Construction method for protecting the airplane runway surface from being cracked to spit out crush stones

Information

  • Patent Grant
  • 6491472
  • Patent Number
    6,491,472
  • Date Filed
    Tuesday, November 21, 2000
    24 years ago
  • Date Issued
    Tuesday, December 10, 2002
    22 years ago
  • Inventors
  • Examiners
    • Hartmann; Gary S.
    Agents
    • Chan; Raymond Y.
    • David and Raymond Patent Group
Abstract
A process is designed to finish all slits of the surface layer of an airplane runway. The process involves a first step in which a slit is heated such that the surface of the slit is dry, and that the capillary holes of the slit are opened up. The surface of the slit is then provided with a coating of an asphalt synthetic agent. The coating is subsequently heated to cause the molecules of the asphalt synthetic agent to diffuse into the capillary holes of the slit, thereby preventing the water from finding its way into the gradation layer of the runway. In the meantime, the slit is provided with a soft interface capable of preventing the water from finding its way into the slits of the surface layer of the runway. The soft interface is securely attached to the slits regardless of the climatic changes.
Description




FIELD OF THE INVENTION




The present invention relates generally to the construction of airplane runway, and more particularly to processes of finishing slits of surface layers of runway, taxiway, apron, hangar, and the like.




BACKGROUND OF INVENTION




The conventional process of finishing slits of surface layers of the runway and the like is described and discussed hereinafter with reference to the accompanying

FIGS. 1-20

. The runway in question has a length of 3000 meters, a width of 60 meters, and a thickness of 30 centimeters.




As shown in

FIG. 1

, the runway is formed of a gradation layer A, and a surface layer


10


which is paved on the gradation layer A and is formed of pavement concrete (PC) or reinforced concrete (RC).




As shown in

FIG. 2

, the runway is provided on the gradation layer A with a plurality of first surface layer units


10


A, which are parallel to one another at an interval of six meters and are equal in length to the runway. The surface layer units


10


A are formed of pavement concrete or reinforced concrete.




As shown in

FIG. 3

, the runway surface layer


10


is further formed of a plurality of second surface layer units


10


B, which are paved side by side with the first surface layer units


10


A such that a second slit


17


is formed in the juncture of the first surface layer unit


10


A and the second surface layer unit


10


B.




As shown in

FIG. 4

, the surface layer


10


is provided with a longitudinally-oriected expansion slit


11


, which is formed by cutting in the juncture of the first surface layer unit


10


A and the second surface layer unit


10


B. The expansion slit


11


has a depth of 3 cm, and a width of 1 cm.




As shown in

FIG. 5A

, the runway surface layer


10


is provided with hundreds of guide slits


12


, which are arranged at a predetermined interval such that they are perpendicular to the length of the runway, The guide slits


12


are intended to prevent the formation of irregular cracks in the surface layer


10


.




As shown in

FIG. 5B

, each of the guide slits


12


is provided with a horizontally-oriented expansion slit


13


which has a depth of 3 cm and a width of 1 cm, thereby resultion in formation of a number of checkers


14


on the surface layer


10


, as shown in FIG.


6


. The checkers


14


are intended to prevent the surface layer


10


from being damaged by the effects of expansion and contraction of the surface layer


10


due to the climatic factors.




As shown in

FIGS. 7 and 8

, the longitudinal expansion slit


11


and the horizontal expansion slit


13


are provided with a polyethylene (PE) strip


15


and a polyurethane (PU) slit-filling agent


16


covering the PE strip


15


. The construction of the surface layer


10


is thus completed such that the runway is resistant to water.




The conventional process described above is also used to build taxiway, apron, hangar, and the like, The conventional process has several deficiencies, which are explicitly described hereinafter.




In light of the first surface layer units


10


A and the second surface layer units


10


B being constructed separately, there is formation of the second slit


17


in the juncture of the first surface layer unit


10


A and the second surface layer unit


10


B, as shown in

FIGS. 3

,


4


, and


7


. Upon completion of the guide slit


12


, a through slit


18


is formed in such a way that it extends from the bottom of the guide slit


12


toward the gradation layer A, as shown in FIGS,


5


A,


5


B, and


8


. The slit-filling agent


16


is coated on the inner walls of the longitudinal expansion slit


11


and the horizontal expansion slit


13


, without penetration into the small holes of the inner walls of the expansion slits


11


and


13


. As a result, the slit-filling agent


16


is apt to be stripped form the expansion slits


11


and


13


under the influence of the climatic changes, The slit-filling agent


16


is different in heat expansion coefficient from the first surface layer unit


10


A, the second surface layer unit


10


B, the pavement concrete, and the reinforced concrete. As a result, a water interstice


11


′ is formed between the longitudinal expansion slit


11


and the slit-filling agent


16


, as shown in FIG.


9


. Similarly, a water interstice


13


′ is formed between the horizontal expansion slit


13


and the slit-filling agent


16


, as shown is FIG.


10


. The water finds its way into the gradation layer A via the water interstice


11


′ and the second slit


17


, as shown in

FIGS. 7 and 9

. Similarly, the water finds its way into the gradation layer A via the water insterstice


13


′, the guide slit


12


and the through slit


18


, as shown in

FIGS. 8 and 10

. In light of the effect of the water erosion, A void A


1


is formed in the gradation layer A, as shown in FIG.


11


. The void A


1


weakens the structural strength of the area in the vicinity of the longitudinal expansion slit


11


. Such a weakened area of the surface layer


10


of the runway is apt to cave in when the surface layer


10


is exerted on by an external force of an airplane or heavy equipment, thereby resulting in formation of a pothole


19


in the surface layer


10


of the runway, as shown in FIG.


11


. It is conceivably unsafe for an airplane to land or take off on a runway having potholes. The only workably remedy to provide the gradation layer A of the runway with protection against the water erosion is to replace the slit-filling agent


16


periodically. The periodic replacement of the slit-filling agent


16


is not cost-effective and is apt to hinder the normal operation of the airport.




The rain water tends to accumulate in those checkers


14


which are located in the juncture of the longitudinal expansion slit


11


and the horizontal expansion slit


13


. As a result, the checkers


14


are susceptible to surface crack


14


′, as shown in FIG.


12


. The surface crack


14


′ will eventually become a pothole


19


, The conventional method of repairing the surface crack


14


′ involves a first step in which two slender slits


141


are formed by cutting along two longitudinal sides of the surface crack


14


′, as shown in FIG.


13


. Thereafter, the surface layer


10


located between the two slender slits


141


is removed to form a shallow trench


142


which has a width of 30 cm and a depth of 10 cm, as shown in FIG.


14


. As shown in

FIG. 15

, the shallow trench


142


is then filled with a filling material


20


, which is a mixture containing water, epoxy resin quartz sand, pavement concrete, or reinforced concrete, The filling material


20


is different in heat expansion coefficient from the surface layer


10


and is therefore vulnerable to being separated from the side walls and the bottom wall of the shallow trench


142


, thereby resulting in formation of a second process silt


21


between the filling material


20


and the shallow trench


142


, as shown in FIG.


16


. The water W enters from the second process slit


21


into the surface crack


14


′ which is located under the shallow trench


142


. Subsequently, the water W enters the gradation layer A from the surface crack


14


′. It is also likely that a gap


23


is formed between the bottom wall of the shallow trench


142


and the filling material


20


, as shown in FIG.


17


. This is due to the fact that the filling material


20


is exerted on by the expansion forces of the side walls of the shallow trench


142


. As a result, the filling material


20


is partially jutted out of the shallow trench


142


. The surface layer


10


of the runway is therefore rugged, In other words, the filling material


20


might become a culprit responsible for the flat tire.




In the event that the surface crack


14


′ is numerous, the surface layer


10


of the runway is replaced with a new surface layer. The process of paving a new surface layer involves a first step in which a thickness of 10 cm of the surface layer


10


is removed from the runway, so as to form an intermediate layer


10


′, as shown in FIG.


18


. The intermediate layer


10


′ is sprayed with a layer of asphalt, thereby resulting in formation of a holding layer


101


on the intermediate layer


10


′. The holding layer


101


is then paved with asphalt cement


30


having a thickness of about 5 cm. The asphalt cement layer


30


is covered with a pavement reinforcing fabric


40


, which is made of polyacrylic fiber or polyester fiber. Finally, the pavement reinforcing fabric


40


is covered with an asphalt concrete layer


30


, which has a thickness of 5 cm. A new runway surface layer


30


′ is thus completed, as shown in FIG.


19


.




SUMMARY OF THE INVENTION




The primary objective of the present invention is to provide a process for finishing slits of the surface layer of an airplane runway in such a manner that the gradation layer of the airplane runway is immune from the water erosion, thereby prolonging the service life span of the airplane runway.




The process of the present invention is intended to overcome the deficiencies of the conventional processes described above. According to the process of the present invention, various slits of the surface layer of a runway are effectively resistant to water so as to minimize the water erosion of the gradation layer of the runway. The process of the present invention involves a first step in which the slits of the surface layer of the runway are properly heated to open up the capillary holes of the silts, so as to enhance the bonding of the asphalt synthetic agent with the side walls of the slits. As a result, various slits of the surface layer of the runway are effectively sealed off to an extent that the water is prevented from permeating into the gradation layer of the runway. The slits of the surface layer are further provided with a soft interface capable of preventing the formation of the second process slit, the surface crack, and the reflective crack.




The soft interface of the present invention is securely attached to the slits such that the chemical properties of the soft interface are not affected by the climatic changes, and that the soft interface is capable of converting a vertical internal stress into a horizontal action force, thereby preventing the formation of the reflective crack in the surface layer of the runway.




The process of the present invention involves the use of waterproof rubber cloth by which all slits of the surface layer of the runway are made waterproof. As a result, the gradation layer of the runway is free of voids which are caused by the water erosion. The use of the waterproof rubber cloth can also prevent the formation of the reflective crack in the surface layer of the runway. The process of the present invention eliminates the formation of potholes in the surface layer of the runway.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

shows a cross-sectional view of an airplane runway that is built by the conventional method.





FIG. 2

shows a sectional schematic view of the conventional runway having surface layer units.





FIG. 3

shows another sectional schematic view of the conventional runway having surface layer units.





FIG. 4

shows a sectional schematic view of the conventional runway having a longitudinally-oriented expansion slit.





FIG. 5A

shows a sectional schematic view of the conventional runway having a guide slit.





FIG. 5B

shows a sectional schematic view of the conventional runway having a guide slit on which a horizontal expansion slit is formed.





FIG. 6

shows a top view of the conventional runway having a number of checkers formed on the surface layer thereof.





FIG. 7

shows a sectional schematic view of the waterproof process of the longitudinal expansion slit of the conventional runway.





FIG. 8

shows a sectional view taken along the direction indicated by a line B—B as shown in FIG.


7


.





FIG. 9

shows an enlarged sectional view of a water interstice formed between the longitudinal expansion slit and the slit-filling agent of the conventional runway.





FIG. 10

shows an enlarged sectional view of a water interstice formed between the horizontal expansion slit and the slit-filling agent of the conventional runway.





FIG. 11

shows a sectional schematic view of a crack of the longitudinal expansion slit of the surface layer of the conventional runway.





FIG. 12

shows a top view of a surface crack of the checkers of the surface layer of the conventional runway.





FIG. 13

shows a top view of two slender slits formed by cutting along two longitudinal sides of the surface crack as shown in FIG.


12


.





FIG. 14

shows a sectional view taken along the direction indicated by a line C—C as shown in FIG.


13


.





FIG. 15

shows a sectional schematic view of a filling material disposed in a shallow trench as shown in FIG.


14


.





FIG. 16

shows an enlarged sectional view of a second process slit formed between the filling material and the shallow trench as shown in FIG.


15


.





FIG. 17

shows a sectional schematic view of a protrusion of the filling material as shown in FIG.


16


.





FIG. 18

shows a sectional schematic view of an intermediate layer of the conventional runway.





FIG. 19

shows a sectional schematic view of an intermediate layer of the conventional runway a holding layer formed on the intermediate layer, and a pavement reinforcing fabric covering the holding layer.





FIG. 20

shows a sectional schematic view of a reflective crack formed in the surface layer of the conventional runway.





FIG. 21

shows a sectional schematic view of a holding layer formed on the longitudinal expansion slit of the present invention.





FIG. 22

shows a sectional schematic view of a waterproof rubber cloth covering the holding layer as shown in FIG.


21


.





FIG. 23

shows a sectional schematic view of an asphalt synthetic agent filling a longitudinal expansion slit as shown in FIG.


22


.





FIG. 24

shows a sectional schematic view of a horizontal expansion slit of the present invention which is filled with an asphalt synthetic agent.





FIG. 25

is a sectional schematic view showing a shallow trench that is formed by cutting on a surface crack of the checkers of the present invention.





FIG. 26

shows a sectional schematic view of a first holding layer that is formed on the shallow trench as shown in FIG.


25


.





FIG. 27

is a sectional schematic view showing that a waterproof rubber cloth is disposed on the first holding layer as shown in FIG.


26


.





FIG. 28

s a sectional schematic view showing that a second holding layer is formed on the waterproof rubber cloth as shown in FIG.


27


.





FIG. 29

shows s sectional schematic view of a preformed small matrix of the present invention.





FIG. 30

shows a sectional schematic view of the shallow trench containing the small matrix as shown in FIG.


29


.





FIG. 31

shows a sectional schematic view of an intermediate layer of the surface layer of the present invention which is paved with an asphalt synthetic agent.





FIG. 32

shows a sectional schematic view of all slits of the surface layer of the present invention and an asphalt synthetic agent covering the slits.





FIG. 33

shows a sectional schematic view of the surface layer of the present invention and an asphalt concrete paving the surface layer.





FIG. 34

shows a sectional schematic view of the surface layer of the present invention containing a waterproof rubber cloth and an asphalt concrete covering the waterproof rubber cloth.











DETAILED DESCRIPTION OF THE INVENTION




The asphalt synthetic agent of the present invention is prepared by melting a straight asphalt and a blown asphalt in an appropriate ratio. The asphalt synthetic agent of the present invention is capable of penetration into the capillary bores of a matrix as well as the surface cracks of the matrix. In addition, the asphalt synthetic agent of the present invention has an excellent adhesion enabling the asphalt synthetic agent to hold together the waterproof rubber cloth and the holding layer of the surface layer of a runway. Furthermore, the asphalt synthetic agent of the present invention is resilient and resistant to water, corrosion and wear.




The process of the present invention is designed to finish all slits of the surface layer of an airplane runway under construction or in use. The process involves a first step in which a slit to be finished is heated to dry the slit and to open up the capillary bores of the slit. Thereafter, the surface of the slit is coated with an appropriate amount of the asphalt synthetic agent


50


, as shown in FIG.


21


. The coating


50


is then heated to cause the molecules of the asphalt synthetic agent


50


to move into the capillary holes of the slit until the slit is fully filled with the agent


50


. It must be added here that the process of the present invention comprises a preparatory step prior to the first step. The preparatory step includes shores such as slit-sawing, excavating, grinding, cleaning, etc.




As shown in

FIGS. 21

,


22


, and


23


, a longitudinal expansion slit


11


is first heated such that the surface of the longitudinal expansion slit


11


is dry rapidly, and that the capillary holes of the slit


11


are opened up. The dry surface of the slit


11


is then provided with a coating


50


of an asphalt synthetic agent. The coating


50


is heated to cause the molecules of the asphalt synthetic agent


50


to move into the slit side wall


111


, the slit bottom wall


112


, the capillary holes of the arcuate top comers


113


of the slit


11


, and a second process slit


17


, As a result, a holding surface


51


is formed, as shown in FIG.


21


.




As shown in

FIG. 22

the holding surface


51


is provided with a waterproof rubber cloth


60


adhered thereto. Thereafter, the slit


11


is filled with a hot asphalt synthetic agent


50


′, which is level with the open top of the slit


11


, as shown in FIG.


23


.




In light of the asphalt synthetic agent


50


′ and the holding surface


51


being made of the same material, the asphalt synthetic agent


50


′ is securely attached to the holding surface


51


under the circumstance of expansion and contraction of the runway due to the climatic changes. In addition, the holding surface


51


is secured in place by the slit side wall


111


, the slit bottom wall


112


, and the capillary holes of the arcuate top corners


113


. The longitudinal expansion slit


11


and the second process slit


17


are completely filled with the asphalt synthetic agents


50


and


50


′ as well as the waterproof rubber cloth


60


. In other words, the longitudinal expansion slit


11


is made waterproof in its entirety such that water can not find its way into the gradation layer A of the runway, thereby preventing the formation of a void A


1


in the gradation layer A. As a result, the surface layer


10


of the runway is free of a pothole


19


. The pothole


19


is further averted by the holding surface


51


which covers the arcuate top corners


113


of the slit


11


.




As shown in

FIG. 24

, the process of the present invention is sued to finish a horizontal expansion slit


13


of the surface layer


10


of the runway, The process comprises a first step in which the surface of the horizontal expansion slit


13


is heated to dry the slit


13


and to open up the capillary holes of the slit


13


. The dry surface of the horizontal expansion slit


13


is then provided with a coating


50


of an asphalt synthetic agent. The coating


50


is heated to cause the molecules of the asphalt synthetic agent to diffuse into the slit side wall


131


, the slit bottom wall


132


, the capillary holes of the arcuate top corners


133


of the slit


13


, and a guide slit


12


, thereby resulting in formation of a holding surface


51


. The holding surface


51


is then provided with a waterproof rubber cloth


60


adhered thereto. Finally, the horizontal expansion slit


13


is filled with a hot asphalt synthetic agent


50


′, which is level with the open top of the slit


13


.




The treatments of the longitudinal expansion slit


11


and the horizontal expansion slit


13


are identical. For this reason, the water can not find its way into the gradation layer A via the horizontal expansion slit


13


. As a result, the gradation layer A is free of a void A


1


. In the meantime, the surface layer


10


of the runway is free of a pothole


19


.




As shown in

FIGS. 25-30

, the process of the present invention is employed to treat a surface crack


14


′ of the surface layer


10


of the runway. The process includes a first step in which the checkers


14


of two longitudinal sides of the surface crack


14


′ are provided with a slender slit


141


. Thereafter, the portion of the surface layer


10


located between the two slender slits


141


is removed to form a shallow trench


142


having a width and a depth. The shallow trench


142


is cleaned before it is heated to dry its side walls


141


′ and bottom wall


142


′, and to open up the capillary holes of the shallow trench


142


. The side walls


141


′ and the bottom wall


142


′ of the shallow trench


142


are then provided with a coating


50


of an asphalt synthetic agent. The coating


50


is then heated to cause the molecules of the asphalt synthetic agent to diffuse into the side walls


141


′, the bottom wall


142


′, the capillary holes of the shallow trench


142


, and the surface crack


14


′ thereby resulting information of a first holding surface


52


. The first holding surface


52


is then provided with a waterproof rubber cloth


60


attached thereto. The waterproof rubber cloth


60


is coated with the asphalt synthetic agent


50


such that a second holding surface


53


is formed on the waterproof rubber cloth


60


, as shown is FIG.


28


.




A small matrix


70


is preformed such that the small matrix


70


is corresponding in volume to the shallow trench


142


. The small matrix


70


is heated to open up the capillary holes of the surfaces of the small matrix


70


. Thereafter, the small matrix


70


is treated in such a way that the capillary holes of the small matrix


70


are filled with the asphalt synthetic agent


50


, as shown in FIG.


29


.




Before the small matrix


70


is inserted into the shallow trench


142


, the surfaces of the small matrix


70


and the second holding surface


53


of the shallow trench


142


are heated, The small matrix


70


is disposed in the shallow trench


142


such that the small matrix


70


is intimately held by the second holding surface


53


, as shown in FIG.


30


.




In light of the asphalt synthetic agent


50


of the small matrix


70


being identical to the asphalt synthetic agent


50


of the second holding surface


53


, the small matrix


70


is held securely in place in the shallow trench


142


such that the small matrix


70


is intimately held by the second holding surface


53


, thereby preventing the small matrix


70


from jutting out of the open top of the shallow trench


142


.




The incident of the filling material


20


jutting out of the second process slit


21


of the conventional runway, as illustrated in

FIGS. 16 and 17

, can be thus averted by the process of the present invention.




As illustrated in

FIGS. 31

to


34


, a process of the present invention is employed to rebuild the surface layer


10


of the runway. The process begins with the removal of an appropriate thickness of the surface layer


10


, thereby resulting in an intermediate layer


10


′, which is then provided with a coating


50


of an asphalt synthetic agent, as shown in FIG.


31


. The coating


50


is heated such that the molecules of the asphalt synthetic agent of the coating


50


diffuse into the capillary holes of the surfaces of all silts of the intermediate layer


10


′, thereby resulting in formation of a holding surface


54


, as shown in FIG.


32


. It must be noted here that the asphalt synthetic agent also diffuses into the capillary holes of the surfaces of the second process slit


17


and the through slit


18


. The holding surface


54


is then paved with an asphalt concrete


30


having an appropriate thickness and conforming to the runway specifications, as illustrated in FIG.


33


. The holding surfaces


54


of the longitudinal expansion slit


11


, the guide slit


12


, the horizontal expansion slit


13


, the second process slit


17


, and the through slit


18


are provided with a waterproof rubber cloth


60


attached thereto, as shown in FIG.


34


. When all the slits of the runway are exerted on by the reaction force of an airplane or heavy-duty vehicle, or by a vertical internal stress brought about by the climatic changes, the slits are capable of converting the vertical internal stress into a horizontal action force, thanks to the holding surface


54


and the waterproof rubber cloth


60


. As a result, the new surface layer


10


′ is free of the reflective slit, In addition, the holding surface


54


and the waterproof rubber cloth


60


serve to prevent the water “W” from finding its way into the gradation layer A of the runway. The new surface layer


10


′ of the runway does not cave in. In view of the lack of the voids in the gradation layer A of the runway, the new surface layer


10


′ of the runway is immune from pothole.




The processes of the present invention described above are equally applicable to taxiway, apron, hangar, highway, bridge surface, and the like.



Claims
  • 1. A process for finishing an expansion slit of a surface layer of a runway for protecting from being cracked to split out crush stones, comprising the steps of:(a) heating surfaces of side walls, a bottom wall and arcuate top corners of said expansion slit of said surface layer to dry said side walls, said bottom wall and said arcuate top corners and open up capillary bores of said surfaces of said expansion slit; (b) coating said surfaces of said side walls, said bottom wall and said arcuate top corners of said expansion slit with a coating of asphalt synthetic agent, which has a predetermined thickness and is made by melting a straight asphalt and a blown asphalt to form a mixture with a predetermined ratio, wherein a top portion of a second slit extended downwardly from said bottom wall of said expansion slit is filled with a section of said asphalt synthetic agent; (c) heating said coating of asphalt synthetic agent coated on said surfaces of said side walls, said bottom wall and said arcuate top corners to cause molecules of said coating of asphalt synthetic agent to diffuse into said capillary holes of said surfaces of said side walls, said bottom wall and arcuate top corners of said expansion slit to form a holding surface on said surfaces of said expansion slit; (d) attaching a waterproof rubber cloth on a bottom of said holding surface to waterproof said second slit from outside; and (e) filling a gap defined between two sides of said holding surface and said waterproof rubber cloth adhered at said bottom of said holding surface of said expansion slit with a hot asphalt synthetic agent until said hot asphalt synthetic agent is level with an open top of said expansion slit.
  • 2. The process, as recited in claim 1, wherein said expansion slit is a longitudinal expansion slit and said second slit is a second process slit.
  • 3. The process, as recited in claim 1, wherein said expansion slit is a horizontal expansion slit and said second slit is a guide slit.
  • 4. A process for finishing a surface crack of a surface layer of a runway for protecting from being cracked to split out crush stones, comprising the steps of:(a) forming two slender slits extending along two longitudinal sides of a top portion of said surface crack; (b) removing a portion of said surface layer located between said two slender slits to form a shallow trench having a width and a depth; (c) cleaning said shallow trench and heating said shallow trench to dry side walls and a bottom wall of said shallow trench to open up capillary holes of said side walls and said bottom wall of said shallow trench; (d) coating said side walls and said bottom wall of said shallow trench with a coating of asphalt synthetic agent, which has a predetermined thickness and is made by melting a straight asphalt and a blown asphalt to form a mixture with a predetermined ratio; (e) heating said coating of asphalt synthetic agent coated on said side walls and said bottom wall of said shallow trench to cause molecules of said coating of asphalt synthetic agent to diffuse into said capillary holes of said side walls and said bottom wall of said shallow trench to form a first holding surface on said side walls and said bottom wall of said shallow trench; (f) attaching a waterproof rubber cloth on a bottom of said first holding surface to waterproof said surface crack positioned right below said shallow trench from outside; (g) coating said waterproof rubber cloth on top of said bottom of said first holding surface with another coating of asphalt synthetic agent to form a second holding surface on said waterproof rubber cloth and define a cavity between said second holding surface coated on said waterproof rubber cloth and said first holding surface coated on said side walls of said shallow trench; (h) providing a matrix having a size adapted for filling said cavity of said shallow trench space; (i) heating side walls and a bottom wall of said matrix to open capillary holes of said side walls and said bottom wall and filling said capillary holes of said matrix with an asphalt synthetic agent; (j) heating said side walls and said bottom wall of said matrix and said second holding surface of said shallow trench; and (k) disposing said matrix into said cavity of said shallow trench wherein said matrix is intimately held by said second holding surface so as to prevent said matrix from jutting out of an open top of said shallow trench.
  • 5. A process for rebuilding a surface layer with at least a slit thereon of a runway for protecting from being cracked to split out crush stones, comprising the steps of:(a) removing an upper portion of said surface layer leaving a lower portion of said surface layer as an intermediate layer; (b) coating a top surface of said intermediate layer with a coating of asphalt synthetic agent; (c) heating said coating of asphalt synthetic agent to cause molecules of said coating of asphalt synthetic agent to diffuse into capillary holes of said top surface of said intermediate layer and side walls of said slit formed on said intermediate layer to form a holding surface; (d) attaching a waterproof rubber cloth on said holding surface, wherein said waterproof rubber cloth is extended along said slit and has a width larger than a width of said slit to waterproof said slit; and (e) paving an asphalt concrete, having a thickness equal to said thickness of said removed upper portion of said surface layer, on said holding surfaces.
  • 6. The process, as recited in claim 5, in the step (b), wherein a top portion of said slit is filled with said coating of asphalt synthetic agent.
  • 7. The process, as recited in claim 6, wherein said slit is a longitudinal expansion slit.
  • 8. The process, as recited in claim 6, wherein said slit is a horizontal expansion slit.
  • 9. The process, as recited in claim 6, wherein said slit is a guide slit.
  • 10. The process, as recited in claim 6, wherein said slit is a through slit.
  • 11. The process, as recited in claim 5, wherein said slit is a longitudinal expansion slit.
  • 12. The process, as recited in claim 5, wherein said slit is a horizontal expansion slit.
  • 13. The process, as recited in claim 5, wherein said slit is a guide slit.
  • 14. The process, as recited in claim 5, wherein said slit is a through slit.
CROSS REFERENCE OF RELATED APPLICATION

This is a Continuation-In-Part application of a non-provisional application, application Ser. No. 09/349,771, filed Jul. 9, 1999 now abandoned.

US Referenced Citations (20)
Number Name Date Kind
3611888 Kavalir et al. Oct 1971 A
4069182 McDonald Jan 1978 A
4084912 Pyle et al. Apr 1978 A
4109033 Blankenhorn et al. Aug 1978 A
4162998 Doi et al. Jul 1979 A
4252487 Jeppson Feb 1981 A
4324504 Cottingham et al. Apr 1982 A
4407605 Wirtgen Oct 1983 A
4547399 Fujihara et al. Oct 1985 A
4620645 Hale Nov 1986 A
4684288 Chapa Aug 1987 A
4765772 Benedetti et al. Aug 1988 A
5183353 Buckelew Feb 1993 A
5405213 O'Connor Apr 1995 A
5513925 Dempsey et al. May 1996 A
5556225 Marino Sep 1996 A
5630677 Barroso May 1997 A
5664906 Baker et al. Sep 1997 A
5827008 Smith et al. Oct 1998 A
6113308 Johnson, II Sep 2000 A
Foreign Referenced Citations (1)
Number Date Country
31 31 722 Dec 1982 DE
Continuation in Parts (1)
Number Date Country
Parent 09/349771 Jul 1999 US
Child 09/718149 US