1. Field of the Invention
The present invention relates generally to the construction industry, and relates more specifically to a construction system and method for constructing multi-story buildings including high-rise buildings using premanufactured structures.
2. Description of Related Art
Conventional building construction methods have focused on the cost and efficiency advantages of having construction mostly manufactured at the manufacturing plants or factories. Current construction techniques that use manufactured housing structures include building modules of a certain room to be delivered to a construction site. Manufactured housing techniques offer some advantages over on-site construction methods. For example, construction for manufactured housing may be carried out year round regardless of the weather since manufacturing within a factory or plant can occur indoors. Manufactured housing methods also require less time to complete construction since assembly lines are more efficient than requiring less streamlined field work on-site.
However, it is not always cheaper to manufacture the modules at a manufacturing plant or factory to be delivered to the construction site for further integration and finishing on-site. Handling of modules can be extremely difficult, time-intensive and cost-prohibitive since there are weight and craning issues. Shipping modular structures or spaces can raise transportation issues due to weight and space problems. Due to sizes of the modules, trucks may only fit one to two modules at the most to deliver to the construction site. Lifting the modules to and from the trucks require huge cranes at the manufacturing plants as well as at the construction sites.
On-site construction is conventionally preferred for building high-rise and multi-story buildings because manufactured housing techniques are not adapted for building such building structures. Therefore, the present invention utilizes manustructures or premanufactured structures to overcome the limitations of utilizing manufactured housing structures or modules in constructing high-rise and multi-story buildings.
The advantages of the present invention is a construction system and method using as many repetitive and self-sustaining construction methods and as many preassembled and prefinished components as possible. Preassembled and prefinished components are constructed in a manufacturing facility, transported to the construction site and permanently installed within the structure in conjunction with other components to create a fully finished, comfortable and weather-tight living environment.
Standardizing the components and constructing them in a manufacturing facility certainly provide the advantages of reduced materials waste, reduced energy costs and increased labor productivity. The initial assembly of the components may eventually become automated, but currently has the advantage of being carried out by less skilled labor under the supervision of highly qualified managers. Given that assembly will occur in an environmentally controlled setting, the quality of the product can be closely monitored. The potential for mold or materials damage due to exposure may be reduced by the present invention.
The present invention construction system and method results in rapid construction of multi-story buildings with institutional grade construction quality by saving time and money that takes half the time of conventional construction approaches for truly sustainable multi-story buildings.
Therefore, the present invention overcomes the disadvantages and limitations associated with multi-story modular construction and conventional construction methods to yield an energy efficient structure that can be constructed at a highly accelerated schedule at a low cost and continue to operate with very low maintenance expenses. The present invention is directed to a construction system and method for building structures of three or more stories comprised of premanufactured, preassembled, and prefinished components requiring little or no additional finishing after leaving the factory. The present invention may be used to build residential, hospital, institutional, or any multistory buildings alike for creating an energy efficient, inexpensive, and flexible building for quick assembly for multiple purposes.
The present construction system and method of constructing energy efficient multi-story buildings with a plurality of units comprises: premanufacturing a plurality of non-weight bearing walls, the plurality of non-weight bearing walls with finished exterior including all electrical, insulating, plumbing and communications components; premanufacturing a plurality of interior components adapted to connect to the plurality of non-weight bearing walls; premanufacturing a plurality of exterior components adapted to attach to exterior surfaces of the multi-story building; transporting the premanufactured and prefinished plurality of non-weight bearing walls, the plurality of interior components, and the plurality of exterior components to a building site; preparing a foundation for the multi-story building at the building site for providing support to a plurality of load-bearing structural columns; constructing the plurality of load-bearing structural columns of the building at the building site; forming floor and ceiling slabs to attach to the plurality of structural columns at each level of the building; lifting each of the floor and ceiling slabs to attach to each of the plurality of structural columns at the each level while installing stairs and elevators to attach to the plurality of structural columns and the floor and ceiling slabs; installing the plurality of non-weight bearing walls and the plurality of interior components between the floor and ceiling slabs at the each level of the building; installing the plurality of exterior components on exterior surfaces of the building; and installing stairs and elevators to attach to the plurality of structural columns and the floor and ceiling slabs; wherein the plurality of non-weight bearing walls, the plurality of interior components, and the plurality of exterior components are assembled and installed to provide the energy efficient multi-story building with the plurality of units with different floor plans and optionally a retail level with underground parking.
Using the first method of construction, the step of installing the plurality of non-weight bearing walls, the plurality of interior components and the plurality of exterior components for a plurality of standard single units comprises: installing exterior window walls on exterior sides of the plurality of standard single units and partially enclosing each of the plurality of standard single units; installing demising walls in a perpendicular direction interfacing with the exterior window walls and partially enclosing the each of the plurality of standard single units; installing utility walls on the interior sides of the plurality of standard single units in a perpendicular direction interfacing with the demising walls and connecting with the demising walls to completely enclose the each of the plurality of standard single units; installing end walls on the exterior sides of the plurality of standard single units at ends of the building in a parallel direction as the demising walls and completely enclosing the each of the plurality of standard single units located at the ends of the building; installing bathroom floor pans into a preformed recess within the floor and ceiling slabs in the each of the plurality of standard single units; connecting utilities and plumbing fixtures to the utility walls; installing entry doors adjacently positioned by the utility walls; installing interior partitions within the each of the plurality of standard single units for separating rooms and configuring the each of the plurality of standard single units; installing kitchen and bathroom components to the utility walls; installing roof components on top of the building; and assembling exterior walkways depending on the building's configuration.
A method of constructing an energy efficient multi-story building with a plurality of units comprises: (a) premanufacturing a plurality of non-weight bearing walls, the plurality of non-weight bearing walls with finished exterior including all electrical, insulating, plumbing and communications components; (b) premanufacturing a plurality of interior components adapted to connect to the plurality of non-weight bearing walls; (c) premanufacturing a plurality of exterior components adapted to attach to exterior surfaces of the multi-story building; (d) transporting the premanufactured and prefinished plurality of non-weight bearing walls, the plurality of interior components, and the plurality of exterior components to a building site; (e) preparing a foundation for the multi-story building at the building site for providing support to a plurality of load-bearing structural columns; (f) constructing the plurality of load-bearing structural columns of the building at the building site; (g) forming a plurality of floor and ceiling slabs to attach to the plurality of structural columns at each level of the building; (h) lifting a first slab from the plurality of floor and ceiling slabs up to top of the building; (i) installing the plurality of non-weight bearing walls other than exterior window walls and some of the plurality of interior components on a second slab located beneath the first ceiling slab; (j) loading the exterior window walls and rest of the plurality of interior components on the second slab; (k) lifting the second slab with the plurality of non-weight bearing walls and the plurality of interior components whether installed or loaded immediately beneath the first ceiling slab; (l) attaching securely the second slab to the plurality of structural columns located immediately below the first slab to form a top level; (m) installing the exterior window walls, the rest of the plurality of interior components to the first slab to complete the top level; (n) repeating steps (i) through (m) until all levels of the building are completed; (o) installing a plurality of exterior components on exterior surfaces of the building; and (p) installing stairs and elevators to attach to the plurality of structural columns and the floor and ceiling slabs; wherein the plurality of non-weight bearing walls, the plurality of interior components, and the plurality of exterior components are assembled and installed to provide the energy efficient multi-story building with the plurality of units with different floor plans and, optionally, a retail level with underground parking.
Using the second method of construction, the step of installing the plurality of non-weight bearing walls, the plurality of interior components, and the plurality of exterior components for a plurality of standard single units comprises: (a) installing demising walls and partially enclosing the each of the plurality of standard single units; (b) installing utility walls on the interior sides of the plurality of standard single units in a perpendicular direction interfacing with the demising walls and connecting with the demising walls to partially enclose the each of the plurality of standard single units; (c) installing end walls on the exterior sides of the plurality of standard single units at ends of the building in a parallel direction as the demising walls and substantially enclosing the each of the plurality of standard single units located at the ends of the building; (d) installing bathroom floor pans into a preformed recess within the floor and ceiling slabs in the each of the plurality of standard single units; (e) installing kitchen and bathroom components to the utility walls; (f) connecting utilities and plumbing fixtures to the utility walls; (g) loading exterior window walls, entry doors and interior partitions on the second floor slab before securely attaching the second slab to the plurality of structural columns located immediately below the first slab; (h) installing the exterior window walls on exterior sides of the plurality of standard single units and to the first slab completely enclosing each of the plurality of standard single units after securely attaching the second slab to the plurality of structural columns located immediately below first slab; (i) installing the entry doors adjacently positioned by the utility walls and to the first slab after securely attaching the second slab to the plurality of structural columns located immediately below the first slab; (j) installing the interior partitions within the each of the plurality of standard single units for separating rooms and configuring the each of the plurality of standard single units, and to the first slab after securely attaching the second slab to the plurality of structural columns located immediately below the first slab to complete the top level; (k) repeating steps (a) through (j) until all levels of the building are completed; (l) installing roof components on top of the building; and (m) assembling exterior walkways depending on the building's configuration.
The present construction system and method for constructing energy efficient multi-story buildings using premanufactured structures comprises: a plurality of units comprised of a plurality of standard studio units or a plurality of mixed units, the mixed units comprising standard studio units and one to multiple bedrooms.
The present construction system and method for constructing energy efficient multi-story buildings with a plurality of non-weight bearing walls comprising: premanufactured, prefinished and preassembled exterior window walls comprising windows, insulation and weather seal; premanufactured, prefinished and preassembled end walls comprising electrical wiring, plumbing, vapor barrier, insulation, studs for framing and sound barrier, fire-rated interior and exterior surfaces; premanufactured, prefinished, preassembled and prewired exterior walls comprising electrical wiring, vapor barrier, insulation, studs for framing and sound barrier, and fire-rated interior and exterior surfaces with an optional window or door; premanufactured, prefinished, prebundled, preassembled, preplumbed and prewired demising walls comprising electrical wiring, insulation, studs for framing and sound barrier, and fire-rated interior and exterior surfaces; premanufactured, prefinished, preassembled, prebundled and preplumbed utility walls comprising electrical and communications wiring for adjacent walls, electrical service panel, kitchen and bath wall plumbing, fans, and toilet mounting support with a water-resistant, interior surface; and vapor barrier, insulation, plumbing chase, studs for framing, and sound and air barrier with a water resistant exterior surface.
The present construction system and method for constructing energy efficient multi-story buildings, wherein the step of installing the plurality of non-weight bearing walls, the plurality of interior components and the plurality of exterior components for a plurality of standard single units comprises: installing exterior window walls on exterior sides of the plurality of standard single units and partially enclosing each of the plurality of standard single units; installing demising walls in a perpendicular direction interfacing with the exterior window walls and partially enclosing the each of the plurality of standard single units; installing utility walls on the interior sides of the plurality of standard single units in a perpendicular direction interfacing with the demising walls and connecting with the demising walls to completely enclose the each of the plurality of standard single units; installing end walls on the exterior sides of the plurality of standard single units at ends of the building in a parallel direction as the demising walls and completely enclosing the each of the plurality of standard single units located at the ends of the building; installing bathroom floor pans into a preformed recess within the floor and ceiling slabs in the each of the plurality of standard single units; connecting utilities and plumbing fixtures to the utility walls; installing entry doors by the utility walls; installing interior partitions within the each of the plurality of standard single units for separating rooms and configuring the each of the plurality of standard single units; installing kitchen and bathroom components to the utility walls; installing roof components on top of the building; and assembling exterior walkways depending on the building's configuration.
The present construction system and method for constructing energy efficient multi-story buildings, wherein the step of installing the plurality of non-weight bearing walls, the plurality of interior components and the plurality of exterior components for a plurality of mixed units comprises: installing exterior window walls on exterior sides of the plurality of mixed units and partially enclosing each of the plurality of mixed units; installing demising walls in a perpendicular direction interfacing with the exterior window walls and partially enclosing the each of the plurality of mixed units; installing end walls on the exterior sides of the plurality of mixed units at ends of the building in a parallel direction from the demising walls and completely enclosing the each of the plurality of mixed units located at the ends of the building; installing exterior walls on the interior sides of the plurality of mixed units connecting with the utility walls and enclosing additional bedrooms of the plurality of mixed units; installing bathroom floor pans into a preformed recess within the floor and ceiling slabs in the each of the plurality of mixed units; installing the utility walls on the exterior sides of the plurality of mixed units in a perpendicular direction to the demising walls and connecting with the exterior walls to completely enclose the each of the plurality of mixed units; connecting utilities to the utility walls; installing entry doors by the utility walls in a parallel direction from the utility walls; installing interior partitions within the each of the plurality of mixed units for separating rooms and configuring the each of the plurality of mixed units with different floor plans; installing kitchen and bathroom components to the utility walls; installing roof components on top of the building; and assembling exterior walkways depending on the configuration of the building.
The present invention further utilizes recycled products and materials and incorporates alternative energy sources and methods of environmental control. Water collection and retention, and use of solar panels for heat and power are also incorporated in the manner best-suited for the local conditions and energy efficiency.
The foregoing and other objectives, features, and advantages of the invention will be more readily understood upon consideration of the following detailed description of the invention, taken in conjunction with the accompanying drawings.
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate various exemplary embodiments.
Before describing the invention and the figures, some of the terminology should be clarified. Please note that the terms and phrases may have additional definitions and/or examples throughout the specification. Where otherwise not specifically defined, words, phrases, and acronyms are given their ordinary meaning in the art. Exemplary embodiments may be better understood with reference to the drawings, but these embodiments are not intended to be of a limiting nature.
As used herein, “exterior window wall” refers to a pre-fabricated and pre-bundled wall unit with pre-assembled sections with insulated aluminum and glass exterior, unitized window wall system. The exterior window wall is an aluminum and glass panel with an operable window unit. The exterior window wall may include an integral sliding door and railing to create an open wall with a flush ‘Juliet’ balcony. A first type of exterior window wall is used in a straight configuration. A second type of exterior window wall is used in corner units located adjacently to a building's corners. A third type of exterior window wall, also referred to as “the exterior wall panel” that is a pre-fabricated and pre-bundled wall unit with pre-assembled sections with insulated aluminum and glass exterior, unitized window wall system and a fixed opaque window assembly positioned directly adjacent to unit doors at the ends of a building. All of the exterior window walls are fully weather-sealed and able to provide at least an R-value of 20. An R-value refers to a measure of thermal resistance that is typically used in the building industry.
As used herein, “exterior wall” refers to a pre-fabricated, pre-bundled, and non-utility wall unit with pre-assembled sections that includes electrical wiring, vapor barrier and thermal insulation with a finished interior surface. The exterior wall may include plumbing for sprinklers.
As used herein, “end wall” refers to a pre-fabricated, pre-bundled, and non-plumbing wall unit with pre-assembled sections that includes electrical wiring, vapor barrier and thermal insulation with a finished interior surface. The end wall is very similar to the exterior wall except that the end wall has a significantly different configuration, typically used as the end wall for a building. The end wall may include plumbing for sprinklers.
As used herein, “demising wall” refers to a pre-fabricated, pre-bundled, and pre-finished wall unit with pre-assembled sections that includes electrical wiring and may include electrical radiant heat with an approximate length of 20 feet. The demising wall may include plumbing for sprinklers.
As used herein, “utility wall” refers to a pre-fabricated and pre-bundled wall with pre-assembled sections that includes kitchen and bath wall plumbing, a unit's electrical service panel, exhaust vents/fans, and any associated electrical and communications distribution wiring for the adjacent walls. The utility wall's plumbing includes the kitchen and bath supply, waste lines and vent piping. The utility wall has a finished interior surface and contains pre-installed exhaust vents/fans and vent trims. The utility wall further includes thermal insulation, and encapsulates a unit's plumbing chase. The utility wall has a finished exterior surface, and may include fire-rated wall board and insulation to act as integral air and vapor barrier.
As used herein, “parapet wall” refers to a pre-manufactured, pre-finished, and pre-assembled wall with approximately 16 to 18 feet at the top portion of the exterior wall that connects to a roof slab and accommodates a building's roofing and garden roof conditions.
As used herein, “entry door,” refers to a pre-fabricated, pre-bundled entry door unit with operable re-light panel, inner and outer frames, and all associated door hardware with pre-assembled sections that includes electrical wiring and may include plumbing for sprinklers as rapid installation and to be set in place at the final exterior wall or next to the utility walls. A threshold is provided for installation after the entry door is in place.
As used herein, “exterior walkway” refers to a pre-fabricated, pre-bundled walkway with pre-assembled sections that supports railing and decking for rapid installation.
As used herein, “bathroom floor pan” refers to a single pre-cast and pre-fabricated unit with a sloped shower floor and integral drain that is set in place. The bathroom floor pan is constructed for easy delivery and rapid installation.
As used herein, “kitchen unit” refers to a pre-fabricated and pre-assembled kitchen unit that includes cabinets, preinstalled plumbing, plumbing connections, electrical wiring, vent ducting, countertops, at least one sink, exhaust vents/fans and light fixtures to be installed in the kitchen on the utility walls.
As used herein, “bathroom vanity” refers to at least one sink and preinstalled plumbing to be installed in the bathroom on the utility walls.
As used herein, “cabinets” refers to premanufactured and preassembled cabinets with integral exhaust fans and light fixtures to be installed in the kitchen and bathroom on the utility walls.
Referring now in detail to the drawing figures,
The construction of the multi-story building 100 is described in detail for the load bearing assembly of the structural frame 400, and floor and ceiling slabs 450. More specifically,
For preconstruction and excavation prior to building the structural frame 400, conventional methods of surveying, excavation and shoring may be utilized that are appropriate for the existing soil/ground conditions and preferred depth required for excavation. For example, deeper excavation requires shoring and possible below-grade waterproofing. Shoring may be constructed using concrete or wood depending on the best option for the area. Locating, trenching and extending the existing utilities to the new structure utilize conventional methods of construction and occur in conjunction with excavation and construction of the foundation.
For foundation construction, including basements, if applicable, footing is first applied and spread and matted evenly. Any forming, reinforcing, and casting of footings and foundation walls utilize conventional methods of concrete construction. For basements formwork and reinforcing of below-grade walls may utilize conventional slip-form concrete construction. Slip-form construction refers to a method by which large towers or bridges are built from concrete by pouring concrete into a form and moving the hardened concrete. Typically, slip-form construction minimizes the materials used in formwork and labor, and reduces the amount of concrete waste produced. Slip-form construction also allows for the foundation walls to be erected with the rapid speed with minimal amount of concrete waste. Unlike other concrete methods, slip-form construction does not produce over-shot concrete structures and requires very little clean-up or hauling away of waste concrete product. All site utilities will be extended to the building's service points while staged and protected for future connections. Similarly for elevator and stair foundation, excavation and forming of the foundation for the elevator and stair systems are carried out in conjunction with the rest of the building's excavation and forming. Formwork is properly placed, reinforcement added, and the foundation concrete may be placed and finished.
For concrete slab on grade construction, conventional construction practices are utilized. A slab-at-grade may occur either at the basement level or at grade level if no basement is built. Utilities are extended so that they are 6 to 8 feet above the top of the slab either at the basement level or at grade level. Once this step is finished, the steps of placing the backfill, providing compaction, installing gravel, positioning vapor barrier if required for local geotechnical review and securing the slab reinforcement to be followed by placing and finishing the concrete slab. If a particular design incorporates below-grade parking, the step of constructing a ramp is to be implemented. Alternatively, the step of constructing a ramp can occur after the slab-on-grade is positioned into place. Typically, the ramp's formwork is placed and followed by the step of securing and installing of the slab reinforcement. After these steps, the ramp's concrete slab may be placed and finished.
Assuming that only one level of parking is constructed below-grade, the steps of positioning the shoring and forming the slab at-grade level are carried out after the basement slab and ramp are placed. Afterwards, the steps of securing slab reinforcement, any block-outs, or sleeves required for the building's mechanical, plumbing, electrical, communications, site planter drainage, irrigation, parking control systems and electrical connections for security and lighting are implemented. The steps of pouring, finishing and sealing concrete are then implemented. If commercial or retail level is being considered for the at-grade level, then the concrete slab at the second story is placed by conventional shoring and forming methods.
For constructing a plaza 110 for retail at the street level with an exterior courtyard, a residential terrace may be constructed at the level immediately above the retail level as shown in
The next sequence of steps involves installation of elevators and stairs. The pre-fabricated, pre-bundled stairs with pre-assembled sections is delivered to the site. Lower sections of the stairs are set and anchored into place simultaneously with the placement of the street level slab or at-grade slab 430. The logical installation of the stairs will track closely with the installation of the building's vertical columns 405. Installation of the structural framing for the elevator enclosure will track in conjunction with installation of the rest of the building's vertical columns 405.
Upon constructing the structural steel columns, the casting of the typical floor and roof slabs may begin. If using the plaza/retail level 110 slab as a base, the building's typical floor slabs and the roof slab are poured one on-top-of the other, using the slab 450 below as the formwork for the slab 450 above. All of the slabs 450 will remain stacked on the plaza/retail level 110 surface until the slabs 450 have cured and reached the desired design strength. Upon curing, the slabs 110 are ready to be hoisted or lifted up to their finished elevation via a series of strand jacks mounted on the load bearing steel framing. Upon creating all of the slabs 450, they will then be hoisted up to the appropriate elevation level via strand jacks that are mounted on each horizontal column 410A-410E so that every slab 450 is securely positioned and attached at every level of the building so that a plurality of non-weight bearing walls 505, 520, 535, 510, 515 (as described later), a plurality of interior components 555, 525, 562, 565, 567, 568, 559, 557, 571, 570, 573 (as described later) and a plurality of exterior components 730, 800, 803, 815 (as described later) are installed at every level in between a floor slab and a ceiling slab 450A-E at each level.
An alternative method may include lifting the top or roof slab 450E (also referred to as a first ceiling slab) all the way to the top at roof of the building. Immediately after securing the first ceiling slab 450E, a plurality of non-weight bearing walls 520, 535, 510, 515, except for the exterior window walls 505, (as described later) and some of the plurality of interior components 555, 559, 557, 571, 570, 573 (as described later), including the bathroom floor pans 555, kitchen and bathroom components 559, 557, 570, 571, 573 are installed on a second slab 450D beneath the first slab 450E that is not yet lifted and securely attached to the first slab 450E. Upon installation of the plurality of non-weight bearing walls 520, 535, 510, 515 (as described later) and some of the plurality of interior components 555, 559, 557, 571, 570, 573 (as described later), and upon loading of the exterior window walls 505 and rest of the plurality of interior components 525, 562, 565, 567, 568 on the second slab 450D below, the second slab 450D with the plurality of non-weight bearing walls 505, 520, 535, 510, 515, the second slab 450D is lifted or hoisted up under the first slab at the top 450E and securely attached to the first slab 450E to make the top floor or level.
Upon securely attaching the second slab 450D to the first slab 450E, the loaded exterior window walls 505 and the rest of the plurality of interior components 525, 562, 565, 567, 568, including the entry doors 525 and interior partitions 562, 565, 567, 568 are installed to the first slab 450E to complete the top level of the building. A plurality of non-weight bearing walls 520, 535, 510, 515, except for the exterior window walls 505 and some of the plurality of interior components 555, 559, 557, 571, 570, 573, including the bathroom floor pans 555, kitchen and bathroom components 559, 557, 570, 571, 573 are again installed on a third slab 450C beneath the second slab 450D. Similar to the previously described process for constructing the top level, the exterior window walls 505 and the rest of the plurality of interior components 525, 562, 565, 567, 568 are loaded on the third slab 450C below, and the third slab 450C with the plurality of non-weight bearing walls and the plurality of interior components, whether installed or loaded, is lifted up or hoisted up under the second slab 450D to make a level beneath the top level. The exterior window walls 505 and the rest of the plurality of interior components 525, 562, 565, 567, 568 are installed to the second slab 450D after the third slab 450C is securely attached to the second slab 450D. This process of installing and loading the plurality of non-weight bearing walls and the plurality of the interior components is repeated until all the levels of the building is completed. A plurality of exterior components 730, 800, 803, 815 (as described later) are installed on exterior surfaces of the building after the plurality of non-weight bearing walls and plurality of interior components are completely installed.
Upon suspending the slab 450A-E at its appropriate elevation level, each slab 450A-E is bolted to the vertical columns 405 which are load bearing steel framing. For example, the first floor and ceiling slab 450A is held and supported by the vertical columns 405 at the first horizontal support column 410A. The second floor and ceiling slab 450B are held and supported by the vertical column 405 at the second horizontal support column 410B. The third floor and ceiling slab 450C is held and supported by the vertical columns 405 at the third horizontal support column 410C. The fourth floor slab 450D is held and supported by the vertical columns 405 at the fourth horizontal support column 410D. The fifth floor slab 450E is held and supported by the vertical columns 405 at the fifth horizontal support column 410E. Conventional steel reinforcing bars can be used in the slabs 450A-E. The span of the slab 450A-E is set at a distance that can be supported within the depth and width of the slab 450A-E. Upon placing the slabs 450A-E at appropriate elevation levels, they will fully support their spans without the use of supplemental beams or columns. Electric radiant heat coils can be incorporated into the concrete floor and ceiling slabs 450 to heat each unit.
The structural, floor and ceiling slabs 450A-E act as the finished floor slab for the unit above and the finished ceiling slab for the unit below. The floor and ceiling of the units are exposed surfaces of concrete slabs 450A-E. Acoustical isolation at the slabs 450A-E is achieved by requiring the tenant to provide throw rugs or other approved floor covering over minimal area of the slab 450A-E.
Each of the demising walls 520A-B is positioned directly opposite of each other in a parallel direction to enclose the studio unit 300B. The bathroom floor pan 555 contains a toilet 559, a bathroom vanity 557, and a shower base 560. The bathroom floor pan 555 is positioned in the left-hand corner against the utility wall 535 and the second demising wall 520B next to the kitchen island 575. The shower 566 (later shown in
On the opposing side of the exterior window walls 505A-C and exterior window wall panel 505G in a parallel direction, the utility wall 535 is installed for connecting the bathroom and kitchen components. An exterior wall 510 is also installed adjacent to the utility walls 535 after the first entry door 525. The exterior wall 510 encloses a portion of the first bedroom of the two-bedroom unit 300E. The entry door 525 is positioned and installed at the corner of the utility walls 535 for easy entry into the unit 300E. An entry door 525 may also be located in the exterior wall 510.
The demising wall 520A-B is positioned directly between the units at the end of the exterior window walls 505A-B in a parallel direction to enclose the two-bedroom unit 300E. The bathroom floor pan 555 contains a toilet 559, a bathroom vanity 557, and a shower base 560. The bathroom floor pan 555 is positioned and installed in a pre-fabricated recess (as shown in later FIGS.), wall finishes 563A-B in the middle area against the utility wall 535 next to the kitchen unit 570 with the kitchen sink 571, stove 572, countertop, and cabinets (as shown in later FIGS.). The shower base 560 is partitioned off by the first and second shower partitions 562A-B. The bathroom is partitioned off by the sliding bathroom door 558 that is attached to the second shower partition 562B and reconfigurable partitions 565A-B on each lateral side of the bathroom. Immediately adjacent to the bathroom, the kitchen unit 570 is installed against the utility wall 535 that has the stove 572, sink 571, and cabinets. Other internal furniture such as a bed, desk, chair, dresser, coffee table, and couches may be placed anywhere.
Alternatively,
More specifically,
As shown in
As shown in
A slip member 630 is then anchored firmly to the underside of the slab 650 at the ceiling portion or the head portion of the exterior window wall 605B. The slip member 630 is shimmed so that it is perfectly level to receive the bottom exterior window wall 605B with the head support member 611B and rests at its exact elevation. The exterior window walls 605A, 605B are constructed to allow approximately ⅝″ of shim space at the top and bottom for leveling and alignment. A third fastener 621C is used to attach a head wedge 615B to the underside of the slab 650. The bottom anchor block 625B within the slab 650 receives and catches the third fastener 621C to firmly secure the slip member 630 to the slab 650. The small flashing 617 is used to seal the head wedge 615B. Upon anchoring the slip member 630A to its proper position under the slab 650, the exterior window wall 605B with the head support member 611B is inserted into the slip member 630A. Upon securing the head portion of the exterior window wall 605B with the slip member 630B, the bottom portion of the exterior window wall 605A is positioned tightly against the anchor 612 and at the bottom side (not shown in this FIG.) of the exterior window wall 605B. As shown in
The exterior window walls 605 already have integrated insulating panels 630 which are already included during manufacturing. Therefore, the exterior window walls 605 are installed and enclosed by trims 617 without a need to place any insulating panels 620 around the horizontal columns 610 to insulate the slab 650 and the exterior window walls 605A-B from outer air and moisture. The completely assembled exterior window walls 605A-B are shown in
The next method of constructing a building is installing end walls 515, particularly when a unit is located in the middle of a building 101, 102, 103. A living unit that is located in the middle of a building 101, 102, 103, is enclosed between two demising walls 520 that are parallel to one another. In this case, both the demising walls 520A-B with its structural members are placed one after the other. However, for a living unit that is located at the end of a building 101, 102, 103, the end unit requires installation of an end wall 515 in lieu of a second demising wall 520B or an exterior window wall 505, 605. The preferred sequence is to install the end wall 515 with its structural members immediately following installation of the exterior window walls 505, 605 as shown in previous
A base anchor 612A is securely attached to the slab 650 using a first fastener 621A that is drilled vertically down into the slab 650 for receiving the bottom portion of the end wall 515A. A second anchor 612B is also drilled upwardly into the slab 650 to securely attach the head anchor 612B to the underside of the slab 650. The end wall 515 utilizes a thermally insulated anchors 612A-B that are securely attached to the slab 650 prior to installing the end wall 515A-B. The end walls 515 are suspended via a crane and moved into place from the exterior of the building. The end wall 515A is set onto the slab 650 and secured into place via access from the interior face of the building. Simultaneously, the head portion of the end wall 515B is placed into the slip member 630 and secured in place. In order to secure the head portion of the end wall 515B to the anchor 612B, a third fastener 621C is securely inserted horizontally through the vertical side of the anchor 612B and into the end wall 515B. The vertical portion of the anchor 612B has pre-punched slots (not shown in FIGS.) through which the third fastener 621 is screwed horizontally to accommodate vertical movement of the end wall 515B due to vibration of the slab 650. Consequently, a horizontal gap 673 allows slight, vertical deflection of the slab 650. A vertical gap 672 also allows horizontal movement of the slab 650. These gaps 672, 673 may be filled with fire safing materials 670 prior to attaching the metal panel 661.
A final insulated metal panel 661A and a painted sheet metal trims 665A-B are installed once the end walls 515A-B are securely anchored into place. Normally, the metal panels 661B-C on the exterior side of the end walls 515A-B are pre-manufactured and already attached to the end walls 515A-B. However, the final metal panel 661A is attached after complete installation of the end walls 515A-B to conceal and insulate the exterior edge of the slab 650 located between the two end walls 515A-B.
The next step of constructing a building for the present invention involves placing or installing the demising walls 520A-B as shown in
As shown in
As shown in
The next step is to insert a support fastener 689A horizontally from the vertical side of the head support member 685B through the demising wall 520B. In
The next step is filling the horizontal gap 673 created between the underside of the slab 650 and the head portion of the demising wall 520B with fire safing materials 670. The next step is sealing any open spaces between the slab 650 and the base portion of the demising wall 520A with caulk, preferably fire-resistant caulk, to prevent any fire from getting through the space. Caulk or similar fire-resistant material is also used to seal the space between the horizontal portion of the head support member 685B and the head portion of the demising wall 520B whereby the fire safing materials 670 are inserted. This horizontal gap whereby the fire safing materials 670 are filled also allows vertical movement of the slab 650 due to vibration. Upon sealing the open spaces between the demising walls 520A-B and the slab 650, the first and second trims 682A-B are attached on each side of the demising wall 520B at the head portion. Removable, pre-finished pressure-fit trim 682 conceals bottom of the wall connections. The first and second trims 682A-B are substantially Z-shaped with an upper vertical portion and a lower vertical portion connected by an upper horizontal portion. The lower vertical portion also has a perpendicular, lower horizontal portion. The trims 682 also have a preattached fire rated, wall panel on the inside. The lower horizontal portions of the trims 682A-B are inserted between the slab 650, pad 690 and a horizontal portion of the already attached head support member 685B until the inner fire rated wall panel on the trims 682A-B touch the demising wall 520B as shown in
Upon secure attachment of the exterior window walls 505A-B, the demising wall 520 is positioned and secured. Upon secure attachment of the demising walls 520, the rods 698A-D, fire safing 670, trims 691C-D, and fire caulking 674 are provided between the demising wall 520 and the exterior window walls 505A-B. Similarly, the rods 698A-D, trims 691C-D, and fire safing 670 and fire caulking 674 are inserted between the demising wall 520 and the closing panel 699B once the demising walls 520 and entry doors 700A-B are securely positioned perpendicularly. The first door member 700A is positioned on the right side of the closure panel 699B after attaching the exterior window walls 525 and first window member 700A to the floor and ceiling slab 650 (as described in
The next step of constructing a building is placing or installing utility walls 535.
Installation of the utility walls 535 utilizes a pre-finished, acoustically sealed head bracket member 685A that is substantially shaped as an L, a head anchor 686A at the head portion of the utility wall 535 which are securely attached to the ceiling slabs 650 with a pad 690 inbetween the head bracket member 685A and the ceiling slab 650. Installation of the utility walls 535 further utilizes base anchors 687A-B at the base portion of the utility walls 535 to securely attach to the floor slabs 650. First, the utility wall 535 is set onto the bathroom floor pan 555 of the floor slab 650 as shown in
Simultaneously, a head anchor 686A is drilled upwardly into the slab 650 by permanently attaching a head bracket member 685B to the underside of the slab 650 for attaching a utility wall 535B. The head anchor 686A may be a bolt or similar attachment means to securely attach the head bracket member 685B to the slab 650. The head portion of the utility wall 535A-B is then securely tilted into the head bracket member 685B while aligning the vertical portion of the angle member 671 with the vertical portion of the head bracket member 685B. The utility wall 535 utilizes a thermally insulated head bracket member 685B that is securely attached to the slab 650 prior to installing the utility wall 535A-B. As shown in
As shown in
Upon securing the utility walls 535, insulated metal panels 661A-C are installed once the utility walls 535A-B are securely anchored into place. Normally, the metal panels 661B-C on the exterior side of the utility walls 535A-B are pre-manufactured and already pre-finished by being attached to the exterior side of the utility walls 535A-B. However, the final metal panels 661A, 661C are attached after complete installation of the utility walls 535A-B to conceal and insulate the exterior edge 651 of the slab 650 located between the two utility walls 535A-B.
An angle-shaped panel attachment angle 679 is first secured to the utility wall 535B with a fastener 681B as shown in
The next step of constructing a building is connecting utility components and installing fixtures. All of the unit's utility connections occur at the utility walls 535. The electrical and communications main lines run vertically in the utility wall 535. At each unit, the electrical service feeds directly into the utility wall's 535 breaker panel. Wiring connections to other wall components occur via pre-installed wiring. Electrical and communications connections are carried out at the time of installation of each adjacent utility wall 535. In
The next step of constructing a building is inserting a bathroom floor pan 555 and a shower base 560 with an integral drain 556 into a recess 595 within the floor slab 650. The recess 595 or depression is cast into the slab 650 and shaped to receive the bathroom floor pan 555 and shower base 560. The bathroom floor pan 555 is a pre-cast, pre-formed component with an integral shower base 560 and sloping floors towards the drain 556 for directing water to the drain 556. The bathroom floor pan 555 is field set in grout after the installation of the utility wall 535. In
The next step of construction is placing exterior walls 510. Living units that are 30 feet and wider may have a room against the exterior wall 510 at the chase wall side of the unit. If these rooms are to be used as bedrooms, building code may require that a door or window be provided that is large enough to accommodate egress. In these types of conditions, exterior walls 510 can be used. The exterior wall 510 is composed and anchored in exactly the same manner as the end walls 515 as shown in
Similar to the end walls 515, the exterior walls 510 are suspended via a crane and moved into place from the exterior of the building. The exterior walls 510 are set onto the floor slab 650 and secured into place. Simultaneously, the head portion of the exterior wall 510 is placed adjacent to the anchor 612 and secured into place. The vertical side of the head anchor 612 has pre-punched slots to allow screw or fastener attachment to occur between the anchor 612 and the exterior wall 510 to accommodate vertical movement caused by vibration of the slab 650. An insulated metal panel 661 and removable, pre-finished metal trim 665 are installed at the head section to conceal the top of exterior wall 510 insulation and connections once the exterior walls 510 are securely anchored into place. The metal panel 661 conceals and insulates the vertical edge 651 of the slab 650. Upon installing the final metal panel 661A and the metal trim 682, a backer rod 683 is sealed at the joint between the two metal panels 661A-B and over the panel fastener 681 to cover the joint. The installation of this final metal panel 661A and trim 682 complete the installation of the exterior walls 510 creating a weather-tight and water-tight system.
The next step of construction is installing the entry door 525. The entry door 525 is a pre-assembled, pre-wired and pre-finished component. The entry door 525 comes with a door portion 705, inner frame 707 to house the door portion 705, outer frame 706 to support the entry door 525, and an operable relight panel 704 positioned above the door portion 705. All associated hardware for the door portion 705 is pre-installed except for thresholds or covers 710 to prevent bottom draft, an outer frame 706, and a closure panel 699. The closure panel 699 is preferably made of aluminum, however, other types of materials can be used to enclose the door assembly. The entry door 525 may come in a right-hand or a left-hand door configuration to accommodate different unit layouts. The entry door 525 has an operable relight panel 704 above the door portion 705. Electrical connections to be made between walls such as the demising wall 520 and the utility wall 535 are made in the cavity between the door portion 705 and the operable relight panel 704. As shown in
The operable relight panel 704 of the entry door 525 is anchored to the ceiling slab 650 above via a head anchor 612 which is secured to the ceiling slab 650. Attachment of the removable panel 704 of the entry door 525 is very similar to the head connection of the exterior window walls 505, 605 as shown in
Upon anchoring the slip members 630A-B to its proper position under the slab 650, the entry door 525 with the head support member 611B is inserted into the slip members 630A-B. Upon securing the head portion of the entry door 525 with the slip members 630A-B, the bottom portion of the entry door 525 is positioned tightly against the anchor 612 and at the bottom side (not shown in this FIG.) of the entry door 525. As shown in
The next step of construction is installing interior partitions 562, 565, 567 and bedroom doors 568 for separating rooms or configuring rooms with different layouts as shown in
At the head portion of the partitions 562, 565, 567 and bedroom doors 568 whereby they attach to the bottom side of the ceiling slab 650, a rigid C-shaped receptor channel 713A is attached to the bottom side of the ceiling slab 560 using a first head anchor 612B. The receptor channel 713A is approximately 2″ deep and 2″ wide so that the top portion of the partition 565 is inserted at least half way to ¾″ into the receptor channel 713A. Before inserting the partition 565 into the receptor channel 713A and set in place, shims 718 are placed between the vertical portions of the receptor channel 713A and the top portion of the partition 565 to create friction and to provide additional support for securely holding the partition 565 in place. At the receptor channel 713 of the head portion, a continuous rubber glazing gasket 719 will be inserted between channel and partition to secure the panel onto place. Sealant will be provided at vertical wall joints where the glazing acts as a shower enclosure. The partition 565 is anchored to the walls via edge angles (not shown in this FIG.).
A sliding bedroom door 568, whether made of glass or other materials, is attached to a sliding door guide 715 previously attached to the ceiling slab 650 via a second head anchor 612B. The sliding door guide 715 basically guides the sliding bedroom door 568 at the top portion so that it can slide open and close easily. The sliding bedroom door 568 is suspended from a sliding door track 715 mounted to the underside of the ceiling slab 650. The protruding structure 733 from the top portion of the sliding bedroom door 568 extends into the sliding door track 715 and to catch the sliding door track 715. A trim 714, preferably made of aluminum or other types of materials, is used to attach the top portion of the sliding bedroom door 568 to the underside of the ceiling slab 650 via a second head anchor 612B as shown in
At the bottom portion of the partition 565 and bedroom door 568, a bottom receptor channel 713C is attached to the floor slab 650 by a bottom anchor 612A to insert a partition base member 711. The partition base member 711 is fully positioned within the bottom receptor channel 713C so that a third fastener or fastening means 717D is horizontally drilled through the bottom receptor channel 713C and into the partition base member 711 for securely attaching the bottom portion of the partition 565. Furthermore, a sliding door guide 716 is adjacently positioned on the floor slab 650 next to the bottom receptor channel 713C and attached to the floor slab 650 by drilling two bottom anchors 612A through the flat portions of the sliding door guide 716 and into the floor slab 650. The sliding bedroom door 568 has a groove 738 that fits over the protruding sliding door guide 716. An attachment member 739 that extends below the end of the sliding door 568 keeps the sliding door 568 above the ground of the floor slab 650 for easy sliding of the door 568. The majority of the weight of the sliding door 568 will be carried on rollers in ceiling-mounted track 715. This mechanism is typically used between the kitchen and bathroom. The partitions 565 may also be used to help establish privacy between bedrooms. A 4″ thick reconfigurable glass wall system will be used where partitions 565 are called for between living and dining areas and bedrooms. In these applications, the sliding aluminum and glass doors are suspended from a sliding door track that is supported by the wall system's vertical mullions.
The next step of construction is installing kitchen and bathroom components. As shown in
The next step of construction is installing parapet wall 730 for the roof as shown in
Upon installing and anchoring the parapet wall 730, exterior sheathing 740A is applied on the opposite side of the insulated panel 732 to the roof side of the parapet wall 730. As shown in
The next step of construction is installing the roof. The majority of the building's roof is a flat membrane roof. In one of the exemplary applications, the roof area has a garden roof system. The garden roof system is a low-maintenance, green roof system which helps reduce the site storm water run-off flow rates. This garden roof system uses high quality recycled materials and improves air quality via the creation of oxygen and the reduction of dust. The cover provided by the planting 770 minimizes the impact from UV and varying temperatures on the surrounding environment and increases the life of the roof. Sloped roofing may be used in selective locations such as independent walkways, areas with stairs and elevator landings.
Translucent roof panels may be used at sloping roofs to allow as much natural light as possible to the areas below. Any run-off from the roof surfaces are collected and stored as gray water for irrigating the plants on the green roof and in-the-site landscape. In one of the exemplary applications, an Insulated Roof Membrane (IRMA) also called a Protected Roof Membrane (PMR) System may be installed after the parapet wall 730 is installed. A monolithic, thermoplastic roofing membrane 750 is placed directly on the concrete roof slab 650. This monolithic, thermoplastic roofing membrane 750 is a fully adhered, seamless, self-healing membrane that can be mopped onto the top of the roof slab 650. Upon applying the roofing membrane 750, the roof is covered with a fiberglass-reinforced protective layer or root barrier, and additionally covered with a layer of CFC-free, closed cell rigid insulation as an air barrier. The thickness of the insulation layers are determined by the local environment and governing thermal design values.
As shown in
The next step of construction is assembling exterior walkways. The application of the exterior walkways are determined by the overall building configuration and the need for structural framing adjacent to the face of the building. In another embodiment wherein the building takes on a rectilinear or L-shape scenario, all sides have diagonal bracing. In
The steps described in
Two and Four Bedroom Units:
A typical two-bedroom unit is one and half times longer than a studio unit. Four-bedroom units are typically twice the size of a standard studio unit. There are also standard plans for two and three-bedroom corner units and efficiency units as shown in
The first step of constructing multiple bedroom units is delivering and staging of demising walls 520 as described in
As previously described in FIGS. 13 and 15-18, the next step of constructing multiple bedroom units is installing the exterior window walls 505. The sequence for the delivery and installation of the exterior window walls 505 and components are described for the standard applications in
The next step of constructing multiple bedroom units is placing end walls 515 for units as described in
The exterior wall 510 is then suspended via a crane and moved into place from the exterior of the building. The exterior wall 510 is set onto the floor slab 650 and secured into place via access from the exterior face of the building. Simultaneously, the head portion of the exterior wall 510 is placed into the slip member 630 and secured in place. In order to secure the head portion of the exterior wall 510 to the head anchor 612, a fastener 621 is securely inserted horizontally through the vertical side of the anchor 612 and into the exterior wall 510. The head anchor 612 further has pre-punched slots to allow any screw or fastener attachment to occur between the anchor 612 and the inner wall panel 657 to accommodate vertical movement caused by slab 650 vibration. Removable, prefinished, metal head trim 665 is placed to conceal the top of the exterior wall 510 insulation and connections. Upon anchoring the exterior wall 510 into place, a final, insulated metal panel 661 and a painted sheet metal trim 682 are installed on the outer surface of the exterior wall 510. The final metal panel 661 conceals and insulates the edge 651 of the floor and ceiling slab 650. As shown in
The next step of construction is placing the utility wall 535 as previously described for the standard application in
The next step of constructing multiple bedroom units is inserting a bathroom floor pan 555 with an integral drain 556 into a recess 595 within the floor slab 650 as standard application and previously described in
The next step of constructing multiple bedroom units is installing the entry door 525 and its associated parts. Installation of the entry door 525 is previously described for the standard application in
The next step of constructing outer structures such as the parapet wall 730 for the roof, roof, and exterior or common walkways are the same as previously described in
It should be noted that relative terms are meant to help in the understanding of the structures and are not meant to limit the scope of the invention. Similarly, the term “head” is meant to be relative to the term “base,” and the term “top” is meant to be relative to the term “bottom.” It should also be noted that the term “right” is meant to be relative to the term “left,” and the term “horizontal” is meant to be relative to the term “vertical.” Furthermore, the present invention is described in terms of perpendicular and parallel in direction, the terms are not meant to be limiting. It should be further noted that although the present invention is described in terms of first and second walls, the terms are not meant to be limiting. It should be further noted that although the present invention is described using certain structures such as fasteners, however, any other types of means can be used to attach the walls.
The terms and expressions that have been employed in the foregoing specification are used as terms of description and not of limitation, and are not intended to exclude equivalents of the features shown and described. This application is intended to cover any adaptations or variations of the present invention. It will be appreciated by those of ordinary skill in the art that any arrangement that is calculated to achieve the same purpose may be substituted for the specific embodiment shown. It is also to be understood that the following claims are intended to cover all of the generic and specific features of the invention herein described and all statements of the scope of the invention which, as a matter of language, might be said to fall therebetween.
Number | Name | Date | Kind |
---|---|---|---|
1883376 | Meier et al. | Oct 1932 | A |
2419319 | Lankton | Apr 1947 | A |
2562050 | Lankton | Jul 1951 | A |
2686420 | Youtz | Aug 1954 | A |
2871544 | Youtz | Feb 1959 | A |
3017723 | Von Heidenstam | Jan 1962 | A |
3052449 | Long et al. | Sep 1962 | A |
3053015 | Graham | Sep 1962 | A |
3221454 | Togni | Dec 1965 | A |
3245183 | Tessin | Apr 1966 | A |
3388512 | Newman | Jun 1968 | A |
3490191 | Ekblom | Jan 1970 | A |
3579935 | Regan et al. | May 1971 | A |
3590393 | Hollander | Jul 1971 | A |
3594965 | Saether | Jul 1971 | A |
3604174 | Nelson, Jr. | Sep 1971 | A |
3638380 | Perri | Feb 1972 | A |
3707165 | Stahl | Dec 1972 | A |
3713265 | Wysocki et al. | Jan 1973 | A |
3721056 | Toan | Mar 1973 | A |
3722169 | Boehmig | Mar 1973 | A |
3727753 | Starr | Apr 1973 | A |
3742666 | Antoniou | Jul 1973 | A |
3755974 | Berman | Sep 1973 | A |
3762115 | McCaul, III | Oct 1973 | A |
3766574 | Smid, Jr. | Oct 1973 | A |
3821818 | Alosi | Jul 1974 | A |
3853452 | Delmonte | Dec 1974 | A |
3906686 | Dillon | Sep 1975 | A |
3921362 | Ortega | Nov 1975 | A |
3926486 | Sasnett | Dec 1975 | A |
3971605 | Sasnett | Jul 1976 | A |
3974618 | Cortina | Aug 1976 | A |
4050215 | Fisher | Sep 1977 | A |
4078345 | Piazzalunga | Mar 1978 | A |
4107886 | Ray | Aug 1978 | A |
4142255 | Togni | Mar 1979 | A |
4171545 | Kann | Oct 1979 | A |
4178343 | Rojo, Jr. | Dec 1979 | A |
4221441 | Bain | Sep 1980 | A |
4226061 | Day, Jr. | Oct 1980 | A |
4280307 | Griffin | Jul 1981 | A |
4314430 | Farrington | Feb 1982 | A |
4325205 | Salim | Apr 1982 | A |
4327529 | Bigelow, Jr. | May 1982 | A |
4341052 | Douglass, Jr. | Jul 1982 | A |
4435927 | Umezu et al. | Mar 1984 | A |
4441286 | Skvaril | Apr 1984 | A |
4447996 | Maurer, Jr. | May 1984 | A |
4477934 | Salminen | Oct 1984 | A |
4507901 | Carroll | Apr 1985 | A |
4513545 | Hopkins, Jr. | Apr 1985 | A |
4528793 | Johnson | Jul 1985 | A |
4646495 | Chalik | Mar 1987 | A |
4655011 | Borges | Apr 1987 | A |
4856244 | Clapp | Aug 1989 | A |
4919164 | Barenburg | Apr 1990 | A |
5076310 | Barenburg | Dec 1991 | A |
5205091 | Brown | Apr 1993 | A |
5307600 | Simon, Jr. | May 1994 | A |
5359820 | McKay | Nov 1994 | A |
5402612 | diGirolamo et al. | Apr 1995 | A |
5412913 | Daniels et al. | May 1995 | A |
5459966 | Suarez | Oct 1995 | A |
5471804 | Winter, IV | Dec 1995 | A |
5493838 | Ross | Feb 1996 | A |
5509242 | Rechsteiner et al. | Apr 1996 | A |
5528877 | Franklin | Jun 1996 | A |
5628158 | Porter | May 1997 | A |
5660017 | Houghton | Aug 1997 | A |
5678384 | Maze | Oct 1997 | A |
5697189 | Miller | Dec 1997 | A |
5699643 | Kinard | Dec 1997 | A |
5724773 | Hall | Mar 1998 | A |
5755982 | Strickland | May 1998 | A |
5850686 | Mertes | Dec 1998 | A |
5867964 | Perrin | Feb 1999 | A |
5870867 | Mitchell | Feb 1999 | A |
5987841 | Campo | Nov 1999 | A |
5997792 | Gordon | Dec 1999 | A |
6000194 | Nakamura | Dec 1999 | A |
6073401 | Iri et al. | Jun 2000 | A |
6076319 | Hendershot | Jun 2000 | A |
6086350 | Del Monte | Jul 2000 | A |
6154774 | Furlong | Nov 2000 | A |
6243993 | Swensson | Jun 2001 | B1 |
6244008 | Miller | Jun 2001 | B1 |
6260329 | Mills | Jul 2001 | B1 |
6301838 | Hall | Oct 2001 | B1 |
6308465 | Galloway et al. | Oct 2001 | B1 |
6308491 | Porter | Oct 2001 | B1 |
6393774 | Fisher | May 2002 | B1 |
6481172 | Porter | Nov 2002 | B1 |
6484460 | VanHaitsma | Nov 2002 | B2 |
6625937 | Parker et al. | Sep 2003 | B1 |
6651393 | Don | Nov 2003 | B2 |
6837013 | Foderberg et al. | Jan 2005 | B2 |
6922960 | Sataka | Aug 2005 | B2 |
7143555 | Miller | Dec 2006 | B2 |
7389620 | McManus | Jun 2008 | B1 |
7395999 | Walpole | Jul 2008 | B2 |
7444793 | Raftery et al. | Nov 2008 | B2 |
7467469 | Wall | Dec 2008 | B2 |
7484339 | Fiehler | Feb 2009 | B2 |
7676998 | Lessard | Mar 2010 | B2 |
7694462 | O'Callaghan | Apr 2010 | B2 |
7721491 | Appel | May 2010 | B2 |
7748193 | Knigge et al. | Jul 2010 | B2 |
7908810 | Payne, Jr. et al. | Mar 2011 | B2 |
7921965 | Surace | Apr 2011 | B1 |
8109058 | Miller | Feb 2012 | B2 |
8234833 | Miller | Aug 2012 | B2 |
8251175 | Englert et al. | Aug 2012 | B1 |
8322086 | Weber | Dec 2012 | B2 |
8359808 | Stephens, Jr. | Jan 2013 | B2 |
8424251 | Tinianov | Apr 2013 | B2 |
8539732 | Leahy | Sep 2013 | B2 |
8555581 | Amend | Oct 2013 | B2 |
8621806 | Studebaker et al. | Jan 2014 | B2 |
8769891 | Kelly | Jul 2014 | B2 |
20020059763 | Wong | May 2002 | A1 |
20020170243 | Don et al. | Nov 2002 | A1 |
20030005653 | Sataka | Jan 2003 | A1 |
20030101680 | Lee | Jun 2003 | A1 |
20030140571 | Muha et al. | Jul 2003 | A1 |
20030167712 | Robertson | Sep 2003 | A1 |
20040103596 | Don | Jun 2004 | A1 |
20050081484 | Yland | Apr 2005 | A1 |
20050108957 | Quesada | May 2005 | A1 |
20050188632 | Rosen | Sep 2005 | A1 |
20050198919 | Hester, Jr. | Sep 2005 | A1 |
20050210764 | Foucher et al. | Sep 2005 | A1 |
20050235581 | Cohen | Oct 2005 | A1 |
20050247013 | Walpole | Nov 2005 | A1 |
20060021289 | Elmer | Feb 2006 | A1 |
20060096202 | Delzotto | May 2006 | A1 |
20060117689 | Onken et al. | Jun 2006 | A1 |
20060179764 | Ito | Aug 2006 | A1 |
20060248825 | Garringer | Nov 2006 | A1 |
20070074464 | Eldridge | Apr 2007 | A1 |
20070107349 | Erker | May 2007 | A1 |
20070157539 | Knigge et al. | Jul 2007 | A1 |
20070163197 | Payne et al. | Jul 2007 | A1 |
20070209306 | Andrews et al. | Sep 2007 | A1 |
20070294954 | Barrett | Dec 2007 | A1 |
20080057290 | Guevara et al. | Mar 2008 | A1 |
20080104901 | Olvera | May 2008 | A1 |
20080168741 | Gilgan | Jul 2008 | A1 |
20080178542 | Williams | Jul 2008 | A1 |
20080282626 | Powers, Jr. | Nov 2008 | A1 |
20080289265 | Lessard | Nov 2008 | A1 |
20080295450 | Yogev | Dec 2008 | A1 |
20090100769 | Barrett | Apr 2009 | A1 |
20090113820 | Deans | May 2009 | A1 |
20090134287 | Klosowski | May 2009 | A1 |
20090165399 | Campos Gines | Jul 2009 | A1 |
20090205277 | Gibson | Aug 2009 | A1 |
20090293395 | Porter | Dec 2009 | A1 |
20100064601 | Napier | Mar 2010 | A1 |
20100186313 | Stanford et al. | Jul 2010 | A1 |
20100229472 | Malpas | Sep 2010 | A1 |
20100263308 | Olvera | Oct 2010 | A1 |
20100325971 | Leahy | Dec 2010 | A1 |
20100325989 | Leahy | Dec 2010 | A1 |
20110023381 | Weber | Feb 2011 | A1 |
20110056147 | Beaudet | Mar 2011 | A1 |
20110296769 | Collins et al. | Dec 2011 | A1 |
20110296778 | Collins et al. | Dec 2011 | A1 |
20110300386 | Pardue, Jr. | Dec 2011 | A1 |
20120151869 | Miller | Jun 2012 | A1 |
20130067832 | Collins et al. | Mar 2013 | A1 |
20130133277 | Lewis | May 2013 | A1 |
20140013695 | Wolynski et al. | Jan 2014 | A1 |
20140047780 | Quinn et al. | Feb 2014 | A1 |
20140059960 | Cole | Mar 2014 | A1 |
20140069035 | Collins et al. | Mar 2014 | A1 |
20140083046 | Yang | Mar 2014 | A1 |
20140130441 | Sugihara et al. | May 2014 | A1 |
Number | Date | Country |
---|---|---|
2005200682 | May 2005 | AU |
02137279 | Mar 2008 | CN |
1045078 | Oct 2000 | EP |
1739246 | Jan 2011 | EP |
2281964 | Feb 2011 | EP |
H0310985 | Jan 1991 | JP |
10234493 | Sep 1998 | JP |
2000144997 | May 2000 | JP |
2008073434 | Apr 2008 | JP |
2008110104 | May 2008 | JP |
20060066931 | Jun 2006 | KR |
WO 9722770 | Jun 1997 | WO |
WO 2007059003 | May 2007 | WO |
WO 2010030060 | Mar 2010 | WO |
Entry |
---|
M.A. Riusillo; Lift Slab Construction: Its History, Methodology, Economics and Applications; Jun. 1, 1988, ACI-Abstract. |
International Search Report and Written Opinion for PCT Application No. PCT/US2011/001039 mailed on Oct. 5, 2011. |
Final Office Action mailed Apr. 15, 2014, in U.S. Appl. No. 14/077,565, Arlan Collins, filed Jun. 8, 2010. |
Final Office Action mailed Apr. 18, 2012, in U.S. Appl. No. 12/796,603, Arlan E. Collins, filed Jun. 8, 2010. |
Final Office Action mailed Apr. 18, 2012, in U.S. Appl. No. 13/155,319, Arlan Collins, filed Jun. 7, 2011. |
Final Office Action mailed May 9, 2013, in U.S. Appl. No. 13/155,319, Arlan Collins, filed Jun. 7, 2011. |
Final Office Action mailed May 11, 2012, in U.S. Appl. No. 12/796,625, Arlan Collins., filed Jun. 8, 2010. |
Final Office Action mailed May 6, 2013, in U.S. Appl. No. 12/796,603, Arlan E. Collins, filed Jun. 8, 2010. |
Non Final Office Action mailed Dec. 27, 2013, in U.S. Appl. No. 14/077,565, Arlan Collins, filed Jun. 8, 2010. |
Non Final Office Action mailed Jul. 18, 2013, in U.S. Appl. No. 12/796,625, Arlan Collins, filed Jun. 8, 2010. |
Non Final Office Action mailed Nov. 8, 2012, in U.S. Appl. No. 13/155,319, Arlan Collins, filed Jun. 7, 2010. |
Non Final Office Action mailed Oct. 11, 2011, in U.S. Appl. No. 12/796,625, Arlan Collins, filed Jun. 8, 2010. |
Non Final Office Action mailed Oct. 19, 2011, in U.S. Appl. No. 13/155,319, Arlan Collins, filed Jun. 7, 2010. |
Non-Final Office Action mailed Apr. 11, 2014, in U.S. Appl. No. 13/700,429, Arlan Collins, filed Nov. 27, 2012. |
Non-Final Office Action mailed Jul. 18, 2013, in U.S. Appl. No. 12/796,603, Arlan E. Collins, filed Jun. 8, 2010. |
Non-Final Office Action mailed Oct. 11, 2011, in U.S. Appl. No. 12/796,603, Arlan E. Collins, filed Jun. 8, 2010. |
Notice of Allowance Action mailed Jun. 9, 2014, in U.S. Appl. No. 12/796,625, Arlan Collins, filed Jun. 8, 2010. |
Notice of Allowance Action mailed Mar. 14, 2014, in U.S. Appl. No. 12/796,625, Arlan Collins, filed Jun. 8, 2010. |
Notice of Allowance Action mailed May 6, 2014, in U.S. Appl. No. 12/796,625, Arlan Collins, filed Jun. 8, 2010. |
Notice of Allowance Action mailed Nov. 15, 2013, in U.S. Appl. No. 12/796,625, Arlan Collins, filed Jun. 8, 2010. |
Notice of Allowance mailed Jul. 8, 2014, in U.S. Appl. No. 14/077,565, Arlan Collins, filed Jun. 8, 2010. |
“Beam to column connection”, TATA Steel, http://www.tatasteelconstruction.com/en/reference/teaching—resources/architectural—studio—reference/elements/connections/beam—to—column—connections, 2014. |
“Emerging Trends 2012 Executive Summary”, Urban Land Institute, Ch. 1, Mar. 13, 2011. |
“How to Soundproof a Ceiling—Soundproofing Ceilings”, http://www.soundproofingcompany.com/soundproofing-solutions/soundproof-a-ceiling/, Apr. 2, 2014, 1-7. |
“Structural Insulated Panel”, Wikipedia, http://www.en.wikipedia.org//wiki/Structural—insulated—panel, May 30, 2014. |
“Structural Insulated Panels”, SIP Solutions, http://www.sipsolutions.com/content/structural-insulated panels, Aug. 15, 2014. |
“US Apartment & Condominium Construction Forecast 2003-2017”, Statista, Inc. |
Azari, et al., “Modular Prefabricated Residential Construction—Constraints and Opportunities”, PNCCRE Technical Report #TR002, Aug. 2013, 90. |
Borzouie, Jamaledin et al., “Seismic Assesment and Reahbilitation of Diaphragms”, http://www.nosazimadares.ir/behsazi/15WCEE2012/URM/1/Roof.pdf, Dec. 31, 2011. |
Gonchar, “Paradigm Shift—Multistory Modular”, Architectural Record, Oct. 2011, 144-148. |
Kerin, et al., “National Apartment Market Report—2013”, Marcus & Millichap, 2013, 1-9. |
McIlwain, “Housing in America—The Next Decade”, Urban Land Institute, 2010, 1-28. |
McIlwain, “The Rental Boost From Green Design”, Urban Land, http://urbanland.uli.org/sustainability/the-rental-boost-from-green-design/, Jan. 4, 2012, 1-6. |
Shashaty, Andre, “Housing Demand”, Sustainable Communities, Apr. 2011, 14-18. |
Sichelman, “Severe Apartment Shortage Looms”, Urban Land, http://urbanland.uli.org/capital-markets/nahb-orlando-severe-apartment-shortage-looms/, Jan. 13, 2011, 1-2. |
Stiemer, S F. “Bolted Beam-Column Connections”, http://faculty.philau.edu/pastorec/Tensile/bolted—beam—column—connections.pdf, Nov. 11, 2007, 1-16. |
Number | Date | Country | |
---|---|---|---|
20110296789 A1 | Dec 2011 | US |