Claims
- 1. An apparatus, comprising:a first member; a second member releasably attached to the first member; and a control line shear mechanism disposed proximate an interface between the first member and the second member, wherein: the first and second members are moveable in an axial direction to release from one another; the control line shear mechanism comprises a first shear member attached to the first member and a second shear member attached to the second member; and the first and second shear members are adapted to cooperatively shear a control line as the first and second members separate.
- 2. The apparatus of claim 1, wherein the first and second members are releasably attached to each other by a release mechanism.
- 3. The apparatus of claim 2, wherein the release mechanism comprises a shear element.
- 4. The apparatus of claim 2, wherein the control line shear mechanism comprises a control line passageway within the first and second members.
- 5. The apparatus of claim 4, wherein the control line passageway comprises a recess on the external surface of the first and second members.
- 6. An apparatus, comprising:a first member; a second member releasably attached to the first member; and a control line shear mechanism disposed proximate an interface between the first member and the second member, wherein the control line shear mechanism is integral to the first and second member; and wherein the first and second members are adapted for releasably connecting devices in a well.
- 7. An apparatus, comprising:a first member; a second member releasably attached to the first member; and a control line shear mechanism disposed proximate an interface between the first member and the second member, wherein the control line shear mechanism comprises a solenoid driven cutter.
- 8. An apparatus, comprising:a first tubular member; a second tubular member releasably attached to the first tubular member; the first and second tubular members are moveable in an axial direction to release from one another; a control line shear mechanism, disposed proximate an interface between the first member and the second member, comprising a first and second control line shear member; the first control line shear member being attached to the first tubular member; the second control line shear member being attached to the second tubular member; and the first and second control line shear members are adapted to cooperatively shear a control line as the first and second tubular members separate.
- 9. A shear sub, comprising:a first member; a second member releasably attached to the first member; the first and second members defining a control line passageway; and the control line passageway comprising a pair of shearing blades adapted to shear a control line during release.
- 10. The shear sub of claim 9, wherein the control line passageway is positioned at an angle to the direction of release.
- 11. The shear sub of claim 10, wherein the control line passageway comprises a recess on the external surface of the first and second members.
- 12. The shear sub of claim 10, wherein the control line passageway comprises a passageway enclosed within the first and second members.
- 13. A method, comprising:releasing a first member from a second member, such that devices within a well are released from one another; and before or during the releasing step, cutting a control line proximal to the point of separation of the first and second members.
- 14. The method of claim 13, wherein the first and second members comprise a safety joint.
- 15. The method of claim 14, wherein the safety joint is used to connect two segments of a tubular string within a wellbore.
- 16. The method of claim 15, wherein the safety joint comprises a control line cutting mechanism that cuts the control line as the first and second members are separated.
- 17. The method of claim 13, wherein the separation of the first member from the second member is independent from the cutting of the control line.
- 18. A method, comprising:releasing a first member from a second member; and before or during the releasing step, cutting a control line proximal to the point of separation of the first and second members, wherein the separation of the first member from the second member is independent from the cutting of the control line and the cutting of the control line is achieved using a solenoid driven cutter.
- 19. A method of completing a well comprising:providing a tubular string comprising a safety sub, the safety sub including a point of separation and comprising a control line cutting mechanism; attaching a control line to the tubular string, the control line being disposed through the control line cutting mechanism; inserting the tubular string and control line into the well; separating the tubular string at the safety sub; and cutting the control line with the control line cutting mechanism at the point of separation.
- 20. The method of claim 19, further comprising:removing the upper portion of the separated tubular string and the upper portion of the cut control line from the well.
Parent Case Info
The present application claims the benefit of U.S. provisional application No. 60/204,239 filed on May 15, 2000.
US Referenced Citations (19)
Foreign Referenced Citations (1)
Number |
Date |
Country |
WO 0065194 |
Nov 2000 |
WO |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/204239 |
May 2000 |
US |