The present invention relates to one that estimates the cost of an apparatus composed of a plurality of components, such as a communication apparatus or information processing apparatus and, more particularly to a cost information management system, a cost information management method, and a cost information management program configured to cover the entire design process of the apparatus from, e.g., the design upstream stage (development and planning stage) to design down stream stage (detailed design stage) so as to estimate the cost of the apparatus.
Conventionally, when the cost of an apparatus was calculated, a specialist sets a price based on experience or skill, or, sometimes, by intuition with reference to the design drawing of the target apparatus. In the information system field, the cost of an apparatus was estimated by appropriately correcting the cost of each component based on previous manufacturing process data or CAD shape data pertaining to a similar component and manufacturing cost data pertaining to the similar component (refer to, e.g., Patent Document 1).
Patent Document 1: Jpn. Pat. Appln. Laid-Open Publication No. 2002-182732
However, in the above method, estimated cost may fluctuate depending on experience or skill level of the specialist. In addition, cost estimation cannot be performed without previous manufacturing process data or CAD shape data concerning similar component. Further, a detailed design drawing or CAD data is not generally prepared in the development and planning stage of a target apparatus, which does not allow the specialist or system to perform cost estimation. In this case, there is no choice but to start a development project with the cost of the entire apparatus and therefore profit and loss forecast remaining obscure.
The present invention has been made to the above problems, and an object thereof is to provide a cost information management system, a cost information management method, and a cost information management program which are capable of performing cost estimation with a high level of accuracy without relying on a specialist skill and capable of covering the entire design process of the apparatus from the design upstream stage (development and planning stage) to design down stream stage (detailed design stage) of design.
To solve the above problems, according to an aspect of the present invention, there is provided a cost information management system that manages cost information relating to production of an apparatus in first and second stages of the production, comprising: an input section that inputs functional parameters for respective circuits constituting the apparatus in the first and second stages and a setting value of apparatus desired cost; and a controller that calculates the apparatus cost in the first stage based on the main functional parameters input by the input section, compares the calculated value with apparatus desired cost to determine whether to move to the second stage, additionally sets other functional parameters that have not been set in the first stage in the case where it has been determined to move to the second stage so as to calculate the apparatus cost in the second stage, and compares the calculated value with apparatus desired cost.
Further, in the cost information management system according to the present invention, the controller ends the apparatus development process in the case where the apparatus cost in the second stage is not more than the apparatus desired cost.
Further, the cost information management system according to the present invention comprises an output section that outputs the apparatus cost in the first and second stages calculated by the controller.
Further, the cost information management system according to the present invention comprises a storage section having a cost table in which costs corresponding to the functional parameters set for the respective circuits constituting the apparatus are previously stored, and the controller refers to the cost table stored in the storage section to obtain the costs of the respective circuits which correspond to the functional parameters input by the input section and calculates the apparatus cost in the first and second stages.
According to another aspect of the present invention, there is provided a cost information management method that manages cost information relating to production of an apparatus in first and second stages of the production, comprising: an input step that inputs functional parameters for respective circuits constituting the apparatus in the first and second stages and a setting value of apparatus desired cost; and a cost estimation step that calculates the apparatus cost in the first stage based on the main functional parameters input by the input step, compares the calculated value with apparatus desired cost to determine whether to move to the second stage, additionally sets other functional parameters that have not been set in the first stage in the case where it has been determined to move to the second stage so as to calculate the apparatus cost in the second stage, and compares the calculated value with apparatus desired cost.
Further, in the cost information management method according to the present invention, the cost estimation step ends the apparatus development process in the case where the apparatus cost in the second stage is not more than the apparatus desired cost.
Further, the cost information management method according to the present invention comprises an output step that outputs the apparatus cost in the first and second stages calculated by the cost estimation step.
Further, in the cost information management method according to the present invention, a storage section having a cost table in which costs corresponding to the functional parameters set for the respective circuits constituting the apparatus are previously stored are provided, and the cost estimation step refers to the cost table stored in the storage section to obtain the costs of the respective circuits which correspond to the functional parameters input by the input section and calculates the apparatus cost in the first and second stages.
According to still another aspect of the present invention, there is provided a cost information management program allowing a computer to manage cost information relating to production of an apparatus, the program allowing the computer to execute: an input step that inputs functional parameters for respective circuits constituting the apparatus in first and second stages and a setting value of apparatus desired cost; and a cost estimation step that calculates the apparatus cost in the first stage based on the main functional parameters input by the input step, compares the calculated value with apparatus desired cost to determine whether to move to the second stage, additionally sets other parameters that have not been set in the first stage in the case where it has been determined to move to the second stage so as to calculate the apparatus cost in the second stage, and compares the calculated value with apparatus desired cost.
The cost information management system shown in
In general, as shown in
In the present invention, functional parameters are set for the respective circuits constituting such an apparatus on a type-by-type basis, as shown in
Further, in the present invention, the cost table 3A shown in
Next, operation of the cost information management system having the above configuration will be described with reference to a flowchart shown in
First, upon development of an apparatus, main functional parameters for the respective circuits constituting the apparatus and an apparatus desired cost are input through the input unit 4 (step S1) in the apparatus planning stage. For example, circuit scale: 70 k-gate, outside dimension: 22 mm2 are input as the functional parameters for input circuit 11, concrete numeric values relating to circuit scale and outside dimension are input as the functional parameters for processing circuit 12 and output circuit 13, concrete numeric values relating to memory scale and outside dimension are input as the functional parameters for the memory circuit 14, and concrete numeric values relating to input system and outside dimension are input as the functional parameters for the power supply circuit 15.
Then, based on the above setting values input as the functional parameters, the central processing unit 1 refers to the cost tables of
Cost of input circuit 11: 500-700 yen
Cost of processing circuit 12: 600-800 yen
Cost of output circuit 13: 600-800 yen
Cost of memory circuit 14: 500-700 yen
Cost of power supply circuit 15: 400-600 yen
Apparatus cost (summation): 2600-3600 yen
Then, the central processing unit 1 determines whether the apparatus cost calculated in the planning stage is not more than the apparatus desired cost or not (step S3). If, e.g., 3000 yen has been set as the apparatus desired cost, development process can be continued since there exists a lower limit of the apparatus cost lower than the apparatus desired cost and is shifted to the design stage. On the other hand, the calculated value of the apparatus cost is larger than the apparatus desired cost value, the development of the apparatus is abandoned.
In the design stage, other functional parameters that have not been set for the respective circuits are set (step S4) and then the apparatus cost is calculated (step S5). The calculated apparatus cost is output as display data by the output unit 5. As a result, variation in the value of the apparatus cost can be reduced to improve the cost accuracy. Then, determination is made based on a comparison between the calculated value of the apparatus cost and apparatus desired cost (step S6). For example, in the input circuit 11, internal operation speed and number of signal pins are additionally set as the functional parameters so as to improve the cost accuracy.
In the case where the value of the apparatus cost calculated as described above is not more than the apparatus desired cost, the apparatus development process is ended. On the other hand, in the case where the value of the apparatus cost calculated as described above is more than the apparatus desired cost, the flow is shifted to step S4 where the functional parameters are changed to thereby execute the subsequent steps S5 and S6.
In the flowchart of
Although the cost table 3A shown in
Cost of input circuit 11=circuit scale×k1+internal operation speed×k2+number of signal pins×k3+outside dimension×k4(k1 to k4: standard unit price)
The cost calculation using the above expression can be applied to the cost calculations for the processing circuit 12, output circuit 13, memory circuit 14 and power supply circuit 15.
Further, the cost information management system can be embodied in the same way as the cost information management method and cost information management program. That is, it is only necessary to follow the respective processing steps and program of the flowchart of
In this case, by storing a program allowing a computer to execute the respective steps shown in
The computer-readable medium mentioned here includes: a portable storage medium such as a CD-ROM, a flexible disk, a DVD disk, a magneto-optical disk, or an IC card; a database that holds computer program; another computer and database thereof; and a transmission medium on a network line.
As described above, according to the above embodiment, cost of a target apparatus in the planning stage is calculated based on the functional parameters set for the respective circuits constituting the apparatus in the planning stage, the calculated value and apparatus desired cost are compared to each other to thereby determine whether it is possible to move to the design stage, and the apparatus cost in the design stage is calculated after the determination. Thus, it is possible to perform cost estimation with a high level of accuracy without relying on a specialist skill as well as to cover the entire design process of the apparatus from the design upstream stage (development and planning stage) to design down stream stage (detailed design stage), enabling profit and loss to be grasped at the start time of the development project. Although the first and second stages are set respectively as the planning stage and design stage in the present invention, they may arbitrarily be defined.
According to the present invention, cost of a target apparatus in a first stage (e.g., planning stage) is calculated based on the functional parameters set for the respective circuits constituting the apparatus in the first stage, the calculated value and apparatus desired cost are compared to each other to thereby determine whether it is possible to move to a second stage (e.g., design stage), and the apparatus cost in the second stage is calculated after the determination. Thus, it is possible to perform cost estimation with a high level of accuracy without relying on a specialist skill as well as to cover the entire design process of the apparatus from upstream of the first stage (development and planning stage) to down stream of the second stage (detailed design stage), enabling profit and loss to be grasped at the start time of the development project.