This invention deals with building construction and more specifically with the construction of prefabricated special concrete shear-walls, prefabricated special concrete moment frames, hybrid pre-cast/site cast concrete construction, ductile reinforcement connections, and new and novel methods of fulfilling the requirements of the seismic specifications of the current and proposed model building codes.
In a typical example of the preferred embodiment of the present invention, with a minimum rating of 5,000 psi concrete, a typical 7-½″ wall section requires approximately 55% of the concrete required for an equivalent solid concrete wall, yet provides in excess of 85% of the equivalent effective load capacity, or about 8,000 lbs./lf.
This results in an effective factored load rated capacity for seismic applications of approximately 6,000 lbs./lf.
When filled with insulation, (R=5/1″) the wall is engineered to a thermal rating of R-13.
Every 1,000 sq. ft. of wood construction replaced with concrete saves an estimated 15 to 20 trees, (and lasts many times as long.)
Pursuant to Chapters 16, 18 & 19 of the Uniform Building Code, for regular structures designed according to: Table 16 N, 1629.1-1629.10.2-1630.2.1-1630.2.3.2-1630.8.2.2-1630.9.2-1630.10.1-1630.11-1630.4-1630.5-1630.6-1630.7-1630.8-1630.8.2.2-1631.2-1631.5.5-1631.5.6-1631.5.7-1632.5-1633.2.4.1-1633.2.8-1633.2.9-1809.4-1921.3.2-1921.3.3-1921.4.4.5-1921.6.6-2213.7.1.3 the maximum allowed building height for a special moment resisting frame in concrete is not limited
Conventional methods of constructing prefabricated concrete buildings and particularly prefabricated concrete foundations and foundation walls in seismically active areas have become increasingly difficult to design in recent years as the requirements of State's building codes and the model building codes on which they are based have become more restrictive with the continuing scientific research and resultant improved understanding of the vulnerability of ordinary concrete and conventional reinforcement methods to seismic events.
These requirements have effectively prevented numerous innovative building systems from being utilized in seismically active areas.
A recent “quick” search of the U.S. Patent office database returns 1147 matches for “building panel”.
Most State's model codes are regularly updated to implement improvements, standardizations, and new technologies that have been adopted by the model code organizations. During the last ten years, consolidation has resulted in one model code organization, the “International Code Council” (ICC).
Their publications, particularly the “International Residential Code” (IRC 2006), and the “International Building Code” (IBC 2006), when in reference to standards for concrete construction, refer to the “American Concrete Institute” and in particular their committee 318, and it's most recent publication; which is currently “Building Code Requirements for Structural Concrete (ACI 318-05) and Commentary (ACI 318-05R).
The IBC 2006 and ACI 318-05 further reference the “American Society of Civil Engineers Minimum Design Loads for Buildings and Other Structures”, or “ASCE 7”, Most of the specifications and details are for cast in place concrete, and any reference to pre-cast concrete generally or in regards to seismic requirements particularly are that any design with pre-cast concrete components should meet or exceed the strength requirements for cast in place concrete.
For construction details with exclusive relevance to precast concrete, readers are referred to the Precast Concrete Institute, (PCI), and its publication “PCI Precast and Prestressed Concrete Handbook”, (PCI-99).
Further complicating the provisions is section 1908 of the “IBC 2006”, and specifications 1908.1.1 through 1908.1.16, which are modifications, exceptions, or additions to the seismic provisions of ACI 318-05
Other organizations, regulatory bodies and bureaucracies contributing or participating in construction technologies evaluation, seismic safety, and concerns relevant to seismic design include the Department of Housing and Urban Development, (HUD), the Federal Emergency Management Agency, (FEMA), the Building Seismic Safety Council, (BSSC), the National Earthquake Hazard Reduction Program, (NEHRP), the Earthquake Engineering Research Institute, (EERI), the Applied Technology Council, (ATC), the Scientific Earthquake Studies Advisory Committee, (SESAC), the National Institute of Standards and Technologies, (NIST), the National Science Foundation, (NSF), the United States Geological Survey, (USGS), the U.S. Army Engineer Research and Development Center, (ERDC), the Consortium of Universities for Research in Earthquake Engineering, (CUREE), the Multidisciplinary Center for Earthquake Engineering, (MCEER), the Pacific Earthquake Engineering Resource Center, (PEER), the National Hazards Center at the University of Colorado, (NHC), the Southern California Earthquake Center, (SCEC), the Mid-America Earthquake Center, (MAEC), and the Network for Earthquake Engineering Simulation, (NEES).
Earthquake preparedness organizations include the Cascadia Region Earthquake Workgroup, (CREW), the Western States Seismic Policy Council, (WSSPC), the Northeast States Emergency Consortium, (NSEC), and the Central US Earthquake Consortium, (CUSEC).
HUD has long recognized the potential benefits of panelized building construction and in September of 2004 it presented a document entitled “Residential Panels Benchmark Requirements”, which outlined the state of the art at that time, categorized the various types of panel construction, and established some criteria for evaluating the various methods.
Except for “Structurally Insulated Panels Systems”, (SIPS), and “concrete-skinned studs” (also known in the trade as Concrete Thin Shell, (CTS)), the model code makes no explicit provisions for the testing or use of other panel system in earthquake resistant construction, unless it is attached to a seismically designed structural steel.
HUD prepared a list of performance measures that was refined to “10 headings to focus the measures and to allow them to dovetail with code requirements, which would permit the performance measures to relate directly to relevant code citations.”
Commentary from the American Concrete Institute outlines the following considerations for seismic design:
“The principal steps involved in the earthquake-resistant design of a typical concrete structure according to building code provisions are as follows:
a. calculation of base shear corresponding to computed or estimated fundamental period of vibration of the structure (a preliminary design of the structure is assumed here).
b. distribution of the base shear over the height of the building
It is important to note that some buildings are required to be designed by a dynamic, rather than a static, lateral force procedure when one or more criteria of the static procedure are not satisfied.”
Examples of attempts at resolving these needs are extensive in the patent literature and in the marketplace. The purpose of this invention is to improve upon the prior art to achieve the promise of these technologies with a cost effective seismic code compliant building technology.
The primary focus of this invention pertains to affordable residential construction; however nothing about this invention limits it to such use.
In U.S. residential construction one of the more successful panel systems is the “Superior Wall System™”, which is designed for basement/1st level construction with conventional light construction for up to an additional 2-½ floors. It is based on patents by Zimmerman, U.S. Pat. Nos. 6,494,004; 5,656,194; 5,055,252; 4,934,121; 4,751,803; 4,605,529; and 4,570,398. In its most recent iteration, the “Xi™” wall system, (patent #6,494,004), it fulfills the 10 categories of measure by HUD criteria effectively. It is manufactured at 17 facilities and is available in 24 States and the District of Columbia, It is the subject of ICC-ES legacy report #21-72 reissued Nov. 1st, 2005 (rated at 4,000 lb./If), and HUD Structural Engineering Bulletin #1117 Rev. 5, (4,360 lbs./If).
The “Superior Wall System™”, is not, however, available in areas with significant potential for seismic activity, (seismic zones D, E, and F.)
Analysis of the Superior Wall System™, reveals that principle among the reasons that the system is not available for seismic applications is insufficient/untested anchorage to a foundation system to resist seismic shear, inadequate and/or non-continuous reinforcement resulting in plastic hinge regions, a lack of ductile connections for beams, shear walls, or columns within the building, and a lack of a damping mechanism for dissipating the energy of a seismic event by ductile yielding or other means. In the parlance of the current building codes, it does not meet the requirements for “Special Concrete Moment Resisting Shear Walls”.
One of the compelling rationales for concrete panel construction is the presumption of fire resistance. The ICC re-issued legacy report of the UBC, ER-3264, on Dec. 1, 2003. Its subject is the “Design of Fire-resistive Construction for Precast and Prestressed Concrete. It further states “The design of fire-resistive construction requires the use of the PCI manual “Design for Fire Resistance of Precast Prestressed Concrete,” 1989, a copy of which must be submitted to the building official when a fire-resistive design under this report is submitted for approval
The wall panel system herein described, with the benefit of the connectors, boundary elements and ductile anchoring devices of the present invention, offers a building system conforming to the existing model codes for use anywhere including regions of high seismic activity. The wall panel system offers an economical building system that is beneficial to environmental conservation, durable, non-flammable, thermally efficient, attractive, and flexible to adaptations of conventional building technologies, components, and accessories.
It may be seen in all known examples of the prior art that in each embodiment a substantially orthogonal connection attaches each wall panel one to another. Even in panel systems with integral corner panels the panel connections are potential failure points during a seismic event.
The diagonal wall connectors and wall anchor/shear plate with post-tensioning brace plate connectors of the present invention, along with the building methods described, provide a wall panel connection that is as strong or stronger than the wall panels themselves, as well as being ductile and therefore able to dissipate substantial energy as that energy is transmitted amongst the various portions of the building component system during a seismic event.
It will be seen in the following descriptions that the dimensions of the columns are not limited by the dimensions of the wall panels, and therefore a multiple story construction may be designed according to the engineering requirements of a precast concrete moment frame building.
a) is an enlargement of
a) is an enlargement of
a) is an enlargement of
Conventional architectural building plans are prepared for a prospective building owner or developer by an architect or engineer. Soil, geo-technical, civil, and any other engineering studies required by the code and local building officials are prepared. The plans are submitted to a licensed panel manufacturer for evaluation of engineering requirements by an authorized engineer.
A feasibility study is performed and upon acceptance an estimate of the building and construction costs is prepared. When a contract to build is executed, the licensed panel manufacturer prepares the necessary plans and documentation for permit application, including engineering of the structural assembly components, structural walls, columns, beams, diaphragms, moment frames, trusses, reinforcement bar, wire, cable, anchors, inserts, plates, ductile connectors, channel, tubing, and any other embedded elements and any other structural members.
Engineering documentation of all loads, shear, stress, yield, moment calculations, inspections, tests, or other requirements are prepared.
Architectural engineering documentation and drawings of patterns, designs, art work, textures, colors, and chemistry of cement composites, admixtures, colorants, precise ratios of water, temperatures, mixing times, ASTM specifications, MSDS documentation, curing times and procedures, or other requirements are prepared.
Architectural engineering drawings with detailing, tolerances, and specifications are prepared.
Building plans and documentation are submitted to the local building officials for permits.
Any modifications necessary to comply with local codes or other requirements to obtain building permits are completed.
Upon issuance of approved building plan permits, shop drawings with detailing, tolerances, and specifications are prepared.
Site work and preparation commences and the foundation structural elements such as pilings, footings, grade beams, mat slabs or diaphragms are built. Engineering precision of all formwork and anchorage is essential with any precast structure. The code specified tolerance of ¼″ variation in 40′ must be rigorously maintained.
Certified mill test reports are required for each shipment of reinforcing steel and/or structural steel to be used in structures assigned to Seismic Design Category D, E or F for resistance to flexural, shear and axial forces in reinforced concrete, intermediate and special moment frames, and boundary elements of special reinforced concrete shear walls. Structural steel must conform to one of the following specifications:
Reusable assembly molds are formed on a horizontal surface or on a surface prepared with architectural features or designs, according to the drawings. The fascia of the mold may be crafted in a variety of ways to suit the particular application, or prepared directly upon a suitably flat surface with a proper seal and release agent. Some of the more common mold forming materials are lumber, plywood, polystyrene foam, stainless steel, or fiberglass and resins. Sometimes reinforced latex is used to make castings of existing complex shapes. Other applications may use gypsum and/or cement and urethanes or vinyl.
The panel is framed at its top and bottom to establish the precise height of the panel. Additional components to provide for openings in the panel for the attachment of frames for doors, windows, or other features are placed against the mold face, with bracing and clamping devices to secure the components precisely in the mold.
Corner column and center column panel molds are formed with fascia corresponding to the adjoining wall panels as described in the drawings.
The ends of wall panel molds have a diagonal face that is facilitated by a diagonal wedge to provide a bracing surface to the ductile panel end connector. The wedge is placed perpendicular between the top and bottom of the mold, aligned and set to the precise dimensions of the panel.
The mold is suitably prepared with sealants and release agents to facilitate the production of the panel.
A surface layer of fiber-reinforced engineered cement composite (ECC) or other approved exterior type cement coating material, (stucco) or other cementitious materials as specified by the architectural or engineering documentation containing the specified coloring and waterproofing agents is applied to the entire exterior surface of the panel, (the inner face of the mold) sufficient to reach a uniform level surface and then such additional depth as may be required for the engineering of the particular application, (typically a minimum of 1″.)
Corner column panel molds are applied with a surface layer to each orthogonal face either simultaneously with the corner of the mold downwards, (each face of a typical corner at 45 degrees from horizontal), or in the case of molds which are particularly smooth or where the cement coating is not viscous enough to adhere to the mold face then each face is applied alternately in the horizontal position and allowed to set before alternating with the adjoining face.
Center column panel molds with diagonal wedges to form the sides (edges) of the column are applied with a surface layer to the face.
(The science of concrete chemistry has made tremendous strides in recent years as witnessed by the emergence of a variety of proprietary composites with extraordinary purported properties of strength and ductility, far in excess of values established for “ready mix” concrete. While it is beyond the scope of the present invention to address the merits of specific compositions, it is the recommendation of this inventor that every consideration be given to continuous improvements in the art of concrete preparation. Minor alterations in concrete formulations and admixtures with proprietary pozzolans, fly ash, silica fume, slag, wollastonite, steel and synthetic fibers, high range water reducers, crystallizers, artificial and specialty aggregates, etc., can have a profound affect on the material properties and by inference the presumed durability of concrete formulations.)
On each wall panel end a ductile panel end connector which is a boundary element plate that is fabricated of certified mill test steel plate and with slots in the end face are attached to the reinforcement assembly of Prestressing strand, welded wire and/or reinforcing bar. (In the preferred embodiment of this invention (shown in
A second layer of fiber reinforced concrete, ECC, foamed concrete, or other cementitious material as specified in the engineering documentation is applied over the first layer and covering the reinforcement assembly to the prescribed thickness of the building shell, (typically a minimum of 1-¼″) or as specified in the engineering documentation. Threaded inserts for the attachment of hooks for lifting and moving the panels may be placed along the top of the panels if they are not already incorporated in the reinforcement assembly.
(Under most circumstances it is possible to install the entire reinforcement assembly as a single continuous assembly, which is the preferred embodiment of the present invention, and to apply the cementitious material more or less continuously; however nothing about the present invention precludes the subsequent installation of additional reinforcement, cementitious materials, or other components or assemblies when required.
Foam or other forming materials to shape the interior ribs and beams of the wall panel are inserted into the panel assembly and glued, clamped, and braced to secure its position within the mold.
A third layer of fiber reinforced concrete, ECC, foamed concrete, or other cementitous material as specified in the engineering documentation is applied over the second layer and covering the reinforcement assembly to the prescribed thickness of the wall panel, (typically a minimum of ¾″, for a typical minimum shell thickness of 2-¾″.)
The interior of the wall is typically molded by forming with polystyrene foam that remains attached to the wall panel. The forming creates “ribs” and “beams” that are designed to emulate conventional framing, (studs, plates, etc.) so that conventional wall board, moldings, etc. and fasteners can be attached in the customary way. An assembly of polystyrene foam blocks is placed into the mold and fastened or braced with suitable anchoring to maintain its position during the final casting procedure. The rib configuration reduces the weight of the wall, provides substantial strength while minimizing the surface area exposed to the interior for better thermal efficiency, provides an area for thermal insulation in the finished wall, and facilitates the wall panel conforming to the specified wall dimensions. Devices such as electrical boxes, cable clips, etc. which are ordinarily nailed in wood frame construction may have their nails replaced with appropriate screw type anchors and may be inserted into cut-outs of the polystyrene foam adjoining the ribbed portion of the form according to the plans.
A trowel is drawn between the forms or between the perimeters of door or window framed openings and the forms and any excess cementitious material is removed.
In this preferred embodiment, a modified 1-⅝″ 25 gauge galvanized steel “hat channel” which has been riveted, welded, glued, or otherwise closed to form a triangular cross section is embedded into the concrete along the top, bottom, and along any other horizontal elements of the panel, (to replicate top and bottom plates, sub sills, headers, etc.), and along each rib or vertical element, (to replicate studs, trimmers, etc.), to facilitate the eventual attachment of the wall board and/or other interior wall materials.
In an alternative embodiment, an unmodified 1-⅝″ 25 gauge galvanized steel “hat channel” which has been fitted with an insulation strip on its interior face is embedded into the concrete along the top, bottom, and along any other horizontal elements of the panel, (to replicate top and bottom plates, sub sills, headers, etc.), and along each rib or vertical element, (to replicate studs, trimmers, etc.), to facilitate the eventual attachment of the wall board or other interior wall materials. This embodiment requires larger ribs and beam portions for embedment, and typically is somewhat more labor intensive.
Outside corner column molds are positioned with the corner down. Reinforcement according to the drawings, (including metallic or plastic ducts for the passage of post-tensioning cable), are placed within the mold and foam or other forming material is situated to create a cavity. The form is filled with a layer of fiber reinforced concrete, ECC, foamed concrete, or other cementitious material as specified in the engineering documentation is applied over the first layer of ECC and covering the reinforcement assembly to the prescribed thickness of the building shell, (typically a minimum of 1-¼″). Threaded inserts for the attachment of hooks for lifting and moving the panels may be placed along the top of the panels if they are not already incorporated in the reinforcement assembly. The sides of the column fascia are now diagonal, to meet flush with the diagonal ends of the connected building panels to form the finished building corner assembly.
Center column molds are positioned with the panel face down. Reinforcement according to the drawings is placed upon the first layer of ECC within the mold. Diagonal ends partially enclose the mold cavity and it is therefore particularly important with this element to assure the proper consolidation of the ECC with vibration. The form is filled with a second layer of ECC, fiber reinforced concrete, foamed concrete, or other cementitious material as specified in the engineering documentation over the first layer of ECC and covering the reinforcement assembly to the prescribed thickness of the building shell, (typically a minimum of 1¼″). Threaded inserts for the attachment of hooks for lifting and moving the panels may be placed along the top of the panels if they are not already incorporated in the reinforcement assembly. The sides of the column fascia are now diagonal, to meet flush with the diagonal ends of the building panels.
(Center and corner Columns may be engineered to serve as supports for interior beams or interior walls as well as connections for exterior wall panels.)
Any excess concrete that may be extruded from between the edges of the hat channel is removed.
Rapid laminations of the wall assembly with appropriate admixtures in the ECC assure that no cold joints will form between the layers and that the wall will therefore behave as a unit.
Floor/ceiling diaphragms may be similarly prepared with ribs to emulate ceiling joists and embedded hat channel for attachment of wall board for the finished ceiling. (Threaded inserts may be substituted for the embedded hat channel when suspended ceilings are specified).
Each panel is allowed to cure (set) for a period of time and under such conditions as is described in the engineering documentation and according to the testing procedures provided in the code.
When the concrete has achieved its prescribed hardness, the panel may be removed from the mold assembly.
Additional structural elements such as beams, columns, diaphragms, moment frames, trusses, and any other pre-cast structural members are similarly prepared, with or without architectural decoration, as described in the building plans and engineering documentation.
Alternatively, conventional wood or steel framing, hollow-core or double -T floor panels, or modular or manufactured homes may be built above the pre-cast concrete panel structure.
The building components are assembled according to the plans and in the order specified in the architectural and engineering specifications, typically by crane. Brass plate dividers, with corresponding slots to the slots in the boundary element steel of the wall panel ends or the wall panel/center column connectors are placed between the faces of the end plates and attached with bolts forming a slotted bolt connector/friction slip surface Wall anchor/shear plate with post-tensioning brace plate is attached to cast-in-place anchors or to suitable building code approved wedge type or similar anchors in the end of wall openings adjoining wall connections. Any required site assembled reinforcement is attached or welded. Column panels are placed; grouted or caulked according plan specifications and post-tensioning cable or strand is threaded through the duct from wall panel to adjoining wall panel. The cable is tensioned to plan specifications, which secures the column panel securely to the wall panels in preparation for site casting. The post-tensioning cable provides a mechanism for self-righting of walls after minor seismic displacements as well as securing the intermediate or special concrete columns to the intermediate or special concrete shear walls. Vertical and horizontal post-tension cable may also be installed for additional reinforcement when specified in the engineering plans. Multiple floor assemblies may proceed directly after wall assembly of the previous floor. Column panels are installed after the upper wall anchor/shear plate with post-tensioning brace plate is attached with all-thread to the panel or other types of construction on the floor above. Column cavities with reinforcement as specified in the drawings is site cast by filling the column cavities with fiber reinforced concrete, ECC, or other cementitious material as specified in the engineering documentation. Site casting, grouting, and any other structural work is completed, each floor of the structure being completed in its turn, roofing, doors and windows, interior framing, electrical, mechanical, plumbing, insulation, and similar improvements are completed, wall board is installed, painting, flooring, cabinetry, and finishing work is completed. As work progresses all necessary regular and special inspections are requested and performed until final inspection of the finished building is completed and delivered for occupancy.