The present invention relates to a method of controlling at least one transmission parameter of a connection between a transmitting station and a receiving station in a communication system. The invention relates further to an arrangement in a communication system and to a receiving station for use in a communication system.
In a mobile telecommunication system, such as a CDMA (Code Division Multiple Access) or WCDMA (Wide-band CDMA) or TDMA (Time division Multiple Access) system, transmission power levels between a base station (BS) and a mobile station (MS) associated with said BS can be continuously adjusted during an ongoing connection between the BS and the MS. This is done in order to provide a sufficient quality for the required transmission power levels as low as possible at the same time. By means of this it is possible to avoid “wasting” any network resources and MS battery resources, and to enable as great a number of mobile stations as possible to communicate simultaneously with the same BS having only limited power resources.
One system of power control is based on Power Control (PC) commands transmitted from one station to another to cause the other station to alter its power. The commands can be transmitted e.g. in a WCDMA closed loop. The closed loop power control mechanism between the BS and MS is used for equalising the power of signals from the MS at the BS input and also for compensating fast power deviations from the nominal level. These closed loop PC (CL PC) commands can be sent both in the uplink (towards the base station) and in the downlink (towards the mobile station), whereafter the BS or the MS will process the received command and reduce/increase its transmission power towards the receiving station (i.e. MS or BS respectively) accordingly.
For example, in the currently proposed WCDMA system it is envisaged that an outer loop PC generated by a radio network controller (RNC) of the WCDMA system will attempt to set the connection quality target (that the closed loop follows) of a physical connection between the BS and MS to be such that the required FER (Frame Error Ratio) target of the connection is met with a minimal connection quality target. The connection quality target can be announced e.g. by means of a so called Eb/No (Signalling Energy/Noise) target or SIR (signal to Interference Ratio) target or a similar parameter indicating some quality measurement for the connection. The relationship is such that the connection quality target (e.g. the SIR target) has to be set such that the FER remains at an appropriate level. The actual connection quality value (e.g. SIR) is then adjusted in accordance with the target value, and should follow any changes in the target value. The idea behind this is that by increasing the connection quality target value the connection quality will increase and the FER will improve.
However, if the FER target cannot be met due to e.g. a limitation in the available transmission power when severe interference or attenuation is predicted, the connection quality target will start increasing even though this rise in the connection quality target will not help in causing a better connection between the MS and the BS. If the power limitation is caused by a temporary lack of power caused by a condition such as slow fading or a temporarily weak connection (if, for instance, the MS is situated temporarily in a tunnel or cellar), the quality target will be unnecessarily high once this condition has been removed. This will result in an excessively high transmitted power until the quality target has returned to its normal (appropriate) level. At the BS side this unnecessarily used power resource could be used for transmission towards other mobile stations. At the MS side this will lead among other things, to unnecessary high power consumption and to a possible disturbance to other radio and/or electronic devices.
To give a more precise example, if the BS runs out of power (i.e. a power limitation situation occurs), then the mobile station MS will experience a higher FER than the set FER target. This will result (if not limited by some means) in an unlimited rise of the SIR target value. In accordance with one exemplifying possibility the average rate per frame of this rise can be given by the formula.
rise_per_frame=(FER−FERth) step_size
Thus, if the actual FER is 2%, the FER target is 1% and the step size is 0.5 dB the SIR target will in ten seconds (1000 frames) be raised by 1%*1000*0.5 dB=5 dB, which can be considered to be a substantial rise. If the higher FER has been caused by e.g. shadowing and the situation changes suddenly the SIR target will be much too high for a while after this condition ends. In this specific example, the SIR target would decrease gradually back to its appropriate value in approximately 5/0.0005=1000 frames=10 seconds.
Earlier proposals to solve this problem have been based on setting absolute limits on the values of the quality targets. There are, however, some problems associated with this type of solution. Firstly, the set absolute limits have to be relatively loose due to the variations in the required quality target for satisfactory quality of the communication. Secondly, the setting of absolute limits for the MS is problematic due to the fact that the absolute value of the quality value setpoint depends heavily on the used estimation method.
The embodiments of the present invention aim to at least partially overcome one or several of the disadvantages of the prior art proposals in avoiding an undesired and/nt in the air interface between the transmitting and receiving station.
According to a first aspect, the invention provides a method of controlling at least one transmission parameter of a connection between a transmitting station and receiving station in a communication system comprising:
According to a second aspect the invention provides an arrangement for controlling at least one transmission parameter of a connection between a transmitting station and a receiving station in a communication system comprising:
According to a further aspect, the invention provides a receiving station for use in a communication system, comprising:
In a more specific embodiment a transmission power level parameter is also changed. A still more specific embodiment comprises transmitting power control commands between the transmitting station and the receiving station, said power control commands including either the power up or the power down request in accordance with the determined requirement, wherein the step of monitoring the distribution of the power up and the power down requirements comprises monitoring the requests derived from the power control commands. According to one alternative the form of the distribution of the power up and the power down requirements is defined on basis of variations in the Signal Interference Ratio (SIR) target. The transmitting station can be a base station and the receiving station a mobile station, or then vice versa. Said determining of the power up requirement or power down requirement and said monitoring of the distribution can be accomplished at the receiving station, or then said determining of the power up requirement or power down requirement is accomplished at the receiving station and said monitoring of the distribution is accomplished at the transmitting station. The step of changing the transmission parameter may comprise returning the transmission parameter to a predefined or default value. At least some of parameters controlling the transmission parameter of the connection can be transmitted to the receiving and/or transmitting station using mobile networks apparatus. In addition, it is possible to use at least two different sets of control parameters simultaneously when controlling the connection.
Several advantages are obtainable by means of the embodiments of the present invention, as they provide a new type of solution for controlling the connection between transmitting and receiving stations, and for instance, for controlling the connection quality target and/or power levels used for the transmission. By means of the proposed embodiments it is possible to prevent unnecessary high power levels after a temporality weak connection has returned to its normal quality. It is also possible to prevent unnecessary rise in the power level the receiving station asks from the transmitting station in case where it is not possible for the transmitting station to provide any more power.
The invention and other objects and advantages thereof will now be explained in an exemplifying manner with reference to the annexed drawings, in which:
The BS transmits to each of the mobile stations MS with a power level that is adjusted in accordance with, for example, a Power Control (PC) command or similar message received from each of the respective mobile stations MS, that is, the transmission power levels can be different at a given moment between the base station BS and each of the respective mobile stations MS. Correspondingly, each MS transmits towards the BS with a power level adjusted in accordance with particular PC commands transmitted by the BS to that precise MS. For example, in the proposed WCDMA system the PC commands would be transmitted in a WCDMA closed loop. In order to be able to accomplish this functionality, both the BS and the MS are equipped with appropriate control and processing units.
The base station includes further a control unit 11. Control unit 11 is arranged to control the received power control commands or similar messages and to monitor the distribution of the power up and power down requests, as will be explained later. It is noted that even though this example shows the controller and the monitoring facility as a single unit 11, they could also be in the form of separated units. It is also to be appreciated that the single unit could also comprise the power up/power down control and/or any other possible control functionalities a transmitting station controller may have. It is noted that the MS may comprise similar functionalities and that monitoring can also be done at the mobile station of
The PC command from the MS and received at the BS may indicate that the transmission power level toward the MS (the receiving station in this example) should go up (power up) or that the transmission power level should go down (power down). In normal operation conditions the average distribution between the determined power up and power down situations should be about 50/50 within a certain predefined period, such a 100 frames or 100 seconds. If the form of the distribution within the period deviates from this, e.g. such that there are 80 requests for “up” and only 20 “down”, this 80/20 distribution indicates that for some reason the connection does not meet the quality requirements and that the receiving station (for instance, the control unit, such as a CPU 1, of the mobile station of
The need for sending a power up or a power down request is determined on the basis of monitoring the quality of the received transmission signal at the receiving station (i.e. either at the BS or the MS). This determination can, for example, be based on monitoring whether the FER (Frame Error Ratio) meets the FER target or not. If not, the SIR (Signal to Interference Ratio) target is raised, and subsequently a power up request is formed and transmitted to the transmitting station in order to improve the quality of the received transmission by increasing the transmission power of the connection. However, if the transmitting station cannot respond to this request, the result is that the receiving station will still suffer from a bad quality connection, and in order to correct the situation it will increment the power requirement e.g. by 0.5 dB. As already explained, this will only lead to an unwanted rise in the target value, and the correction of this “unnatural” situation may take some time.
As disclosed by the flow chart of
One algorithm which can be used here is in pseudocode as follows.
SIR_old=SIR_target (n)
Calculate the average amount of transmitted “up” commands during a period of k frames. Then
The threshold values can be set in accordance with predefined control parameters to achieve satisfactory performance. According to one possibility, the control parameters used in the algorithms can be sent to each BS of the system over an Iub interface and/or over the air interface from the BS to the MS. The control parameters can also be centrally updated e.g. by the network operator, e.g. in the case that more/less transmission power resources become available, either temporarily or permanently. Instead of having the control unit within the receiving station, the control unit for this can also be situated in another network or there could be separate control units interfacing the network including the receiving and the transmitting stations.
As can be seen from the above algorithm, when the control unit of the receiving station determines that the form of the distribution deviates more than is allowed from the average distribution, it will immediately return the SIR_target to the predefined SIR_old value, whereafter the operation will continue from this default value, and thereby excessively high target values are avoided in case of limited transmission power and the power level is returned rapidly into a minimal appropriate level should the connection conditions suddenly improve. Even though the quality of the connection does not become better as such by means of this proposal, it does help in removing problems relating to an excessive increase of the target value.
According to one embodiment, if the above algorithm determines the SIR target increase at the BS, this action shall be reported to the radio network controller designated by 12 in
It should be noted, that this type of algorithm can also be used in a concatenated form, i.e. two or more different sets of control parameters can run in parallel. In practice this can be implemented e.g. such that there are two monitoring periods, a shorter one and a longer one, wherein the arrangement is such that in the shorter monitoring period the control parameters are set such that a greater deviation in the distribution is allowed, while the longer period averaging a greater amount of frames allows a smaller amount of deviation in the distribution. By means of using several sets of control parameters it is possible to improve further the system's sensitivity for different types of variations and/or disturbances in the connection.
At present the proposed solution as such is believed to be preferably applicable at the MS end, considering current implementation of network functionalities. However, the solution can be equally implemented at the BS side as well or instead without departing from the scope of the idea. In addition, even though the preferred implementation at the moment is such that the determining of the need for power up or power down requirements and the monitoring of the distribution thereof are both accomplished at the receiving station, this can also be implemented such that only said determining step of the need for power up or power down is accomplished at the receiving station and said monitoring of the distribution is then accomplished at the transmitting station subsequent to having received the power up/power down commands or similar indication of the changed power requirements. In the latter alternative the transmitting station can then, for example, purely ignore the power up requests without any further processing after having detected a deviation in the distribution exceeding a threshold value, or immediately drop the transmitting power in case a power down biased distribution is recognised.
In addition to the deviation of the average, the monitored form of the distribution can also be, for instance, a certain pattern of the power up and power down requirements indicating some special air interface condition. After having detected a predefined form of subsequent power up and power down requirements, the system may change the predefined transmission parameter, such that the quality target or the power level in accordance with predefined parameter values, such as return the quality target or power level to a default (lower) value or to increase the target or power level by more than one “normal” step at once or then “freeze” the parameter to a certain value for some time. This type of distribution form detection can also form part of the concatenated solution whereby the transmission parameter adjustment will be based simultaneously both on the distribution deviation detection and on the distribution pattern detection.
If the adjustment system is biased e.g. such that it will automatically lower the power level or the quality target if no power up requests are received, the form of distribution used in the proposed solution can then be derived from the proportion between the received power up requests and the power down status.
In the simulation the PC commands were averaged on 20 frames periods (320 PC commands), and the threshold1 was set to equal 0.6. These parameters leave 0.2×320=64 PC command margin for the UP commands, i.e. the power can rise 64 dB during the average period without the algorithm giving a false alarm (in case the PC commands are otherwise error free). The channel was a 2-tap channel with antenna diversity (uncorrelated antennas) and the used channel speed was 3 km/h.
As can be seen from
Thus the invention provides a clear advantage over the prior art proposals, as it enables more rapid and dynamic response to the changed transmission conditions and makes it possible to avoid unwanted increases in the connection quality target values in cases where it is not possible to receive any more transmission power.
It is noted herein that while the above describes some embodiments of the present invention there are several variations and modifications which may be made to the disclosed solution without departing from the spirit and scope of the present invention as defined in the appended claims.
Number | Date | Country | Kind |
---|---|---|---|
9919595 | Aug 1999 | GB | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/EP00/08145 | 8/17/2000 | WO | 00 | 8/2/2002 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO01/13536 | 2/22/2001 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
5056109 | Gilhousen et al. | Oct 1991 | A |
5621723 | Walton, Jr. et al. | Apr 1997 | A |
5623484 | Muszynski | Apr 1997 | A |
5722051 | Agrawal et al. | Feb 1998 | A |
5812938 | Gilhousen et al. | Sep 1998 | A |
5835527 | Lomp | Nov 1998 | A |
5862489 | Aalto | Jan 1999 | A |
5914947 | Saito | Jun 1999 | A |
5924043 | Takano | Jul 1999 | A |
6032026 | Seki et al. | Feb 2000 | A |
6373823 | Chen et al. | Apr 2002 | B1 |
6405052 | Faber | Jun 2002 | B1 |
6490461 | Muller | Dec 2002 | B1 |
6493541 | Gunnarsson et al. | Dec 2002 | B1 |
6529482 | Lundby | Mar 2003 | B1 |
Number | Date | Country |
---|---|---|
0682417 | Nov 1995 | EP |
0709973 | May 1996 | EP |
0822672 | Feb 1998 | EP |
9726716 | Jul 1997 | WO |
0052846 | Sep 2000 | WO |