Abstract
A system for connecting flow interface equipment to a subsea manifold is disclosed. The system relates particularly to an apparatus adapted to inject fluids into a well having a flow bore. The system includes a connection apparatus adapted to land a conduit means on a subsea manifold and to connect a conduit means of the connection apparatus to a choke body of the manifold.
Description
BACKGROUND

This invention relates in general to subsea well production, and in particular to a connection system for connecting flow interface equipment, such as a pump to a subsea Christmas tree assembly.


DESCRIPTION OF RELATED ART

A subsea production facility typically comprises a subsea Christmas tree with associated equipment. The subsea Christmas tree typically comprises a choke located in a choke body in a production wing branch. There may also be a further choke located in an annulus wing branch. Typically, well fluids leave the tree via the production choke and the production wing branch into an outlet flowline of the well. However, in such typical trees, the fluids leave the well unboosted and unprocessed.


BRIEF SUMMARY

According to a first aspect of the present invention there is provided an apparatus for connecting to a subsea wellbore, the wellbore having a manifold and a choke body, the apparatus comprising: a frame adapted to land on the manifold; a conduit system having a first end for connection to the interior of the choke body and a second end for connection to a processing apparatus; wherein the conduit system comprises a conduit means supported by the frame; wherein the frame comprises at least one frame member that is adapted to land on the manifold in a first stage of the connection and wherein the conduit means is adapted to be brought into fluid communication with the interior of the choke body in a second stage of the connection.


The two-stage connection provides the advantage that damage to the mating surfaces between the conduit means and the flow line of the tree assembly can be avoided whilst the frame is being landed, since at least a part of the frame is landed before the connection between the conduit means and the interior of the choke body is made up. Hence, the two-stage connection acts to buffer and protect the mating surfaces. The two-stage connection also protects the choke itself from damage whilst the frame is being landed; in particular, the mating surface of the choke is protected.


In some embodiments, processing apparatus e.g. multi-phase flow meters and pumps can be mounted on the frame and can be landed on the tree with the frame. Alternatively, the processing apparatus may be located remote from the tree, e.g. on a further subsea installation such as a manifold or a pile, and the frame may comprise connections for jumper conduits which can lead fluids to and from the remote processing apparatus.


The processing apparatus allows well fluids to be processed (e.g. pressure boosted/injected with chemicals) at the wellhead before being delivered to the outlet flowline of the well. The invention may alternatively be used to inject fluids into the well using the outlet flowline as an inlet.


Often the processing apparatus, e.g. subsea pump, is flow meter, etc. is quite heavy and bulky. In embodiments where heavy/bulky apparatus is carried by the frame, the risk of damage to the mating surfaces between the conduit means and the flow line of the tree assembly is particularly great.


Optionally, the apparatus further comprises an actuating means mounted on the frame, the actuating means being adapted to bring the conduit means into fluid communication with the interior of the choke body. Typically, the actuating means comprises at least one hydraulic cylinder. Alternatively, the actuating means may comprise a cable or a screw jack which connects the conduit means to the frame, to control the movement of the conduit means relative to the frame.


The conduit means is not necessarily brought into direct communication with the choke body. In some embodiments (the first embodiment and the third embodiment below), the conduit means is connected with the interior of the choke body via a further, secondary conduit.


In a first embodiment, a mounting apparatus is provided for landing a flow interface device, particularly a subsea pump or compressor (referred to collectively at times as “pressure intensifier”) on a subsea production assembly.


Optionally, the at least one frame member of the first connection stage comprises a lower frame member, and the apparatus further comprises an upper frame member, the upper frame member and the lower frame member having co-operating engagement means for landing the upper frame member on the lower frame member.


In the first embodiment, a secondary conduit in the form of a mandrel with a flow passage is mounted to the lower frame member. The operator lowers the lower frame member into the sea and onto the production assembly. The production assembly has an upward facing receptacle that is sealingly engaged by the mandrel.


In this embodiment, the conduit means comprises a manifold, which is mounted to the upper frame member. The manifold is connected to a flow interface device such as a pressure intensifier, which is also mounted to the upper frame member. The operator lowers the upper frame member along with the manifold and pressure intensifier into the sea and onto the lower frame member, landing the manifold on the mandrel. During operation, fluid flows from the pressure intensifier through the manifold, the mandrel, and into the flow line.


Preferably, the subsea production assembly comprises a Christmas tree with a frame having guide posts. The operator installs extensions to the guide posts, if necessary, and attaches guidelines that extend to a surface platform. The lower and upper frame members have sockets with passages for the guidelines. The engagement of the sockets with the guide posts provides gross alignment as the upper and lower frame members are lowered onto the tree frame.


Also, preferably the Christmas tree frame has upward facing guide members that mate with downward facing guide members on the lower frame member for providing finer alignment. Further, the lower frame member preferably has upward facing guide members that mate with downward facing guide members on the upper frame member for providing finer alignment. One or more locking members on the lower frame member lock the lower frame member to the tree frame. Additionally, one or more locking members on the upper frame member lock the upper frame member to the lower frame member.


Optionally, the apparatus further comprises buffering means provided on the frame, the buffering means providing a minimum distance between the frame and the tree.


The buffering means may comprise stops or adjustable mechanisms, which may be incorporated with the locking members, or which may be separate from the locking members.


The adjustable stops define minimum distances between the lower frame member and the upper plate of the tree frame and between the lower frame member and the upper frame member.


The buffering means typically comprise threaded bolts, which engage in corresponding apertures in the frame, and which can be rotated to increase the length they project from the frame. The ends of the threaded bolts typically contact the upper frame member of the tree, defining a minimum distance between the frame and the tree.


Optionally, a further buffering means is provided between the lower and upper frame members to define a minimum distance between the lower and upper frame members. The further buffering means also typically comprises threaded bolts which extend between the lower and upper frame members. The extent of projection of the threaded bolts can be adjusted to provide a required separation of the upper and lower frame members.


The buffering means (e.g. the adjustable stops) provides structural load paths from the upper frame member through the lower frame member and tree frame to the tree and the wellhead on which the tree is mounted. These load paths avoid structural loads passing through the mandrel to the upward facing receptacle (i.e. the choke body).


In a second embodiment, the frame is lowered as a unit, but typically has an upper portion (an upper frame member) that is vertically movable relative to the lower portion (a lower frame member). A processing apparatus (in the form of a pressure intensifier) and a conduit means (a mandrel) are mounted to the upper portion. An actuating means comprising one or more jack mechanisms is provided between the lower and upper portions of the frame. When the lower portion of the frame lands on the tree frame, the lower end of the mandrel will be spaced above the flow line receptacle. The jack mechanisms then lower the upper portion of the frame, causing the mandrel to stab sealingly into the receptacle (the choke body). Thus, in this embodiment, the conduit means comprises a single mandrel having a single flowpath therethrough.


In a third embodiment, the conduit means has a flexible portion. Preferably, the flexible portion is moveable relative to the frame. Typically, the flexible portion of the conduit means is fixed relative to the frame at a single point. Typically, the flexible portion of the conduit means is connected to the processing apparatus and supported at the processing apparatus connection, in embodiments where the processing apparatus is supported on the frame.


Optionally, the conduit means comprises two conduits, one of which is adapted to carry fluids going towards the processing apparatus, the other adapted to carry fluids returning from the processing apparatus. Typically, each of the two conduits of the conduit means is fixed relative to the frame at a respective point. Typically, the flexible portion of each of the two conduits of the conduit means is connected to the processing apparatus and is supported at the processing apparatus connection (where a processing apparatus is provided on the frame).


Typically, the flexible portion of the conduit means is resilient. Typically, the direction of movement of the flexible portion of the conduit means in the second stage of the connection defines an axis of connection and the flexible portion of the conduit means is curved in a plane perpendicular to the axis of connection to provide resilience in the connection direction. In such embodiments, the flexible portion of the conduit means is in the form of a coil, or part of a coil. This allows the lower end of the conduit means (the connection end) to be moved resiliently in the connection direction.


Typically, the flexible portion of the conduit means supports a connector adapted to attach to the choke body (either directly or via a further conduit extending from the choke body), the flexible portion of the conduit means allowing relative movement of the connector and the frame to buffer the connection.


Typically, an actuating means is provided which is adapted to move the flexible portion relative to the frame to bring an end of the flexible portion into fluid communication with the interior of the choke body. The actuating means typically comprises a swivel eye mounting hydraulic cylinder.


Considering now all embodiments of the invention, the conduit system may optionally provide a single flowpath between the choke body and the processing apparatus.


Alternatively, the conduit system provides a two-flowpath system: a first flowpath from the choke body to the processing apparatus and a second flowpath from the processing apparatus to the choke body. In such embodiments, the conduit system can comprise a housing and an inner hollow cylindrical member, the inner cylindrical member being adapted to seal within the interior of the choke body to define a first flow region through the bore of the cylindrical member and a second separate flow region in the annulus between the cylindrical member and the housing.


Typically, the first and second flow regions are adapted to connect to a respective inlet and an outlet of the processing apparatus.


Such embodiments can be used to recover fluids from the well via a first flowpath, process these using the processing apparatus (e.g. pressure boosting) and then to return the fluids to the choke body via a second flowpath for recovery through the production wing branch. The division of the inside of the choke body into first and second flow regions by the inner cylindrical member allows separation of the first and second flowpaths within the choke body.


If used, the housing and the inner hollow cylindrical member typically are provided as the part of the conduit system that directly connects to the choke body, i.e. in the first embodiment, this is the secondary conduit; in the second embodiment, the conduit means, and in the third embodiment, the secondary conduit.


Optionally, the processing apparatus is provided on the frame. In this case, the processing apparatus is typically connected to the conduit means before the frame is landed on the tree.


Alternatively, the processing apparatus is provided on a further subsea manifold, such as a suction pile. Jumper cables can be connected between the frame on the manifold and the further subsea manifold to connect the processing apparatus to the conduit system. In this case, the processing apparatus is typically connected to the conduit means as a final step.


In all embodiments, the frame typically includes guide means that co-operate with guide means provided on the manifold, to align the frame with the manifold. The frame may also or instead comprise a guide pipe that surrounds at least a part of the conduit system, to protect it from impact damage.


All embodiments use the space inside the choke body after the choke bonnet has been removed and the choke withdrawn. However, it may still be desirable to be able to use a choke to control the fluid flow. Optionally, a replacement choke is provided on the frame, the replacement choke being connectable to the conduit system.


Embodiments of the invention can be used for both recovery of production fluids and injection of fluids.


According to a second aspect of the present invention there is provided a method of connecting a processing apparatus to a subsea wellbore, the wellbore having a manifold and a choke body, the method comprising: landing a frame on the manifold and connecting a conduit system between the choke body and the processing apparatus, the frame supporting a conduit means of the conduit system; wherein the frame comprises at least one frame member that is landed on the manifold in a first connection stage, and wherein the conduit means is brought into fluid communication with the interior of the choke body in a second connection stage.


The method typically includes the initial steps of removing the choke bonnet and connecting the secondary conduit to interior of the choke body.


The choke bonnet is removed and the secondary conduit may be installed by choke bonnet changing equipment (e.g. the third embodiment). Alternatively, the secondary conduit may be supported on the lower frame member and may be installed when the lower frame member is landed on the manifold (e.g. the first embodiment).


According to a third aspect of the present invention there is provided an apparatus for connecting to a subsea wellbore, the wellbore having a manifold and a choke body, the apparatus comprising: a frame having a conduit system, the frame being adapted to land on the tree, the conduit system including a first end which is adapted to connect to the choke body such that the conduit is in fluid communication with the interior of the choke body, and a second end connectable to a processing apparatus; wherein the frame comprises buffering means adapted to buffer the connection between the first end of the conduit system and the choke body.


In the first embodiment, the buffering means may be provided by the adjustable stop means, which provide structural load paths from the upper frame member through the lower frame member and tree frame to the tree and the wellhead on which the tree is mounted which avoid structural loads passing through the mandrel to the choke body.


In the second embodiment, the buffering means is typically provided by the arrangement of the upper and lower frame members, the upper frame member being moveable to lower the mandrel (the conduit means) into connection with the choke body in a controlled manner, only after the frame has been landed.


In the third embodiment, the buffering means may be provided by the flexible portion of the conduit means, which allows movement of the conduit end that connects to the secondary conduit. Therefore, the connection end of the conduit means will not heavily impact into the secondary conduit as it is able to deflect as necessary, using the flexibility of the conduit means, and can optionally be maneuvered for even greater control (e.g. by an actuating mechanism).


According to a fourth aspect of the present invention there is provided an apparatus for connecting to a subsea wellbore, the wellbore having a manifold and a choke body, the apparatus comprising: a frame adapted to land on the manifold; a conduit system having a first end for connection to the choke body and a second end for connection to a processing apparatus; wherein at least a part of the conduit system is supported by the frame; wherein the conduit system comprises at least one flexible conduit having an end that is moveable relative to the frame to make up a communication between the processing apparatus and the choke body. In such embodiments, the end of the flexible conduit can deflect if it impacts with the choke body (or any secondary conduit extending from the choke body). Thus in such embodiments, the flexible conduit ensures that the load carried by the frame is not transferred to the choke body.





BRIEF DESCRIPTION OF THE DRAWINGS

Embodiments of the invention will now be described, by way of example only, and with reference to the following drawings, in which:



FIG. 1 is an elevational view of a subsea tree assembly, partially in section, and showing an apparatus for connecting a flow interface to a subsea wellbore;



FIG. 2 is an enlarged view, partially in section, of a choke body of the tree assembly and a lower portion of a mandrel of the apparatus of FIG. 1;



FIG. 3 is a top view of the tree frame of FIG. 1, with the connecting apparatus for the flow interface device removed;



FIG. 4 is a top view of a lower frame member of the connecting apparatus of FIG. 1;



FIG. 5 is a sectional view of the lower frame member of FIG. 4, taken along the line 5-5 of FIG. 4;



FIG. 6 is a top view of an upper frame member of the connecting apparatus of FIG. 1;



FIG. 7 is a partially sectioned view of the upper frame member of FIG. 6, taken along the line 7-7 of FIG. 6;



FIG. 8 is a schematic view of an alternate embodiment of a connecting system, shown prior to landing on the subsea tree assembly;



FIG. 9 is a schematic view of the mounting system of FIG. 8, with a lower frame member of the connecting system landed on the subsea tree assembly and the upper frame member in an upper position;



FIG. 10 is a schematic view of the subsea tree assembly and the connecting system of FIG. 8, with the upper frame member in a lower position;



FIG. 11 is a side view with interior details of a third embodiment of the invention;



FIG. 12 is an enlarged view in cross-section of a portion A of the FIG. 11 embodiment;



FIG. 13 is a plan view of the FIG. 11 embodiment;



FIGS. 14A, B, C, and D show a series of views with cross-sectional details showing the FIG. 11 apparatus being installed on a manifold;



FIG. 15 shows an enlarged view of FIG. 14D;



FIG. 16 shows a side view of an embodiment similar to that of FIG. 11, the frame also supporting a replacement choke; and



FIG. 17 shows an alternative embodiment similar to that of FIG. 16, wherein an actuating means is provided to control the movement of a conduit means.





DETAILED DESCRIPTION

Referring to FIG. 1, production assembly 11 in this example includes a subsea Christmas tree 13. Christmas tree 13 is a tubular member with a tree connector 15 on its lower end that connects to a wellhead housing (not shown) located on the sea floor. Tree 13 may be conventional, having a vertical bore with a master valve 17 and a swab valve 19. A production passage in tree 13 leads laterally to a production wing valve 21. Tree 13 may be either a type having a tubing hanger landed within, or it may be a type in which the tubing hanger lands in the wellhead housing below the tree.


A production choke body or receptacle 23 mounts to production wing valve 21. Choke body 23 comprises a housing for a choke insert (not shown) that is adjustable to create a back pressure and a desired flow rate. Choke body 23 connects to a production flow line 25 that leads to sea floor processing equipment or directly to a production facility at sea level. After being installed with a pressure intensifier, as will be subsequently explained, a choke insert may not be required. One use for the connecting apparatus of this invention is to retrofit existing trees that have previously operated without a pressure intensifier.


Tree 13 may also have an annulus valve 27 that communicates with a tubing annulus passage (not shown) in the well. An annulus choke 29 connects to annulus valve 27 for controlling a flow rate either into or out of the tubing annulus. Annulus choke 29 is normally located on a side of production assembly 11 opposite production choke body 23. Annulus choke 29 has a body with a choke insert similar to production choke body 23.


A tree cap 31 releasably mounts to the upper end of tree 13. A tree frame 33 extends around tree 13 for mounting various associated equipment and providing protection to tree 13 if snagged by fishing nets. Tree frame 33 is structurally connected to the body of tree 13, such that weight imposed on tree frame 33 transfers to tree 13 and from there to the wellhead housing (not shown) on which tree 13 is mounted. Tree frame 33 has an upper frame member portion or plate 35 that in this instance is located above swab valve 19 and below tree cap 31. Upper plate 35 surrounds tree 13, as shown in FIG. 3, and is generally rectangular in configuration. Tree frame upper plate 35 has a cutout 36 that provides vertical access to choke body 23 and a cutout 38 that provides vertical access to annulus choke 29.


As shown in FIG. 3, preferably tree frame upper plate 35 has a plurality of guide members 37. Guide members 37 may vary in type, and prior to retrofitting with a pressure intensifier, were used to land equipment for retrieving and replacing the choke insert (not shown) in choke body 23 and in annulus choke 29. Although some subsea trees do not have any type of guide members, many do, particularly trees installed during the past 10-15 years. In this example, each guide member 37 comprises an upward facing cylinder with an open top. Guide members 37 are mounted in pairs in this example with a locking member 39 located between them. Locking member 39 has a latch that latches onto a locking member inserted from above. Four separate sets of guide members 37 are shown in FIG. 3, with one set located on opposite sides of cutout 36 and the other sets on opposite sides of cutout 38.



FIG. 3 also shows a control pod receptacle 40 that may be conventional. Control pod receptacle 40 has guide members 37 and locking members 39 for landing an electrical and hydraulic control pod (not shown) lowered from sea level. A plurality of guide posts 41 are located adjacent sides of tree frame 33. Typically, each guide post 41 is located at a corner of tree frame 33, which is generally rectangular in configuration. Only one guide post 41 is shown in FIG. 1, but the other three are the same in appearance. The existing guide posts 41 likely may not be long enough for the retrofit of a pressure intensifier in accordance with this invention. If so, a guide post extension 42 is installed over each guide post 41, and becomes a part of each guide post 41. Guide post extensions 42 protrude upward past tree cap 31. A guideline 43 with a socket on its lower end slides over and connects to each guide post 41 or guide post extension 42, if such are used. Guidelines 43 extend upward to a platform or workover vessel at sea level.


Still referring to FIG. 1, a flow interface device lower frame member 45 lands on and is supported by tree frame upper plate 35. In this embodiment, lower frame member 45 is a flat generally rectangular member, as shown in FIG. 4, but it need not be a flat plate. A mandrel 47 is secured to one side of lower frame member 45. Mandrel 47 has a tubular lower portion with a flange 49 that abuts and seals to a mating flange on choke body 23. Alternatively, mandrel 47 could be positioned on an opposite edge of lower frame member 45 and mate with the body of annulus choke 29, rather than choke body 23.


A clamp 51 locks flange 49 to the flange of choke body 23. Clamp 51 is preferably the same apparatus that previously clamped the choke insert (not shown) into choke body 23 when production assembly 11 was being operated without a pressure intensifier. Clamp 51 is preferably actuated with an ROV (remote operated vehicle) to release and actuate clamp 51.


Referring to FIG. 2, mandrel 47 has a lower bore 52 that aligns with choke body vertical bore 53. A retrievable plug 55 is shown installed within a lower portion of choke vertical bore 53. A lateral passage 57 leads from choke body vertical bore 53 above plug 55 to production wing valve 21 (FIG. 1). Plug 55 prevents fluid flowing down through mandrel 47 from entering flow line 25. Some installations have a valve in flow line 25 downstream of choke body 23. If so, plug 55 is not required.


Referring to FIG. 5, lower frame member 45 has a plurality of guide members 67 on its lower side that mate with guide members 37 of tree frame upper plate 35 as show in FIG. 3. Only one of the sets of guide members 67 is shown, and they are shown in a schematic form. Furthermore, a locking member 69 protrudes downward from lower frame member 45 for locking engagement with one of the locking members 39 (FIG. 3) of tree frame upper plate 35. Lock member 69 is also shown schematically. Other types of locks are feasible.


Lower frame member 45 also has guide post sockets 71, each preferably being a hollow tube with a downward facing funnel on its lower end. Guide post sockets 71 slide over guide lines 43 (FIG. 1) and guide posts 41 or extensions 42. Guide posts 41 or their extensions 42 provide a gross alignment of mandrel 47 with choke body 23 (FIG. 1). Guides 67 and 37 (FIG. 1) provide finer alignment of mandrel 47 with choke body 23 (FIG. 1).


Referring still to FIG. 5, lower frame member 45 also preferably has a plurality of upward facing guide members 75. In this example, guide members 75 are the same type as guide members 37 (FIG. 3), being upward facing cylinders with open tops. Other types of guide members may be utilized as well. In this instance, preferably there are four sets of guide members 75, with each set comprising two guide members 75 with a locking member 77 located between as shown in FIG. 4. Guide members 75 are located in vertical alignment with guide members 37 (FIG. 3), but could be positioned elsewhere. Lower frame member 45 also has a cutout 79 on one side for providing vertical access to annulus choke 29 (FIG. 3).


An adjustment mechanism or mechanisms (not shown) may extend between lower frame member 45 and tree frame upper plate 37 to assure that the weight on lower frame member 45 transfers to tree frame upper plate 37 and not through mandrel 47 to choke body 23. While the lower end of mandrel 47 does abut the upper end of choke body 23, preferably, very little if any downward load due to any weight on lower frame member 45 passes down mandrel 47 to choke body 23. Applying a heavy load to choke body 23 could create excessive bending moments on the connection of production wing valve 21 to the body of tree 13. The adjustment mechanisms may comprise adjustable stops on the lower side of lower frame member 45 that contact the upper side of tree frame upper plate 37 to provide a desired minimum distance between lower frame member 45 and upper plate 37. The minimum distance would assure that the weight on lower frame member 45 transfers to tree upper plate 35, and from there through tree frame 33 to tree 13 and the wellhead housing on which tree 13 is supported. The adjustment mechanisms could be separate from locking devices 69 or incorporated with them.


Referring to FIG. 1, after lower frame member 45 lands and locks to tree frame upper plate 35, an upper frame member 81 is lowered, landed, and locked to lower frame member 45. Upper frame member 81 is also preferably a generally rectangular plate, but it could be configured in other shapes. Upper frame member 81 has a mandrel connector 83 mounted on an upper side. Mandrel connector 83 slides over mandrel 47 while landing. A locking member 85, which could either be a set of dogs or a split ring, engages a grooved profile on the exterior of mandrel 47. Locking member 85 locks connector 83 to mandrel 47. A hydraulic actuator 87 strokes locking member 85 between the locked and released positions. Preferably, mandrel connector 83 also has a manual actuator 89 for access by an ROV in the event of failure of hydraulic actuator 87. A manifold 91 is a part of or mounted to an upper inner portion of mandrel connector 83. Manifold 91 has a passage 93 that sealingly registers with mandrel passage 52.


As shown by the dotted lines, a motor 95, preferably electrical, is mounted on upper frame member 81. A filter 97 is located within an intake line 98 of a subsea pump 99. Motor 95 drives pump 99, and the intake in this example is in communication with sea water. Pump 99 has an outlet line 101 that leads to passage 93 of manifold 91.


As shown in FIG. 6, upper frame member 81 has four guide post sockets 103 for sliding down guidelines 43 (FIG. 1) and onto the upper portions of guide posts 41 or guide post extensions 42. Upper frame member 81 has downward extending guide members 105 that mate with upward extending guide members 75 of lower frame member 45, as shown in FIG. 7.


Locking members 107 mate with locking members 77 (FIG. 4) of lower frame member 45. Upper frame member 81 has a central hole 109 for access to tree cap 31 (FIG. 1).


Adjustable mechanisms or stops (not shown) may also extend between lower frame member 45 and upper frame member 81 to provide a minimum distance between them when landed. The minimum distance is selected to prevent the weight of pump 99 and motor 95 from transmitting through mandrel connector 83 to mandrel 47 and choke body 23. Rather, the load path for the weight is from upper frame member 81 through lower frame member 45 and tree frame upper plate 35 to tree 13 and the wellhead housing on which it is supported. The load path for the weight on upper frame member 81 does not pass to choke body 23 or through guide posts 41. The adjustable stops could be separate from locking devices 107 or incorporated with them.


In the operation of this example, production assembly 11 may have been operating for some time either as a producing well, or an injection well with fluid delivered from a pump at a sea level platform. Also, production assembly 11 could be a new installation. Lower frame member 45, upper frame member 81 and the associated equipment would originally not be located on production assembly 11. If production assembly 11 were formerly a producing well, a choke insert (not shown) would have been installed within choke body 23.


To install pressure intensifier 99, the operator would attach guide post extensions 42, if necessary, and extend guidelines 43 to the surface vessel or platform. The operator removes the choke insert in a conventional manner by a choke retrieval tool (not shown) that interfaces with the two sets of guide members 37 adjacent cutout 36 (FIG. 3). If production assembly 11 lacks a valve on flow line 25, the operator lowers a plug installation tool on guidelines 43 and installs a plug 55.


The operator then lowers lower frame member 45 along guidelines 43 and over guide posts 41. While landing, guide members 67 and lock members 69 (FIG. 5) slidingly engage upward facing guide members 37 and locking members 39 (FIG. 1). The engagement of guide members 37 and 67 provides fine alignment for mandrel 47 as it engages choke body 23. Then, clamp 51 is actuated to connect the lower end of mandrel 47 to choke body 23.


The operator then lowers upper frame member 81, including pump 99, which has been installed at the surface on upper frame member 81. Upper frame member 81 slides down guidelines 43 and over guide posts 41 or their extensions 42. After manifold 91 engages mandrel 47, connector 83 is actuated to lock manifold 91 to mandrel 47. Electrical power for pump motor 95 may be provided by an electrical wet-mate connector (not shown) that engages a portion of the control pod (not shown), or in some other manner. If the control pod did not have such a wet mate connector, it could be retrieved to the surface and provided with one.


Once installed, with valves 17 and 21 open, sea water is pumped by pump 99 through outlet line 101, and flow passages 93, 52 (FIG. 2) into production wing valve 21. The sea water flows down the well and into the formation for water flood purposes. If repair or replacement of pressure intensifier 99 is required, it can be retrieved along with upper frame member 81 without disturbing lower frame member 45.


An alternate embodiment is shown in FIGS. 8-10. Components that are the same as in the first embodiment are numbered the same. The mounting system has a lower frame member or frame portion 111 and an upper frame member or frame portion 113. Jack mechanisms, such as hydraulic cylinders 115, extend between lower and upper frame members 111, 113. Hydraulic cylinders 115 move upper frame member 113 relative to lower frame member 111 from an upper position, shown in FIGS. 8 and 9, to a lower position, shown in FIG. 10. Lower frame member 111 preferably has guide members on its lower side for engaging upward facing guides on tree frame upper plate 35, although they are not shown in the drawings.


Mandrel 117 is rigidly mounted to upper frame member 113 in this embodiment and has a manifold portion on its upper end that connects to outlet line 101, which in turn leads from pressure intensifier or pump 99. Mandrel 117 is positioned over or within a hole 118 in lower frame member 111. When upper frame member 113 moves to the lower position, shown in FIG. 10, mandrel 117 extends down into engagement with the receptacle of choke body 23.


In the operation of the second embodiment, pressure intensifier 99 is mounted to upper frame member 113, and upper and lower frame members 113, 111 are lowered as a unit. Hydraulic cylinders 115 will support upper frame member 113 in the upper position. Guidelines 43 and guide posts 41 guide the assembly onto tree frame upper plate 35, as shown in FIG. 9. Guide members (not shown) provide fine alignment of lower frame member 111 as it lands on tree frame upper plate 35. The lower end of mandrel 117 will be spaced above choke body 23. Then hydraulic cylinders 115 allow upper frame member 113 to move downward slowly. Mandrel 117 engages choke body 23, and clamp 51 is actuated to clamp mandrel 117 to choke body 23. Locks (not shown) lock lower and upper frame members 111, 113 to the tree frame of tree 13.



FIGS. 11 to 13 show a third embodiment of the invention. FIG. 11 shows a manifold in the form of a subsea Christmas tree 200. The tree 200 has a production wing branch 202, a choke body 204, from which the choke has been removed, and a flowpath leading to a production wing outlet 206. The tree has an upper plate 207 on which are mounted four “John Brown” feet 208 (two shown) and four guide legs 210. The guide legs 210 extend vertically upwards from the tree upper plate 207. The tree also supports a control module 205.



FIGS. 11 and 13 also show a frame 220 (e.g. a skid) located on the tree 200. The frame 220 has a base that comprises three elongate members 222 which are cross-linked by perpendicular bars 224 such that the base has a grid-like structure. Further cross-linking arched members 226 connect the outermost of the bars 222, the arched members 226 curving up and over the base of the frame 220.


Located at approximately the four corners of the frame 220 are guide funnels 230 attached to the base of the frame 220 on arms 228. The guide funnels 230 are adapted to receive the guide legs 210 to provide a first (relatively course) alignment means. The frame 220 is also provided with four “John Brown” legs 232, which extend vertically downwards from the base of the frame 220 so that they engage the John Brown feet 208 of the tree 200.


A processing apparatus in the form of a pump 234 is mounted on the frame 200. The pump 234 has an outlet and inlet, to which respective flexible conduits 236, 238 are attached. The flexible conduits 236, 238 curve in a plane parallel to the base of the frame 220, forming a partial loop that curves around the pump 234 (best shown in FIG. 13). After nearly a complete loop, the flexible conduits 236, 238 are bent vertically downwards, where they connect to an inlet and an outlet of a piping interface 240 (to be described in more detail below). The piping interface 240 is therefore suspended from the pump 234 on the frame 220 by the flexible conduits 236, 238, and is not rigidly fixed relative to the frame 220. Because of the flexibility of the conduits 236, 238, the piping interface 240 can move both in the plane of the base of the frame 220 (i.e. in the horizontal plane of FIG. 11) and in the direction perpendicular to this plane (vertically in FIG. 11). In this embodiment, the conduits 236, 238 are typically steel pipes, and the flexibility is due to the curved shape of the conduits 236, 238, and their respective single points of suspension from the pump 234, but the conduits could equally be made from an inherently flexible material or incorporate other resilient means.


A secondary conduit 250 is connected to the choke body 204, as best shown in FIG. 15. The secondary conduit 250 comprises a housing 252 in which an inner member 254 is supported. The inner member 254 has a cylindrical bore 256 extending therethrough, which defines a first flow region that communicates with the production wing outlet 206. The annulus 258 between the inner cylindrical member 254 and the housing 252 defines a second flow region that communicates with the production wing branch 202.


The upper portion of the secondary conduit 250 is solid (not shown in the cross-sectional view of FIG. 15) and connects the inner member 254 to the housing 252; the solid upper portion has a series of bores therethrough in its outer circumference, which provides a continuation of the annulus 258. The inner member 254 comprises two portions, for ease of manufacture, which are screwed together before the secondary conduit 250 is connected to the choke body 204.


The inner member 254 is longer than the housing 252, and extends into the choke body 204 to a point below the production wing branch 202. The end of the inner member 254 is provided with a seal 259, which seals in the choke body 204 to prevent direct flow between the first and second flow regions. The secondary conduit 250 is clamped to the choke body 204 by a clamp 262 (see FIG. 12) that is typically the same clamp as would normally clamp the choke in the choke body 204. The clamp 262 is operable by an ROV.


Also shown in FIG. 15 is a detailed view of the piping interface 240; the FIG. 15 view shows the piping interface 240 before connection with the secondary conduit 250. The piping interface comprises a housing 242 in which is supported an inner member 244. The inner member has a cylindrical bore 246, an upper end of which is in communication with the flexible conduit 238. An annulus 248 is defined between the housing 242 and the inner member 244, the upper end of which is connected to the flexible conduit 236. The piping interface 240 and the secondary conduit 250 have co-operating engaging surfaces; in particular the inner member 254 of the secondary conduit 250 is shaped to stab inside the inner member 244 of the piping interface 240. The outer surfaces of the housings 242, 252 are adapted to receive a clamp 260, which clamps these surfaces together.


The piping interface 240 is shown connected to the secondary conduit 250 in the views of FIGS. 11 and 12. As shown in FIG. 12, the inner member 254 of the secondary conduit 250 is stabbed inside the inner member 244 of the piping interface 240, and the clamp 260 clamps the housings 242, 252 together. The cylindrical bores 256, 246 are therefore connected together, as are the annuli 248, 258. Therefore, the cylindrical bores 256 and 246 form a first flowpath which connects the flexible conduit 238 to the production wing outlet 206, and the annuli 248 and 258 form a second flowpath which connects the production wing branch 202 to the flexible conduit 236.


A method of connecting the pump 234 to the choke body 204 will now be described with reference to FIG. 14.



FIG. 14A shows the tree 200 before connection of the pump 234, with a choke C installed in the choke body 204.


The production wing valve is closed and the choke C is removed, as shown in FIG. 14B, to allow access to the interior of the choke body 204. This is typically done using conventional choke change out tooling (not shown).



FIG. 14C shows the secondary conduit 250 being lowered onto the choke body 204. This can also be done using the same choke change out tooling. The secondary conduit 250 is clamped onto the choke body 204 by an ROV operating clamp 262.



FIG. 14D shows the secondary conduit 250 having landed on and engaged with the choke body 204, and the piping interface 240 being subsequently lowered to connect to the piping interface 240. FIG. 15 shows a magnified version of FIG. 14D for greater clarity.


The landing stage of FIG. 14D comprises a two-stage process. In the first stage, the frame 220 carrying the pump 234 is landed on the tree 200. The guide funnels 230 of the frame receive the guide legs 210 of the tree 200 to provide a first, relatively coarse alignment. The John Brown legs 232 of the frame engage the John Brown feet 208 of the tree 200 to provide a more precise alignment.


In the second stage, the piping interface 240 is brought into engagement with the secondary conduit 250 and the clamp 260 is applied to fix the connection. The two-stage connection process provides protection of the mating surfaces of the secondary conduit 250 and the piping interface 240, and it also protects the choke 204; particularly the mating surface of the choke 204. Instead of landing the frame and connecting the piping interface 240 and secondary conduit in a single movement, which could damage the connection between the piping interface 240 and the secondary conduit 250 and which could also damage the choke 204, the two-stage connection facilitates a controlled, buffered connection.


The piping interface 240 being suspended on the curved flexible conduits 236, 238 allows the piping interface 240 to move in all three spatial dimensions; hence the flexible conduits 236, 238 provide a resilient suspension for the piping interface on the pump 234. If the piping interface 240 is not initially accurately aligned with the secondary conduit 250, the resilience of the flexible conduits 236, 238 allows the piping interface 240 to deflect laterally, instead of damaging the mating surfaces of the piping interface 240 and the secondary conduit 250. Hence, the flexible conduits 236, 238 provide a buffering means to protect the mating surfaces.


A slightly modified version of the third embodiment is shown in FIG. 16. The piping interface 240, the secondary conduit 250 and the tree 200 are exactly the same as the FIG. 11 embodiment, and like parts are designated by like numbers. The piping interface 240 and the secondary conduit 250 are installed on the tree as described for the FIG. 11 embodiment.


However, in contrast with the FIG. 15 embodiment, the FIG. 16 embodiment comprises a frame 320 that does not carry a pump. Instead, the frame 320 is provided with two flow hubs 322 (only one shown) that are connected to respective jumpers leading to a processing apparatus remote from the tree. This connection is typically done as a final step, after the frame has landed on the tree and the connection between the piping interface 240 and the secondary conduit 250 has been made up. The processing apparatus could be a pump installed on a further subsea structure, for example a suction pile. A replacement choke 324 is also provided on the frame, which replaces the choke that has been removed from the choke body 204 to allow for insertion of the inner member 254 of the secondary conduit 250 into the choke body 204.


The replacement choke 324 is connected to one of the hubs 322 and to one of the flexible conduits 236, 238. The other of the flexible conduits 236, 238 is connected to the other hub 322.


The FIG. 16 frame is provided with a guide pipe 324 that extends perpendicularly to the plane of the frame 320. The guide pipe 324 has a hollow bore and extends downwards from the frame 320, surrounding the piping interface 240 and the vertical portion of at least one (and optionally both) of the flexible conduits 236, 238; the guide pipe 324 has a lateral aperture to allow the conduits 236, 238 to enter the bore. The guide pipe 324 thus provides a guide for the piping interface 240 which protects it from damage from accidental impact with the tree 200, since if the frame 320 is misaligned, the guide pipe 324 with impact the tree frame, instead of the piping interface 240. In an alternative embodiment, the guide pipe 324 could be replaced by guide members such as the guide funnels and John Brown legs of the FIG. 11 embodiment. In further embodiments, both the guide pipe 324 and these further guide members may be provided.


In use, the well fluids flow through the choke body 240, through the annuli 258, 248, through flexible conduit 238 into one of the hubs 322, through a first jumper conduit, through the processing apparatus (e.g. a pump) through a second jumper conduit, through the other of the hubs 322, through the replacement choke 324, through the flexible conduit 236 through the bores 246, 256 and to the production wing outlet 206. Alternatively, the flow direction could be reversed to inject fluids into the well.


A further alternative embodiment is shown in FIG. 17. This embodiment is very similar to the FIG. 16 embodiment, and like parts are designated with like numbers. In the FIG. 17 embodiment, the second hub 322 is also shown. In this embodiment, the guide pipe 324 surrounds only the flexible conduit 238, the other flexible conduit 236 only entering the guide pipe at the connection to the piping interface 240.


The principal difference between the embodiments of FIGS. 17 and 16 is the provision of an actuating means, which connects the flexible conduit 238 to the frame to control the movement of the flexible conduit 238 and hence the position of the piping interface 240. The actuating means has the form of a hydraulic cylinder, more specifically, a swivel eye mounting hydraulic cylinder 326. The hydraulic cylinder 326 comprises two spherical joints, which allow the lower end of the hydraulic cylinder to swing in a plane parallel to the plane of the frame 320 (the X-Y plane of FIG. 17). The spherical joints typically comprise spherical eye bushes. The swivel joints typically allow rotation of the hydraulic cylinder around its longitudinal axis by a total of approximately 180 degrees. The swivel joints also typically allow a swing of plus or minus ten degrees in both the X and Y directions. Hence, the hydraulic cylinder 326 does not fix the position of the flexible conduit 238 rigidly with respect to the frame 320, and does not impede the flexible conduit 238 from allowing the piping interface 240 to move in all three dimensions.



FIG. 17A shows the hydraulic cylinder 236 in a retracted position for landing the frame 320 on the tree 200 or for removing the frame 320 from the tree 200. In this refracted position, the flexible conduit 238 holds the piping interface 240 above the secondary conduit 250 so that it cannot engage or impact with the secondary 250 during landing.


To make up the connection between the piping interface 240 and the secondary conduit 250, the hydraulic cylinder is extended; the extended position is shown in FIG. 17B. In the extended position, the piping interface 240 now engages the secondary conduit 250. The pressure in the hydraulic cylinder 326 is now released to allow the clamp 260 to be actuated. The clamp 260 is actuated by an ROV, and pulls the piping interface 240 into even closer contact with the secondary conduit 250 to hold these components firmly together.


This invention has significant advantages. In the first embodiment, the lower frame member and mandrel are much lighter in weight and less bulky than the upper frame member and pump assembly. Consequently, it is easier to guide the mandrel into engagement with the choke body than it would be if the entire assembly were joined together and lowered as one unit. Once the lower frame member is installed, the upper frame member and pump assembly can be lowered with a lesser chance of damage to the subsea equipment. The upper end of the mandrel is rugged and strong enough to withstand accidental impact by the upper frame member. The two-step process thus makes installation much easier. The optional guide members further provide fine alignment to avoid damage to seating surfaces.


The movable upper and lower frame members of the mounting system of the second embodiment avoid damage to the seating surfaces of the mandrel and the receptacle.


While the invention has been shown in only a few of its forms, it should be apparent to those skilled in the art that it is not so limited but is susceptible to various changes without departing from the scope of the invention. For example, although shown in connection with a subsea tree assembly, the mounting apparatus could be installed on other subsea structures, such as a manifold or gathering assembly. Also, the flow interface device mounted to the upper frame member could be a compressor for compressing gas, a flow meter for measuring the flow rate of the subsea well, or some other device.


In the third embodiment, protection of the connection between the piping interface 240 and the secondary conduit 250 is achieved by the two-step connection process. Additional buffering is provided by the flexible conduits 236, 238, which allow resilient support of the piping interface 240 relative to the pump/the frame, allowing the piping interface 240 to move in all three dimensions. In some embodiments, even greater control and buffering are achieved using an actuation means to more precisely control the location of the piping interface 240 and its connection with the secondary conduit 250.


Improvements and modifications can be incorporated without departing from the scope of the invention. For example, it should be noted that the arrangement of the flowpaths in FIGS. 11 to 17 are just one example configuration and that alternative arrangements could be made. For example, in FIG. 16, the replacement choke could be located in the flowpaths before the first flow hub, so that the fluids pass through the choke before being diverted to the remote processing apparatus. The replacement choke could be located at any suitable point in the flowpaths.


Furthermore, in all embodiments, the flowpaths may be reversed, to allow both recovery and injection of fluids. In the third embodiment, the flow directions in the flexible conduits 236, 238 (and in the rest of the apparatus) would be reversed.


A replacement choke 324 could also be used in the other embodiments, as described for the FIG. 16 embodiment. The replacement choke 234 need not be provided on the frame.


All embodiments of the invention could be provided with a guide pipe, such as that shown in FIG. 16.


In alternative embodiments, the actuating means of FIG. 17 is not necessarily a swivel eye mounting hydraulic cylinder 326. In other embodiments, the hydraulic cylinder may only have a single swivelable connection, and in other embodiments, the hydraulic cylinder could have a reduced or even almost no range of movement in the X-Y plane. In further embodiments, this hydraulic cylinder could be replaced by a simple cable in the form of a string, which is attached to a part of the flexible conduit 238. The flexible conduit 238 could then simply be raised and lowered as desired by pulling and releasing the tension in the cable. In a further embodiment, the hydraulic cylinder could be replaced by a screw jack, also known as a power jack, a first screw member of the screw jack being attached to the frame, and a second screw member being coupled to the flexible conduit 238. Operating the screw jack also raises and lowers the end of the conduit means, as desired.


Although the above disclosures principally refer to the production wing branch and the production choke, the invention could equally be applied to a choke body of the annulus wing branch.


In the FIG. 11 embodiment, either of the conduits 236, 238 could be attached to the inlet and the outlet of the pump 234 and either may be attached to the inlet and the outlet of the piping interface 240.


Many different types of processing apparatus could be used. Typically, the processing apparatus comprises at least one of: a pump; a process fluid turbine; injection apparatus; chemical injection apparatus; a fluid riser; measurement apparatus; temperature measurement apparatus; flow rate measurement apparatus; constitution measurement apparatus; consistency measurement apparatus; gas separation apparatus; water separation apparatus; solids separation apparatus; and hydrocarbon separation apparatus.


The processing apparatus could comprise a pump or process fluid turbine, for boosting the pressure of the fluid. Alternatively, or additionally, the processing apparatus could inject gas, steam, sea water, drill cuttings or waste material into the fluids. The injection of gas could be advantageous, as it would give the fluids “lift”, making them easier to pump. The addition of steam has the effect of adding energy to the fluids.


Injecting sea water into a well could be useful to boost the formation pressure for recovery of hydrocarbons from the well, and to maintain the pressure in the underground formation against collapse. Also, injecting waste gases or drill cuttings etc into a well obviates the need to dispose of these at the surface, which can prove expensive and environmentally damaging.


The processing apparatus could also enable chemicals to be added to the fluids, e.g. viscosity moderators, which thin out the fluids, making them easier to pump, or pipe skin friction moderators, which minimise the friction between the fluids and the pipes. Further examples of chemicals which could be injected are surfactants, refrigerants, and well fracturing chemicals. The processing apparatus could also comprise injection water electrolysis equipment.


The processing apparatus could also comprise a fluid riser, which could provide an alternative route between the well bore and the surface. This could be very useful if, for example, the flowline 206 becomes blocked.


Alternatively, processing apparatus could comprise separation equipment e.g. for separating gas, water, sand/debris and/or hydrocarbons. The separated component(s) could be siphoned off via one or more additional process conduits.


The processing apparatus could alternatively or additionally include measurement apparatus, e.g. for measuring the temperature/flow rate/constitution/consistency, etc. The temperature could then be compared to temperature readings taken from the bottom of the well to calculate the temperature change in produced fluids. Furthermore, the processing apparatus could include injection water electrolysis equipment.

Claims
  • 1. An assembly for injecting chemicals into a well having a flow bore extending through a tree and into the well, the tree including a lateral branch extending from the tree and having a lateral branch bore with a first lateral branch bore portion communicating with the flow bore and a second lateral branch bore portion communicating with a lateral branch outlet, the assembly comprising: an access port disposed into the lateral branch between the first and second lateral branch bore portions;a chemical injection apparatus communicating with the access port; andan injection flowpath extending from the chemical injection apparatus through the access port and either into the first lateral branch bore portion to inject chemicals into the well flow bore or into the second lateral branch bore portion and through the outlet to inject chemicals into a flowline.
  • 2. The assembly of claim 1 wherein the injection flowpath includes a releasable conduit communicating the chemical injection apparatus with the lateral branch bore to inject chemicals into the well flow bore.
  • 3. The assembly of claim 2 wherein the lateral branch bore communicates with a flowline, the flowline being closed during injection into the tree flow bore.
  • 4. The assembly of claim 1, further comprising: a mounting apparatus on the tree;a utility skid tree support system including a utility skid with a conduit communicating with the chemical injection apparatus;the lateral branch having an upwardly facing access bore extending from the lateral branch bore; andthe conduit having a connector to connect with the upwardly facing access bore and an aligning member for engaging the mounting apparatus to locate and align the connector with respect to the upwardly facing access bore.
  • 5. The assembly of claim 1, wherein: the tree having an upper end and a tree guide;a utility skid tree support system on the tree;a utility skid with a skid guide and a fluid conduit communicating with the chemical injection apparatus;the lateral branch being mounted to the tree below the upper end and including an access bore extending upwardly from the lateral branch bore; and
  • 6. An assembly for injection of fluids into a well having a flow bore extending through a tree and into the well, comprising: a lateral branch on the tree having a lateral branch bore communicating with the flow bore and having an end port, the lateral branch including an access port communicating with the lateral branch bore through the wall of the lateral branch between the flow bore and the end port;an injection conduit communicating with the access port to form an injection flowpath extending from an apparatus, through the access port, and into the lateral branch bore to either inject fluids into the flow bore or to inject fluids through the end port; anda closure member for opening and closing the end port of the lateral branch.
  • 7. An assembly for injection into a well having a tree flow bore extending through a tree and into the well, comprising: a lateral branch on the tree having a lateral branch bore, the lateral branch bore communicating with the flow bore and having an outlet communicating with a line and the lateral branch including a choke body having a choke passage therethrough forming part of the lateral branch bore and at least one port through a wall thereof communicating with the choke passage and not forming a part of the choke passage; anda conduit communicating with the at least one port to form a single path injection flowpath extending from an injection apparatus and through the wall of the choke body into the choke passage to either inject fluids into the flow bore or through the outlet and into the line.
  • 8. The assembly of claim 7 wherein the injection apparatus is a chemical injection apparatus, the lateral branch bore being in communication with the tree flow bore to inject chemicals into the tree flow bore.
  • 9. The assembly of claim 7 wherein the injection apparatus is a chemical injection apparatus, the lateral branch bore being in communication with a flowline to inject chemicals into the flowline.
  • 10. The assembly of claim 7 wherein the injection apparatus injects materials, the lateral branch bore being in communication with the tree flow bore to inject materials into the tree flow bore.
  • 11. The assembly of claim 7 wherein the injection apparatus injects materials, the lateral branch bore being in communication with a flowline to inject materials into the flowline.
  • 12. An assembly for injection of fluids into a well having a flow bore extending through a tree and into the well, the tree including a lateral branch extending from the tree and having a branch bore communicating with the flow bore, comprising: the lateral branch including an access port communicating with the branch bore and the branch bore having an outlet;a fluids injection apparatus communicating with the access port;a closure member for closing the branch bore between the access port and the outlet; andwith the closure member closed, an injection flowpath extending from the fluids injection apparatus through the access port and into the branch bore to inject fluids into the well flow bore.
  • 13. The assembly of claim 12 wherein a conduit communicates the fluids injection apparatus with the access port.
  • 14. The assembly of claim 13 wherein a single path injection flowpath is formed between the fluids injection apparatus and the flowbore.
  • 15. The assembly of claim 12 wherein the lateral branch includes an outlet and a closure member for opening and closing the outlet of the branch.
  • 16. The assembly of claim 12 wherein the fluids include water from the sea.
  • 17. The assembly of claim 12 wherein the fluids are chemicals.
  • 18. The assembly of claim 12 wherein the branch port is formed by a choke body.
  • 19. An assembly for the injection of fluids into a well having a flow bore extending through a tree and into the well, the tree including a lateral branch extending from the tree and having a branch bore communicating with the flow bore and having an outlet communicating with a flowline, comprising: a choke body having a first port communicating with the branch bore and a second port communicating with the flowline;first and second hubs disposed on the tree, the first hub being connected to the first port and the second hub being connected to the second port; anda processing apparatus being releasably connected to the first and second hubs.
  • 20. The assembly of claim 19 wherein the processing apparatus includes at least one of the group consisting of a pump, a process fluid turbine, an injection apparatus for injecting gas or steam, a materials injection apparatus, a chemical reaction vessel, a pressure regulation apparatus, a fluid riser, a measurement apparatus, a temperature measurement apparatus, a flow rate measurement apparatus, a constitution measurement apparatus, a consistency measurement apparatus, a gas separation apparatus, a water separation apparatus, a solids separation apparatus, a hydrocarbon separation apparatus, and a combination thereof.
CROSS REFERENCE TO RELATED APPLICATIONS

This application is a continuation of U.S. application Ser. No. 13/267,039 filed Oct. 6, 2011, which is a divisional of U.S. application Ser. No. 10/590,563 (now U.S. Pat. No. 8,066,076) filed Dec. 13, 2007, which is a U.S. National Phase Application of PCT/GB2005/000725 filed Feb. 25, 2005, which claims the benefit of U.S. Provisional Application No. 60/548,727 filed Feb. 26, 2004, all of which are incorporated herein by reference in their entireties for all purposes.

US Referenced Citations (237)
Number Name Date Kind
1758376 Sawyer May 1930 A
1944573 Williams et al. Jan 1934 A
1944840 Humason Jan 1934 A
1994840 Thoen Mar 1935 A
2132199 Yancey Oct 1938 A
2233077 Gillespie et al. Feb 1941 A
2276883 Schon et al. Mar 1942 A
2412765 Buddrus et al. Dec 1946 A
2790500 Jones Apr 1957 A
2893435 Eichenberg Jul 1959 A
2962356 Johns Nov 1960 A
3101118 Culver et al. Aug 1963 A
3163224 Haeber et al. Dec 1964 A
3358753 Haeber Dec 1967 A
3378066 Otteman et al. Apr 1968 A
3593808 Nelson Jul 1971 A
3595311 Harbonn et al. Jul 1971 A
3603409 Watkins Sep 1971 A
3608631 Sizer et al. Sep 1971 A
3688840 Curington et al. Sep 1972 A
3705626 Glenn, Jr. et al. Dec 1972 A
3710859 Hanes et al. Jan 1973 A
3753257 Arnold Aug 1973 A
3777812 Burkhardt et al. Dec 1973 A
3820558 Mueller Jun 1974 A
3834460 Brun et al. Sep 1974 A
3953982 Pennock May 1976 A
3957079 Whiteman May 1976 A
4042033 Holland et al. Aug 1977 A
4046191 Neath Sep 1977 A
4046192 Darnborough Sep 1977 A
4095649 Chateau et al. Jun 1978 A
4099583 Maus Jul 1978 A
4102401 Erbstoesser Jul 1978 A
4105068 Tam Aug 1978 A
4120362 Chateau et al. Oct 1978 A
4134456 Ball Jan 1979 A
4190120 Regan Feb 1980 A
4210208 Shanks Jul 1980 A
4223728 Pegg Sep 1980 A
4260022 Van Bilderbeek Apr 1981 A
4274664 Thominet Jun 1981 A
4291772 Beynet Sep 1981 A
4294471 Van Bilderbeek Oct 1981 A
4347899 Weeter Sep 1982 A
4401164 Baugh Aug 1983 A
4403658 Watkins Sep 1983 A
4405016 Best Sep 1983 A
4444275 Beynet et al. Apr 1984 A
4457489 Gilmore Jul 1984 A
4478287 Hynes et al. Oct 1984 A
4502534 Roche et al. Mar 1985 A
4503878 Taylor Mar 1985 A
4509599 Chenoweth et al. Apr 1985 A
4572298 Weston Feb 1986 A
4589493 Kelly et al. May 1986 A
4607701 Gundersen Aug 1986 A
4610570 Brockway Sep 1986 A
4626135 Roche Dec 1986 A
4629003 Baugh Dec 1986 A
4630681 Iwamoto Dec 1986 A
4646844 Roche et al. Mar 1987 A
4648629 Baugh Mar 1987 A
4695190 Best et al. Sep 1987 A
4702320 Gano et al. Oct 1987 A
4721163 Davis Jan 1988 A
4749046 Gano Jun 1988 A
4756368 Ikuta et al. Jul 1988 A
4813495 Leach Mar 1989 A
4820083 Hall Apr 1989 A
4830111 Jenkins et al. May 1989 A
4832124 Rayson May 1989 A
4848471 Bencze et al. Jul 1989 A
4848473 Lochte Jul 1989 A
4848475 Dean et al. Jul 1989 A
4874008 Lawson Oct 1989 A
4896725 Parker et al. Jan 1990 A
4899822 Daeschler et al. Feb 1990 A
4911240 Haney et al. Mar 1990 A
4919207 Ikuta et al. Apr 1990 A
4926898 Sampey May 1990 A
4972904 Godare Nov 1990 A
5010956 Bednar Apr 1991 A
5025865 Caldwell Jun 1991 A
5044672 Skeels Sep 1991 A
5069286 Roensch Dec 1991 A
5074519 Pettus Dec 1991 A
5085277 Hopper Feb 1992 A
5143158 Watkins Sep 1992 A
5163782 Paulo Nov 1992 A
5201491 Domangue Apr 1993 A
5213162 Iato May 1993 A
5248166 Wilkins Sep 1993 A
5255745 Czyrek Oct 1993 A
5280766 Mohn Jan 1994 A
5295534 Porter Mar 1994 A
5299641 Paulo et al. Apr 1994 A
5310006 Freitas et al. May 1994 A
5398761 Reynolds et al. Mar 1995 A
5456313 Hopper Oct 1995 A
5462361 Sato Oct 1995 A
5492436 Suksumake Feb 1996 A
5526882 Parks Jun 1996 A
5535826 Brown Jul 1996 A
5544707 Hopper Aug 1996 A
5649594 Flak et al. Jul 1997 A
5678460 Walkowc Oct 1997 A
5719481 Mo Feb 1998 A
5730551 Skeels Mar 1998 A
5807027 Ostergaard Sep 1998 A
5868204 Pritchett Feb 1999 A
5884706 Edwards Mar 1999 A
5927405 Monjure Jul 1999 A
5944152 Lindsay Aug 1999 A
5971077 Lilley Oct 1999 A
5988282 Jennings et al. Nov 1999 A
5992526 Cunningham et al. Nov 1999 A
5992527 Garnham et al. Nov 1999 A
6039119 Hopper et al. Mar 2000 A
6050339 Milberger Apr 2000 A
6053252 Edwards Apr 2000 A
6076605 Lilley et al. Jun 2000 A
6098715 Seixas Aug 2000 A
6109352 Edwards Aug 2000 A
6116784 Brotz Sep 2000 A
6123312 Dai Sep 2000 A
6138774 Bourgoyne, Jr. Oct 2000 A
6145596 Dallas Nov 2000 A
6182761 Bednar Feb 2001 B1
6186239 Monjure Feb 2001 B1
6209650 Ingebrigtsen et al. Apr 2001 B1
6227300 Cunningham May 2001 B1
6289992 Monjure Sep 2001 B1
6296453 Layman Oct 2001 B1
6321843 Baker Nov 2001 B2
6352114 Toalson et al. Mar 2002 B1
6367551 Fenton Apr 2002 B1
6388577 Carstensen May 2002 B1
6457529 Calder Oct 2002 B2
6457530 Lam Oct 2002 B1
6457540 Gardes Oct 2002 B2
6460621 Fenton et al. Oct 2002 B2
6481504 Gatherar Nov 2002 B1
6484807 Allen Nov 2002 B2
6494267 Allen Dec 2002 B2
6497286 Hopper Dec 2002 B1
6516861 Allen Feb 2003 B2
6554075 Fikes et al. Apr 2003 B2
6557629 Wong May 2003 B2
6612368 Kent Sep 2003 B2
6612369 Rocha et al. Sep 2003 B1
6637514 Donald et al. Oct 2003 B1
6648070 Cove et al. Nov 2003 B2
6651745 Lush Nov 2003 B1
6655455 Bartlett et al. Dec 2003 B2
6675900 Baskett et al. Jan 2004 B2
6698520 Fenton et al. Mar 2004 B2
6719059 Dezen et al. Apr 2004 B2
6755254 DeBerry Jun 2004 B2
6760275 Carstensen Jul 2004 B2
6763890 Polsky et al. Jul 2004 B2
6763891 Humphrey et al. Jul 2004 B2
6805200 DeBerry Oct 2004 B2
6823941 Donald Nov 2004 B2
6832874 Appleford et al. Dec 2004 B2
6840323 Fenton Jan 2005 B2
6902005 Radi et al. Jun 2005 B2
6907932 Reimert Jun 2005 B2
6966383 Milberger Nov 2005 B2
6968902 Fenton Nov 2005 B2
7032673 Dezen Apr 2006 B2
7040408 Sundararajan May 2006 B2
7069995 Chan et al. Jul 2006 B2
7073592 Polsky et al. Jul 2006 B2
7111687 Donald Sep 2006 B2
7201229 White et al. Apr 2007 B2
7210530 Lush May 2007 B2
7243729 Tyrrell et al. Jul 2007 B2
7270185 Fontana Sep 2007 B2
7331396 Reimert et al. Feb 2008 B2
7363982 Hopper Apr 2008 B2
7520989 Ostergaard Apr 2009 B2
7569097 Campen Aug 2009 B2
7596996 Zollo et al. Oct 2009 B2
7699099 Bolding Apr 2010 B2
7718676 Moussy May 2010 B2
7740074 White Jun 2010 B2
7757772 Donohue Jul 2010 B2
7770653 Hill Aug 2010 B2
7823648 Bolding Nov 2010 B2
7909103 Fenton Mar 2011 B2
8011436 Christie et al. Sep 2011 B2
8776891 Donald et al. Jul 2014 B2
20010011593 Wilkins Aug 2001 A1
20010050185 Calder et al. Dec 2001 A1
20020000315 Kent et al. Jan 2002 A1
20020070026 Fenton et al. Jun 2002 A1
20020074123 Regan Jun 2002 A1
20030010498 Tolman et al. Jan 2003 A1
20030019632 Humphrey et al. Jan 2003 A1
20030145997 Langford et al. Aug 2003 A1
20030146000 Dezen et al. Aug 2003 A1
20040026084 Donald Feb 2004 A1
20040057299 Kozakai et al. Mar 2004 A1
20040154790 Cornelssen et al. Aug 2004 A1
20040154800 Jack et al. Aug 2004 A1
20040200620 Ostergaard Oct 2004 A1
20040206507 Bunney Oct 2004 A1
20040251030 Appleford et al. Dec 2004 A1
20050028984 Donald et al. Feb 2005 A1
20050058535 Meshenky et al. Mar 2005 A1
20050109514 White et al. May 2005 A1
20050173322 Ostergaard Aug 2005 A1
20050263194 Tseng et al. Dec 2005 A1
20060237194 Donald et al. Oct 2006 A1
20070144743 White et al. Jun 2007 A1
20080047714 McMiles Feb 2008 A1
20080128139 White Jun 2008 A1
20080169097 Bolding et al. Jul 2008 A1
20080277122 Tinnen Nov 2008 A1
20080302535 Barnes Dec 2008 A1
20090025936 Donald et al. Jan 2009 A1
20090126938 White May 2009 A1
20090260831 Moksvold Oct 2009 A1
20090266542 Donald et al. Oct 2009 A1
20090266550 Fenton Oct 2009 A1
20090294125 Donald et al. Dec 2009 A1
20090294132 Donald et al. Dec 2009 A1
20090301727 Donald et al. Dec 2009 A1
20090301728 Donald et al. Dec 2009 A1
20100025034 Donald et al. Feb 2010 A1
20100044038 Donald et al. Feb 2010 A1
20100206546 Donald et al. Aug 2010 A1
20100206547 Donald et al. Aug 2010 A1
20100206576 Donald et al. Aug 2010 A1
20100300700 Garbett et al. Dec 2010 A1
20110192609 Tan et al. Aug 2011 A1
Foreign Referenced Citations (46)
Number Date Country
498216 Apr 1999 AU
10415841 Mar 2007 BR
638019 Aug 1983 CH
2541715 Apr 1976 DE
3738424 May 1989 DE
0036213 Sep 1981 EP
0568742 Nov 1993 EP
0572732 Dec 1993 EP
0719905 Mar 1996 EP
0952300 Mar 1998 EP
0841464 May 1998 EP
1990505 Sep 2002 EP
1639230 Jan 2009 EP
1918509 Oct 2009 EP
2710946 Apr 1995 FR
242913 Nov 1925 GB
1022352 Mar 1966 GB
2197675 May 1998 GB
2319795 Jun 1998 GB
2346630 Aug 2000 GB
2361726 Oct 2001 GB
0312543.2 May 2003 GB
0405454.0 Mar 2004 GB
0405471.4 Mar 2004 GB
2445493 Jul 2008 GB
20061778 May 2006 NO
9008897 Aug 1990 WO
9630625 Oct 1996 WO
9815712 Apr 1998 WO
9906731 Feb 1999 WO
9928593 Jun 1999 WO
9949173 Sep 1999 WO
0047864 Aug 2000 WO
0053937 Sep 2000 WO
0070185 Nov 2000 WO
02038912 May 2002 WO
02088519 Nov 2002 WO
03033868 Apr 2003 WO
03078793 Sep 2003 WO
2005040545 May 2005 WO
2005047646 May 2005 WO
2005083228 Sep 2005 WO
2006041811 Apr 2006 WO
2007075860 Jul 2007 WO
2007079137 Jul 2007 WO
2008034024 Mar 2008 WO
Non-Patent Literature Citations (284)
Entry
European International Search Report dated Mar. 4, 2002; PCT/GB01/04940 (3 p.).
European Official Communication dated Mar. 5, 2003; Application No. 00929690.6 (2 p.).
European Response to Official Communication; Application No. 00929690.6; Response filed Jun. 27, 2003 (5 p.).
European Official Communication dated Aug. 29, 2003; Application No. 00929690.6 (3 p.).
European Examination Report dated Apr. 28, 2004; Application No. 00929690.6 (3 p.).
European Response to Examination Report; Application No. 00929690.6; Response filed Aug. 30, 2004 (20 p.).
European Communication dated Sep. 19, 2006; Application No. 01980737.9 (1 p.).
European Response to EPO Communication; Application No. 01980737.9; Response filed Oct. 6, 2006 (5 p.).
European Article 96(2) Communication dated Feb. 5, 2007; Application No. 04735596.1 (6 p.).
European Response to Examination Report; Application No. 047355961; Response filed Aug. 14, 2007 (15 p.).
European Search Report dated Apr. 16, 2007; Application No. 06024001.7 (2 p.).
European Article 96(2) Communication dated Jun. 12, 2007; Application No. 05717806.3 (3 p.).
European Response to Article 96(2) Communication dated Jun. 12, 2007; Application No. 05717806.3; Response filed Sep. 19, 2007 (17 p.).
European Examination Report dated Jun. 15, 2007; Application No. 01980737.9 (5 p.).
Response to European Examination Report dated Jun. 15, 2007; Application No. 01980737.9; Response filed Oct. 9, 2007 (12 p.).
European Examination Report dated Nov. 22, 2007; Application No. 04735596.1 (3 p.).
European Response to Examination Report dated Nov. 22, 2007; Application No. 04735596.1; Response filed Feb. 19, 2008 (101 p.).
European Examination Report dated Dec. 13, 2007; Application No. 06024001.7 (1 p.).
Response to European Examination Report dated Dec. 13, 2007; Application No. 06024001.7; Response filed Mar. 10, 2008 (6 p.).
European Search Report dated Mar. 28, 2008; Application No. 08000994.7 (4 p.).
European Response to Written Opinion dated Aug. 8, 2008; Application No. 08000994.7 (10 p.).
European Examination Report dated Oct. 30, 2008; Application No. 08000994.7 (2 p.).
European Response to Examination Report dated Oct. 30, 2008 w/amended specification; Application No. 08000994.7; Response filed Dec. 11, 2008 (94 p.).
European Examination Report dated May 18, 2009; Application No. 08162149.2 (8 p.).
European Response to Examination Report dated May 18, 2009; Application No. 08162149.2; Response filed Nov. 18, 2009 (132 p.).
Response to Article 94(3) and Rule 71(1) dated May 18, 2009; Application No. 08162149.2 (3 p.).
European Examination Report dated May 4, 2010; Application No. 07864486.1 (3 p.).
European Response to Examination Report dated May 4, 2010; Application No. 07864486.1; Response filed Nov. 12, 2010 (10 p.).
European Examination Report dated May 4, 2010; Application No. 07864482.0 (3 p.).
European Search Report dated Jun. 25, 2010; Application No. 10161116 (2 p.).
European Search Report dated Jun. 25, 2010; Application No. 10161117 (2 p.).
European Search Report dated Jun. 25, 2010; Application No. 10161120 (2 p.).
European Search Report dated Aug. 2, 2010; Application No. 10161117.6 (1 p.).
European Response to Examination Report dated Aug. 2, 2010; Application No. 10161117.6; Response filed Dec. 2, 2010 (6 p.).
European Examination Report dated Aug. 2, 2010; Application No. 10161116.8 (1 p.).
European Response to Examination Report dated Aug. 2, 2010; Application No. 10161116..8; Response filed Dec. 2, 2010 (13 p.).
European Examination Report dated Aug. 4, 2010; Application No. 10161120.0 (1 p.).
European Response to Examination Report dated Aug. 4, 2010; Application No. 10161120.0; Response filed Dec. 2, 2010 (6 p.).
European Examination Report dated Oct. 14, 2010; Application No. 10167181.6 (3 p.).
Response to European Examination Report dated Oct. 14, 2010; Application No. 10167181.6; Response filed Feb. 9, 2011 (6 p.).
European Examination Report dated Oct. 14, 2010; Application No. 10167183.2 (3 p.).
Response to European Examination Report dated Oct. 14, 2010; Application No. 10167183.2; Response filed Feb. 14, 2011 (4 p.).
European Examination Report dated Oct. 14, 2010; Application No. 10167182.4 (3 p.).
Response to European Examination Report dated Oct. 14, 2010; Application No. 10167182.4; Response filed Feb. 10, 2010 (6 p.).
European Examination Report dated Oct. 14, 2010; Application No. 10167184.0 (3 p.).
Response to European Examination Report dated Oct. 14, 2010; Application No. 10167184.0; Response filed Feb. 10, 2011 (8 p.).
European Examination Report dated Nov. 10, 2010; Application No. 07842464.5 (3 p.).
Response to European Examination Report dated Nov. 10, 2010; Application No. 07842464.5; Response filed Mar. 18, 2011 (11 p.).
European Search Report and Opinion dated Dec. 3, 2010; Application No. 10185795.1 (4 p.).
European Search Report dated Dec. 9, 2010; Application No. 10013192 (3 p.).
European Office Action Pursuant to Article 94(3) dated Dec. 29, 2010; Application No. 06024001.7 (4 p.).
Norwegian Examination Report dated Aug. 19, 2005; Application No. 20015431 (6 p.).
Response to Norwegian Examination Report dated Aug. 19, 2005; Application No. 20015431 (19 p.).
Norwegian Examination Report dated Mar. 22, 2010; Application No. 20032037 (8 p.).
Norwegian Office Action dated Oct. 20, 2010; Application No. 20032037 (4 p.).
International Search Report dated Mar. 4, 2002; PCT/GB01/04940 (3 p.).
International Search Report and Written Opinion dated Sep. 22, 2004; PCT/GB2004/002329 (13 p.).
International Search Report and Written Opinion dated Jun. 7, 2005; PCT/GB2005/000725 (8 p.).
International Search Report and Written Opinion dated Jan. 27, 2006; PCT/GB2005/003422 (8 p.).
International Search Report and Written Opinion dated Apr. 16, 2007; PCT/GB2004/002329 (10 p.).
International Search Report and Written Opinion dated Jun. 13, 2008; PCT/US2007/084884 (8 p.).
International Search Report and Written Opinion dated Jun. 13, 2008; PCT/US2007/084879 (9 p.).
International Search Report and Written Opinion dated Aug. 12, 2008; PCT/US2007/078346 (9 p.).
www.subsea7.com; “Multiple Application Re-Injection System” (undated) (2 p.).
Baker Hughes; “Intelligent Well System;Complete Range of Intelligent Well Systems,” (undated) (4 p.).
Notice of Litigation for U.S. Appl. No. 10/558,593 (77 p.).
Patent Search Report INPADOC Patent Family (3 p.) (undated).
Venture Training Manual Part 1 (undated) (48 p.).
Venture Training Manual Part 2 (undated) (25 p.).
ABB Retrievable Choke Insert pp. 3, 8 (undated) (2 p.).
Kvaerner Pump Photo “G” (undated) (1 p.).
Aker Kvaemer; Multibooster System “H” (undated) (4 p.).
Progressing Cavity and Piston Pumps; National Oilwell “K” (undated) (2 p.).
Weatherford Artificial Lift Systems “M” (2 p.).
“Under Water Pump for Sea Bed Well” by A. Nordgren, “l” Dec. 14, 1987 (2 p.).
Petroleum Abstracts Oct. 25, 2001 (48 p.).
Petroleum Abstracts Oct. 30, 2001 (79 p.).
Derwent Abstracts Nov. 2, 2001 (16 p.).
www.subsea7.com “New Technology to Increase Oil Production Introduce to Subsea Market,” Jun. 13, 2002 (2 p.).
ABB Brochure entitled “Subsea Chokes and Actuators” dated Oct. 2002 (12 p.).
Kvaerner Oilfield Products A.S. Memo-Multiphase Pumping Technical Issues, dated May 19, 2004 “D” (10 p.).
Offshore Article “Multiphase Pump,” Jul. 2004 “C” (1 p.).
JETECH DA-4D & DA-8D Ultra-High Pressure Increases “L” (3 p.).
Force Pump, Double-Acting, Internet, Glossary “J” dated Sep. 7, 2004 (2 p.).
Online Publication: Weatherford Ram Pump dated Aug. 10, 2005 “B” (2 p.).
Framo Multiphase Booster Pumps dated Aug. 10, 2005 “F” (1 p.).
A750/09, In the Court of Session, Intellectual Property Action, Closed Record, in the Cause DES Operations et al. vs. Vetco Gray, Inc., et al., Updated record to include adjusted Answers to Minute of Amendment Oct. 21, 2010 (90p.).
A750/09, In the Court of Session, Intellectual Property Action, Note of Arguments for the First to Fifth Defenders Dec. 30, 2010 (18 p.).
A750/09, In the Court of Session, Intellectual Property Cause; Response to the Pursuers to the Note of Argument for the Defenders Mar. 3, 2011 (12 p.).
A750/09, In the Court of Session, Intellectual Property Action, Open Record, D.E.S. Operations Limited, Cameron Systems Ireland Limited (Pursuers) against Vetco Gray, Inc., Paul White, Paul Milne, and Norma Brammer (Defenders) Adjusted for the Pursuers Feb. 9, 2010 as further adjusted for the Pursuers Apr. 6, 2010 (53pp).
Initiation of Proceedings Before the Comptroller, Oct. 22, 2009; in the Matter of DES Operations Limited and Cameron Systems Ireland Limited and Vetco Gray Inc., and in the Matter of an Application Under Sections 133, 91A, 121A, and 371 of the Patent Act 1977, Statement of Grounds, Oct. 22, 2009 (21pp).
Singapore Examination Report dated Jan. 10, 2007; Application No. 200507390-3 (5 p.).
Singapore Written Opinion dated May 3, 2010; Application No. 200903220-2 (5 p.).
Singapore Written Opinion dated Oct. 12, 2010; Application No. 200903221-0 (11 p.).
Response to Singapore Written Opinion Dated Oct. 12, 2010; Application No. 200903221-0; Response filed Mar. 8, 2011 (11 p.).
U.S. Office Action dated Feb. 26, 2003; U.S. Appl. No. 10/009,991 (5 p.).
Response to Office Action dated Feb. 26, 2003; U.S. Appl. No. 10/009,991; Response filed May 12, 2003 (7 p.).
Notice of Allowance dated May 28, 2003; U.S. Appl. No. 10/009,991 (5 p.).
Provisional Application filed Oct. 22, 2003; U.S. Appl. No. 60/513,294 (15 p.).
Provisional Application filed Feb. 26, 2004; U.S. Appl. No. 60/548,630 (23 p.).
Provisional Application filed Feb. 26, 2004; U.S. Appl. No. 60/548,727 (36 p.).
U.S. Office Action dated Mar. 25, 2004; U.S. Appl. No. 10/415,156 (6 p.).
Response to Office Action dated Mar. 25, 2004; U.S. Appl. No. 10/415,156 (9 p.).
Notice of Allowance dated Jul. 26, 2004; U.S. Appl. No. 10/415,156 (4 p.).
U.S. Office Action dated Dec. 20, 2005; U.S. Appl. No. 10/651,703 (8 p.).
Response to Office Action dated Dec. 20, 2005; U.S. Appl. No. 10/651,703 (13 p.).
Notice of Allowance dated Apr. 26, 2006; U.S. Appl. No. 10/651,703 (7 p.).
Response to Notice of Allowance dated Apr. 26, 2006; U.S. Appl. No. 10/51,703 (7 p.).
Provisional Application filed Nov. 19, 2007; U.S. Appl. No. 61/190,048 (24 p.).
U.S. Office Action (Restriction Requirement) dated Feb. 11, 2008; U.S. Appl. No. 10/558,593 (7 p.).
Response to Office Action (Restriction Requirement) dated Feb. 11, 2008; U.S. Appl. No. 10/558,593 (12 p.).
U.S. Office Action (Restriction Requirement) dated Jul. 10, 2008; U.S. Appl. No. 10/558,593 (6 p.).
Response to Office Action (Restriction Requirement) dated Jul. 10, 2008; U.S. Appl. No. 10/558,593 (12 p.).
U.S. Office Action dated Jan. 8, 2009; U.S. Appl. No. 10/558,593 (8 p.).
Response to Office Action dated Jan. 8, 2009; U.S. Appl. No. 10/558,593 (31 p.).
Final Office Action dated Jul. 7, 2009; U.S. Appl. No. 10/558,593 (6 p.).
Response to Final Office Action dated Jul. 7, 2009; U.S. Appl. No. 10/558,593 (26 p.).
Office Action (Restriction Requirement) dated Jan. 7, 2010; U.S. Appl. No. 12/541,934 (5 p.).
Response to Office Action dated Jan. 7, 2010; U.S. Appl. No. 12/541,934 (6 p.).
U.S. Office Action dated Jul. 21, 2010; U.S. Appl. No. 10/558,593 (10 p.).
Response to Office Action dated Jul. 21, 2010; U.S. Appl. No. 10/558,593 (9 p.).
Office Action dated Aug. 12, 2010; U.S. Appl. No. 12/441,119 (14 p.).
Response to Office Action dated Aug. 12, 2010; U.S. Appl. No. 12/441,119; Response filed Nov. 8, 2010 (12 p.).
U.S. Office Action dated Aug. 31, 2010; U.S. Appl. No. 10/590,563 (13 p.).
Response to Office Action dated Aug. 31, 2010; U.S. Appl. No. 10/590,563; Response filed Nov. 29, 2010 (8 p.).
U.S. Office Action dated Oct. 6, 2010; U.S. Appl. No. 12/541,938 (7 p.).
Response to Office Action dated Oct. 6, 2010; U.S. Appl. No. 12/541,938; Response filed Jan. 11, 2011 (8 p.).
Office Action dated Dec. 7, 2010; U.S. Appl. No. 12/541,936 (12 p.).
Response to Office Action dated Dec. 7, 2010; U.S. Appl. No. 12/541,936; Response filed Jan. 20, 2011 (9 p.).
Notice of Allowance dated Jan. 6, 2011; U.S. Appl. No. 10/558,593 (26 p.).
Final Office Action dated Feb. 3, 2011; U.S. Appl. No. 12/441,119 (12 p.).
Office Action dated Feb. 16, 2011; U.S. Appl. No. 12/541,937 (7 p.).
Final Office Action dated Mar. 2, 2011, U.S. Appl. No. 10/590,563 (7 p.).
Response to Final Office Action dated Mar. 2, 2011; U.S. Appl. No. 10/590,563; Response filed Apr. 26, 2011 (8 p.).
Norwegian Office Action dated Mar. 28, 2011; Application No. 20015431 (3 p.).
Response to Final Office Action dated Feb. 3, 2011; U.S. Appl. No. 12/441,119; Response filed Mar. 30, 2011 (11 p.).
Final Office Action dated Mar. 30, 2011; U.S. Appl. No. 12/541,938 (5 p.).
Response to Final Office Action dated Mar. 30, 2011; U.S. Appl. No. 12/541,938; Response filed Apr. 18, 2011 (10 p.).
Notice of Allowance dated Apr. 1, 2011; U.S. Appl. No. 12/541,936 (5 p.).
Notice of Allowance dated Apr. 4, 2011; U.S. Appl. No. 10/558,593 (5 p.).
U.S. Office Action dated Apr. 13, 2011; U.S. Appl. No. 12/441,119 (10 p.).
Office Action Dated Apr. 14, 2011; U.S. Appl. No. 12/768,324 (7 p.).
Office Action Dated Apr. 28, 2011; U.S. Appl. No. 12/768,332 (6 p.).
Notice of Allowance Dated May 6, 2011, U.S. Appl. No. 12/541,938 (5 p.).
U.S. Office Action/Advisory Action dated May 6, 2011; U.S. Appl. No. 10/590,563 (3p.).
U.S. Office Action dated May 25, 2011; U.S. Appl. No. 12/515,534 (7p.).
Supplemental Notice of Allowance dated Jun. 8, 2011; U.S. Appl. No. 12/541,936 (2p.).
Notice of Allowance dated Jun. 28, 2011; U.S. Appl. No. 10/590,563 (14p.).
Response to Office Action dated Dec. 6, 2010; Canadian Application No. 2,526,714; Response filed Jun. 6, 2011 (16p.).
Response to Search Opinion; European Application No. 10185612.8; Response filed Jun. 29, 2011 (13p.).
Examination Report dated Jun. 30, 2011; European Application No. 10161116.8 (2p.).
Examination Report dated Jun. 30, 2011; European Application No. 10161117.6 (2p.).
Examination Report dated Jun. 30, 2011; European Application No. 10161120.0 (2p.).
Examination Report dated Jun. 30, 2011; European Application No. 10167181.6 (2p.).
Examination Report dated Jun. 30, 2011; European Application No. 10167182.4 (2p.).
Examination Report dated Jun. 30, 2011; European Application No. 10167183.2 (2p.).
Examination Report dated Jun. 30, 2011; European Application No. 10167184.0 (2p.).
Supplemental Notice of Allowance dated Jul. 7, 2011; U.S. Appl. No. 10/558,593 (7p.).
Response to Office Action dated Apr. 14, 2011; U.S. Appl. No. 12/768,324; Response filed Jul. 14, 2011 (7p.).
Response to Office Action dated Apr. 28, 2011; U.S. Appl. No. 12/768,332 (7 p.).
Notice of Allowance dated Jul. 22, 2011; U.S. Appl. No. 12/441,119 (15 p.).
European Search Report dated Dec. 2, 2010; European Application No. 10185612.8 (4 p.).
Norwegian Response to Office Action dated Jun. 22, 2011; Application No. 20015431 (19p.).
European Response to Search Opinion; Application No. 10185795.1; Response filed Aug. 3, 2011 (12 p.).
U.S. Office Action dated Jul. 21, 2011; U.S. Appl. No. 12/515,729 (53 p.).
Supplemental Notice of Allowance dated Aug. 8, 2011; U.S. Appl. No. 12/441,119 (9 p.).
Summons to Oral Proceedings dated Aug. 3, 2011; European Application No. 01980737.9 (3 p.).
European Response to Search Opinion; European Application No. 10013192.9; Response filed Aug. 10, 2011 (10 p.).
Notice of Allowability dated Aug. 26, 2011; U.S. Appl. No. 10/590,563 (11 p.).
European Office Action dated Aug. 22, 2011; Application No. 10185612.8 (2 p.).
U.S. Final Office Action dated Sep. 7, 2011; U.S. Appl. No. 12/541,937 (13 p.).
European Response to Oral Summons dated Sep. 22, 2011, EP Application No. 01980737.9 (42 p.).
Supplemental Notice of Allowance dated Oct. 11, 2011; U.S. Appl. No. 12/441,119 (8 p.).
Office Action dated Oct. 17, 2011; U.S. Appl. No. 12/768,337 (64 p.).
Notice of Allowance dated Oct. 17, 2011; U.S. Appl. No. 12/768,332 (56 p.).
Office Action dated Oct. 17, 2011; U.S. Appl. No. 12/768,324 (18 p.).
Canadian Office Action dated Oct. 14, 2011; Canadian Application No. 2,526,714 (3 p.).
Notice of Allowance dated Oct. 23, 2011; U.S. Appl. No. 12/515,534 (7 p.).
Corrected Notice of Allowance dated Oct. 26, 2011; U.S. Appl. No. 12/541,938 (8 p.).
European Exam Report dated Nov. 14, 2011; European Application No. 05781685.2 (3 p.).
European Decision to Grant dated Nov. 4, 2011; European Application No. 01980737.9 (4 p.).
Supplemental Notice of Allowability dated Dec. 6, 2011; U.S. Appl. No. 12/768,332 (10 p.).
Notice of Allowance dated Dec. 16, 2011; U.S. Appl. No. 13/116,889 (7 p.).
Response to Office Action dated Aug. 22, 2011; Response dated Dec. 22, 2011; European Application No. 10185612.8 (2 p.).
Office Action dated Dec. 22, 2011; U.S. Appl. No. 12/515,729 (31 p.).
Notice of Allowance dated Dec. 23, 2011; U.S. Appl. No. 12/768,337 (5 p.).
Examination Report dated Dec. 20, 2011; GB Application No. 0821072.6 (2 p.).
Observations dated May 10, 2011; GB Application No. 0821072.6 (19 p.).
European Response to Exam Report; European Application No. 10167184.0; Response filed Jan. 4, 2012 (142 p.).
Supplemental Notice of Allowability dated Jan. 9, 2012; U.S. Appl. No. 13/116,889 (10 p.).
European Response to Office Action; European Application No. 10185795.1; Response filed Jan. 23, 2012 (2 p.).
European Response to Office Action; European Application No. 10013192.9; Response filed Jan. 23, 2012 (2 p.).
Supplemental Notice of Allowance; U.S. Appl. No. 12/768,337 (10 p.).
Response to Office Action dated Oct. 17, 2011 U.S. Appl. No. 12/768,324 (5 p.).
Canadian Notice of Allowance dated Feb. 23, 2012; Canadian Application No. 2,555,403 (1 p.).
U.S. Notice of Allowance dated Mar. 29, 2012; U.S. Appl. No. 12/768,324 (18p.).
U.S. Response to Office Action Dated Dec. 22, 2011; Response filed Mar. 22, 2012; U.S. Appl. No. 12/515,729 (14p.).
U.S. Corrected Notice of Allowability dated Mar. 29, 2012; U.S. Appl. No. 13/116,889 (11p.).
Canadian Response to Office Action dated Oct. 7, 2011; Response filed Mar. 22, 2012; Canadian Application No. 2,526,714 (18 p.).
European Decision to Grant dated Mar. 15, 2012; European Application No. 01980737.9 (1 p.).
European Response to Office Action Dated Nov. 14, 2011; European Application No. 05781685.2; Response filed May 22, 2012 (3 p.).
U.S. Corrected Notice of Allowability dated Jan. 8, 2012; U.S. Appl. No. 12/768,324 (10 p.).
Australian Response to Office Action; Australian Application No. 20112001651 Response Filed Jun. 20, 2012 (124 p.).
European Office Action dated Feb. 7, 2012; European Application No. 07864482.0 (8 p.).
U.S. Office Action dated Jul. 20, 2012; U.S. Appl. No. 13/164,291 (71 p.).
European Response to Office Action Dated Feb. 7, 2012; Application No. 07864482.0; Response Filed Aug. 9, 2012 (10 p.).
European Search Report and Opinion Dated Aug. 6, 2012; Application No. 12003132.3 (7 p.).
Canadian Office Action Dated Aug. 8, 2012; Canadian Application No. 2,526,714 (2 p.).
U.S. Office Action dated Sep. 4, 2012; U.S. Appl. No. 13/415,635 (5 p.).
Office Action dated Oct. 3, 2012; U.S. Appl. No. 13/536,433 (9 p.).
U.S. Office Action dated Oct. 12, 2012; U.S. Appl. No. 13/205,284 (9 p.).
U.S. Office Action dated Nov. 6, 2012; U.S. Appl. No. 13/405,997 (12 p.).
U.S. Response to Office Action Dated Jul. 20. 2012; U.S. Appl. No. 13/167,291; Response Filed Nov. 15, 2012 (13 p.).
U.S. Response to Office Action Dated Sep. 4, 2012; U.S. Appl. No. 13/415,635; Response Filed Dec. 4, 2012 (7 p.).
Lafitte, J.L., et al., “Dalia Subsea Production System: Presentation and Challenges,” (OTC 18541) 2007 Offshore Technology Conference, Houston, Texas Apr. 30-May 3, 2007 (10 p.).
Dalia Brochure, Total S.A., Feb. 2007, France (98 p.).
U.S. Final Office Action dated Dec. 24, 2012; U.S. Appl. No. 13/164,291 (6p.).
U.S. Response to Office Action Dated Oct. 12, 2012; U.S. Appl. No. 13/205,284; Response Filed Jan. 14, 2013 (8 p.).
U.S. Response to Office Action Dated Nov. 6, 2012; U.S. Appl. No. 13/405,997; Response Filed Feb. 5, 2013 (13 p.).
U.S. Response to Final Office Action Dated Dec. 24, 2012; U.S. Appl. No. 13/164,291; Response Filed Feb. 25, 2013 (7 p.).
U.S. Final Office Action Dated Mar. 6, 2013; U.S. Appl. No. 13/205,284 (11 p.).
U.S. Office Action Dated Mar. 6, 2013; U.S. Appl. No. 13/415,635 (18 p.).
U.S. Final Office Action Dated Mar. 6, 2013; U.S. Appl. No. 13/536,433 (15 p.).
Notice of Allowance Dated Mar. 7, 2013; U.S. Appl. No. 13/164,291 (9 p.).
U.S. Office Action Dated Mar. 18, 2013; U.S. Appl. No. 13/591,443 (10 p.).
U.S. Final Office Action Dated Apr. 8, 2013; U.S. Appl. No. 13/405,997 (15 p.).
U.S. Response to Final Office Action Dated Mar. 6, 2013; U.S. Appl. No. 13/205,284; Response Dated May 6, 2013 (11 p.).
U.S. Response to Final Office Action Dated Mar. 6, 2013; U.S. Appl. No. 13/536,433; Response Dated May 6, 2013 (26 p.).
U.S. Response to Office Action Dated Mar. 6, 2013; U.S. Appl. No. 13/415,635; Response Dated Jun. 6, 2013 (14p.).
U.S. Response to Final Office Action Dated Mar. 6, 2013; U.S. Appl. No. 13/536,433; Response Dated Jun. 6, 2013 (11 p.).
U.S. Response to Final Office Action Dated Apr. 8, 2013; U.S. Appl. No. 13/405,997; Response Filed Jun. 12, 2013 (18 p.).
U.S. Response to Office Action Dated Mar. 18, 2013, U.S. Appl. No. 13/591,443; Response Filed Jun. 18, 2013 (10 p.).
Canadian Notice of Allowance dated May 30, 2013; Canadian Application No. 2,526,714 (1 p.).
U.S. Notice of Allowance dated Jun. 20, 2013; U.S. Appl. No. 13/536,433 (11 p.).
U.S. Office Action Dated Jul. 17, 2013; U.S. Appl. No. 13/687,290 (6 p.).
European Response to Office Action dated Sep. 10, 2012; Response Dated Jun. 14, 2013; European Application No. 12003132.3 (13 p.).
European Decision to Grant dated Jul. 15, 2013; European Application No. 10161117.6 (5 p.).
European Decision to Grant dated Jul. 15, 2013; European Application No. 101611200 (5 p.).
U.S. Supplemental Notice of Allowability dated Aug. 27, 2013; U.S. Appl. No. 13/536,433 (6 p.).
U.S. Notice of Allowance dated Sep. 5, 2013; U.S. Appl. No. 13/205,284 (10 p.).
European Office Action dated Aug. 21, 2013; European Application No. 07864486.1 (5 p.).
U.S. Final Office Action dated Sep. 12, 2013; U.S. Appl. No. 13/415,635 (17 p.).
U.S. Final Office Action dated Sep. 16, 2013; U.S. Appl. No. 13/267,039 (11 p.).
U.S. Final Office Action dated Sep. 27, 2013; U.S. Appl. No. 13/591,443 (7 p.).
European Decision to Grant dated Sep. 26, 2013; European Application No. 10167181.6 (2 p.).
U.S. Supplemental Notice of Allowability dated Oct. 8, 2013; U.S. Appl. No. 13/205,284 (6 p.).
U.S. Supplemental Notice of Allowability dated Oct. 11, 2013; U.S. Appl. No. 13/405,997 (6 p.).
European Decision to Grant dated Sep. 19, 2013; European Application No. 10185612.8 (2 p.).
European Decision to Grant dated Sep. 5, 2013; European Application No. 10167183.2 (2 p.).
European Office Action dated Sep. 6, 2013; European Application No. 10167182.4 (1 p.).
U.S. Response to Final Office Action Dated Sep. 12, 2013; U.S. Appl. No. 13/415,635; Response Filed Nov. 12, 2013 (14 p.).
European Office Action dated Sep. 10, 2013; European Application No. 10013192.9 (1 p.).
U.S. Response to Final Office Action Dated Sep. 16, 2013; U.S. Appl. No. 13/267,039; Response Filed Nov. 18, 2013 (11 p.).
U.S. Response to Office Action Dated Jul. 19, 2013; U.S. Appl. No. 13/687,290; Response Filed Nov. 19, 2013 (17 p.).
U.S. Response to Final Office Action Dated Sep. 12, 2013 and Advisory Action Dated Nov. 25, 2013; U.S. Appl. No. 13/415,635; Response Filed Dec. 13, 2013 (12 p.).
U.S. Response to Final Office Action Dated Sep. 16, 2013 and Advisory Action Dated Dec. 11, 2013; U.S. Appl. No. 13/267,039; Response Filed Dec. 16, 2013 (8 p.).
U.S. Response to Final Office Action Dated Sep. 27, 2013; U.S. Appl. No. 13/591,443; Response Dated Dec. 27, 2013 (12 p.).
U.S. Notice of Allowance Dated Jan. 14, 2014; U.S. Appl. No. 13/687,290 (8 p.).
U.S. Advisory Action Dated Jan. 24, 2014; U.S. Appl. No. 13/591,443 (3 p.).
U.S. Notice of Allowance Dated Jan. 27, 2014; U.S. Appl. No. 13/267,039 (5 p.).
U.S. Notice of Allowance Dated Jan. 31, 2014; U.S. Appl. No. 13/415,635 (38 p.).
U.S. Notice of Allowance Dated Mar. 12, 2014; U.S. Appl. No. 13/591,443 (29 p.).
European Response to Office Action Filed Mar. 13, 2014; European Application No. 10161116.8 (17 p.).
European Response to Office Action Filed Mar. 13, 2014; European Application No. 101671824 (10 p.).
European Response to Office Action Filed Mar. 13, 2014; European Application No. 10013192.9 (13 p.).
Australian Examination Report dated Jul. 3, 2014; Australian Application No. 2012238329 (6 p.).
SG Examination Report dated Jul. 28, 2010; Singapore Application No. SG 200901449-9 (4 p.).
Statement Accompanying Information Disclosure Statement; U.S. Appl. No. 13/536,433; filed Dec. 28, 2012 (3 p.).
Canadian Office Action dated Dec. 22, 2014; Canadian Application No. 2,826,503 (5 p.).
Norwegian Office Action dated Mar. 15, 2015; Norwegian Application No. 20063911 (4 p.).
Australian Examination Report dated Jul. 3, 2003; Application No. 47694/00 (2 p.).
Australian Response to Examination Report; Application No. 47694/00; Response filed Jul. 5, 2004 (20 p.).
Australian Examination Report dated Jul. 21, 2006; Application No. 2002212525 (2 p.).
Australian Response to Examination Report; Application No. 2002212525; Response filed Jun. 22, 2007 (33 p.).
Australian Examiners Report dated Sep. 14, 2010; Application No. 2004289864 (2 p.).
Australian Response to Examiners Report; Application No. 2004289864; Response filed Dec. 7, 2010 (23 p.).
Australian Examiners Report No. 3 dated Dec. 13, 2010; Application No. 2004289864 (1 p.).
Brazilian Examination Report dated Apr. 3, 2008; Application No. PI0115157-6 (3 p.).
Canadian Office Action dated Jan. 10, 2007; Application No. 2,373,164 (2 p.).
Response to Canadian Office Action; Application No. 2,373,164; Response filed Jul. 10, 2007 (16 p.).
Canadian Office Action dated Oct. 12, 2007; Application No. 2,428,165 (2 p.).
Response to Canadian Office Action; Application No. 2,428,165; Response filed Jan. 3, 2008 (16 p.).
Canadian Office Action dated Dec. 6, 2010; Application No. 2,526,714 (3 p.).
EP Preliminary Examination Report & Written Opinion dated Sep. 4, 2001; PCT/GB00/01785 (17 p.).
Related Publications (1)
Number Date Country
20140332222 A1 Nov 2014 US
Provisional Applications (1)
Number Date Country
60548727 Feb 2004 US
Divisions (1)
Number Date Country
Parent 10590563 US
Child 13267039 US
Continuations (1)
Number Date Country
Parent 13267039 Oct 2011 US
Child 14282937 US