COOPERATIVE OPTIMAL CONTROL METHOD AND SYSTEM FOR WASTEWATER TREATMENT PROCESS

Information

  • Patent Application
  • 20220194830
  • Publication Number
    20220194830
  • Date Filed
    March 09, 2022
    2 years ago
  • Date Published
    June 23, 2022
    2 years ago
Abstract
In a cooperative optimal control system, firstly, two-level models are established to capture the dynamic features of different time-scale performance indices. Secondly, a data-driven assisted model based cooperative optimization algorithm is developed to optimize the two-level models, so that the optimal set-points of dissolved oxygen and nitrate nitrogen can be acquired. Thirdly, a predictive control strategy is designed to trace the obtained optimal set-points of dissolved oxygen and nitrate nitrogen. This proposed cooperative optimal control system can effectively deal with the difficulties of formulating the dynamic features and acquiring the optimal set-points.
Description
TECHNICAL FIELD

In this present invention, a cooperative optimal control system (COCS) is designed to coordinate the different time-scale performance indices, realize the real-time optimal control of wastewater treatment process (WWTP), and improve the system performance. It is feasible to apply the proposed COCS to the dynamic WWTP, and realize the tracking control of the dissolved oxygen (SO) and the nitrate nitrogen (SNO). This system can not only address the cooperative problem of the different performance indices, but also conserve the operation cost, improve the effluent quality, and guarantee the efficient stable operation. The technology of this present invention is a part of advanced manufacturing technologies, which belongs to the field of control engineering and wastewater treatment engineering.


BACKGROUND

WWTP is conducted to effectively adsorb, decompose and oxidize the pollutants based on physical, chemical and biological reactions, so that the pollutants can be degraded and separated from the wastewater, thereby realizing the purification. The efficient operation plays an important role in improving the optimal control performance and optimizing the system performance, which is an important strategy for alleviating scarcity of water resources. It has not only good economic benefits, but also significant environmental and social benefits. Therefore, the research results of the present invention have broad application prospects.


WWTP is a complex industrial system, and it has obvious nonlinearity and time-varying features. In addition, WWTP comprises different dynamic response times and multiple performance evaluation indices, which make it difficult to realize the optimal control. Since the performance indices are conflicting with each other, and influenced by different system response times, how to achieve the cooperation between the performance indices with different time scales is of great significance to improve the system performance and ensure its efficient and stable operation. It is significant to improve the operation performance based on the cooperative performance indices, which can not only improve the optimal operations, but also guarantee the control performance. Therefore, it is necessary to explore a novel optimal control method, where different time-scale performance indices can be formulated, and the optimal set-points of the control variables can be acquired, so that the requirements of the optimal control can be satisfied. Appropriate optimal control method can not only adjust the relationship of the performance indices, so as to guarantee the effluent quality and reduce the operation cost, but also provide suitable dynamic optimal set-points to reduce and cope with the occurrence of the abnormal conditions, and ensure the efficient and stable operation. In addition, by improving the automation level of WWTP, it can also effectively decrease the operation management and operation personnel, as well as minimize the operation cost.


SUMMARY

In this present invention, a COCS is designed for WWTP, where the different time-scale performance indices models are formulated based on the system response time, the different time-scale performance indices models are then optimized by a cooperative optimization algorithm, so that the optimal set-points of SO and SNO can be obtained, and then a predictive control strategy is designed to trace the obtained optimal set-points of SO and SNO. In this present invention, a COCS is designed. This proposed COCS can address the different time-scale performance indices formulation problem by the two-level performance indices models. It can optimize the multiple time-scale performance indices by the cooperative optimization algorithm based on the data-driven assisted model, so that the problem about the optimal set-points of SO and SNO can be solved. Moreover, a predictive control strategy is designed to trace the obtained optimal set-points of SO and SNO. Based on COCS, not only the multiobjective optimal control problem can be approached, but also the performance indices can be improved, as well as the efficient and stable operation.


This invention develops a COCS for WWTP. This proposed COCS can solve the problem of description of performance indexes at different time scales by using a two-layer performance index modeling method; and utilize a cooperative optimization algorithm based on a data driven assisted model to solve the problem. The different time-scale performance index models are then optimized by the cooperative optimization algorithm, where the set-points of SO and the concentration of SNO can be obtained. Then a predictive control strategy is developed to trace the obtained optimal set-points of SO and SNO. Based on the proposed COCS, not only the system performance can be improved, but also efficient and stable operation can be guaranteed.


A cooperative optimal control system is developed for WWTP, its features include the design of system framework and the optimal controller, the specific steps are:


(1) The designed optimal control system contains a center control unit, a blower, an internal flow recycle pump, sensor unit that includes a SO sensor, two SNO sensors, a suspend solid (SS) sensor, an ammonia nitrogen (SNH) sensor, two mixed liquor suspended solids (MLSS) sensors.


The center control unit is used to receive the measured data from the installed sensors, calculate the optimal set-points of the control variables based on the measured data, and generate the control commands to guarantee the operation of WWTP.


The blower and the internal flow recycle pump, taken as two important executors of the optimal control system, are applied to perform the control commands transmitted by the center control unit. As shown in FIG. 1, the blower is installed at entrance of the aerobic tank to increase the oxygen content and speed up the treatment process of aerobic bacteria, the internal flow recycle pump is installed below the anoxic tank to increase the mixture reflux. Both the blower and the internal flow recycle pump are communicatively connected to the center control unit to receive control commands from the center control unit.


The sensor unit is used to measure the data of process variables, a SO sensor, located in the aerobic tank, is configured to measure the values of SO; two SNO sensors, located in the anoxic and secondary sedimentation tanks, are configured to measure the values of SNO; a SS sensor, located in the aerobic tank, is configured to measure the values of SS; a SNH sensor, located in the secondary sedimentation tank, is configured to measure the values of SNH; two MLSS sensors, located in the anoxic and secondary sedimentation tank, are configured to measure the values of MLSS. All the sensors discussed above are communicatively connected to the center control unit to transmit measured data to the center control unit in real time.


(2) The adaptive calculation of the optimal set-points of control variables, rather than the fixed values by expert experience, the steps are:


1) select the related process variables of the pumping energy (PE), where PE refers to the power consumption caused by internal flow recycle pump: SNO, MLSS, and choose the related process variables of the aeration energy (AE), where AE refers to the power consumption caused by blower and the effluent quality (EQ): SO, SS, SNH, SNO;


2) formulate the two-level models based on the different time scales, the upper-level model is for PE, and the lower-level models are for AE and EQ:












F
1



(

t
1

)


=


l
1



(


x
u



(

t
1

)


)



,




(
1
)









f
1



(

t
2

)


=


l
2



(



x
l



(

t
2

)


,


x
u
*



(

t
1

)



)



,







f
2



(

t
2

)


=


l
3



(



x
l



(

t
2

)


,


x
u
*



(

t
1

)



)



,




(
2
)







where F1(t1) is the upper-level model for PE at time t1, l1(xu(t1)) is a mapping function of PE model, f1(t2) is the lower-level model for AE at time t2, l2(xl(t2), x*u(t1)) is a mapping function of AE model, x*u(t1) is optimal set-points of nitrate nitrogen SNO*, f2(t2) is the lower-level model for EQ at time t2, l3(xl(t2), x*u(t1)) is a mapping function of EQ model, xu(t1)=[SNO(t1), MLSS(t1)] is input variables vector of PE at time t1, SNO(t1) is concentration of SNO at time t1, MLSS(t1) is concentration of MLSS at time t1, and initial values of the two variables are [0.85, 1.56], xl(t2)=[SO(t2), SS(t2), SNH(t2)], SO(t2) is concentration of SO at time t2, SS(t2) is concentration of SS at time t2, SNH(t2) is concentration of SNH at time t2, [SO(t2), SS(t2), SNH(t2), SNO*(t1)] is input variables vector of AE and EQ at time t2, and initial values of [SO(t2), SS(t2), SNH(t2), SNO*(t1)] are [1.9, 11.6, 3.8, 0.95];


3) design a cooperative optimization algorithm to optimize the upper-level and lower-level optimization problems for obtaining the optimal set-points of the control variables, where the optimization period in the upper level is 1-3 hours, such as 2 hours, dedicated to the slower process dynamics, in the lower level is 10-50 minutes, such as 3 minutes, dedicated to the faster process dynamics, the steps are:


{circle around (1)} formulate the upper-level and lower-level problems:










Min







F
1



(



S
NO



(

t
1

)


,

MLSS


(

t
1

)



)



,




(
3
)







Min


[



f
1



(



S
O



(

t
2

)


,


S
NH



(

t
2

)


,

SS


(

t
2

)


,


S
NO
*



(

t
1

)



)


,






f
2



(



S
O



(

t
2

)


,


S
NH



(

t
2

)


,

SS


(

t
2

)


,


S
NO
*



(

t
1

)



)



]


,




(
4
)







where Min F1(SNO(t1), MLSS(t1)) is the upper-level optimization problem, Min [f1(SO(t2), SNH(t2), SS(t2), SNO*(t1)), f2(SO(t2), SNH(t2), SS(t2), SNO*(t1))] is the lower-level optimization problem;


{circle around (2)} set the number of the particle population in the upper level optimization I1, the number of the particle population in the lower level optimization I2, the maximum number of iterations in the upper level optimization N1, and the maximum number of iterations in the lower level optimization N2, where I1=50, I2=50, N1=20, N2=50;


{circle around (3)} introduce the single particle swarm optimization (SPSO) algorithm to optimize the upper-level optimization problem, the position and the velocity of the ith particle can be shown as:












s
i



(

t
1

)


=

[



s

i
,
1




(

t
1

)


,


s

i
,
2




(

t
1

)



]


,




(
5
)









v
i



(

t
1

)


=

[



v

i
,
1




(

t
1

)


,


v

i
,
2




(

t
1

)



]


,




(
6
)







si(t1) is the position of the ith particle at time t1, si,1(t1) is the value of SNO at time t1, si,2(t1) is the value of MLSS at time t1, vi(t1) is the velocity of the ith particle at time t1, i is the number of particles, 1=1, 2, . . . , 50, the update process of si(t1) and vi(t1) are












v

i
,
d




(


t
1

+
1

)


=


0.7



v

i
,
d




(

t
1

)



+

0.72


(



p

i
,
d




(

t
1

)


-


s

i
,
d




(

t
1

)



)


+

0.72


(



g
d



(

t
1

)


-


s

i
,
d




(

t
1

)



)




,




(
7
)









s

i
,
d




(


t
1

+
1

)


=



s

i
,
d




(

t
1

)


+


v

i
,
d




(


t
1

+
1

)




,




(
8
)







where d is the space dimension, d=1, 2, vi,d(t1) is the velocity of the ith particle in the dth dimension at time t1, pi,d(t1) is the individual optimal solution of the ith particle in the dth dimension at time t1, gd(t1) is the global optimal solutions of the ith particle at time t1;


{circle around (4)} if SPSO reaches the preset maximum number of evolutions N1, stop the iterative evolution process, transfer the value of SNO* to the lower level; if SPSO does not reach the preset maximum number of evolutions N1, return to step {circle around (3)};


{circle around (5)} introduce the multiobjective particle swarm optimization (MOPSO) algorithm to optimize the lower-level optimization problem, the position of the jth particle aj(t2) and the velocity of the jth particle bj(t2) can be represented as aj(t2)=[aj,1(t2), aj,2(t2), aj,3(t2), aj,4(t2)], ai,1(t2) represents the value of SO at time t2, ai,2(t2) represents the value of SNH at time t2, ai,3(t2) represents the value of SS at time t2, ai,4(t2) represents the value of SNO* at time t2, bj(t2)=[bj,1(t2), bj,2(t2), bj,3(t2), bj,4(t2)], j is the number of particles, j=1, 2, . . . , 50; during the iterative evolution process, the obtained non-dominated solutions are conserved in the external archive Z(t2), Z(t2)=[z1(t2), z2(t2), . . . , zj(t2), . . . , z50(t2)], the update rule of the external archive is:













z


j



(

t
2

)


=



z
j



(

t
2

)


+

0.09




D


(


z
j



(

t
2

)


)






,




(
9
)







where zj(t2) is the jth non-dominated solution at time t2 before the archive is updated, žj(t2) is the jth non-dominated solution at time t2 after the archive is updated, zj(t2)=[zj,1(t2), zj,2(t2)], žj(t2)=[žj,1(t2), žj,2(t2)], zj,1(t2) and žj,1(t2) are the values of SO before and after the archive is updated, which are derived by MOPSO algorithm, zj,2(t2) and žj,2(t2) are the values of SNO before and after the archive is updated, which are derived by MOPSO algorithm, VD is the gradient descent direction;


{circle around (6)} establish the multi-input-multi-output radial basis assisted model (RBSM) based on the non-dominated solutions in Z(t2):












B
j



(

t
2

)


=




k
=
1

8





o

j
,
k




(

t
2

)


×


θ

j
,
k




(

t
2

)





,




(
10
)







where Bj(t2) is the output vector of RBSM, Bj(t2)=[Bj,1(t2), Bj,2(t2)]T, Bj,1(t2) is the predicted value of the aeration energy at time t2, Bj,2(t2) is the predicted value of the effluent quality at time t2, oj(t2)=[oj,1(t2), oj,2(t2), . . . , oj,8(t2)]T are the connection weights, θj(t2)=[θj,1(t2), θj,2(t2), . . . , θj,8(t2)]T is the output vector of the neurons in hidden layer, the sum of the squared errors between the output of RBSM and the actual system is expressed as











e


(


z
n



(

t
2

)


)


=



min


(



B
n



(

t
2

)


-

Q


(

t
2

)



)


T



(



B
n



(

t
2

)


-

Q


(

t
2

)



)



,




(
11
)







where e(zn(t2)) is the sum of the squared errors between the outputs of nth non-dominated solution Bn(t2) and the actual system Q(t2), nϵ[1, 50], Q(t2)=[Q1(t2), Q2(t2)] is the real outputs of AE and EQ in the actual system that obtained by electricity meter and the sensors in real time, select the solution corresponding to the minimal sum of the squared error as the global optimal solution;


{circle around (7)} if MOPSO reaches the preset maximum number of evolutions N2, stop the iterative evolution process and output the optimal set-points of dissolved oxygen SO*; if MOPSO does not reach the preset maximum number of evolutions N2, return to step {circle around (5)}; then the optimal set-points of SNO*and SO*can be obtained.


(3) Perform the control commands. If the measured value of SNO is lower or higher than SNO*, it is noted that the internal recycle flow in anoxic tank should be adjusted to satisfy the operating requirement by manipulating the electromagnetic valve of the internal flow recycle pump. Specifically, the signal or data of the measured value of SNO can be transmitted to the center control unit in real time, and the center control unit compares the measured value of SNO with SNO*, and then sends a command to the internal flow recycle pump to control its electromagnetic valve in real time. If the measured value of SO is lower or higher than SO*, it is noted that the supplied oxygen should be adjusted by manipulating the fan frequency of the blower. Specifically, the signal or data of the measured value of SO can be transmitted to the center control unit in real time, and the center control unit compares the measured value of SO with SO*, and then sends a command to the blower to control its fan frequency in real time. The detailed adjusting strategy is realized by the predictive control. The steps are:


{circle around (1)} define the cost functions in the predictive control strategy:












J
1



(
t
)


=



1
2






q
=
1

5




(



z
1



(
t
)


-


y
1



(
t
)



)

2



+


1
2






m
=
1

4



Δ







u


(
t
)


T


Δ






u


(
t
)







,







J
2



(
t
)


=



1
2






q
=
1

5




(



z
2



(
t
)


-


y
2



(
t
)



)

2



+


1
2






m
=
1

4



Δ







u


(
t
)


T


Δ






u


(
t
)







,




(
12
)







where z1(t) and z2(t) are the optimal set-points of SO* and SNO*, y1(t) and y2(t) are the predicted values of SO and SNO;


{circle around (2)} update the control laws based on the predictive control strategy, the updated rule is:











u


(

t
+
1

)


=


u


(
t
)


+

Δ






u


(
t
)





,




(
13
)







where u(t) is the control law at time t, Δu(t) are the control variations, whose expressions are shown as:











Δ







u
1



(
t
)



=



1
2







J
1



(
t
)



/




u
1



(
t
)





+


1
2







J
2



(
t
)



/




u
1



(
t
)







,






Δ







u
2



(
t
)



=



1
2







J
1



(
t
)



/




u
2



(
t
)





+


1
2







J
2



(
t
)



/




u
2



(
t
)







,




(
14
)







where Δu(t) are the variations of the manipulated variables electromagnetic valve of the internal flow recycle pump and the fan frequency of the blower, Δu(t)=[Δu1(t), Δu2(t)]. The values of SO and SNO will be changed accordingly, and then transmitted to the center control unit to realize the optimal control. The effects of the proposed optimal control results are reflected by the daily average of PE value, the daily average of AE value, the daily average of EQ value, and the tracking control results of SO and SNO, as shown in FIGS. 2-6.


The center control unit includes at least a processor and a memory communicatively connected to the processor. The memory stores instructions executable by the processor, and the instructions are executed by the processor to carry out the above discussed data collecting, modeling, and parameter adjusting steps described above.


The Novelties of this Present Disclosure Contain:


(1) Since WWTP is a complex and dynamic biochemical reaction process, conflicts with coupling performance indices, it is necessary to coordinate the performance indices in this present invention, and then improve the system performance, as well as guarantee the efficient and stable operation. However, due to the nonlinearity, strong coupling feature, and the conflicted multiple time-scale performance indices, it is difficult to realize the optimal control in WWTP. According to the operation features, a COCS method based on the cooperation optimization algorithm and predictive control strategy is proposed, which can balance the coupling performance indices and improve the operation efficiency.


(2) In this present invention, a COCS based on the cooperation optimization algorithm and predictive control strategy is studied to realize the optimal control in WWTP. This proposed optimal control method can efficiently capture the dynamic features of the performance indices, and acquire the optimal set-points of SO and SNO based on the dynamic working scenarios. Moreover, this proposed COCS can improve the optimization indices, and optimize the control performance.


Attention: for the convenient description, a data-driven assisted model based cooperative optimization algorithm and a predictive control strategy are used to describe and optimize the performance index, and trace the optimal set-points of SO and SNO. The other optimal control methods based on different optimization algorithm and control strategy also belong to the scope of this present invention.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 shows the control system scheme of WWTP.



FIG. 2 shows the results of PE in COCS.



FIG. 3 shows the results of AE in COCS.



FIG. 4 shows the results of EQ in COCS.



FIG. 5 includes FIG. 5(a) and FIG. 5(b), and shows the results of SO in COCS.



FIG. 6 includes FIG. 6(a) and FIG. 6(b), and shows the results of SNO in COCS.





DETAILED DESCRIPTION

The system shown in FIG. 1 includes a sand filter for filtering out sand and other particles contained in the wastewater to be treated. Connected to the sand filter is a primary settling tank for settling filtered wastewater. The wastewater output from the primary settling tank is sent to a biochemical reaction tank to oxide and decompose the organic matters. After reaction in a biochemical reaction tank, the wastewater is introduced into a secondary sedimentation tank, after sedimentation treatment, the wastewater is discharged to complete the wastewater treatment.


1. The design of the cooperative optimal control system for WWTP, the steps are:


(1) The designed optimal control system contains the center control unit, blower, internal flow recycle pump, sensor unit that includes a SO sensor, two SNO sensors, a SS sensor, a SNH sensor, two MLSS sensors.


The center control unit is used to receive the measured data from the installed sensors, calculate the optimal set-points of the control variables based on the measured data, and generate the control commands to guarantee the operation of WWTP. The blower and internal flow recycle pump are applied to perform the control commands transmitted by the center control unit. The sensor unit is used to measure the data of process variables, a SO sensor, located in the aerobic tank, is configured to measure the values of SO; two SNO sensors, located in the anoxic and secondary sedimentation tanks, are configured to measure the values of SNO; a SS sensor, located in the aerobic tank, is configured to measure the values of SS; a SNH sensor, located in the secondary sedimentation tank, is configured to measure the values of SNH; two MLSS sensors, located in the anoxic and secondary sedimentation tank, are configured to measure the values of MLSS.


(2) The adaptive calculation of the optimal set-points of control variables, rather than the fixed values by expert experience, the steps are:


1) select the related process variables of PE: SNO, MLSS, and choose the related process variables of AE and EQ: SO, SS, SNH, SNO;


2) formulate the two-level models based on the different time scales, the upper-level model is for PE, and the lower-level models are for AE and EQ:












F
1



(

t
1

)


=


l
1



(


x
u



(

t
1

)


)



,




(
1
)









f
1



(

t
2

)


=


l
2



(



x
l



(

t
2

)


,


x
u
*



(

t
1

)



)



,







f
2



(

t
2

)


=


l
3



(



x
l



(

t
2

)


,


x
u
*



(

t
1

)



)



,




(
2
)







where F1(t1) is the upper-level model for PE at time t1, l1(xu(t1)) is a mapping function of PE model, f1(t2) is the lower-level model for AE at time t2, l2(xl(t2), x*u(t1)) is a mapping function of AE model, x*u(t1) is optimal set-points of nitrate nitrogen SNO*, f2(t2) is the lower-level model for EQ at time t2, l3(xl(t2), x*u(t1)) is a mapping function of EQ model, xu(t1)=[SNO(t1), MLSS(t1)] is input variables vector of PE at time t1, SNO(t1) is concentration of SNO at time t1, MLSS(t1) is concentration of MLSS at time t1, and initial values of the two variables are [0.85, 1.56], xl(t2)=[SO(t2), SS(t2), SNH(t2)], SO(t2) is concentration of SO at time t2, SS(t2) is concentration of SS at time t2, SNH(t2) is concentration of SNH at time t2, [SO(t2), SS(t2), SNH(t2), SNO*(t1)] is input variables vector of AE and EQ at time t2, and initial values of [SO(t2), SS(t2), SNH(t2), SNO*(t1)] are [1.9, 11.6, 3.8, 0.95];


3) design a cooperative optimization algorithm to optimize the upper-level and lower-level optimization problems for obtaining the optimal set-points of the control variables, where the optimization period in the upper level is 1-3 hours, such as 2 hours, dedicated to the slower process dynamics, in the lower level is 10-50 minutes, such as 30 minutes, dedicated to the faster process dynamics, the steps are:


{circle around (1)} formulate the upper-level and lower-level problems:










Min







F
1



(



S
NO



(

t
1

)


,

MLSS


(

t
1

)



)



,




(
3
)







Min


[



f
1



(



S
O



(

t
2

)


,


S
NH



(

t
2

)


,

SS


(

t
2

)


,


S
NO
*



(

t
1

)



)


,






f
2



(



S
O



(

t
2

)


,


S
NH



(

t
2

)


,

SS


(

t
2

)


,


S
NO
*



(

t
1

)



)



]


,




(
4
)







where Min F1(SNO(t1), MLSS(t1)) is the upper-level optimization problem, Min [f1(SO(t2), SNH(t2), SS(t2), SNO*(t1)), f2(SO(t2), SNH(t2), SS(t2), SNO*(t1))] is the lower-level optimization problem;


{circle around (2)} set the number of the particle population in the upper level optimization I1, the number of the particle population in the lower level optimization I2, the maximum number of iterations in the upper level optimization N1, and the maximum number of iterations in the lower level optimization N2, where I1=50, I2=50, N1=20, N2=50;


{circle around (3)} introduce the single particle swarm optimization (SPSO) algorithm to optimize the upper-level optimization problem, the position and the velocity of the ith particle can be shown as:












s
i



(

t
1

)


=

[



s

i
,
1




(

t
1

)


,


s

i
,
2




(

t
1

)



]


,




(
5
)









v
i



(

t
1

)


=

[



v

i
,
1




(

t
1

)


,


v

i
,
2




(

t
1

)



]


,




(
6
)







si(t1) is the position of the ith particle at time t1, si,1(t1) is the value of SNO at time t1, si,2(t1) is the value of MLSS at time t1, vi(t1) is the velocity of the ith particle at time t1, i is the number of particles, i=1, 2, . . . , 50, the update process of si(t1) and vi(t1) are












v

i
,
d




(


t
1

+
1

)


=


0.7



v

i
,
d




(

t
1

)



+

0.72


(



p

i
,
d




(

t
1

)


-


s

i
,
d




(

t
1

)



)


+

0.72


(



g
d



(

t
1

)


-


s

i
,
d




(

t
1

)



)




,




(
7
)









s

i
,
d




(


t
1

+
1

)


=



s

i
,
d




(

t
1

)


+


v

i
,
d




(


t
1

+
1

)




,




(
8
)







where d is the space dimension, d=1, 2, vi,d(t1) is the velocity of the ith particle in the dth dimension at time t1, pi,d(t1) is the individual optimal solution of the ith particle in the dth dimension at time t1, gd(t1) is the global optimal solutions of the ith particle at time t1;


{circle around (4)} if SPSO reaches the preset maximum number of evolutions N1, stop the iterative evolution process, transfer the value of SNO* to the lower level; if SPSO does not reach the preset maximum number of evolutions N1, return to step {circle around (3)};


{circle around (5)} introduce the multiobjective particle swarm optimization (MOPSO) algorithm to optimize the lower-level optimization problem, the position of the jth particle aj(t2) and the velocity of the jth particle bj(t2) can be represented as aj(t2)=[aj,1(t2), aj,2(t2), aj,3(t2), aj,4(t2)], ai,1(t2) represents the value of SO at time t2, ai,2(t2) represents the value of SNH at time t2, ai,3(t2) represents the value of SS at time t2, ai,4(t2) represents the value of SNO* at time t2, bj(t2)=[bj,1(t2), bj,2(t2), bj,3(t2), bj,4(t2)], j is the number of particles, j=1, 2, . . . , 50; during the iterative evolution process, the obtained non-dominated solutions are conserved in the external archive Z(t2), Z(t2)=[z1(t2), z2(t2), . . . , zj(t2), . . . , z50(t2)], the update rule of the external archive is:













z


j



(

t
2

)


=



z
j



(

t
2

)


+

0.09




D


(


z
j



(

t
2

)


)






,




(
9
)







where zj(t2) is the jth non-dominated solution at time t2 before the archive is updated, žj(t2) is the jth non-dominated solution at time t2 after the archive is updated, zj(t2)=[zj,1(t2), zj,2(t2)], žj(t2)=[žj,1(t2), žj,2(t2)], zj,1(t2) and žj,1(t2) are the values of SO before and after the archive is updated, which are derived by MOPSO algorithm, zj,2(t2) and žj,2(t2) are the values of SNO before and after the archive is updated, which are derived by MOPSO algorithm, VD is the gradient descent direction;


{circle around (6)} establish the multi-input-multi-output radial basis assisted model (RBSM) based on the non-dominated solutions in Z(t2):












B
j



(

t
2

)


=




k
=
1

8









o

j
,
k




(

t
2

)


×


θ

j
,
k




(

t
2

)





,




(
10
)







where Bj(t2) is the output vector of RBSM, Bj(t2)=[Bj,1(t2), Bj,2(t2)]T, Bj,1(t2) is the predicted value of the aeration energy at time t2, Bj,2(t2) is the predicted value of the effluent quality at time t2, oj(t2)=[oj,1(t2), oj,2(t2), . . . , oj,8(t2)]T are the connection weights, θj(t2)=[θj,1(t2), θj,2(t2), . . . , θj,8(t2)]T is the output vector of the neurons in hidden layer, the sum of the squared errors between the output of RBSM and the actual system is expressed as











e


(


z
n



(

t
2

)


)


=



min


(



B
n



(

t
2

)


-

Q


(

t
2

)



)


T



(



B
n



(

t
2

)


-

Q


(

t
2

)



)



,




(
11
)







where e(zn(t2)) is the sum of the squared errors between the outputs of nth non-dominated solution Bn(t2) and the actual system Q(t2), nϵ[1, 50], Q(t2)=[Q1(t2), Q2(t2)] is the real outputs of AE and EQ in the actual system that obtained by electricity meter and the sensors in real time, select the solution corresponding to the minimal sum of the squared error as the global optimal solution;


{circle around (7)} if MOPSO reaches the preset maximum number of evolutions N2, stop the iterative evolution process and output the optimal set-points of dissolved oxygen SO*; if MOPSO does not reach the preset maximum number of evolutions N2, return to step {circle around (5)}; then the optimal set-points of SNO*and SO* can be obtained.


(3) Perform the control commands. If the measured value of SNO is lower or higher than SNO*, it is noted that the internal recycle flow in anoxic tank should be adjusted to satisfy the operating requirement by manipulating the electromagnetic valve of the internal flow recycle pump. Specifically, the signal or data of the measured value of SNO can be transmitted to the center control unit in real time, and the center control unit compares the measured value of SNO with SNO*, and then sends a command to the internal flow recycle pump to control its electromagnetic valve in real time. If the measured value of SO is lower or higher than SO*, it is noted that the supplied oxygen should be adjusted by manipulating the fan frequency of the blower. Specifically, the signal or data of the measured value of SO can be transmitted to the center control unit in real time, and the center control unit compares the measured value of SO with SO*, and then sends a command to the blower to control its fan frequency in real time. The detailed adjusting strategy is realized by the predictive control. The steps are:


{circle around (1)} define the cost functions in the predictive control strategy:












J
1



(
t
)


=



1
2






q
=
1

5








(



z
1



(
t
)


-


y
1



(
t
)



)

2



+


1
2






m
=
1

4







Δ







u


(
t
)


T


Δ






u


(
t
)







,







J
2



(
t
)


=



1
2






q
=
1

5








(



z
2



(
t
)


-


y
2



(
t
)



)

2



+


1
2






m
=
1

4







Δ







u


(
t
)


T


Δ






u


(
t
)







,




(
12
)







where z1(t) and z2(t) are the optimal set-points of SO* and SNO*, y1(t) and y2(t) are the predicted values of SO and SNO;


{circle around (2)} update the control laws based on the predictive control strategy, the updated rule is:











u


(

t
+
1

)


=


u


(
t
)


+

Δ






u


(
t
)





,




(
13
)







where u(t) is the control law at time t, Δu(t) are the control variations, whose expressions are shown as:











Δ







u
1



(
t
)



=



1
2







J
1



(
t
)



/




u
1



(
t
)





+


1
2







J
2



(
t
)



/




u
1



(
t
)







,






Δ







u
2



(
t
)



=



1
2







J
1



(
t
)



/




u
2



(
t
)





+


1
2







J
2



(
t
)



/




u
2



(
t
)







,




(
14
)







where Δu(t) are the variations of the manipulated variables electromagnetic valve of internal flow recycle pump and the fan frequency of blower, Δu(t)=[Δu1(t), Δu2(t)]. The values of SO and SNO will be changed accordingly, and then transmitted to the center control unit to realize the optimal control. The effects of the proposed optimal control results are reflected by the daily average of PE value, the daily average of AE value, the daily average of EQ value, and the tracking control results of SO and SNO.


The control system scheme based on COCS is shown in FIG. 1, and the optimal control results are presented in FIGS. 2-6. FIG. 2 gives the daily average PE values, X axis shows the time, and the unit is day, Y axis is the average PE value, and the unit is €/KWh. FIG. 3 gives the daily average AE values, X axis shows the time, and the unit is day, Y axis is the average AE value, and the unit is €/KWh. FIG. 4 gives the daily average EQ values, X axis shows the time, and the unit is day, Y axis is the average EQ value, and the unit is €/m3. FIG. 5(a) gives SO values, X axis shows the time, and the unit is day, Y axis is control results of SO, and the unit is mg/L. FIG. 5(b) gives the control errors of SO, X axis shows the time, and the unit is day, Y axis is control errors of SO, and the unit is mg/L. FIG. 6(a) gives the SNO values, X axis shows the time, and the unit is day, Y axis is control results of SNO, and the unit is mg/L. FIG. 6(b) gives the control errors of SNO, X axis shows the time, and the unit is day, Y axis is control errors of SNO, and the unit is mg/L.

Claims
  • 1. A method of designing a cooperative optimal control system for WWTP, comprising the steps: (1) providing an optimal control system that contains a center control unit, a blower, an internal flow recycle pump, sensor unit that includes a SO sensor, two SNO sensors, a SS sensor, a SNH sensor, two MLSS sensors;the center control unit is configured to receive measured data from the sensor unit, calculate optimal set-points of control variables based on the measured data, and generate control commands to optimize operation of the WWTP;the blower and the internal flow recycle pump are applied to perform the control commands transmitted by the center control unit;the sensor unit is used to measure data of process variables, the SO sensor, located in the aerobic tank, is configured to measure values of SO; the two SNO sensors, located in the anoxic and secondary sedimentation tanks, are configured to measure values of SNO; the SS sensor, located in the aerobic tank, is configured to measure values of SS; the SNH sensor, located in the secondary sedimentation tank, is configured to measure values of SNH; the two MLSS sensors, located in the anoxic and secondary sedimentation tank, are configured to measure values of MLSS;(2) adaptive calculation of the optimal set-points of control variables, rather than the fixed values by expert experience, the steps are:1) select related process variables of PE: SNO, MLSS, and choose related process variables of AE and EQ: SO, SS, SNH, SNO;2) formulate two-level models based on different time scales, an upper-level model is for PE, and lower-level models are for AE and EQ:
Priority Claims (1)
Number Date Country Kind
201810499231.X May 2018 CN national
CROSS REFERENCE TO RELATED APPLICATION

This application is a continuation-in-part of application Ser. No. 16/109,651 filed on Aug. 22, 2018, which claims priority to Chinese Patent Application No. 201810499231.X, filed on May 23, 2018, entitled “Cooperative optimal control system for wastewater treatment process”, the contents of the above identified applications are herein incorporated by reference in its entirety.

Continuation in Parts (1)
Number Date Country
Parent 16109651 Aug 2018 US
Child 17691096 US