The invention relates a cooling device equipped with a compressor device and to a method for operating the compressor device.
Conventionally, pulse tube refrigerators and Gifford-McMahon coolers are used for cooling magnetic resonance scanners and cryo-pumps. These cooling devices use gas compressors, in particular helium compressors, in combination with rotary or turning valves. The rate at which compressed helium is introduced into and removed from the cooling device is in the range of 1 Hz. A problem of conventional screw or piston compressors is that oil from the compressor may get into the working gas and thus enter the cooling device, thereby contaminating the device.
Moreover, acoustic compressors and high frequency compressors are known in which one or more pistons are put in linear resonance oscillation by a magnetic field. Those resonance frequencies are within a range of a few tens of Hertz and therefore are not suited for being used with pulse tube refrigerators and Gifford-McMahon coolers for generating very low temperatures, such as below ten degrees Kelvin.
The Swiss patent document CH457147B discloses a membrane compressor or membrane pump that has a working chamber sub-divided into a gas volume and a liquid volume by an elastic, airtight and liquid-tight membrane. A liquid pump periodically forces liquid into the liquid volume of the working chamber causing the elastic membrane to expand in the direction of the gas volume and to compress the gas in a compression function or to retract away from the gas volume in a pumping function. The disadvantage is that the airtight, liquid-tight and pressure-resistant seal of the elastic membrane in the working chamber is comparatively expensive. The membrane is heavily loaded, particularly in the area of the seal, so that either very expensive materials must be used or a lower service life must be accepted.
The German patent document DE10344698B4 discloses a heat pump and a refrigerating machine with a compressor device. The compressor device includes a compressor chamber in which a balloon is arranged. The balloon is periodically loaded with liquid so that the gas surrounding the balloon is periodically compressed and relaxed again. This has the disadvantage that the balloon casing can scrape or rub under certain operating states on the hard and possibly edged inner surface of the compressor chamber. As a result, perforations or fissures in the balloon casing can form due to the pressure conditions. Moreover, the permeability of the balloon casing is too high when helium is used as the working gas, causing substantial quantities of helium to be quickly lost. Thus, the service life of such systems that use balloons is unsatisfactory.
The German patent document DE91837 discloses a membrane pump for liquids that may also be used as a “gas compression pump”. A liquid is introduced between a membrane and the piston valves such that the liquid is present in the gas chamber. The device thus is a compression device with a liquid seal. There is no physical separation of the gas to be compressed and the hydraulic liquid.
The published international patent application WO2014/016415A2 discloses a compressor device that includes a metal bellows as the compressor element, which is impermeable to all working gases except hydrogen. The metal bellows allows the working gas to be kept oil-free. However, on account of an interaction with the working liquid, the efficiency of the compensation container is unsatisfactory. It is an object of the invention to provide a compressor device that uses a metal bellows as the compressor element, but yet that is more efficient than the compressor device of WO2014/016415A2. Furthermore, it is an object of the invention to provide a cooling device for the compressor device.
The invention relates to a compressor device, to a cooling device equipped therewith, and to a method for operating the compressor device. Pulse tube coolers and Gifford-McMahon coolers are used to cool nuclear spin tomographs and cryopumps. To supply cooled working gas to the cooling device, gas compressors and in particular helium compressors are used with rotational or rotary valves. The rate at which compressed helium is introduced into the cooling device and let out again lies in the range of 1 Hz. A problem of conventional screw or piston processors is that oil from the compressor can get into the working gas and thus the cooling device and can contaminate the cooling device. By providing a second compressor stage, a common pump device can be used twice, which results in a two-stage compressor device. The working gas is compressed in each flow direction of the working liquid, in one flow direction in the first compressor stage and in the opposite flow direction in the second compressor stage. Thus, the efficiency of the compressor device is improved.
In a first embodiment, a compressor device includes a first compressor chamber, a second compressor chamber, a pump and a rotary valve. The first compressor chamber is divided by a first metal bellows into a first gas volume inside the first metal bellows and a first liquid volume outside the first metal bellows. A working gas is present in the first gas volume, and a working liquid is present in the first liquid volume. A first working liquid connection is connected to the first liquid volume, and a first high-pressure working gas connection is connected to the first gas volume. The second compressor chamber is divided by a second metal bellows into a second gas volume inside the second metal bellows and a second liquid volume outside the second metal bellows. The working gas is present in the second gas volume, and the working liquid is present in the second liquid volume. A second working liquid connection is connected to the second liquid volume, and a second high-pressure working gas connection is connected to the second gas volume.
The pump compresses the working gas in the first gas volume by pumping the working liquid from the second liquid volume through the second working liquid connection, through the first working liquid connection and into the first liquid volume. The working gas in the second gas volume is compressed as the pump pumps the working liquid from the first liquid volume into the second liquid volume. The working gas flows through both the first high-pressure working gas connection and the second high-pressure working gas connection to the rotary valve.
The compressor device also includes a cooling device, first and second heat exchangers, a low-pressure gas storage container and a high-pressure gas storage container. The rotary valve alternately allows working gas to flow from the high-pressure gas storage container into the cooling device and from the cooling device into the low-pressure gas storage container. The cooling device is a Gifford-McMahon cooler or a pulse tube refrigerator. The working gas flows from the first gas volume, through the first high-pressure working gas connection, through the rotary valve and into the cooling device and also flows from the second gas volume, through the second high-pressure working gas connection, through the rotary valve and into the cooling device. The working gas flows from the first gas volume, through the first high-pressure working gas connection, through the first heat exchanger and through the rotary valve. The working gas also flows from the second gas volume, through the second high-pressure working gas connection, through the second heat exchanger and through the rotary valve. The working gas flows from the rotary valve, into the low-pressure gas storage container, through the first low-pressure working gas connection and into the first gas volume. The working gas also flows from the rotary valve, into the low-pressure gas storage container, through the second low-pressure working gas connection and into the second gas volume.
The compressor device also includes a first low-pressure check valve and a first high-pressure check valve. The first low-pressure check valve is connected to the first low-pressure working gas connection and permits working gas to flow only in a direction through the first low-pressure working gas connection and into the first gas volume. The first high-pressure check valve is connected to the first high-pressure working gas connection and permits working gas to flow only in a direction out of the first gas volume and through the first high-pressure working gas connection.
In a second embodiment, the compressor device includes the first compressor chamber, the second compressor chamber, the pump, the rotary valve and a buffer storage container. The first compressor chamber includes the first metal bellows that divides the first compressor chamber into the first gas volume inside the first metal bellows and the first liquid volume outside the first metal bellows. The working gas is present in the first gas volume, and the working liquid is present in the first liquid volume. The high-pressure check valve permits the working gas to flow only in a direction out of the first gas volume. The second compressor chamber includes the second metal bellows that divides the second compressor chamber into the second gas volume inside the second metal bellows and the second liquid volume outside the second metal bellows. The working gas is present in the second gas volume, and the working liquid is present in the second liquid volume. The low-pressure check valve permits the working gas to flow only in a direction into the second gas volume.
The pump pumps the working liquid between the first liquid volume and the second liquid volume. The working gas in the first gas volume is compressed as the pump pumps the working liquid from the second liquid volume into the first liquid volume. The working gas in the second gas volume is also compressed as the pump pumps the working liquid from the first liquid volume into the second liquid volume. The working gas flows from the first gas volume, through the high-pressure check valve, through the buffer storage container, through the low-pressure check valve and into the second gas volume.
The compressor device of the second embodiment also includes a cooling device. The working gas flows from the second gas volume to the cooling device, and the working gas flows from the cooling device to the first gas volume. The cooling device is a Joule-Thomson cooler.
Other embodiments and advantages are described in the detailed description below. This summary does not purport to define the invention. The invention is defined by the claims.
The accompanying drawings, where like numerals indicate like components, illustrate embodiments of the invention.
Reference will now be made in detail to some embodiments of the invention, examples of which are illustrated in the accompanying drawings.
The compressor device according to the present invention can be designed either as a non-transporting compressor device 10 or as a transporting compressor device 11. In the non-transporting configuration, a predetermined amount of working gas 12 is alternately compressed and relaxed in two transporting stages. No working gas is supplied from the outside or discharged to the outside in the non-transporting compressor device 10.
The gas flow is controlled in a simple manner during compression and relaxation of the gas using check valves 17 at high-pressure working gas connections 19-20 and by using check valves 18 at low-pressure working gas connections 21-22. The compressed working gas 12 is cooled after each compression stroke in the two compressor stages 13-14 using heat exchangers 23-24 downstream of the high pressure working gas connections 19-20.
A high-pressure gas line 25 and a low-pressure gas line 26 are configured to store gas on account of their volume. Alternatively, a low-pressure gas storage container 27 and a high-pressure gas storage container 28 are provided in the high-pressure gas line 25 and in the low-pressure gas line 26, respectively.
In the transporting configuration of a second compressor device 11, the working gas 12 is first compressed or pre-compressed in the first compressor stage 13 and stored intermediately in a buffer storage container 29. The second compressor stage 14 operates in an idle mode and serves as a compensation container 31 for the working liquid 15. When an amount of working gas 12 at a middle pressure Pmid is reached in the buffer storage 29, which corresponds to the second gas volume 33 in the second compressor stage 14, during the next compressor stroke the pre-compressed working gas 12 from the buffer storage 29 is compressed in the second compressor stage 14 to an end pressure Pend. The working gas 12 compressed to an end pressure Pend is then released to the outside or stored in the high-pressure gas storage container 28.
In the transporting configuration of the first compressor device 10, the working gas 12 is first compressed or pre-compressed in the first compressor stage 13 and at the same time is transferred into the second gas volume 33 of the second compressor stage 14. In the second compressor stage 14, the working gas 12 which has been pre-compressed to a middle pressure Pmid is then compressed to the end pressure Pend. The working gas 12 which has been compressed to the end pressure Pend is then released to the outside or stored in the high-pressure gas storage container 28.
Hydraulic oil as defined by the German Industry Standard DIN 51524 is preferably used as the working liquid 15, which is additionally water-free or desiccated. In the first and second compressor devices 10 and 11, the hydraulic oil is present in a closed system comprising the pump 16, the working liquid compensation container 31 and a liquid volume 30 in the compressor chamber 13 such that during operation no water from the environment can be absorbed by the hydraulic oil. Alternatively, water can also be used as the working liquid 15. Water is also advantageous as the working liquid because in the case of a defect, water that has penetrated into a downstream cryo-cooler can be removed more easily than can hydraulic oil that has penetrated into a downstream cooler. Water also is more advantageous as a working liquid in explosion-protected applications because water is noncombustible and non-explosive. Moreover, water is non-toxic and therefore environmentally friendly.
For cryo-applications, helium, neon or nitrogen are preferably used as the working gas 12, depending on the temperature range.
The two compressor stages 13-14 are constructed in the same way such that both of the gas volumes 32-33 are equal and both of the liquid volumes 30-31 are equal. The gas volumes 32-33 are inside the metal bellows 36-37, and the liquid volumes are outside the metal bellows 36-37. A connection 38-39 for the working fluid leads out of each of the liquid volumes 30-31. The gas volumes 32-33 are each connected both to a high-pressure working gas connection 19-20 and to a low-pressure working gas connection 21-22. The low-pressure working gas connections 21-22 are provided with check valves 18 that are permeable in the direction of compressor stages 13-14. The high-pressure working gas connections 19-20 are provided with check valves 17 that, in contrast to check valves 18 at the low-pressure working gas connections 21-22, have opposite forward directions. Thus, the check valves 17 permit working gas to flow only in the direction out of the gas volumes 32-33, and the check valves 18 permit working gas to flow only in the direction into the gas volume 32-33. The high-pressure working gas connections 19-20 are connected to the common high-pressure gas line 25 via the check valves 17. The low-pressure working gas connections 21-22 are connected to the low-pressure gas line 26 via the check valves 18.
The check valves 17 in the high-pressure working gas connections 19-20 are permeable in the direction of the common high-pressure gas line 25, and the check valves 18 in the low-pressure working gas connections 21-22 are permeable in the direction of the compressor stages 13-14. The common high-pressure gas line 25 and the common low-pressure gas line 26 end in a motor rotary valve 40 and alternately connect the high-pressure gas line 25 and the low-pressure gas line 26 to a cooling device 41. The cooling device 41 may be a Giffon-McMahon cooler or a pulse tube refrigerator. In some aspects, the cooling device is considered part of the compressor device. In other aspects, the compressor device and the cooling device are separate components. Due to their volume, the high-pressure gas line 25 and the low pressure gas line 26 act as gas storage. In addition, the low-pressure gas storage container 27 and the high-pressure gas storage container 28 are provided in the high-pressure and low-pressure gas lines 25-26. The heat exchangers 23-24 for cooling the compressed working gas are connected downstream of check valves 17 on the two high-pressure working gas connections 19-20. The two working liquid connections 38-39 are connected to a common electromotive pump device 16 that alternatingly pumps working liquid 15 into the first and second liquid volumes 30-31 of the first and second compressor stages 13-14. Either the working liquid 15 is pumped from the second liquid volume 31 into the first liquid volume 30 or vice versa.
In the second operating phase shown in
In the third phase shown in
In the fourth phase shown in
The operating phase illustrated in
By providing a high-pressure storage 28 and a low-pressure storage 27, the rotational frequency of rotary valve 40 is decoupled from the frequency of compression in the two compressor stages. Alternatively, the rotational frequency of rotary valve 40 is synchronized with the frequency of the compressor strokes. In that case, the high-pressure and low-pressure storage volumes 28, 27 may be dispensed with.
Compressor device 11 includes the buffer storage container 29 that is connected via a first gas line 42 and a first lock valve 43 to the second low-pressure working gas connection 22 of the second compressor stage 14. The first high-pressure working gas connection 19 is connected to the buffer storage 29 via the first heat exchanger 23 and a second gas line 44. The low-pressure gas storage 27 is connected via a third gas line 45 and check valve 18 to the first low-pressure working gas connection 21 of the first compressor stage 13. Working gas 12 from the low-pressure gas storage 27 that is to be compressed is supplied to the first compressor stage 13 via the first low-pressure working gas connection 21. The second high-pressure working gas connection 20 of the second compressor stage 14 is connected to the high-pressure gas storage 28 via check valve 17, the second heat exchanger 24 and a fourth gas line 46.
The operating phases illustrated in
In an alternative embodiment to that of
Hydraulic oils as defined by German Industry Standard DIN 51524 are suited as the working liquid 15. The H, HL, HLP and HVLP oils are oils that are readily compatible with customary sealing plastics, such as NBR (acrylonitrile butadiene rubber). However, NBR is not sufficiently helium-impermeable. HF oils are frequently incompatible with customary sealing materials, as described at http://de.wikipedia.org/wiki/Liste_der_Kunststoffe.
Alternatively, water can also be used as the working liquid 15. Water as the working liquid is also advantageous because in the case of defects in a downstream cryo-cooler, penetrated water can more easily be removed than can hydraulic oil that has penetrated into a cooler connected downstream. In addition, water is appropriate as the working liquid in applications protected against explosions because water is non-combustible and non-explosive. Moreover, water is non-toxic and therefore environmentally friendly.
P0 outlet pressure
Pmid1 middle pressure 1
Pmid2 middle pressure 2
Pend end pressure
10 transporting compressor device
11 non-transporting compressor device
12 working gas
13 first compressor stage
14 second compressor stage
15 working liquid
16 common electromotive pump device
17 check valves
18 check valves
19 first high-pressure working gas connection
20 second high-pressure working gas connection
21 first low-pressure working gas connection
22 second low-pressure working gas connection
23 first heat exchanger
24 second heat exchanger
25 high-pressure gas line
26 low-pressure gas line
27 low pressure gas storage
28 high-pressure gas storage
29 buffer storage
30 first liquid volume
31 second liquid volume
32 first gas volume
33 second gas volume
34 first compressor chamber
35 second compressor chamber
36 first metal bellows
37 second metal bellows
38 first working liquid connection
39 second working liquid connection
40 electromotive rotary valve
41 cooling device
42 first gas line
43 first lock valve
44 second gas line
45 third gas line
46 fourth gas line
47 Joule-Thomson cooler
Although the present invention has been described in connection with certain specific embodiments for instructional purposes, the present invention is not limited thereto. Accordingly, various modifications, adaptations, and combinations of various features of the described embodiments can be practiced without departing from the scope of the invention as set forth in the claims.
Number | Date | Country | Kind |
---|---|---|---|
102014217897.5 | Sep 2014 | DE | national |
PCT/EP2015/070507 | Sep 2015 | WO | international |
This application is filed under 35 U.S.C. § 111(a) and is based on and hereby claims priority under 35 U.S.C. § 120 and § 365(c) from International Application No. PCT/EP2015/070507, filed on Sep. 8, 2015, and published as WO 2016/038041 A1 on Mar. 17, 2016, which in turn claims priority from German Application No. 102014217897.5, filed in Germany on Sep. 8, 2014. This application is a continuation-in-part of International Application No. PCT/EP2015/070507, which is a continuation of German Application No. 102014217897.5. International Application No. PCT/EP2015/070507 is pending as of the filing date of this application, and the United States is an elected state in International Application No. PCT/EP2015/070507. This application claims the benefit under 35 U.S.C. § 119 from German Application No. 102014217897.5. The disclosure of each of the foregoing documents is incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
1580479 | Frankenfield | Apr 1926 | A |
2613607 | Sheen | Oct 1952 | A |
2772543 | Berry | Dec 1956 | A |
3205679 | Geist | Sep 1965 | A |
4551979 | Wilensky | Nov 1985 | A |
4553397 | Wilensky | Nov 1985 | A |
4617801 | Clark, Jr. | Oct 1986 | A |
4673415 | Stanford | Jun 1987 | A |
4854131 | Sakitani | Aug 1989 | A |
5375430 | Siegel | Dec 1994 | A |
5381675 | Siegel | Jan 1995 | A |
5383334 | Kaminishizono | Jan 1995 | A |
6192695 | Hirota | Feb 2001 | B1 |
6378312 | Wang | Apr 2002 | B1 |
9234480 | Gayton | Jan 2016 | B2 |
20010051099 | Yatsuzuka | Dec 2001 | A1 |
20050210889 | Arman | Sep 2005 | A1 |
20080008605 | Bauer | Jan 2008 | A1 |
20080011154 | Kong et al. | Jan 2008 | A1 |
20080199327 | Adler | Aug 2008 | A1 |
20090129948 | Hoshino | May 2009 | A1 |
20090322094 | Mahawili | Dec 2009 | A1 |
20090324431 | van Boeyen | Dec 2009 | A1 |
20100263750 | Becker et al. | Oct 2010 | A1 |
20110189029 | Van De Velde | Aug 2011 | A1 |
20130312452 | Gerlach | Nov 2013 | A1 |
20140219842 | Casella | Aug 2014 | A1 |
20150013333 | Eggler | Jan 2015 | A1 |
20150108980 | Buehler | Apr 2015 | A1 |
20150128616 | Hoehne | May 2015 | A1 |
20160032720 | Schexnaider | Feb 2016 | A1 |
20160069359 | Hummelt | Mar 2016 | A1 |
20160208791 | Reeh | Jul 2016 | A1 |
20170167475 | Mori | Jun 2017 | A1 |
20170191476 | Matsuda | Jul 2017 | A1 |
20170218946 | Yamada | Aug 2017 | A1 |
20170248350 | Liu | Aug 2017 | A1 |
20170350382 | Nakano | Dec 2017 | A1 |
20180328638 | Mahmoud | Nov 2018 | A1 |
20190017731 | Mizuno | Jan 2019 | A1 |
Number | Date | Country |
---|---|---|
457147 | Jan 1967 | CH |
101233318 | Jul 2006 | CN |
2856477 | Jan 2007 | CN |
91837 | Jun 1896 | DE |
1077367 | Mar 1960 | DE |
3801160 | Jan 1988 | DE |
10344698 | Sep 2003 | DE |
102004020168 | Nov 2005 | DE |
202007018538 | Dec 2007 | DE |
102008060598 | Jun 2010 | DE |
2011-106755 | Nov 2009 | JP |
WO-2010063817 | Jun 2010 | WO |
WO2014016415 | Jul 2013 | WO |
WO 2014016415 | Jul 2013 | WO |
Entry |
---|
Atkins, T., & Escudier, M. (2013). reservoir. In A Dictionary of Mechanical Engineering. : Oxford University Press. Retrieved Apr. 24, 2020, from https://www.oxfordreference.com/view/10.1093/acref/9780199587438.001.0001/acref-9780199587438-e-5178. (Year: 2013). |
Marchese, J. (Dec. 1, 2014). Ice Breaker: The Role of the Liquid Receiver. Retrieved Apr. 24, 2020, from https://www.achrnews.com/articles/128203-the-role-of-the-liquid-receiver (Year: 2014). |
Office action of the German Patent Office in the related German patent application DE102014217897.5 dated May 5, 2015 (4 pages). |
English translation of Office action of German Patent Office dated May 5, 2015 (3 pages). |
Office action of the ChinesePatent Office in the related Chinese patent application CN201580045402.6 dated Jun. 26, 2018 (9 pages). |
English translation of Office action of the Chinese Patent Office dated Jun. 26, 2018 (13 pages). |
Office action of the Japanese Patent Office in the related Japanese patent application JP2017-512337 dated Jun. 4, 2019, as well as the English translation of the Japanese Office action (11 pages). |
Office action of the ChinesePatent Office in the related Chinese patent application CN201580045402.6 dated Mar. 8, 2019 (10 pages). |
English translation of Office action of the Chinese Patent Office dated Mar. 8, 2019 (16 pages). |
Number | Date | Country | |
---|---|---|---|
20170175729 A1 | Jun 2017 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/EP2015/070507 | Sep 2015 | US |
Child | 15450053 | US |