The present invention relates to a control device and a method for a guided travel of an unmanned vehicle, more particularly to a preferred device and a method for applying to a case where, in a discharge site in a mine and the like, a guided travel of an unmanned vehicle is performed to a target discharge position and earth and sand is unloaded.
In a large mine, a guided travel system for an unmanned vehicle in which the unmanned vehicle such as unmanned off-road dump trucks is guided and travels has been widely used in order to reduce painful works, decrease the production cost, and save the fuel.
The above-mentioned unmanned vehicle has a position measuring device that measures its running position using GPS (Global Positioning System) and the like. Additionally, a monitor station that monitors plural unmanned vehicles obtains, by surveying a work site or teaching, position data on a running course through which the unmanned vehicle is to run, and stores the position data. After receiving the position data of the running course from the monitor station via a radio communication and the like, the unmanned vehicle measures its current position (and its direction) using a position measuring device that the vehicle has, compares the measured current position at the time of traveling with the running course in a sequence, and is steered and controlled so as to sequentially reach each position on the running course.
Here, as a method for obtaining the position data of the running course, for example, a teaching method in which a teaching vehicle actually travels and memorizes the travel path has been widely used.
In this case, the teaching vehicle actually runs so as to pass through target points where the unmanned vehicle has to reach. Then, the position data regarding a path from a running start point to a target point or a path from the running start point through the target point to a running end point is obtained. There is another method that only the position data of the target point is obtained by teaching, and the running course is generated through the obtained position data of the target point.
Japanese Patent Application Laid-open No. 2000-137522 discloses the following related arts 1 and 2.
(Related Art 1)
As shown in
(Related Art 2)
Since a discharge site 21 of a large scale mine or the like is wide, the number of target discharge positions 26′ in the vicinity of a survey line 20 reaches several hundreds points along the survey line 20. Thus, to obtain position data of running courses 27 for each of the large number of target discharge positions 26′ by the teaching work as mentioned in the related art 1, the number of the teaching works using teaching vehicles becomes increase, requiring much more time and man-hour to generate running courses.
And, as shown in
In a case where the related art 1 is employed, works at mines are performed as follows.
Specifically, for example, stripped earth and sand by a stripping work is loaded to an unmanned vehicle 13. The unmanned vehicle 13 travels, by guiding, to the target discharge position 26′ in the vicinity of the survey line 20 in the discharge site 21. At the target discharge position 26′, a carrier (body) performs a dumping operation toward a precipice, thereby falling off the earth and sand loaded on the carrier. The earth and sand, which does not fall off to the precipice and remains on the discharge site, in other words, pile 26c, is pushed out by a bulldozer or other leveling vehicles, and the discharge site 21 is leveled. A discharge work such that a dump truck 13 discharges and falls off earth and sand from a high position to a precipice is called as a high-dump work.
On the other hand, in a case where the related art 2 is employed, works at mines are performed as follows.
Specifically, in a similar way to the above-mentioned case, stripped earth and sand by a stripping work is loaded to an unmanned vehicle 13. The guided travel of the unmanned vehicle 13 is performed to the target discharge position 26′ in the discharge site 21. At the target discharge position 26′, the carrier performs the dumping operation, and the earth and sand loaded on the carrier is unloaded. As a result, the earth and sand is piled on the discharge site as a highly piled up pile 26c without falling off to the precipice. The bulldozer pushes out the highly piled up pile 26c, and the discharge site 21 is leveled. The discharge work such that a dump truck 13 discharges the earth and sand within the discharge site 21 is called as a paddock discharge work.
Recently, the unmanned dump track has become larger, and the earth and sand loaded on the carrier (body) reaches 300 ton or heavier.
According to the related art 1, since the earth and sand is discharged by the high-dump work, in most cases, almost all the earth and sand is fallen off to the precipice, and relatively little earth and sand remains in the discharge site 21. Consequently, as is often the case, leveling work by the bulldozer 16 is performed with relatively high operation efficiency.
However, according to the related art 2, since the earth and sand is discharged by the paddock discharge work, all the discharge earth and sand with more than 300 ton becomes the pile 26c in the discharge site 21. Therefore, it is difficult or may be impossible for an ordinary bulldozer 16 to push out the pile 26c. And even if the bulldoze 16 can push out the pile 26c, such piles 26c are piled up at plural target discharge positions 26′ in the discharge site one after another. And, the amount of discharge work may exceed the capability of leveling work, resulting in decreased work efficiency. Furthermore, to enhance the capability of leveling work, it is necessary to use a larger bulldozer 16, strengthen the pulling power, or increase the number of the bulldozers 16, which may lead to increase in cost of the vehicles.
For this reason, considering only efficiency or cost of the leveling work, it is desirable to employ the related art 1 in which leveling work can be efficiently performed by a bulldozer with ordinary power. As mentioned above, the related art 1, however, requires time or cost for the teaching work on a running course, thus there remains a problem that time or cost required for generating the running course increases.
The present invention has been made in view of the above circumstances and has an object to overcome the above problems and to provide a guided running control device and a method for an unmanned vehicle that can efficiently performs the leveling work at the discharge site without increasing the cost of the vehicle, and easily generate the running course in a short time and low-cost.
A first aspect of the present invention provides a control device for a guided travel of an unmanned vehicle, in which the unmanned vehicle is guided to travel along a running course so as to approach in a desired direction to a target discharge position as a target position where the unmanned vehicle performs a discharge operation at a discharge site, and to perform the discharge operation to discharge a load on the unmanned vehicle at the target discharge position, the control device comprising: survey line position measuring means for measuring each position of a survey line showing a boundary line of the discharge site; running course generation means for, after obtaining a line normal to the survey line based on each of the measured position data of the survey line in the discharge site, generating data of a running course, based on the normal line, in which the target discharge position is positioned at a prescribed distance away from the survey line and a direction of approaching the target discharge position is normal to the survey line; control means for guiding the vehicle to travel along the generated running course to the target discharge position, and operating the vehicle so as to discharge the load on the unmanned vehicle at the target discharge position after the unmanned vehicle reaches the target discharge position.
A second aspect of the present invention provides the control device according to the first aspect of the present invention, wherein the running course generation means; obtains each segment point on the survey line based on the measured position data on the survey line, obtains a line normal to each of the segment points, obtains a point on the normal line at a prescribed distance away from the segment point in an inward direction of the discharge site, obtains a line of which a line shape is corrected by applying a smoothing process to a line that is acquired by connecting each of the obtained points on each of the normal lines, and by setting to the target discharge position a position on a line normal to the line to which this smoothing process is applied, generates the data of the running course in which the direction of this normal line is a direction to approach the target discharge position.
A third aspect of the present invention provides the control device according to the first aspect of the present invention, wherein the running course generation means; obtains a line that a line shape is corrected by applying a smoothing process to a line that is acquired by connecting each of the measured positions on the survey line, obtains a line normal to the corrected line, sets to the target discharge position a position on the normal line, and generates the data of the running course in which a direction of the normal line is a direction to approach the target discharge position.
A fourth aspect of the present invention provides the control device according to the first aspect of the present invention, wherein a mound is formed along the survey line in the discharge site, the unmanned vehicle is provided with a sensor for detecting that a wheel of the unmanned vehicle reaches the mound formed along the survey line, and when the sensor detect that the wheel of the unmanned vehicle reaches the mound formed along the survey line before the wheel reaches the target discharge position, the unmanned vehicle is operated so as to discharge the load on the unmanned vehicle at the position that the sensor detects.
A fifth aspect of the present invention provides the control device according to the fourth aspect of the present invention, wherein the sensor detects a reduction of a speed or a travel distance of the unmanned vehicle, and when the reduction of the speed or the travel distance of the unmanned vehicle is detected by the sensor before a speed reduction instruction to stop the unmanned vehicle at the target discharge position is output, it is determined that the wheel of the unmanned vehicle reaches the mound formed along the survey line, and the unmanned vehicle is operated so as to discharge the load on the unmanned vehicle at the position that the sensor detects.
According to the first aspect of the present invention, as shown in
The second aspect of the present invention includes a restriction on generating means of the running course of the first aspect of the present invention. As shown in
The third aspect of the present invention includes a restriction on generating means of the running course of the first aspect of the present invention. As shown in
The fourth aspect of the present invention further includes, in addition to the first aspect of the present invention, a mound detection section (sensor) 30, and control for running by the mound detection section (sensor) 30, as shown in
The fifth aspect of the present invention includes a further restriction on the fourth aspect of the present invention. The mound detection section (sensor) 30 comprises a sensor that detects a reduction in speed and travel distance of the vehicle 13. When the sensor 30 detects that the speed or travel distance of the unmanned vehicle 13 reduces before an instruction to slow down to stop the unmanned vehicle 13 is given, it is determined that the rear wheel 13d of the unmanned vehicle 13 reaches the mount 20C formed along the survey line 20, and the unmanned vehicle 13 is operated so as to discharge the earth and sand loaded on the unmanned vehicle 13 at the position detected by the sensor.
According to the present invention, by automatic calculation process based on the data regarding each position on the survey line 20 measured through teaching, surveying and the like, plural target discharge positions 26′ are obtained in the vicinity of and along the survey line 20, and the reference approach directions 31 normal to the survey line 20 are determined. Based on the calculation result, running courses 27 to approach each of the target discharge position 26′ in each of the reference approach directions 31 are automatically generated, and each vehicles 13 is guided to travel along each of the generated running courses 27 and discharge at each of the target discharge positions 26′. Thus, it is possible that the vehicle 13 approaches in the vicinity of the survey line with the reference discharge position 31, whereby discharging can be performed in the most efficient manner, and that the vehicle 13 discharges the earth and sand outside the survey line 20 (or in the vicinity of the survey line 20) using the high-dump work in a secure and correct manner. As a result, almost all of the earth and sand can be discharged down to the precipice outside the survey line 20, the earth and sand that remains in the discharge site 21 can be reduced as minimum as possible. Consequently, leveling work can be efficiently performed by ordinary bulldozers 16, and the cost of efficient leveling work, vehicles and the like can be dramatically reduced.
Additionally, unlike the related arts, when generating the plural running courses 27, it is not necessary to differently teach the running courses 27 to each of the target positions (discharge positions). Each of the running courses 27 is automatically generated after measuring each of the positions along the survey line 20 in the discharge range 20L. Therefore, time and cost for carrying work by the vehicle 13, preparation work (teaching or surveying) performed before the leveling work by the vehicle 16 can be reduced.
As mentioned above, according to an aspect of the present invention, leveling work at the discharge site 21 can be efficiently performed without raising the cost of vehicles, and the running courses 27 can be easily generated in a short time and at low cost.
Additionally, according to the fourth and fifth aspect of the present invention, the earth and sand can be discharged outside the survey line 20 in a safety and secure manner without derail and the like of vehicle 13. Thus, it is possible to safely perform the guided travel of the vehicle 13, and operate the discharge work safely.
Hereinbelow, an exemplary embodiment of a control device for a guided travel of a vehicle according to the present invention will be described in detail with reference to the attached drawings.
In this exemplary embodiment, a case is assumed where a discharge range 20L (end points: 20A, 20B) is determined from a survey line 20 that is a boundary line of the discharge site 21, a guided travel of vehicles 13 is performed along running courses 27 to each of the target discharge position 26′ in the discharge range 20L, the vehicles 13 performs dumping operations at each of the target discharge positions 26′, and the earth and sand is discharged outside or in the vicinity of the survey line 20.
Hereinbelow, a description will be made using an unmanned off-road dump truck 13 as an example of the vehicle. The vehicle 13 is a front wheel driving vehicle having a driver's cabin (cab) 13a at a front portion thereon, a rear deck (vessel, body) at a rear portion thereon, and front wheels 13c and rear wheels 13d. The vehicle 13 approaches the target discharge position 26′ in a state of reverse traveling, in other words, in the state that the rear wheels 13d are positioned to a front portion against a traveling direction, in a reference approach direction 31 (reference discharge position) described later, in other words, in the approach direction 31 normal to the survey line 20.
In a work site, a monitor station 12 for managing and monitoring a number of vehicles 13 is provided. The monitor station 12 has a processing section 1, a target position generation section 2, a data input section 3, and a communication section 4. The vehicle 13 has a running course generation section 5, a communication section 6, processing section 7, a position measuring section 8, a running mechanism section 9, a steering mechanism section 10, a running course storing section 11, and a mound detection section 30.
The position measuring section 8 of the vehicle 13 measures a current position of the vehicle. As means for measuring the position, for example, a tire revolution number sensor and a gyroscope provided to the vehicle 13 are used. Then, the position of the vehicle is measured based on output signals from the tire revolution number sensor and the gyroscope. Additionally, the position of the vehicle may be measure by GPS.
The position data measured by the vehicle 13 is processed by the processing section 7, and is sent to the monitor station 12 via the communication section 6.
The communication section 4 in the monitor station 12 receives the position data sent by plural vehicles 13. The processing section 1 generates instruction data that include instructions of the starting, the stopping, and the like, for the vehicle 13 based on positional relationships between each of the plural vehicles 13, and the communication section 4 sends those instruction data to the vehicle 13.
The communication section 6 in the vehicle receives the instruction data sent by the monitor station 12.
And the processing section 7 in the vehicle 13 generates a running instruction and a steering instruction to travel and steer the vehicle in accordance with the received instruction data. The running instruction and the steering instruction are output to a running mechanism section 9 and a steering mechanism, respectively. As a result, the vehicle 13 travels and steers in accordance with the instruction data sent by the monitor station 12.
To the data input section 3 in the monitor station 12, topography data of the discharge site 21 obtained by teaching or surveying are input. While a discharge range 20L is determined in the survey line, each position data on the survey line 20 in the discharge site 21 are input. Vehicle data of the vehicle 13 are also input.
The data that is input into the data input section 3 in the monitor station 12 are processed by the processing section 1. The target position generation section 2 generates positional data regarding plural discharge positions 26 along the survey line 20, and data regarding the reference approach directions 31 (reference discharge position) to approach each of the discharge positions 26.
While selecting a next discharge position 26 from plural discharge positions 26 generated by the target position generation section 2, the processing section 1 selects a next vehicle 13 that travels to the next discharge position 26. Through the communication section 4, a position of the selected discharge position 26 and reference approach direction data are sent to the selected vehicle 13.
The communication section 6 of the vehicle receives the data of a position of the discharge position 26 and the reference approach direction sent from the monitor station 12.
The received data of the position of the discharge position 26 and the reference approach direction are processed in the processing section 7, and the running course generation section 5 generates a running course 27 to approach the discharge position 26, which is regarded as a target discharge position 26′, in the reference approach direction 31 corresponding to the target discharge position 26′. The position data of the generated running course 27 are stored in the running course storing section 11.
The processing section 7 generates the running instruction and the steering instruction in which the vehicle 13 follows each of the positions on the running course 27 by comparing the current vehicle position measured by the position measuring section 8 with each of the positions on the running course 27 stored in the running course storing section 11. The running and the steering instructions are output to the running mechanism section 9 and the steering mechanism section 10, respectively. Consequently, the vehicle 13 is guided to travel along the running course 27, and reaches the target discharge position 26′ in the reference approach direction 31.
A mound 20C is formed along the survey line 20 in the discharge site 21. This mound 20C is higher than the ground level of the discharge site 21.
The vehicle 13 has the mound detection section (sensor) 30 (
In a configuration in
In a configuration in
The communication section 6 in the vehicle 13 receives the position data of the selected running course 27 sent by the monitor station 12. The received position data of the running course 27 are stored in the running course storing section 11.
Next, with reference to the flow chart shown in
First, a path of the running course 27 will be described.
As shown in
A discharge range 20L is a range in the survey line 20 where the discharge is operated. In the discharge range 20L, plural discharge positions 26 are placed in regular intervals along the survey line 20. The intervals of the discharge position 26 are set at distances where leveling operation can be easily performed by a bulldozer 16. The reason that plural discharge positions 26 are placed at regular intervals along the survey line 20 is to prevent the collapse of the edge of the ground and to easily form the mound 20C (
The vehicle 13 starts to travel from the travel starting point, travels in a direction of arrow A on the common running course region 14, and reaches the entrance 21a of the discharge site 21. Passing through the entrance 21a, the vehicle 13 enters into the discharge site 21. Then, the vehicle 13 performs a switchback movement in the discharge site 21. In other words, after advancing toward the arrow B direction, the vehicle 13 travels backward in a direction of arrow C, in principle, along the reference discharge direction 13. Then, the vehicle stops at the target discharge position 26′ and the earth and sand is discharged. In other words, a rear deck (vessel, body) 13b of the dump truck 13 is tilted and the earth and sand on the rear deck 13b is discharged at the target discharge position 26′. After completing the discharge operation, the vehicle 13 advances toward the arrow D, leaves the discharge site 21 from the entrance 21a, and enters into the common running course region 14. Then, the vehicle 13 travels in a direction of arrow E on the common running course region 14, and reaches the travel ending point.
Here, while the discharge site 21 (area inside of and surrounded by the survey line 20) and the common running course region 14 are an area possible to run where the vehicle 13 can run, an area outside of the area possible to run is an area impossible to run where the vehicle 13 cannot run. For example, the outside of the survey line 20 of the discharge site 21 is an area where the vehicle 13 cannot run because of its topographical reasons such as existence of a cliff and wall.
Here, in step 101 of
Next, in the survey line 20 of the discharge site 21, positional data that show each position located on the survey line 20 are input after positions of each of the end points 20A, 20B of the discharge range 20L are designated (step 102).
Each of the positional data on the survey line 20, and the end points 20A, 20B of the discharge range 20L are obtained through survey. Or these data may be obtained through teaching.
A position measuring section 48 in the manned vehicle 40 measures the positions of the manned vehicle 40. As shown in
An operator of the manned vehicle 40 actually travels the vehicle 40 to reach the end point 20A that is one end of the discharge range 20L for discharging the earth and sand. After confirming on the display screen of the display section 42 that the vehicle 40 reaches the desired end point 20A, the operator operates the input section 41 to input a command of “end point”. As a result, at a time of the input, the position measured by the position measuring section 48 is designated as position data that show the end point 20A, and the positional data showing this end point 20A is stored in the processing section 47. Additionally, the operator of the vehicle 40 travels the vehicle 40, along the survey line 20, to the end point 20B that is other end of the discharge range 20L. Through this operation, the data showing each position on the survey line 20 one by one are measured by the position measuring section 48, and stored in the processing section 47. When the vehicle 40 reaches the end point 20B that is the other end point of the discharge range 20L for discharging the earth and sand, the operator operates the input section 41 to input a command of “end point” after confirming that the vehicle 40 reaches the desired end point 20B. As a result, at a time of input, the position measured by the position measuring section 48 is designated as the positional data showing the end point 20B, and the positional data showing this end point 20B are stored in the processing section 47.
The data that are stored in the processing section 47 and show each of the positions on the survey line 20 (data showing each of the positions on the discharge range 20L) are sent from the communication section 46 to the communication section 4 in the monitor station 12. The above-mentioned positional data are received by the communication section 4 of the monitor station 12, and stored in the processing section 1.
In this case, the survey is conducted in advance, and the data showing each of the positions on the survey line 20 are obtained. Each of the positional data on the survey line 20 that is obtained through surveying is input to the data input section 3 in the monitor station 12. On a display screen of the display section 52, positions and shapes of the survey line 20 in the discharge site 21 is displayed based on the topographical data of the discharge site that are input in step 101 and each of the positional data obtained through surveying. An operator in the monitor station performs input operation on the display screen of the display section 52 to designate the end points 20A, 20B of the discharge range 20L for discharging the earth and sand. Through this operation, the positional data showing each of the positions on the discharge range 20L are stored in the processing section 1.
Next, discharge positions 26 and reference approach direction 31 (reference discharge position) at each of the discharge positions 26 are calculated based on the data showing each of the positions on the survey line 20 (data showing each of the positions on the discharge range 20L) obtained as mentioned above.
In this exemplary embodiment, each segment point P1, P2, . . . is obtained on the survey line 20 on the basis of each of the measured position data on the survey line 20. Lines La1, La2, . . . normal to the survey line 20 at each of the segment points P1, P2, . . . are obtained. Points Q1, Q2, . . . located in a prescribed distance d from each of the segment points P1, P2, . . . on each of the normal lines La1, La2, . . . in an inward of the discharge site 21 are obtained for each of the normal lines La1, La2 . . . . By applying a smoothing process to a line Lb that is obtained by connecting each of the points Q1, Q2, . . . on each of the normal lines La1, La2, . . . , a line Lb′ of which a line shape is smoothed is obtained (
In the exemplary embodiment, as shown in
As shown in
Next, as shown in
Next, as shown in
Each of the points on each of the lines Lb′ obtained through the process mentioned above is the start point 51 of the dischargeable section 50.
Next, as shown in
Next, as shown in
Next, as shown
In the above-mentioned description, the calculation process for obtaining the discharge positions 26 and the reference approach directions 31 has been described only as one example. However, the present invention is not intended to be limited to this calculation process.
For example, as shown in
Next, as shown in
As mentioned above, based on each of the measured position data of the survey line 20 in the discharge site 21, the normal lines Lc (normal lines Lc′ in a case of
Note that, even when the running courses 27 vary according to each of the target discharge positions 26′, the running course data in the common running course region 14 in the running course 27 is common data. Therefore, each of the running courses 27 may be efficiently generated by producing only course data within the discharge site 21 and combining the produced course data with the common course data.
When the running courses 27 are generated as mentioned above, a process for guiding the vehicle to travel along the running course 27 is performed in the following steps 105 and 106. In this case, as shown in a loop 100A in
As shown in the loop 100A in
As shown in the loop 100B in
As mentioned above, in a either case of the loop 100A, the loop 100B, the configuration of
At the time of running, the positional data of the running course 27 stored in the running course storing section 11 are read out. The processing section 7 compares the current position of the vehicle measured by the position measuring section 8 with each of the position of the running course 27 read out from the running course storing section 11, and generates a running and a steering instructions in which the vehicle 13 follows each of the sequence of the positions on the running course 27. The running and the steering instructions are output to the running mechanism section 9 and the steering mechanism section 10, respectively. Consequently, as shown in
Specifically, the vehicle 13 starts to travel from the travel starting point, travels in a direction of arrow A on the common running course region 14, and reaches the entrance 21a of the discharge site 21. Passing through the entrance 21a, the vehicle enters into the discharge site 21. Then, the vehicle 13 performs a switchback movement in the discharge site 21. In other words, after advancing toward the arrow B direction, the vehicle 13 travels backward in a direction of arrow C. And, as shown in
The running mechanism section 9 controls the running of the vehicle 13 by adjusting the brake, engine revolution, and the like on the basis of the detected signal from the mound detection section 30.
As shown by the broken line 20C′ in
The detection signal of the mound detection section 30 is output, as an effective signal, to the running mechanism section 9 when the center position of the rear wheel 13d is located in the dischargeable section 50. When the rear wheel 13d reaches the mound 20C, a load is activated to the rear wheel 13d and the speed is reduced. When the detection signal that the speed of the vehicle 13 is reduced is input to the running mechanism section 9, the running mechanism section 9 outputs the speed reduction instruction to stop the vehicle 13, even before the speed reduction instruction to stop the vehicle 13 at the target discharge position 26′ is output. Accordingly, the vehicle 13 stops at a position where the center of the rear wheel 13d is located before the target discharge position 26′ without climbing over the mound 20C′. And then, the discharge operation is performed after the vehicle 13 stops. As a result, it is possible to safely and securely discharge the earth and sand outside of the survey line 20 without derailing and the like of the vehicle 13. Note that when the mound detection section 30 does not detect the mound 20C, in other words, when the speed or travel distance of the vehicle 13 is not reduced by the mound 20C, the running mechanism section 9 outputs the speed reduction instruction to stop the vehicle 13 at the target discharge position 26′, and the vehicle 13 is stopped in a state that the center of the rear wheel 13d is matched with the target discharge position 26′.
Note that, when the center position of the rear wheel 13d is located outside of the dischargeable section 50 (before the dischargeable section 50), the detection signal from the mound detection section 30 is not input to the running mechanism section 9 as the effective signal. Thus, a situation that the vehicle 13 unnecessarily stops to discharge the earth and sand far before the survey line 20 by detecting the small gaps and the like on the ground in the discharge site 21 can be avoided.
After completing the discharge operation, the vehicle 13 advances in a direction of arrow D, leaves the discharge site 21 from the entrance 21a of the discharge site, and enters into the common running course region 14. Then, the vehicle 13 travels in a direction of arrow E on the common running course region 14, and reaches the travel ending point.
As mentioned above, according to the exemplary embodiment, the vehicle 13 can be safely guided to travel, and safely perform the discharge operation.
According to the exemplary embodiment, by automatic calculation process based on the data regarding each position on the survey line 20 measured through teaching, surveying and the like, plural target discharge positions 26′ are obtained in the vicinity of and along the survey line 20, and the reference approach directions 31 normal to the survey line 20 are determined. Based on the calculation result, running courses 27 to approach the target discharge position 26′ in the reference approach direction 31 are automatically generated, and vehicles 13 are guided to travel along the generated running courses 27 and discharge at the target discharge positions 26′. Thus, it is possible that the vehicle 13 approaches in the vicinity of the survey line with the reference discharge position 31, whereby discharging can be performed in the most efficient manner, and discharges the earth and sand outside the survey line 20 (or in the vicinity of the survey line 20) using the high-dump work in a secure and correct manner. As a result, almost all of the earth and sand can be discharged down to the precipice outside the survey line 20, the earth and sand that remains in the discharge site 21 can be reduced as minimum as possible. Consequently, leveling work can be efficiently performed by ordinary bulldozers 16, and the cost of efficient leveling work, vehicles and the like can be dramatically reduced.
Additionally, unlike the related arts, when generating the plural running courses 27, it is not necessary to differently perform teaching operation for the running courses 27 each of which has different target positions (discharge positions). Each of the running courses 27 is automatically generated after measuring each of the positions along the survey line 20 in the discharge range 20L. Therefore, time and cost for carrying work by the vehicle 13, preparation work (teaching or surveying) performed before the leveling work by the vehicle 16 can be reduced.
As mentioned above, according to the exemplary embodiment, leveling work at the discharge site 21 can be efficiently performed without raising the cost of vehicles, and the running courses 27 can be easily generated in a short time and at low cost.
Note that, in the exemplary embodiment, a description has been made by assuming the case where the vehicle 13 carries the earth and sand, and discharges them at the discharge site 21. However, the description is not intended to limit the load that the vehicle 13 carries and discharges to “the earth and sand”, and the types of loads that the vehicle 13 carries and discharges are not limited to the earth and sand.
Number | Date | Country | Kind |
---|---|---|---|
2005-356672 | Dec 2005 | JP | national |
Number | Name | Date | Kind |
---|---|---|---|
5239249 | Ono | Aug 1993 | A |
5387853 | Ono | Feb 1995 | A |
6059063 | Shimizu et al. | May 2000 | A |
6102147 | Shimizu et al. | Aug 2000 | A |
6226572 | Tojima et al. | May 2001 | B1 |
6292725 | Kageyama et al. | Sep 2001 | B1 |
20070150133 | Sudou et al. | Jun 2007 | A1 |
20100076640 | Maekawa et al. | Mar 2010 | A1 |
Number | Date | Country |
---|---|---|
2000-137522 | May 2000 | JP |
Number | Date | Country | |
---|---|---|---|
20070150133 A1 | Jun 2007 | US |