The present invention relates to a container production management system and method, more specifically, to a container production management system and method, in which a container can be specifically identified to manage a production process in the production process of the container.
Patent Document 1 describes one example of a conventional container production management system. According to Patent Document 1, a specific symbol is added to each of resin containers for beverage bottles, thereby connecting each pocket of a rotary conveying device for conveying a resin container to a resin container specific symbol held by each pocket to manage conveyance history information for each resin container.
This production management system is premised on connective rotary conveyance facilities in which the resin container is transferred between the rotary conveying devices adjacent to each other to perform connective conveyance, and therefore a conveyance order of the resin containers is fixed. Thus, even when the specific symbol is printed in the vicinity of an inspection device for a molded bottle, a resin container before printing can be linked with the pocket of the rotary conveying device by tracing back a conveyance route back from a printing stage.
Patent Document 1: JP-A-2013-75712
However, in the production management system described in Patent Document 1, it is difficult to link a specific symbol with each resin container before printing the specific symbol in a process before conveyance by connective rotary conveyance facilities. Therefore, it has been difficult to manage each preform, which is a material member of the resin container, with the specific symbol in a process before conveyance.
Moreover, in conveyance facilities other than the connective rotary conveyance facilities, a conveyance order of the resin containers is changed in several cases, and therefore it has been difficult to link an object symbol with a pocket of a rotary conveying device by tracing back to a stage before printing the specific symbol.
Further, also in a production fine in which a lane is branched and branched lanes are merged in order to improve throughput of production of the resin container, an order of containers is changed in several cases, and therefore it has been difficult to link the specific symbol with the pocket of the rotary conveying device by tracing back the specific symbol and the pocket.
The present invention has been made in view of the circumstances as described above, and an objective of the present invention is to provide a container production management system and method, in which a container production process capable of specifically managing each object ranging from a material member to a container, irrespective of a conveyance order of the object.
In order to achieve the objective described above, the present invention relates to a container production management system for managing a container production process, comprising: an object identification code adding means for adding an object identification code indicating an object identifier, which is information for identifying an object ranging from a material member for each container to the container, to each of the objects; a processing step reading means for reading the object identifier indicated by the object identification code added to each of the objects to be processed in at least one processing step of processing the object added with the object identification code; an inspection step reading means for reading the object identifier indicated by the object Identification code added to each of the objects to be inspected in at least one inspection step of inspecting the object added with the object identification code; and a computing means for creating a database in which the object identifier indicated by the object identification code, information on at least one processing step, and inspection results in at least one inspection step are linked with each other, wherein the object identification code adding means adds the object identification code to the material member for each container; or to a portion to be the material member among raw materials before an individual material member is separated therefrom.
Moreover, the present invention relates to a container production management method, which is container production management system for managing a container production process, comprising: a step of adding an object identification code indicating an object identifier, which is information for identifying an object ranging from a material member for each container to the container; a step of reading the object identifier indicated by the object identification code added to each of the objects to be processed in at least one processing step of processing the object-added with the object identification code; a step of reading the object identifier indicated by the object identification code added to each of the objects to be inspected in at least one inspection step of inspecting the object; and a step of creating a database in which the object identifier indicated by the object identification code, information on at least one processing step, and inspection results in at least one inspection step are linked with each other. In the step of adding the object identification code, the object identification code is added to the material member for each container, or to a portion to be the material member among raw materials before the individual material member is separated therefrom.
Thus, according to the container production management system and method of the present invention, the object identification code for indicating the object ranging from the material member to the container is added to each of the material members, or to each of the portions to be the material member among the raw materials before being separated into the individual material member. The object identification code is added thereto in a stage before molding the container, whereby even before molding the container, the material member for each container can be specifically identified to perform production management.
According to a container production management system and method of the present invention, each object ranging from a material member to a container can be specifically managed, irrespective of a conveyance order of the object.
Hereinafter, a first embodiment of the present invention will be described with reference to
In the first embodiment, a container production management system and method for managing a can body production process for producing a two piece can will be described.
A can body production process 100 to be managed in the present embodiment will be described with reference to
First, in the cupping press step 11, a circular material member is blanked from a sheet-shaped sheet metal S as a raw material unwound from a coil, and simultaneously molded into a cup shape.
Next, in the body maker step 12, a cup-shaped material member C1 is drawn to thinly stretch a can shell part, thereby further molding a can bottom part into a can body C2.
Next, in the printer step 13, the can shell part of the can body C2 is painted and printed, and further dried and baked.
Then, in the inspection step 14, defects inside and outside a can body C3 through the printer step 13 are inspected. As a result of inspection, the can body C3 judged to be defective is excluded from a production line, and only the can body C3 judged to be a good item is shipped.
It should be noted that the can body production process 100 is not limited to a process including all the processing steps 11 to 13. Moreover, the can body production process 100 may further include various steps such as a cleaning step and a coating step in addition to the processing steps 11 to 13. Moreover, the inspection step 14 may be performed in a plurality of steps.
Next, a container production management system for managing the can body production process 100 will be described.
In the present embodiment, each of the objects ranging from the material member to the can body which is the container is identified using an object identifier which is information for identifying each object, thereby being managed.
As shown in
It should be noted that, in the present embodiment, the object identification code is added thereto in the cupping press step 11, but a process for adding the object identification code thereto is not particularly limited, and the object identification code may be added thereto in the body maker step 12, for example.
The object identification code is not particularly limited, as long as the object identification code can indicate the object identifier which is information for identifying each object ranging from the material member to the can body as the container, and may be a character such as an alphanumeric character or a symbol, or an identifier such as a barcode (one-dimensional barcode), for example. The object identification code should be further preferably a two-dimensional code such as a QR code (registered trademark).
A method of adding the object identification code to each object is not particularly limited, either, and the object identification code may be printed on each object with ink, or marked, or printed with a laser beam, for example. Moreover, a seal or a component for displaying the object identification code may be affixed to each object, for example.
Accordingly, the object identification code adding means 1 may be any of a printing device, a marking device, a laser irradiation device and a seal affixing device, for example. (The same shall apply also to any other embodiment.)
Moreover, the object identification code is not limited to a visually or optically readable code, and may be electromagnetically readable code in a contact or non-contact manner. One example of such an object identification code includes a chip that can electromagnetically transmit a signal of a code indicating the object identifier, such as a radio frequency identifier (RFID).
A method of adding such a chip to each object is not particularly limited, and the chip may be affixed to each object, or may be embedded thereinto, for example.
Accordingly, the object identification code adding means 1 may be any of a device provided with a chip affixing mechanism for affixing the chip to the object, and a device provided with a chip embedding mechanism for embedding the chip into the object, for example. (The same shall apply also to any other embodiment.)
Here,
In the present embodiment, before blanking an individual material member C1 and separating the blanked member therefrom, an object identification code D is added to a portion S1 to be blanked circularly as the material member C1 among the sheet metals S. In the same figure, a two-dimensional code D as the object identification code D printed on the sheet metal S is schematically shown.
In particular, when a production process of the two piece can is managed, the object identification code D is preferably added to a portion to be blanked into a bottom part of the two piece can among the sheet metals S. In an example shown in
It should be noted that the object identification code D may be added to the material member C1 blanked from the sheet metal S. For example, the object identification code D may be printed on the material member C1 molded into the cup shape in the cupping press step 1.
In particular, when the production process of the two piece can is managed, the object identification code D should be printed on a portion to be the bottom part of the two piece can, namely, the bottom part of the cup-shaped material member C1.
In the portion to be the bottom part of the two piece can, deformation caused by molding processing of the can body in the body maker step 12 is small, and therefore the object identification code D printed on such a portion also has less deformation. Therefore, also after molding processing, a function of the object identification code D indicating the object identifier is maintained.
Further, in the portion to be the bottom part of the two piece can, printing is not ordinarily performed in the printer step, and therefore printing is not performed on the object identification code D added to such a portion, either. Therefore, also in a printing step, the function of the object identification code D is maintained.
Accordingly, if the object identification code D is added to the portion to be the bottom part of the two piece can, the function of the object identification code D is maintained, irrespective of processing in each process, and the individual object ranging from the material member to the can body can be easily identified.
Moreover, in the cupping press step 11, the circular material member C1 is blanked from the sheet metal S by eight blanking means (not shown) aligned in a direction perpendicular to a conveying direction of the sheet metal S. As a result, as shown in
It should be noted that numbers 1 to 8 are added to each of the eight blanking means as blanking means identifiers for identifying the blanking means. The blanking means for blanking each of the portions to be blanked on the sheet metal S is fixed for each lane, and therefore the object identification code D added to the portion to be blanked can be easily associated with the blanking means identifier. Moreover, also for the material member C1 blanked from the sheet metal S, for example, a position of each material member C1 on a belt conveyer that conveys the blanked material member C1 corresponds to each lane, and therefore the object identification code D added to the blanked material member C1 can be easily associated with the blanking means identifier for the blanking means of each lane. Then, as described later, in the database 5, each of the object identifiers (ID) of the object is linked with each of the blanking means identifiers for the blanking means with which the material member C1 of the object is blanked (see Table 1).
The body maker step reading means 2a, the printer step reading means 2b and the inspection step reading means 3 are not particularly limited, as long as such means can read the object identification code D. For example, when the object identification code D is optically readable, an image pickup device such as a camera is preferable. Moreover, when the object identification code D is electromagnetically readable, a receiving device such as a reader receiving the signal from the chip, such as RFID, is preferable.
In the body maker step 12, the can bodies C2 are molded in parallel separately in eight lanes (not shown). Accordingly, each of the cup-shaped material members C1 is molded from the cup-shaped material member C1 into the can body C2 by any one of body makers in the eight lanes.
Therefore, in the body maker step 12, the body maker step reading means 2a reads the object identification code D added to the object to be processed in each of the eight lanes. Thus, the object identification code D is read for each lane, and therefore the object identification code D is easily associated with each lane.
Then, as the information on the body maker step 12, information on the lane number is transmitted to the computing means 4 together with information on the object identifier indicated by the object identification code D.
It should be noted that the body maker step reading means 2a may read the object identification code D in each lane with one camera or receiver, or may read the object identification code D with each camera or receiver arranged in each of the eight lanes, for example.
Moreover, in each lane, the body maker step reading means 2a may read the object identification code D of the cup-shaped material member C1 before molding, the object identification code D of the can body C2 after molding, or the object identification code D during molding.
The printer step reading means 2b reads the object identification code D added to each of the objects to be processed in the printer step 13. The printer step reading means 2b should preferably read the object identification code D when the can body C2 or C3 is held to the mandrel of the mandrel wheel 132. Timing at which the printer step reading means 2b reads the object identification code D may be before printing, after printing or during printing with the printer plate B.
Moreover, a method of associating the object identification code D of the individual can body read by the printer step reading means 2b with the number of the printer plate B with which the can body is printed is not particularly limited.
For example, the number of the printer plate B is printed on each printer plate B of the blanket wheel 131, or on a place in the vicinity thereof, the printer step reading means 2b picks up an image of the number of the printer plate B on the blanket wheel 131 simultaneously with an image of the object identification code D, whereby the object identification code D of the individual can body may be associated with the number of the printer plate B with which the can body is printed. Moreover, for example, the number of the printer plate B is associated with a rotation angle of the blanket wheel 131, and according to the timing at which the object identification code D is read, the rotation angle of the blanket wheel 131 is detected by a rotation angle detection means such as an encoder, whereby the object identification code D may be associated with the number of the printer plate B. Thus, the object identifier ID indicated by the object identification code D is easily associated with the number of the printer plate.
Then, information on the number of the printer plate B as information on the printer step 13 is transmitted to the computing means 4 together with information on the object identifier ID indicated by the object identification code D.
Moreover, in the printer step 13, the blanket wheel 131, the mandrel wheel 132 and the conveyance wheel 133 rotate in connecting with each other, and therefore the number of each conveyance pocket of the conveyance wheel 133 conveying the individual can body is easily associated with the object identifier ID indicated by the object identification code D together with the number of the printer plate B.
Then, as the information on the printer step 13, information on the number of the conveyance pocket of the conveyance wheel 133 is also transmitted to the computing means 4 together with the information on the object identifier ID indicated by the object identification code D.
The inspection step reading means 3 reads the object identifier ID indicated by the object identification code D added to each of the can bodies C3 to be inspected in the inspection step 14. When the object identification code D is optically readable, the image pickup device for picking up an image of the can body C3 for inspection may also serve as the inspection step reading means 3.
Then, the information on the object identifier ID indicated by the object identification code D of the individual can body C3 is transmitted to the computing means 4 together with information on inspection results of the individual can body C3.
It should be noted that the can body C3 shipped through the inspection step 14 is ordinarily loaded on a pallet. During being loaded on the pallet, the object identification code D of each can body C3 is preferably read. Thus, based on product information linked with the object identifier ID indicated by the object identification code D in the database 5, all the can bodies C3 to be loaded on the pallet can be guaranteed to be predetermined products.
The computing means 4 creates, applying the object identifier ID indicated by the object identification code D as a key, the database 5 in which the blanking means number in the cupping press step 11, the lane number in the body maker step 12, the printer plate number in the printer step 13, and inspection results in the inspection step 14 are linked (associated) with each other.
It should be noted that the computing means 4 may be configured of a computer, or may be provided on a cloud computing system through Internet. Moreover, the database 5 may also be constructed as data in a storage device, or may be provided on the cloud computing system through Internet.
Table 1 shows one example of a content of the database 5. In Table 1, print date and time on which the object identification code D is printed, and completion date and time of the can body are linked with the object identifier ID.
Thus, according to the embodiment, the object identification code D for identifying the object ranging from the material member C1 to a container C3 is added to each of the portions S1 to be the material member C1 among the sheet metals S of raw materials before being separated into the individual material member, whereby as shown in Table 1, the individual object can be managed by applying the object identifier ID as the key in the production process ranging from a stage of the cupping press step 11 before molding the can body to a completed product in the inspection step 14. Thus, even before completing the can body, the material member C1 for each container can be specifically identified to perform production management.
Next, an analysis example of a factor of occurrence of can body defects using such a database 5 will be described.
Here, a histogram of defects is prepared for each processing step by dividing completion date and time on which scratch defects of the can body occur frequently.
From the histogram shown in the same figure, it is known that the defective item is produced, irrespective of the blanking means in the cupping press step 11.
It should be noted that, in the histogram shown in
From the histogram shown in the same figure, it is known that the defective item is produced, irrespective of the lane number in the body maker step 12.
From the histogram shown in the same figure, it is known that the defective item is produced, irrespective of the printer plate number in the printer step 13.
From the histogram shown the same figure, it is known that the defective items passing through a pocket in the number “7” in the printer step 13 is significantly more than the defective items passing through any other pockets. Thus, it is analyzed that occurrence of the can body scratch defects is attributed to the pocket in the number “7” with high possibility.
Thus, in the present embodiment, in the cupping press step 11, the object identification code D for identifying the object ranging from the material member C1 to the container C3 is added to each of the material members C1, or to each of the portions S1 to be the material members C1 among the sheet metals S which are the raw materials before being separated into the individual material member C1. The object identification code D is added thereto in the cupping press step 11 in a stage before molding the can body C2, whereby even before completing the container, the material member for each can body can be specifically identified to perform production management. Accordingly, according to the present embodiment, each object ranging from the material member C1 to the can body C3 can be specifically managed, irrespective of a conveyance order of the object.
It should be noted that, in the present embodiment, the production management system of the can body for the two piece can in which the can bottom part and the can shell part are integrally molded is described, but the present invention can also be applied to production management for a three piece can and a bottle can. Moreover, the can body may be a steel can prepared by applying a sheet metal of steel as the raw material, or an aluminum can prepared by applying a sheet metal of aluminum or aluminum alloy as the raw material. Moreover, the can body may have a can bottom part dented in a dome shape, or a flat can bottom part.
Hereinafter, a container production management system and method according to a second embodiment of the present invention will be described with reference to
A resin container production process 200 to be managed in the present embodiment will be described with reference to
First, in the preform molding step 21, a test tube-shaped preform as a material member is molded from a polyethylene terephthalate (PET) resin. In the present embodiment, a heated and melted resin is injected and filled into a mold at high temperature and high pressure, and then cooled and solidified to perform injection molding of a preform. It should be noted that a preform molding method is not limited to an injection molding method, and the preform may be formed according to a preform compression molding (PCM) method, for example.
In the preform accumulation step 22, molded preforms P1 are accumulated in a container in loose bulk for conveying the preforms P1 to the next stretching blow step 23. It should be noted that, when a production line has an online configuration for directly connecting the preform molding step 21 with the stretching blow step 23, the preform accumulation step 22 can be omitted.
In the stretching blow step 23, a heated preform P1 is inserted into the mold, and then while the preform P1 is stretched in a vertical direction with a stretching rod, compressed air is blown into the preform P1 to swell the preform P1 in a circumferential direction.
In the labeling step 24, a label is covered on a molded PET bottle P2, and the label is shrunk by heating.
Then, in the inspection step 25, visual inspection of a PET bottle P3 through the labeling step 24 is performed. As a result of inspection, the PET bottle P3 judged to be defective is excluded from the production line, and only the PET bottle P3 judged to be a good item is shipped.
It should be noted that the resin container production process 200 is not limited to a process including all the processing steps 21 to 24. Moreover, the resin container production process 200 may be a process further including various steps in addition to the processing steps 21 to 24 described above. Moreover, the inspection step 25 may be performed in a plurality of steps, respectively.
Next, a container production management system for managing the resin container production process 200 will be described.
In the present embodiment, each of objects ranging from a material member to a PET bottle which is a container is identified using an object identifier which is information for identifying each object to perform management.
As shown in
The object identification code adding means 1a can be formed into the same means as the above-described object identification code adding means 1 in the first embodiment. Moreover, the object identification code D can also be formed into the same means as the object identification code D in the first embodiment.
Here,
It should be noted that an object identification code D adding position is not limited to the plane surface place of the neck ring N, and the object identification code D is preferably added to part of a region from an opening of the preform P1 to a preform-shape remaining portion Pn which is not deformed in a post-step and immediately below the neck ring N.
Thus, in the region from the opening to the neck ring N, deformation by molding processing in the stretching blow step 22 is little, and therefore deformation is little also in the object identification code D printed in such a portion. Therefore, a function of the object identification code D indicating the object Identifier is maintained also after molding processing.
Incidentally, in the preform molding step 21, each of the preforms P1 is molded with any one of a plurality of preform molds.
Here,
Then, the preforms P1 from which the preform molds are drawn are aligned on reflecting the alignment of preform molds. Therefore, immediately after drawing the preform mold, the object identification code D is added to the preform P1 in a state in which the alignment of preforms P1 is maintained, whereby the object identification code D can be easily associated with the mold identifier for the preform mold with which the preform P1 added with the object identification code D is molded. Then, as described later, in the database 5, the object identifier ID indicated by the object identification code D is linked with the mold identifier for the preform mold with which the preform P1 as each of the material members is molded.
It should be noted that timing at which the object identification code D is added to the preform P1 is not limited to timing immediately after the preform P1 is removed from the preform mold, and the object identification code D of each preform P1 only needs to be linked with the mold identifier for the mold with which each preform P1 is molded. For example, in a state in which the preform P1 is conveyed in an order corresponding to the alignment of preforms P1, the object identification code D may be added to each preform P1.
The preform accumulation step reading means 2a, the stretching blow step reading means 2b, the labeling step reading means 2c and the inspection step reading means 3a can be formed into the same means as in the first embodiment, respectively.
In the preform accumulation step 22, the preform accumulation step reading means 2c reads the object identification code D of each preform P1 for each container in which the preforms P1 are accumulated and conveyed. Thus, the container number for identifying the container is easily associated with the object identification code D of each preform P1 conveyed by the container.
It should be noted that the object identification code D of each preform P1 is preferably read before accumulating each preform P1 in the container. Moreover, when the object identification code D is RFID, the object identification code D may be read after accumulation.
Then, information on the container number for conveying the preform in the preform accumulation step 22 is transmitted to the computing means 4a together with the information on the object identifier ID indicated by the object identification code D.
The stretching blow step reading means 2d reads the object identification code D added to each of the objects to be processed in the stretching blow step 23. The stretching blow step reading means 2b should read the object identification code D when the preform P1 or the PET bottle P2 is held by a pocket of the blow wheel 232. Timing at which the stretching blow step reading means 2d reads the object identification code D may be before stretching blow, after stretching blow or during stretching blow.
Moreover, a method of associating the object identification code D of each object read by the stretching blow step reading means 2d with the pocket number of the blow wheel 232 on which the object is subjected to stretching blow processing is not particularly limited.
For example, the pocket number is printed on the pocket of the blow wheel 232, or on a place in the vicinity thereof, and the stretching blow step reading means 2d picks up an image of the pocket number on the blow wheel 232 simultaneously with an image of the object identification code D, whereby the object identification code D of each object may be associated with the pocket number when the object is subjected to stretching blow processing. Moreover, for example, each pocket number is associated with a rotation angle of the blow wheel 232, and according to timing at which the object identification code D is read, the rotation angle of the blow wheel 232 is detected by a rotation angle detection means such as an encoder, whereby the object identification code D may be associated with the pocket number. Thus, the object identifier ID indicated by the object identification code D is easily associated with the pocket number.
Then, as information on the stretching blow step 23, information on the pocket number of the blow wheel 232 is transmitted to the computing means 4 together with the information on the object identifier ID indicated by the object identification code D.
The labeling step reading means 2e reads the object identification code D added to each of the PET bottles P2 or P3 to be processed in the labeling step 24. The labeling step reading means 2e also should preferably read the object identification code D when the PET bottle P2 or P3 is held by a pocket of a wheel (not shown) in the labeling step 24. For example, in the case of a shrink label, timing at which the labeling step reading means 2e reads the object identification code D may be before covering the shrink label, after shrink by heating or during both thereof.
Moreover, a method of associating the object identification code D of each PET bottle read by the labeling step reading means 2e with the pocket number of the wheel on which the object is subjected to labeling processing is not particularly limited, either, and the object identification code D may be associated with the pocket number in the same manner as in the stretching blow step 23.
The inspection step reading means 3a can be formed into the same means as the inspection step reading means 3 in the first embodiment.
The inspection step reading means 3a reads the object identification code D added to each of the PET bottles P3 to be inspected in the inspection step 25. When the object identification code D is optically readable, an image pickup device for picking up an image of the PET bottle P3 for inspection may also serve as the inspection step reading means 3a.
Then, the information on the object identifier ID indicated by the object identification code D of the individual PET bottle P3 is transmitted to the computing means 4a together with information on inspection results of the individual PET bottle P3.
The computing means 4a can be formed into the same means as the computing means 4 in the first embodiment.
The computing means 4a creates, by applying the object identifier ID indicated by the object identification code D as a key, the database 5a in which the mold identifier in the preform mold in the preform molding step 21, the container number in the preform accumulation step 22, the pocket number in the stretching blow step 23, the pocket number in the labeling step 24, and inspection results in the inspection step 25 are linked (associated) with each other.
Table 2 shows one example of a content of the database 5a according to the present embodiment. In Table 2, print date and time on which the object identification code D is printed, and completion date and time of the PET bottle are further linked with the object identifier ID.
Thus, according to the embodiment, the object identification code D for identifying the object ranging from the preform P1 to the PET bottle P3 is added to the preform P1 which is the material member, whereby as shown in Table 2, in a production process ranging from a stage of the preform molding step 21 before molding the PET bottle to a completed product in the inspection step 25, the individual object can be managed by applying the object identifier ID as the key. Thus, even before molding the PET bottle, the preform P1 as the material member can be specifically identified to perform production management.
Next, an analysis example of a factor of occurrence of PET bottle defects using such a database 5a MI be described.
Here, a histogram of defects is prepared for each processing step by dividing completion date and time on which PET bottle scratch defects occur frequently.
From the histogram shown in the same figure, it is known that, as for the defective items, PET bottle defective items prepared by applying, as the material member, the preform P1 molded with a mold having a mold identifier “17” (1×7) are significantly more than the defective items with any other molds. In this case, it is analyzed that occurrence of PET bottle scratch defects is attributed to the mold having the mold identifier “17” with high possibility.
From the histogram shown in the same figure, it is known that the defective item is produced, irrespective of the container number in the preform accumulation step 22.
From the histogram shown in the same figure, it is known that the defective item is produced, irrespective of the pocket number in the stretching blow step 23.
Moreover, the PET bottle P3 judged to be defective is also easily associated with the pocket number in the labeling step 24, by applying the object identifier ID as the key, according to the database 5. Then, although not shown, it was confirmed that the defective item is produced, irrespective of the pocket number in the labeling step 24 in the same manner.
Thus, in the present embodiment, in the preform molding step 21 as a stage before the molding step of the PET bottle P2, the object identification code D for identifying the object ranging from the preform P1 to the PET bottle P3 is added to each of the preforms P1 as the material member. Thus, even before molding the PET bottle, the preform P1 which is the material member can be specifically identified to perform production management. Accordingly, according to the present embodiment, each of the objects ranging from the preform P1 as the material member to the PET bottle P3 can be specifically managed, irrespective of a conveyance order of the object.
It should be noted that, in the present embodiment, the production management system and method for the resin container for producing the PET bottle are described, but the present invention can also be applied to a production management system and method for a resin container prepared using a resin other than polyethylene terephthalate.
A third embodiment of the present invention win be described with reference to
A pouch production process 300 to be managed in the present embodiment will be described with reference to
In the bag-making step 34, the raw material sheet unwound from the slit original roll R3 is cut to perform bottom seal and side seal, and when necessary, to attach a spout.
Then, in the inspection step 35, a defect on an outer surface of the pouch container U through the bag-making step 34 is inspected. As a result of inspection, the pouch container U judged to be defective is excluded from a production fine, and only the pouch container U judged to be a good item is shipped.
Next, the container production management system for managing the pouch production process 300 will be described.
In the present embodiment, the pouch production process 300 is managed by identifying each of objects ranging from a sheet piece which is a material member for an individual container to a pouch by using an object identifier which is information for identifying each object.
As shown in
The object identification code adding means 1b can be formed into the same means as the above-described object identification code adding means 1 in the first embodiment. Moreover, the object identification code D can also be formed into the same object identification code D in the first embodiment.
In the bag-making step 34, in cutting of the raw material sheet, the sheet piece for each pouch as the material member is cut or blanked by a plurality of cutter blades (not shown). As an object Identification code, the object identification code D is added to a portion to be blanked of the raw material sheet before cutting an individual sheet piece or the like and separating the cut piece therefrom, or to a sheet piece immediately after being blanked.
The number as each identifier is added to each cutter blade, and therefore the object identification code D added to the portion to be blanked, or to the blanked sheet piece can be easily associated with the number of the cutter blade.
It should be noted that the object identification code D is preferably printed at timing at which the raw material sheet to be intermittently conveyed is stopped. Moreover, when the object identification code D is a barcode, the object Identification code D can be added thereto not only in the case where the raw material sheet or the sheet piece is stopped, but also at timing at which the raw material sheet or the sheet piece is moving. Therefore, the object identification code D can also be added thereto in an upstream stage before intermittently conveying the raw material sheet.
Moreover, for example, in the case of a floss pouch with a spout, the object identification code may be added to the pouch when the pouch is three-dimensionally molded.
The step reading means 2f can be formed into the same means as in the first embodiment.
As the step reading means 2f, for example, when the sheet piece as the material member is heat-sealed by a plurality of seal means, the step reading means 2f preferably reads the object identification code D for each seal means. Thus, each of the objects ranging from the sheet piece to the pouch container U can be easily associated with the seal means with which the object is heat-sealed.
The inspection step reading means 3b can be formed into the same means as the inspection step reading means 3 in the first embodiment.
The inspection step reading means 3b reads the object identification code D added to each of the pouch containers U to be inspected in the inspection step 35. When the object identification code D is optically readable, an image pickup device for picking up an image of the pouch container U for inspection may also serve as the inspection step reading means 3b.
Then, information on the object identifier (pouch ID) indicated by the object identification code D of the individual pouch container U is transmitted to the computing means 4b together with information on inspection results of the individual pouch container U.
The computing means 4b can be formed into the same means as the computing means 4 in the first embodiment.
The computing means 4b creates, by applying the object identifier (pouch ID) indicated by the object identification code D as a key, the database 5b in which the number of the cutter blade and the number of the seal means in the bag-making step 34 for the pouch, and inspection results in the inspection step 35 are linked with each other.
Moreover, the raw material sheet is wound up into a roll-shaped original roll after processing in each processing step of the original roll printing step 31, the original roll laminator step 32 and the original roll slitter step 33. According to the computing means 4b, an original roll identifier for identifying an individual original roll is each set to the print original roll R1, the laminate original roll R2 and the slit original roll R3 as produced in each process.
The computing means 4b further links, in the database 5b, the object identifier of the individual pouch (pouch ID) with the original roll identifier (slit original roll ID) of the slit original roll R3 from which the raw material sheet is unwound, the individual object being separated from the raw material sheet.
Table 3 shows one example of a content of the database 5b according to the present embodiment. In Table 2, print date and time on which the object identification code D is printed, and completion date and time of the pouch container are further linked with the object identifier (pouch ID).
Thus, according to the embodiment, the object identification code D for identifying the object ranging from the sheet piece to the pouch container U is added to the sheet piece which is the material member, whereby as shown in Table 3, an individual object can be managed by applying the object identifier ID as the key in a production process ranging from a stage of the sheet piece before molding the pouch container U to a completed product in the inspection step 35. Thus, even before molding the pouch container U, the sheet piece as the material member can be specifically identified to perform production management.
For example, from the database shown in Table 3, when a frequency of occurrence of defects is particularly high in the pouch container U cut with a cutter blade having the identification number “2”, it is analyzed that occurrence of defective items is attributed to the cutter blade having the identification number “2” with high possibility.
(Linking with Original Roll)
Incidentally, in production of the pouch container U, a feed rate change or meandering of the raw material sheet influences on a dimension of the pouch container U made or a dimension of a laminated part to serve as a cause of occurrence of the detective item in several cases. The feed rate change or meandering of the raw material sheet easily occurs when feed from one original roll is switched to a next original roll before completion of the feed, and therefore a database is preferably created by linking information on presence or absence or time of day of switching with the original roll identifier.
Then, in the present embodiment, as shown in Table 3, linking with the slit original roll R3 which is the original roll of the sheet piece can also be performed by applying the object identifier ID as the key.
It should be noted that, in the database 5b, in addition to items shown in Table 3, for example, a longitudinal dimension and a lateral dimension of the pouch container U, and a slip dimension when the sheet pieces are laminated to each other may be linked with each other by applying the object identifier ID as the key.
Further, in the present embodiment, in the database 5b, the original roll identifiers of the original rolls in each processing step are associated with each other. Therefore, a slit original roll identifier, a laminate original roll identifier and a print original roll identifier can be associated with each other by tracing back the laminate original roll R2 and the print original roll R1 from the slit original roll R3.
Table 4 shows a correspondence relationship between the slit original roll R3 and the laminate original roll R2.
It should be noted that, in addition to items shown in Table 4, information on an original roll length of each slit original roll may be linked with each other by applying a slit original roll identifier ID as the key.
As shown in Table 4, the slit original roll identifier ID is linked with a laminate original roll identifier ID of the laminate original roll R2 before being slit-processed into each slit original roll R3. One slit original roll R3 is processed from one laminate original roll R2 in one case and processed by switching two laminate original rolls R2 in another case.
According to Table 4, each slit original roll R3 can be linked with the laminate original roll R2 being a suppler by tracing back. For example, a slit original roll identifier ID “49A5B301” is linked with a laminate original roll identifier ID “48A5B301”.
Accordingly, for example, when the defective item is produced by the feed rate change or meandering by switching two laminate original roll identifiers R1, namely, the laminate original roll identifiers ID “48A5B301” and “48A5B302,” the cause of occurrence of the defective item can be analyzed by tracing back the slit original roll identifier ID and the laminate original roll identifier ID as linked with each other in the database 5b from the object identifier ID of the pouch container U of the defective item.
Further, Table 5 shows a correspondence relationship between the laminate original roll R2 and the print original roll R1.
As shown in Table 5, the laminate original roll identifier ID is linked with a print original roll identifier ID of the print original roll R1 before being laminated into each laminate original roll R2. One laminate original roll R2 is processed from one print original roll R1 in one case, and processed by switching two print original rolls R1 in another case.
According to Table 5, each laminate original roll R2 can be linked with the print original roll R1 as the supplier by tracing back. For example, a laminate original roll identifier ID “48A58301” is linked with print original roll identifiers ID “47A5B301” and “47A58302”.
Further, Table 6 shows information on the print original roll R1.
As shown in Table 6, it is known that the print original roll identifier ID “47A5B301” linked with the laminate original roll identifier ID “48A5B301” in Table 5 is printed with a printing machine having the identification number “1”.
Accordingly, for example, when occurrence of the defective item is attributed to a specific printing machine, the cause of occurrence of the defective item can be analyzed by tracing back the slit original roll identifier ID, the laminate original roll identifier ID and the print original roll identifier ID as linked with each other in the database from the object identifier ID of the pouch.
Moreover, the present invention is not limited to the embodiments described above, and the present invention can be practiced with various modifications within the scope of the present invention.
The entire contents of the documents described in this description and the description of the Japanese application serving as a basis of claiming the priority concerning the present application to the Paris Convention are incorporated by reference herein.
Number | Date | Country | Kind |
---|---|---|---|
2017-172313 | Sep 2017 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2018/022602 | 6/13/2018 | WO | 00 |