1. Field of the Invention
The present invention relates to a crane whose lowest boom of a boom can be used both for a tower crane and a normal crane.
2. Description of the related Art
In general, in a crane whose lowest boom portion of the boom which consists of several boom portions is used both for the tower crane and the normal crane, the respective minimum distances between spreaders (distance between upper and lower spreaders) Sa and Sb are determined when the boom is raised maximally while the tower crane is considered as a standard, and the distances Sa and Sb are set approximately equal both for the cranes.
However, the maximum boom raise angle of the boom depends on the respective cranes, and thus, the distance is longer for the tower crane, and shorter for the normal crane when the boom is laid on the ground.
Consequently, if an upper spreader is lowered on a rear surface of the boom, the spreader is lowered on a second boom exceeding beyond the lowest boom.
As a result, when the boom is disassembled for the tower crane, it is necessary to relocate the upper spreader which has bee lowered on the second boom to a spreader retainer of the lowest boom.
In addition, when the boom is assembled, it is necessary to relocate the upper spreader from the spreader retainer to a position on the second boom where a boom guyline can be connected.
For the relocation of the upper spreader, there are required employment of another crane, maintenance of a boom raising/lowering rope at a proper tension at the same time, and the like, and this operation is thus very troublesome. Consequently, overall work efficiency of the assembly/disassembly of the boom decreases.
It is an objective of the present invention to provide a crane where an upper spreader can be directly lowered on a spreader retainer of the lowest boom either for a tower or normal crane when a boom is disassembled.
The crane according to the present invention has the following principle constitution.
Namely, the crane according to the present invention is comprised of a base machine, a boom pivotedly attached to the base machine in such a manner that the boom is raised and lowered, and a boom raising/lowering apparatus that raises/lowers the boom. A tower boom for a tower crane specification, or a normal boom with a maximum raising angle of the boom smaller than that of the tower boom for a normal crane specification is respectively attached as the boom. A spreader retainer is attached on a rear surface of a lowest boom portion of the boom used both for the tower boom and the normal boom in common. The boom raising/lowering apparatus is comprised of a gantry, a lower spreader provided on a top of the gantry, an upper spreader disposed closer to an extreme end of the boom than the lower spreader, and a boom raising/lowering rope wound between the upper spreader and the lower spreader. In the crane having the above principle constitution, the distance between both the spreaders is S1 when the boom is maximally raised for the tower crane specification, and S2 when the boom is maximally raised for the normal crane specification, the length of the lowest boom portion is L, and S1, S2, and L are set such that the upper spreader is lowered to the position of the spreader retainer if the boom raising/lowering apparatus lays the boom on the ground for assembling/disassembling the boom for either of the specifications.
According to the present invention, since the distances between the spreaders S1 and S2, and the length of the lowest boom portion L are set such that the upper spreader is lowered to the position of the spreader retainer if the boom raising/lowering apparatus lays the boom on the ground either for the tower crane or the normal crane, it is not necessary to relocate the upper spreader from the second boom to the lowest boom portion for the tower crane.
As a result, when the tower crane is assembled/disassembled, it is possible to eliminate the troublesome operation where an additional crane is used to relocate the upper spreader between the second boom portion and the lowest boom portion while the tension of the boom raising/lowering rope is being observed. Consequently, it is possible to significantly simplify the assembly/disassembly of the boom.
A crane according to the present invention has a principle constitution including a base machine, a boom attached to the base machine for being raised and lowered, and a boom raising/lowering apparatus that raises/lowers the boom. A tower boom for a normal crane specification, or a normal boom with the maximum raise angle of the boom smaller than that of the tower boom for a normal crane specification is attached as the boom. The boom raising/lowering apparatus is comprised of a gantry, a lower spreader provided on a top of the gantry, an upper spreader, and a boom raising/lowering rope wound between the upper spreader and the lower spreader. A spreader retainer is attached on a rear surface of the lowest boom used both for the tower boom and the normal boom. When the boom is assembled/disassembled, the lowest boom is raised/lowered by the boom raising/lowering apparatus while the upper spreader is retained by the spreader retainer. The distance between both the spreaders is S1 when the boom is maximally raised for the tower crane specification, and S2 when the boom is maximally raised for the normal crane specification, the length of the lowest boom is L, and S1, S2, and L are set such that the upper spreader is lowered to the position of the spreader retainer if the boom raising/lowering apparatus lays the boom on the ground for either of the tower crane and normal crane specifications.
A crane according to the present invention, compared with a crane, wherein the length of the lowest boom is La for the both specifications, and spreader distances Sa and Sb corresponding to the respective specifications are approximately equal to each other, S1, S2, and L satisfy the following conditions:
A description will now be given of an embodiment of the present invention with reference to FIGS. 1 to 3.
Both of the cranes use a common base machine A including a crawler type lower traveling body 1 and an upper rotating body 2. A tower boom 3 or a normal boom (normal type boom) 4 is attached to a front section of the upper rotating body 2 respectively for the tower crane or the normal crane.
As the tower crane, a jib 5 extends from a extreme end of the tower boom 3, and an operation is generally carried out by raising/lowering the jib 5 while the tower boom 3 is maintained to a constant angle (approximately 90°).
Alternatively, as the normal crane, an operation is generally carried out by raising/lowering the normal boom 4. In the operation, the maximum boom raise angle is limited to a value smaller than that of the tower boom 3 (80°, for example).
The boom raising/lowering apparatus 11 which raises/lowers the tower boom 3 and normal boom 4 includes a gantry 12 upwardly provided on the upper rotating body 2, a lower spreader 13 provided on a top of the gantry 12, an upper spreader 14, and a boom raising/lowering rope 15 wound between respective sheaves of the lower and upper spreaders 13, 14. The upper spreader 14 is connected to a boom extreme end through a boom guyline 16. The booms 3, 4 are raised/lowered by winding/rewinding the boom raising/lowering rope 15 by means of a raising/lowering winch 17 in this configuration.
In
Both in the tower and normal cranes, when the booms 3, 4 are disassembled, the booms 3, 4 are first laid on the ground by the boom raising/lowering apparatus 11 as dash double dot lines show in
Then, the boom raising/lowering rope 15 is loosened to lower the upper spreader 14 on a rear surface of the boom.
Behind a extreme end of the lowest boom 6 is provided a spreader retainer (bracket) 25. The upper spreader 14 is retained by the spreader retainer 25 with a pin to achieve an assembly/disassembly attitude which can secure the boom raising/lowering states, the boom guyline 16 is detached from the upper spreader 14, and the upper booms are then detached from the lowest boom 6 while boom raising/lowering action is property carried out.
After the disassembly, the base machine A and the lowest boom 6 are conveyed on a trailer while they are still in the assembly/disassembly attitude.
The assembly of the booms 3 and 4 is carried out by a procedure/operation inverse to that of the above disassembly.
Both in the tower and normal cranes, the minimum distance between both the lower and upper spreaders 13, 14 of the boom raising/lowering apparatus 11 (more precisely, the distance between the respective sheaves) is set as a distance which secures a fleet angle of the boom raising/lowering rope 15 equal to or lower than a certain angle.
In the present embodiment, the distance between both the lower and upper spreaders 13, 14 of the boom raising/lowering apparatus 11 is S1 for the maximum boom raising of the tower crane specification, and is S2 for the maximum boom raising of the normal crane specification, and the length of the lowest boom (distance between the center of the boom foot and the extreme end of the boom) is L. Both in the tower crane and normal crane specifications, S1, S2, and L are set such that the upper spreader 14 is lowered to the position of the spreader retainer 25 while the booms 3, 4 are laid on the ground by the boom raising/lowering apparatus 11 as shown in
For the tower crane specification, the maximum boom raise angle is approximately 90°. In this case, this angle is larger than that of the normal crane (approximately 80°), the amount of the winding for the boom is thus large, and both the spreaders 13, 14 are consequently the closest to each other. Therefore, the distance between the spreaders S1 on this occasion is set to a dimension which can secure the desired fleet angle.
Based on this determined inter-spreader distance S1, the length of the lowest boom L (position of the spreader retainer 25) is determined such that the upper spreader 14 is directly lowered to the position of the spreader retainer 25 as shown in
Also for the normal crane specification, the inter-spread distance S2 for the maximum boom raise is determined such that the upper spreader 14 is lowered to the position of the spreader retainer 25 as for the tower crane specification.
It is preferable S2 is determined to be larger than S1.
Compared with both of the crane specifications described in “THE RELATED ART” where the inter-spreader distances Sa and Sb are set as approximately equal to each other, S1 and S2 are set so as to satisfy the following conditions (i) to (iii). It is assumed that the length of the lowest boom 6 is La in “THE RELATED ART”.
It should be noted that the relationship between S2 and Sb is shown in
As a result of the setting described above, both on the tower and normal cranes, the upper spreader 14 can be directly lowered on the extreme end (spreader retainer 25) of the lowest boom 6, and can be retained by the spreader retainer 25 without the necessity of relocating the upper spreader 14 in the longitudinal direction of the boom 6.
Namely, for the tower crane, it is not necessary to relocate the upper spreader 14 lowered on the second boom 7 to the lowest boom 6 (spreader retainer 25) when the boom is disassembled, and to relocate the upper spreader 14 back when the boom is assembled as described in “THE RELATED ART”.
Consequently, it is possible to eliminate the troublesome operation where the upper spreader 14 is relocated using another crane while the tension of the boom raising/lowering rope 15 is being observed for the assembly/disassembly of the boom.
In the crane according to the embodiment, the spreader retainer 25 on the lowest boom 6 is disposed at the position farther from the boom foot than that in “THE RELATED ART” as described above, and it is thus necessary to increase the length of the lowest boom 6 compared with that in “THE RELATED ART”.
Consequently if the transport is simply carried out in the assembly/disassembly attitude on a trailer, the overall length will become longer. If this causes a problem, this problem may be solved by reducing the overall length of the upper rotating body 2 by an amount corresponding to the increase of the lowest boom, and increasing the weight of an upper section of the counterweight 24 by an amount corresponding to a resulting decrease in counter balance capability.
Although the invention has been described with reference to the preferred embodiment in the attached figures, it is noted that equivalents may be employed and substitutions made herein without departing from the scope of the invention as recited in the claims.
Number | Date | Country | Kind |
---|---|---|---|
2003-365235 | Oct 2003 | JP | national |