Claims
- 1. A bridge construction system comprising:
- a first independent longitudinal truss positioned over a first bridge span;
- a second independent longitudinal truss positioned over a second bridge span;
- a gantry movably mounted on said trusses, said gantry having a first leg mounted to said first truss and a second leg mounted to said second truss, said gantry being drivable along said first and second trusses;
- gantry drive means for controllably driving said gantry along said trusses;
- a transverse trolley movably mounted on said gantry, said trolley being drivable along said gantry in a direction generally transverse to said longitudinal trusses, said trolley including winching means for lifting and carrying bridge components to be positioned along said bridge spans, and said trolley being selectively positionable over each of said bridge spans;
- connection means for mounting said longitudinal trusses to bridge components disposed along said bridge spans; and
- said gantry including first compensation means for adapting said gantry to changes in longitudinal truss vertical spacing, second compensation means for adapting said gantry to changes in longitudinal truss grade and third compensation means for adapting said gantry to changes in longitudinal truss horizontal spacing.
- 2. The bridge construction system of claim 1 further including means for selectively launching said longitudinal trusses along successive portions of said bridge spans.
- 3. The bridge construction system of claim 2 wherein said launching means includes means for longitudinally securing said gantry to said longitudinal truss mounting means and longitudinally driving said trusses using said gantry drive means.
- 4. The bridge construction system of claim 1 wherein said longitudinal truss mounting means includes means for adjusting the transverse position of said trusses.
- 5. The bridge construction system of claim 4 wherein said longitudinal truss mounting means includes roller means for supporting said longitudinal trusses for rolling longitudinal movement.
- 6. The bridge construction system of claim 1 wherein said gantry first leg is fixedly mounted to said gantry and said gantry second leg is pivotally mounted to said gantry.
- 7. The bridge construction system of claim 6 wherein said gantry second leg is extendable to adjust the distance between said gantry and said second longitudinal truss.
- 8. The bridge construction system of claim 2 wherein said gantry legs include rollers that rollingly engage said longitudinal trusses.
- 9. The bridge construction system of claim 8 wherein said gantry legs further include launching frames pivotally mounted to said gantry legs, said launching frames being engageable with said longitudinal truss mounting means for longitudinally restraining said gantry during truss launching.
- 10. The bridge construction system of claim 1 wherein said gantry drive mans includes control means for selectively driving said gantry legs in response to changes in grade differential between said first and second longitudinal trusses.
- 11. A construction system for fabricating a multi-span bridge comprising:
- longitudinal support means arranged in a span-wise direction over a pair of bridge spans having completed and uncompleted portions, said longitudinal support means including first and second longitudinal trusses;
- mounting means for mounting said longitudinal support means to completed bridge portions; and
- bridge component transport means moveably mounted on said longitudinal support means for transporting bridge components in a span-wise direction, said transport means including means for lifting and transversely positioning bridge components for mounting to completed bridge portions along said pair of bridge spans, said transport means further including first compensation means for adapting said transport means to changes in longitudinal truss vertical spacing, second compensation means for adapting said transport means to changes in longitudinal truss grade and third compensation means for adapting said transport means to changes in longitudinal truss horizontal spacing.
- 12. The bridge construction system of claim 11 wherein said first and second longitudinal trusses include lower and upper roller rails extending over said pair of bridge spans.
- 13. The bridge construction system of claim 11 wherein said mounting means includes means for transversely positioning said longitudinal support means.
- 14. The bridge construction system of claim 11 wherein said mounting means includes roller means for rollably supporting said longitudinal support means.
- 15. The bridge construction system of claim 11 wherein said transport means includes means for rollably mounting said transport means to said longitudinal support means.
- 16. The bridge construction system of claim 11 wherein said transport means includes drive means for driving said transport means in a span-wise direction over said longitudinal support means.
- 17. The bridge construction system of claim 16 wherein said drive means includes differential means for differentially driving said transport means in response to elevation differences in said bridge spans.
- 18. The bridge construction system of claim 11 wherein said transport means includes an adjustable support frame structure.
- 19. The bridge construction system of claim 11 wehrein said first compensation means includes extendable means for maintaining said transport means in engagement with said longitudinal support means despite changes in longitudinal truss vertical spacing.
- 20. The bridge construction system of claim 11 wherein said second compensation means includes first pivotable joint means for supporting said transport means in engagement with said longitudinal support means despite changes in longitudinal truss grade.
- 21. The bridge construction system of claim 11 wherein said third compensation means includes second pivotable joint means for maintaining said transport means in engagement with said transport means despite changes in longitudinal truss horizontal spacing.
- 22. A method for constructing a multi-span pre-cast segmental bridge having a plurality of piers and at least two decks formed by joining a series of precast segments across the spans extending between successive piers, the method comprising the steps of:
- arranging a first longitudinal truss over a first bridge span so as to be mounted at one truss end to the end of a first completed section of bridge or roadway, at one end of a first bridge span, and so as to be mounted on the next adjacent bridge pier at the other end of the first bridge span;
- arranging a second longitudinal truss over a second bridge span so as to be mounted at one truss end to the end of a second completed section of bridge or roadway at one end of a second bridge span, and so as to be mounted on the next adjacent bridge pier at the other end of the second bridge span;
- rollably mounting on said first and second longitudinal trusses a rolling gantry, said rolling gantry extending transversely between said longitudinal trusses and having a transversely moveable lifting trolley mounted thereon, said rolling gantry further including first compensation means for adapting said rolling gantry to changes in longitudinal truss vertical spacing, second compensation means for adapting said rolling gantry to changes in longitudinal truss grade and third compensation means for adapting said rolling gantry to changes in longitudinal truss horizontal spacing; and
- controllably driving said rolling gantry and said lifting trolley to fetch precast bridge segments from a source area and deliver said bridge segments for successive placement and attachment to said first and second bridge piers and bridge components previously attached thereto.
- 23. The method of claim 22 wherein said bridge segments are successively placed on the side of said bridge piers facing said first and second bridge spans, and on the opposing side of said bridge piers facing next successive bridge spans.
- 24. The method of claim 23 wherein following the completion of the first and second bridge spans and one half of next successive bridge spans, the longitudinal trusses are launched to extend over said next successive bridge spans.
- 25. The method of claim 24 wherein said longitudinal trusses are launched in a two-step sequence wherein said longitudinal trusses are first launched so that a first end thereof is supported over said first and second bridge piers while a second end thereof is supported over next successive bridge piers from said first and second bridge piers, said longitudinal trusses next being launched so that said second end of said longitudinal trusses extend to the middle of the bridge span extending beyond said next successive bridge piers, and so that said first end of said longitudinal trusses extends over the end of the completed portions of said bridge spans.
- 26. The method of claim 23 wherein temporary supports are placed under said longitudinal trusses as bridge components are added to next successive bridge span from said first and second bridge piers.
- 27. A bridge construction system comprising:
- a first longitudinal truss positioned over a first bridge span;
- a second longitudinal truss positioned over a second bridge span;
- said longitudinal trusses including upper and lower roller bearing surfaces;
- a plurality of truss support assemblies mounted to completed sections of said bridge spans, said truss support assemblies including a transverse support beam secured to said completed bridge span sections and a pair of roller assemblies mounted on said transverse support beam for rollably supporting said longitudinal trusses above said bridge spans;
- a gantry movably mounted on said trusses;
- said gantry having a pair of transverse trusses extending between said longitudinal trusses, said transverse trusses having an upper roller bearing surface thereon;
- said gantry further including a lifting trolley rollably mounted on said transverse truss upper roller bearing surfaces, said lifting trolley including a winch and a spreader beam attached to said winch for picking up bridge segments and positioning them over a selected one of said bridge spans;
- said gantry further including a fixed leg assembly and a pivotable leg assembly rollably mounted on said longitudinal truss upper bearing surfaces, said pivotable leg assembly being joined by ball joint connections to said transverse trusses; and
- a gantry drive mounted on said gantry legs for longitudinally translating said gantry along said longitudinal trusses.
- 28. The bridge construction system of claim 27 wherein said gantry legs have pivotally mounted thereon a launching frame connectable to said truss support assemblies to fixedly connect said gantry to said support assemblies to permit said longitudinal trusses to be driven by said gantry drive for launching said bridge construction system along said bridge spans.
- 29. The bridge construction system of claim 27 wherein said gantry leg assemblies are joined by ball joint connections to roller assemblies that are rollably mounted on said longitudinal truss upper bearing surfaces.
- 30. The bridge construction system of claim 29 wherein said roller assemblies include upper and lower rollers for rollably restraining said gantry against elevational movement.
- 31. The bridge construction system of claim 27 wherein said longitudinal truss upper bearing surface includes a longitudinally extending rack, and said gantry drive includes a pinion rollably engaging said rack.
- 32. The bridge construction system of claim 27 wherein said truss support roller assemblies include a plurality of truss support rollers providing elevational support for said longitudinal trusses.
- 33. The bridge construction system of claim 32 wherein said longitudinal trusses include upper and lower flanges and said truss support roller assemblies further include rollers extending between said upper and lower longitudinal truss flanges to restrain said longitudinal trusses against elevation displacement.
- 34. The bridge construction system of claim 33 wherein said truss support roller assemblies further include lateral roller rollably engaging the sides of said lower longitudinal truss flange to restraining said longitudinal trusses against transverse displacement.
- 35. The bridge construction system of claim 27 wherein said truss support assemblies include a transverse jack attached to said truss support roller assemblies for transverse displacement of said longitudinal trusses.
- 36. The bridge construction system of claim 27 wherein said lifting trolley includes a pair of roller assemblies rollably mounted on said transverse truss upper roller bearing surfaces.
- 37. The bridge construction system of claim 36 wherein said lifting trolley includes an operator's cab for controlling movement of said gantry, said trolley and said winch.
- 38. The bridge construction system of claim 27 wherein said gantry pivotable leg is extendable.
- 39. The bridge construction system of claim 27 wherein said fixed leg assembly includes a pair of upright supports, one of said supports having a pivot connection therein to accommodate gantry twist.
Parent Case Info
This is a continuation (FILE WRAPPER) of application Ser. No. 07/558,828 filed July 27, 1990.
US Referenced Citations (11)
Foreign Referenced Citations (2)
Number |
Date |
Country |
2704033 |
Aug 1978 |
DEX |
1523191 |
Mar 1968 |
FRX |
Non-Patent Literature Citations (1)
Entry |
Travaux, No. 469, Apr. 1974, Paris FR, pp. 47-48, Quiedeville, "Material Approprie Aux Conditions De Site Et De Delai: Le Cas Des Ponts De Vienne". |
Continuations (1)
|
Number |
Date |
Country |
Parent |
558828 |
Jul 1990 |
|