Claims
- 1. In manufacture of glass articles wherein a plurality of at least two series of glass gobs are delivered from a corresponding plurality of sources to a corresponding plurality of blank molds in each section of an individual section (IS) glass manufacturing machine by means of a corresponding plurality of predetermined fixed paths to each section of the machine, each of said paths having an upper end at one of said sources and a lower end at one of said blank molds in each machine section, and each of said paths being for delivery of one of said series of glass gobs from its source to one of said blank molds, a method of controlling times of glass gob delivery to the blank molds of each machine section comprising the steps of:
- (a) positioning at said upper end of each said path a gob guide having a plurality of angulated jet orifices disposed in a uniformly spaced circumferential array around said path, and coupling each of said gob guides and its array of orifices to an associated variable air supply such that air from each said supply impinges upon and assists force of gravity to accelerate a gob in each said path by an amount that varies with the amount of air delivered from the variable air supply to the gob guide in that path,
- (b) positioning a gob sensor at the lower end of each said path to sense time of arrival of a gob to the blank mold at the lower end of each said path,
- (c) sensing passage of a gob at said gob sensor at the lower end of one of said paths and determining from such sensed passage a gob arrival time of said one path to the associated blank mold of one machine section, and
- (d) automatically and individually adjusting air flow from said variable air supply through said jet orifices at each gob guide in the other of said paths to said one machine section such that gobs in all of said paths to all of said blank molds in said one machine section, as sensed by associated gob sensors at the lower end of each of said paths, arrive simultaneously at all of said blank molds of said one machine section.
- 2. The method set forth in claim 1 wherein said step (c) further comprises the step of adjusting timing of arrival of glass gobs in said one of said paths by varying air flow from said jet orifices at the gob guide in said one of said paths to obtain a desired gob arrival time at the blank mold at the lower end of said one of said paths.
- 3. The method set forth in claim 2 wherein said steps (c) and (d) are carried out independently for each section of said IS machine.
Parent Case Info
This is a continuation of application Ser. No. 08/331,150 filed Oct. 28, 1994, now abandoned, which is a continuation of application Ser. No. 08/092,348 filed Jul. 16, 1993 and now abandoned.
US Referenced Citations (20)
Continuations (2)
|
Number |
Date |
Country |
Parent |
331150 |
Oct 1994 |
|
Parent |
92348 |
Jul 1993 |
|