that the hoist 10 is attached as desired (that is, such that the working deck 30 is supported by the brackets 34 so that workers can move around on the deck 30), all appropriate formwork and accessories are then attached to the hoist 10 so as to form the desired profile for the next story. Concrete can then be poured in the forms which are left in place until the concrete cures.
Returning to
Alternatively, as best shown in the alternative embodiment depicted in
Returning to the standard embodiment (in which the decks 30, 32 of the two sections 44, 46 move together and the lower decks 32 of both sections 44, 46 are in the raised position as shown in
Once the forms have been separated from the walls 16A, 16B, 16C, 16D and the hoist 10 prepared, the support brackets 34 are detached from the walls 16B, 16D, thereby detaching the working decks 30 of the two sections 44, 46 from the walls 16B, 16D as well. In one embodiment, to the extent that any shear of the bolts (or other attachment devices) of the support brackets 34 has made removal/detachment difficult, the lift cylinders 50 can be extended slightly to shift the working deck 30 upward slightly, thereby alleviating any such shear and making detachment of the support brackets 34 easier. Once the support brackets 34 and thus the working decks 30 have been successfully detached from the walls 16B, 16D, the extendable cylinders 50 of both sections 44, 46 are extended, causing the top deck 12 and the working decks 30 to move upward. When the top deck 12 and the working decks 30 reach the desired height (such that the working decks 30 are disposed at a height that allows the workers to prepare the form panels 18 for the next pour), the support brackets 34 are once again attached to the walls 16B, 16D, thereby attaching the working decks 30 to the walls 16B, 16D. At this point, the formwork and any required ties, yokes, anchors and bolts can be installed in preparation for pouring the next section of concrete. Thus, as in every embodiment disclosed or contemplated herein, extension of the cylinders 50 raises the masts 14, the upper deck(s) 30, and the top deck 12, while the lower deck (or decks) 32 is attached to the walls 16B, 16D and thus remains stationary during the raising of the upper deck(s) 30 and the top deck 12.
Once the support brackets 34 are firmly secured to concrete walls 16B and 16D, the lower deck 32 can then be raised, as shown in
According to any of the implementations disclosed or contemplated herein, the retraction and extension of the cylinders 50 as described herein can occur without the cylinders 50 stopping during the retraction or extension thereof. In other words, the cylinders 50 in certain embodiments accelerate or decelerate, rather than coming to a full stop, during the retraction or extension of the cylinders. By eliminating the stopping and restarting of the cylinders 50 during the retraction or extension thereof, the raising of the lower deck 32 or the upper deck 30 and top deck 12 occurs more smoothly than is possible if the cylinders 50 were coming to full stops at any point during the retraction or extension thereof. The smooth movement of the hoist 10 results in a smoother ride for the operator and any other workers on the hoist 10.
This cycle is repeated for each new floor of the structure 16 until the desired number of floors of the structure have been poured. Once the full height of the walls is poured, the wall climbing form hoist 10 is typically removed from the building structure 16 by a crane or similar device or procedure. Alternatively, the form hoist 10 can be lowered down the structure 16 in a set of cycles that are generally simply a reverse of the steps used to climb up the structure 16. That is, according to one embodiment of the climbing form hoist 10, the movement of the form hoist 10 to a downward position may be effectuated under its own power rather than being removed from the structure 16 by a crane.
In accordance with certain embodiments, the cycling of the concrete wall attachment between the support brackets (such as brackets 34) and the jack brackets (such as brackets 36) allows for the various hoist embodiments (such as hoist 10) disclosed or contemplated herein to operate without any delays or waiting periods to allow the concrete to cure. More specifically, the jack brackets (such as brackets 36) remain attached to the cured concrete that was placed prior to the freshly poured (and thus not yet cured) concrete, thereby making it possible to continue use of the hoist 10 and work thereon without any downtime to allow for the concrete to cure. Generally, the cured concrete poured before the new concrete has matured for several days and thus is capable of supporting the loads that can be generated by the hoist embodiments disclosed or contemplated herein (such as hoist 10). Thus, once the forms are stripped after a pour, the hoist 10 can immediately be raised to the next story, substantially reducing the time to cycle the system after the fresh concrete has been poured in comparison to known systems that require such a delay. The time savings due to not having to wait for the concrete to cure after a pour has a significant impact on a project's completion schedule and the resulting associated cost.
Although the present invention has been described with reference to preferred embodiments, persons skilled in the art will recognize that changes may be made in form and detail without departing from the spirit and scope of the invention.
This application claims the benefit under 35 U.S.C. § 119(e) to U.S. Provisional Application 62/683,187, filed Jun. 11, 2018 and entitled “Concrete Forming System,” and U.S. Provisional Application 62/683,776, filed Jun. 12, 2018 and entitled “Concrete Forming System,” both of which are hereby incorporated herein by reference in their entireties.
Number | Date | Country | |
---|---|---|---|
62683187 | Jun 2018 | US | |
62683776 | Jun 2018 | US |