The present invention relates to endodontic instruments.
Endodontic instruments can be used for cleaning and enlarging the endodontic cavity space (“ECS”), also known as the root canal system of a human tooth.
The root canal system of a human tooth is often narrow, curved and calcified, and can be extremely difficult to negotiate or clean. Indeed, the conventional endodontic or root canal instruments currently available are frequently inadequate in the complete removal of the pulp and the efficient enlargement of the ECS. Furthermore, they are usually predisposed to breakage, causing further destruction to the tooth. Broken instruments are usually difficult, if not impossible to remove, often necessitating the removal of the tooth. Injury to the tooth, which occurs as the result of a frank perforation or alteration of the natural anatomy of the ECS, can also lead to failure of the root canal and tooth loss.
A root canal procedure itself can be better appreciated by referring to
In general, endodontic instruments are used to prepare the endodontic cavity space as described above. Endodontic instruments can include hand instruments and engine driven instruments. The latter can but need not be a rotary instrument. Combinations of both conventional hand and engine-driven rotary instruments are usually required to perform an ECP successfully and safely.
A flute of an endodontic instrument usually includes a sharpened edge configured for cutting. Edge 224 of
An endodontic instrument includes a working portion, which is the portion that can cut or remove material. The working portion is typically the portion along the shaft that is between the tip of the instrument and the shank end of the flutes. Portion 228 is the working portion for the endodontic instrument shown in
Hand instruments are typically manufactured from metal wire blanks of varying sizes. The metallurgical properties of these wires, in general, have been engineered to produce a wide range of physical properties. These wires are usually then twisted or cut to produce specific shapes and styles. Examples of hand instruments include K-type, H-type, and R-type hand instruments.
K-type instruments in current usage include reamers and K-files.
Hand instruments are usually manufactured according to guidelines of the ANSI and the ISO, which specified that a working portion of an instrument be 16 mm in length. ANSI and ISO further specified that a first diameter or D1 of the instrument, be 1 mm from the tip or D0. Other ANSI and ISO specifications require that: instruments have a standard taper of 0.02 mm per mm along the working portion 216; the tip maintain a pyramidal shape no greater than 75° in linear cross section; and hand instruments (e.g., the ones shown in
In addition to the hand instruments described above, there are rotary instruments that are usually motor driven.
G-type drills are available in 14, 18 and 25 mm lengths as measured from tip to shank, which is where the drill can be inserted into a standard slow-speed hand piece via a latch grip 307. G-type drills are available in varying diameters of 0.30 mm to 1.5 mm and from sizes 1 through 6.
The present invention provides methods and apparatus for providing a set of critical path endodontic instruments for preparing an endodontic cavity space.
In general, in one aspect, the invention provides a set of endodontic instruments for preparing an endodontic cavity space. The set includes a first endodontic instrument, a second endodontic instrument, and a third endodontic instrument. Each endodontic instrument includes a working portion that has a cone-like shape. Each working portion has an effective contact area defined by the exposed surface area of the working portion's respective cone-like shape. The difference between the effective contact areas of the first endodontic instrument and second endodontic instrument is substantially the same as the difference between the effective contact areas of the second endodontic instrument and third endodontic instrument.
In general, in another aspect, the invention provides an endodontic instrument for preparing an endodontic cavity space. The endodontic instrument includes a body that is configured to rotate about axis of rotation. The body has a center of mass that is off the axis of rotation, wherein the body is made of NiTi, and wherein the body is operable to swagger when rotated about the axis of rotation.
In general, in another aspect, the invention provides a set of endodontic instruments for preparing an endodontic cavity space. The set includes a first endodontic instrument, a second endodontic instrument, and a third endodontic instrument. Each endodontic instrument has a longitudinal axis. Each endodontic instrument has a cross sectional area at a predetermined point on its longitudinal axis. The predetermined point is substantially the same for the endodontic instruments of the set. The difference between the cross sectional areas of the first and second endodontic instruments is substantially the same as the difference between the cross sectional areas of the second and third endodontic instruments.
The invention can be implemented to realize one or more of the following advantages. The set of endodontic instruments configured as described in this specification reduces the chance of failure by equally or substantially equally allotting the amounts of dental material that is to be removed to prepare an endodontic cavity space among the instruments of the set. An endodontic instrument configured as described in this specification can swagger, as will be explained below, which allows one to prepare and clean the outer and the inner wall of the endodontic cavity space. Furthermore, the endodontic instrument has improved flexibility to allow the instrument to negotiate the tortuous, complex bends of a root canal. The instrument has improved cutting ability to allow the instrument to clean and enlarge the root canal efficiently. The endodontic instrument described, for example, includes features that allow the use of higher cutting torque and cutting speeds. The instrument has improved carriage capacity to haul debris to the coronal aspect of the tooth efficiently. The instrument has improved restoring force or resistance to bending to maintain the integrity of the instrument. The instrument has significant improved resistance to premature fatigue or breakage. The instrument has improved escapement and resistance to binding in the canal.
The details of one or more implementations of the invention are set forth in the accompanying drawings and the description below. Other features and advantages of the invention will become apparent from the description and the drawings.
Like reference numbers and designations in the various drawings indicate like elements.
Reversed Helix
Conventional endodontic instruments have right-handed cutting edges and right-handed helices. A flute that forms a right handed helix spirals around the shaft, in a shank-to-tip longitudinal direction and, furthermore, in a clockwise direction of rotation (as viewed from shank to tip). This configuration is similar to the treads of a screw. Conventional endodontic instruments having this screw-like configuration are prone to binding. Furthermore, the radial lands and negative cutting angles typical of convention endodontic instruments predisposed the instruments to premature fatigue and breakage.
An endodontic instrument in accordance with the invention can include a reversed helix. A reversed helix spirals around the shaft of an instrument, in an shank-to-tip longitudinal direction and, furthermore, in a direction of rotation opposite to the cut direction of rotation. If, for example, the endodontic instrument has a clockwise cut direction of rotation, its helices would spiral in a counter-clockwise direction of rotation (along a longitudinal axis of the shaft in a shank-to-tip direction and as viewed from shank to tip). In this case, the instrument includes right-handed cutting edges. That is, the cutting edge is on the leading edge side of the helices as the instrument is rotated in the cut direction of rotation.
If the endodontic instrument has a clockwise cut direction of rotation (as seen from an end-to-tip perspective), then its flutes can spiral in a counter-clockwise direction of rotation (along a longitudinal axis of the shaft in an end-to-tip direction; and as viewed from an end-to-tip perspective).
An endodontic instrument having the reversed helix is generally not prone to binding and can haul debris from its tip to its end, thus removing the debris from the space being prepared. In one implementation, the endodontic instrument can be fabricated from Ni—Ti or a Ni—Ti alloy. Engine driven instruments, including rotary engine driven instruments, as well as hand instruments can include the described reversed helix configuration.
In the above examples, the endodontic instruments shown included only two flutes. Endodontic instruments having any number of flutes and any spline geometry can incorporate the described reversed helix configuration.
Helices Having Cross Cuts
An endodontic instrument in accordance with the invention can include helices that include one or more cross cuts. The cross cuts of a helix can but need not be at right angles to the helix. In general, the cross cuts can have a geometry and depth so as to increase the flexibility of the endodontic instrument and allow the instrument to bend more easily. FIG. 7A shows an instrument 702 that includes helices having cross cuts.
Web Designs having S-Shaped Splines, Positive Cutting Angles, and None or Reduced Radial Lands
The cutting edges (shown as four arcs delimited by points 830, 832, 834, and 836) can have reduced positive cutting angles, which makes the cutting edges less prone to breakage than cuttings edge with large cutting angles. In the instant specification, a cutting angle of a cutting edge that is formed by a flute can be defined as the angle between (i) a tangent of the spline of the flute at the cutting edge and (ii) a ray extending radially outward from the center of cross section of the instrument. For example, the cutting edge at point 836 that is formed by flute 822 exhibits a cutting angle θ1 defined by tangent 840 and ray 842. Tangent 840 can be mathematically represented as a one-sided derivative, taken at point 836, of a function that represents the spline 844. Alternatively, there are other ways of defining cutting angle. For example, the cutting angle can be defined as the angle θ2 between the described tangent 840 and a tangent 846 of a circumference 848 of the instrument at point 836. Under the alternative definition, the cutting angle θ2 is said to be neutral or zero when the angle is ninety degrees, positive when greater than ninety degrees, and negative when less than ninety degrees.
An S-shaped spline also removes the radial land usually present in conventional endodontic instruments. The crossed hatched area 850 represents a hypothetical radial land. As can be seen, the radial land, if present, would rub against a surface being cut and create unnecessary drag along the working surface of the instrument and render it inefficient and predisposed to breakage.
The described endodontic instrument can be fabricated from a preformed cylindrical metal blanks of nickel titanium. Alternatively, the instrument can be fabricated from others blanks and other materials.
The shank end of the above described instrument can include a latch-type attachment suitable for coupling, usually detachably, to a motor driven chuck. The latch-type attachment can also be suitable for coupling to a handle if the instrument is to be used manually. The tip of the instrument can be smooth while maintaining the conicity, taper, and transverse cross-sectional shape of the instrument.
The following describes an implementation. The tip of the implementation ends in a pyramidal or parabolic shape and is at least 0.05 mm in diameter and 1-3 mm in length. The cutting length (not including the tip) of the implementation is 8-16 mm in length. In general, the cutting length should be at least 2 mm in length. The cutting edges of the implementation is created by including one to six flutes. Alternatively, the implementation can include additional flutes. The flutes usually begin at a first position near the shank end of the instrument and ends at a second position near the tip end of the instrument. The first position is referred to as a maximum flute diameter (or MxFD) and the second position is referred to as a minimum flute diameter (or MnFD). The flutes are concave and are substantially the same as each other. The flutes have a shape and depth that remains constant along the length of the shaft. Alternatively, the shape and/or depth can vary along the length of the shaft. These flutes are spaced along the circumference of the cutting surface. The spacing can be of uniform intervals or irregular intervals. That is, the helix formation or spirals that progress from the shank end to the tip of the instrument can be spaced at regular intervals or increasingly narrower intervals. In the latter case, a greater number of spirals can be included per unit length along the longitudinal axis of the implementation. Each flute forms a neutral or slightly positive cutting angle. The flutes spiral around the shaft of the instrument, completing 360° of rotation for a minimum of 1 mm, and a maximum of 6 mm of axial length of the cutting surface.
Variable Working Surfaces with Flute Modifications and/or Attenuated Cutting Edges
The working surfaces or leading edges of conventional endodontic instruments have been manufactured with active or sharp cutting edges along the entire length of the working surface. This configuration can predispose the instrument to great amounts of torque leading to premature fatigue and breakage. One can mitigate the problem by varying the taper and the length of the working surface. As the instrument increased in diameter, the length of the working surface, or the number of cutting flutes (i.e., the number of flutes that form cutting edges) per unit length along the longitudinal axis of the instrument, can be reduced. Although, this configuration does mitigate the amount of torque that the instrument engenders as the size of the instrument increases, eliminating flutes also eliminates the ability of the instrument to continue to haul debris coronally. As a result, the instrument can become easily clogged creating unnecessary drag on the instrument.
An endodontic instrument in accordance with the invention retains the flutes along the entire length of the working surface to maintain hauling action. The leading edge or the working surface, however, is modified such that only a portion of the working surface cuts. This modification is brought about by blunting or rolling the edge of flutes both at the tip and shank ends of the instrument, leaving the central portion of the cutting surface active. Rolling edges will prevent the instrument from over-enlarging or tearing the foramen of the ECS distally and mitigate drag and pre-mature fatigue proximally.
Endodontic instruments can be provided in sets. A set usually includes instruments of different diameters. In preparing an ECS, an endodontist usually begins the preparation process using the instrument having the smallest diameter. As the ECS is enlarged, the endodontist usually switches to instruments of progressively larger diameters. The rolled edges feature described above can vary from one instrument to another in a set of instruments, with the active surface diminishing in length progressively as the diameter of the instrument increased. This feature would allow the instrument to continue to haul debris coronally, but mitigate the torque that the instrument is subject to when cutting.
Critical Path Set of Endodontic Instruments
A set of endodontic instruments, the instruments of which can have the same length but different diameters, can be provided for use in seriatim to enlarge progressively the ECS 102 of a tooth (
The stress level to which an endodontic instrument is subject can be related to the amount of material the instrument removes. In view of the forgoing, the number of endodontic instruments provided in the set as well as their sizing can be determined so that each instrument of the set is subject to a similar or the same level of stress during its use to remove its apportioned amount of dental material. The determination can be based on a critical set model that will be explain in the following paragraphs.
The indicated portion of the space 109 (
The object 1002 can be incremented along its length, which is typically 12 millimeters, into 12 one-millimeter sections. As can be seen, the transverse cross-sections that so increment the space 109 are circles that are denoted as 50, 51, . . . , 62, where the cross section 50 is at the tip and cross section 62 is at the butt of the space 109.
Note that the shaft (not shown) of each endodontic instrument of the set can be similarly incremented by transverse cross-sections denoted as D1, D2, . . . , D12, each of which can correspond to a respective cross section of the space 109. D6, for example, corresponds to cross section 56.
The cross section 56 represents the portion of the ECS that has the greatest curvature, usually referred to as the fulcrum. The fulcrum usually occurs at or near the midpoint between the foramen and the above described curve point of the ECS and, furthermore, is generally the point where endodontic instruments are most vulnerable to failure, including, for example, catastrophic breakage.
The set of endodontic instruments can be configured to reduce the probability of failure at or near the D6 cross sections of their shafts. In particular, the set can be configured so that the total amount of dental material to be removed at and around cross section 56 is evenly distributed among the instruments of the set. A set of instruments so configured will be referred to as the critical path set.
As can be seen from
A outer circle−A inner circle=π(0.35)2−π(0.1)2
A of annulus at D6=π(0.1225)−π(0.01)
A of annulus at D6=π(0.1125)
For a set of six instruments, the amount of material allotted to each instrument to remove can be represented by diving the above calculated total area by six. Each instrument would then have an increase in cross sectional area at D6 by one-sixth the area calculated above (i.e., the area of the annulus defined by circles 1003 and 1009 at D6), which is calculated as:
In general, a formula to determine the D6 radius of an nth instrument can be defined as:
πrn2=π(rn−1)2+π0.01875
rn2=(rn−1)2+0.01875
rn=[(rn−1)2+0.01875]1/2 [1]
where n represents the sequential position of the instrument in the sequence of instruments in the set, the sequence being based on size. The first instrument in the set, for example, is usually the smallest sized instrument and is the one of the set that is first used to prepare the ECS. Thus, n is an integer that is at least 1. Additionally, rn is the radius of the D6 cross section of the nth instrument, except for r0, which is the radius of the circle 1003 (i.e., the diameter of the unprepared ECS at D6) shown in
πrn2=π(r0)2+n(π0.01875)
rn2=(r0)+n(0.01875)
rn=[(r0)2+n(0.01875)]1/2 [2]
Furthermore, the radius of the D6 cross section of smallest instrument of the set, i.e., instrument No. 1, which corresponds to the radius of the ECS cross section resulting after the first instrument is used to prepare the ECS is:
r12ro2+0.01875
r12=(0.1)2+0.01875
r12=0.010+0.01875
r12=0.0388
r1=0.1696
Thus, the diameter of the D6 cross section of the first instrument is:
d1=0.339 mm
Using either formula [1] or formula [2], the values for d2, d3, d4, d5, and d6 at D6 can be derived. Table 1 shows the derived cross-sectional diameters, d1, d2, d3, d4, d5, and d6, that occur at D0, D6, and D12. The superscript percentages, e.g., those listed in row D6, each represents the percentage increase in cross-sectional area from the previous diameter or instrument. The average of these changes from d1-d6 at D6 is 24%. The average of the changes from d1-d5 at D6 is 29%.
Table 2 show the cross section diameters of a set of instruments that is similar to the critical set. The average increase in diameter is 29%, which, notably, is achieved by logarithmic progression and not linear progression of conventional set, as is the case in conventional sets of instruments.
Table 3 shows the cross section diameters of another set of instruments that is similar to the critical set. The percent change in the D6 cross section diameter of this set is also 29%. Note however, that there is a substantial increase in the diameter of the instruments from d5 to d6, which can still be considered safe, because the rigidity of this instrument prevents any meaningful flexure eliminating fatigue and breakage.
Table 4 shows the cross section diameters of yet another set of instruments that is similar to the critical set. These instruments corresponds very closely to a critical set at D6. The average increase in the D6 cross section diameter from the first to the fifth instrument is 29%, which is identical to the critical set. The instrument with the smallest diameter, the 15/04 can also be discounted or set aside from a critical set, because it is extremely flexible and intrinsically safe.
Optionally, where a set includes one or more instruments that have cross sectional diameters that vary along the shaft, as is the case for the instruments represented in the tables included in this specification, one can roll the cuttings edges of portions of an instrument that has the same diameter as another instrument of the set. Doing so can reduce the resistance to which the instrument is subject and make the instrument even less predisposed to failure. In the tables, shaded cells indicate that the portions listed in the cells can have rolled edges.
Table 5 shows the cross section diameters of yet another set of instruments that is similar to the critical set. These instruments deviate slightly from the critical set; however, it mimics tips sizes and tapes that are familiar to most practitioners.
These calculations and the instrument sets that have been proposed are again, functions of the formula for the area of a circle. Similar calculations can be also be made using formulas for circumference of a circle or the surface area of a frustum. Further, calculations can also be made using the average of the surface areas of all the intersecting diameters of the critical path, their circumferences, the surface areas of the frustums or portions or combinations thereof.
One alternative, for example, can be implemented such that the above-described equal distribution of dental material to be removed can be calculated not only for the D6 cross section, but for any combination of D1-D6 cross sections, or even for any cross section or every cross sections along the axis of the shaft.
The above described differences in D6 cross-section areas of instruments, for example, the difference in the D6 cross-section areas of the first and second instruments and the difference in the D6 cross-section areas of the second and third instruments, need not be exactly equal. The differences in areas can be substantially equal, for example, one difference being no more than twice the other difference.
The cross sections used in the above described model need not be D6 cross sections but can be cross sections substantially the same as the D6 cross section. Cross sections within 5 millimeters of the D6 cross section, for example, can be used in the model.
As an another alternative, a critical set can be defined based- on a calculation of the effective contact area of each endodontic instrument in a set of endodontic instruments. The effective contact area is the exposed surface area of a cone-like shape, which, for an endodontic instrument, is defined as shown in
When a critical set is based on the described effective contact area (i.e., the described surface area of the cone-like shape), the endodontic instrument in a critical set of endodontic instruments can be sized such that the increase of the effective contact area from one endodontic to the next greater sized endodontic instrument is substantially the same.
Alternatively, a critical set can be defined differently from the ways described above. The criterion that should be satisfied is that each endodontic instrument in a set be subject to substantially the same level of torsional stress. Distributing the torsional stress as described reduces breakage.
Distribution of the torsional stress can be fined tuned by changing the working portion of an instrument, as was described above. Reducing the working portion of an instrument, for example, can reduce the level of torsional stress to which the instrument is subject during its use.
Swagger
The phenomenon of “swagger” is viewed as a transverse mechanical wave, which can be modified, and is comparable to the transverse wave that is being produced along a stretched rope or string when it is oscillated. If one ties one end of a long rope to a stationary point, stretches the rope out horizontally, and then gives the end being held a back-and-forth transverse motion, called the excitation force, Fe, the result is a wave pulse that travels along the length of the rope. Observation shows that the pulse travels with a definite speed, maintaining its shape as it travels, and that the individual segments making up the rope move back and forth in a direction perpendicular to the rope's equilibrium position. In physics, this principle can be expressed mathematically by the formula y=f(x, t). Here, the equilibrium position is along the x-axis (corresponding to the stretched rope), and the transverse displacement of any point away from this position (corresponding to the maximum displacement of the rope) is y. Thus, y is a function of both x (the undisplaced position of the point) and time t. This is called the wave function.
At any time t, if one takes a picture of the instantaneous shape of the rope, one finds that y varies sinusoidally with x.
This same system can function in another dimension, where an excitation force is applied along both the y- and the z-axes. Here, at any time t, if one takes a picture of the instantaneous shape of the rope, one finds that y and z vary sinusoidally with x simultaneously. Using the stretched rope as an example, the rope is now observed to produce a spiral or helical wave. In a similar context, if one applies a lateral force, F1, somewhere along the x-axis, while the rope is oscillating sinusoidally in the y dimension, the same phenomenon is observed, that is, the portion of the rope adjacent to, and distal to the lateral force, will also spiral.
In preparing an endodontic cavity space, which is curved along the critical path with a flexible rotary instrument, a similar system can be configured. The instrument is bound in a somewhat fixed position at one end, by the elbow or greater curvature of the canal, and at the other end by the head of the hand piece. Observation of an endodontic instrument with a symmetric transverse cross-section, rotating in an endodontic cavity space appears to have little, if any, deviation from the x-axis. An instrument with an asymmetrical cross-section, acts like a rope with an excitation force or forces applied along the x-axis, or one with an excitation force y and a lateral force applied somewhere along its length. The lateral force, in this instance, is the differential that is produced by relocating the center of mass of the instrument away from the x-axis.
Most of the mathematics for helical wave theory focuses on hydrodynamics, acoustics and electromagnetic fields. Fortunately, Newtonian physics provides a plethora of laws and principles, which can be applied to this phenomenon.
If one considers the relationship between torque λ and angular acceleration a of a point mass m one can better understand the physical nature of swagger. A mass m moving in a circle of radius r acted on by a tangential force Ft is shown in the figure below.
Using Newton's second law to relate Ft to the tangential acceleration at=rawhere a is the angular acceleration
Ft=mat=mra.
And the fact that the torque about the center of rotation due to Ft is λ=Ft·r, one arrives at
λ=mr2a.
If one attempts to apply the above equations to an endodontic instrument, which is tapered from its proximal to its distal end, then each cross-sectional area or lamina along its length has a different mass. Thus, for a rotating rigid body, such as a tapered endodontic instrument made up of a collection of masses m1, m2 . . . mi, the total torque about the axis of rotation is
The angular acceleration of all the points in a rigid body are considered to be the same, thus the equation can be taken outside the summation. Thus, if a constant torque λi, as is applied in a torque controlled dental hand piece, were applied to a fixed mass mi, the acceleration of mi would increase or decrease exponentially as the radius r of mi changed.
Torque, like the waves along a stretched rope, must be defined about a particular set of axes. If one further considers the moment of inertia, I, of a rigid body with mi, a measure of the amount of resistance the body has to changing its state of rotational motion is given. Thus, for a rotating rigid body, made up of a collection of masses m1, m2 . . . mi, the total inertia about the axis of rotation is expressed mathematically,
The units of moment of inertia are kg m2
λ=Ia.
This is the rotational analogue of Newton's second law. The complete set of dynamical equations needed to describe the motion of a rigid body consists of the torque equation given above, plus Newton's Second Law applied to the center of mass or the centroid of the object
Ftotal=macm
Where, acm is the acceleration of the center of mass.
The moment of inertia, like torque must also be defined about a particular set of axes. It is different for different choices of axes.
Extended objects can again be considered as a very large collection of much smaller masses glued together to which the definition of moment of inertia given above can be applied.
Like torque, the moment of inertia depends on how the mass is distributed about the axis. For a given total mass, the moment of inertia is greater if more mass is farther from the axis, than if the same mass is distributed closer to the axis.
The various masses, i.e., cross-sections or laminas, which are distributed along the transverse axis of an endodontic instrument are turning about that transverse axis. The tangential force and/or inertia of the center of mass of each section or lamina of the instrument taken at any point along the transverse axis varies. This varied tangential force or moment predisposes the instrument to oscillate, which in combination with the rotation of the instrument by the dental hand piece creates a helical envelope of motion. This helical envelope of motion now displaces the body of the instrument allowing it to cut intermittently at a given point along the transverse axis. In the case of a curved endodontic cavity space, the instrument will not bind against the outer wall, as does an instrument of symmetric cross-section, but cut both the inner and outer walls of the curve more evenly.
Returning to a planar lamina which extends across a region R in the plane, so that at each point (x, y) in R there is a variable mass density r(x, y), measured in units of mass per unit area, then the total mass of the lamina is given by the double integral
m=∫∫Rρ(x,y)dA
The moment My of the lamina with respect to the y-axis is then ∫∫Rxρ(x,y)dA and similarly Mx=∫∫Ryρ(x,y)dA. Further, the same formulas we used above allow us to find the center of mass (X, Y) of the lamina.
Thus, for a given cross-section or lamina, taken at any region R, the appropriate location of the center of mass of the asymmetric instrument can be pre-determined if the displacement of the body of the instrument from the axis of rotation to the outer wall of the endodontic cavity space has a radius r is measurable.
Although more complex, similar calculations can be made in 3D-space, using similar formulas. For instance, Mxy=∫∫∫Szρ(x,y,z)dV is the moment of the solid S about the xy-plane, and the center of mass (X, Y, Z) of S satisfies the equations
X=Myz/m, Y=Mxz/m, Z=Mxy/m,
m=∫∫∫Sρ(x,y,z)dV being the total mass of S.
Implementations
As shown in
With reference to
With further reference to
The splines 1121A, 1121B, and 1121C are S-shaped and are individually symmetrical. The bisector of each spline divides the spline equally into convex and a concave segments which form the S-shaped curve. The lines that bisect each spline can be drawn to the center of the core 1126 and are equal in length. Further, an alternate bisector a can be drawn from the center of each spline through the greatest concavity the adjacent spline and perpendicular to the lines, which form the equilateral triangle. The bisectors a for each spline 1121A, 1121B, and 1121C are equal.
The greatest depth of each spline can be defined by a segment of a. These depths can vary and, furthermore, be calculated as a percentage of the length of a. The greatest depths of splines 1121A, 1121C, and 1121B, indicated with demarcated line segments 1137A, 1137B, and 1137C, are 15%, 20%, and 25% of the length of a, respectively. The greatest convexities of splines 1121A, 1121B, and 1121C are mirror images of the greatest concavities of the same splines. The depth and height of each spline can vary; however, the cross sectional diameter of the core portion 1126 should generally not be narrower than approximately half or fifty percent of the cross sectional diameter of the shank of the instrument.
With further reference to
With reference to
With further reference to
The splines 1221A, 1221B, 1221C, and 1221D are S-shaped and are individually symmetrical. The bisector of each spline divides the spline equally into convex and a concave segments which form the S-shaped curve. The lines that bisect each spline can be drawn to the center of the core 1226 and are equal in length. Further, an alternate bisector a can be drawn from the center of each spline through the greatest concavity the opposite spline and is also equal in length.
The greatest depth of each spline can be defined by a segment of a. These depths can vary and, furthermore, be calculated as a percentage of the length of a. The greatest depths of splines 1221A and 1221C, indicated with demarcated line segments 1237A and 1237C, are 5% of the length of a. The greatest depth of splines 1221B and 1221D, indicated with line segments 1237B and 1237D, are 25% of a. The greatest convexities of splines 1221A, 1221B, 1221C, and 1221D are mirror images of the greatest concavities of the same splines. The depth and height of each spline can vary; however, the cross sectional diameter of the core portion 1226 should generally not be narrower than approximately half or fifty percent of the cross sectional diameter of the shank of the instrument.
As shown in
With reference to
As shown in
The splines 321A, 321B, 321C, and 321D are S-shaped and are individually symmetrical. The bisector of each spline divides the spline equally into convex and a concave segments which form the S-shaped curve. Alternate bisectors a and b can be drawn from the center of each spline through the greatest concavity the opposite spline.
The greatest depth of each spline can be defined segments of a and b. These depths can vary and, furthermore, be calculated as a percentage of the length of a and b. The greatest depths of splines 321A and 321C, indicated with demarcated line segments 337A and 337C, are 5% of the length of a. The greatest depth 321B and 321D, indicated with demarcated line segments 337B and 337D, are 5% of b. The greatest convexities of splines 321A, 321B, 321C, and 321D are mirror images of the greatest concavities of the same splines. The depth and height of each spline can vary; however, the cross sectional diameter of the core portion 326 should generally not be narrower than half or fifty percent of the cross sectional diameter of the shank of the instrument.
As shown in
With reference to
As shown in
The splines 421A, 421B, 421C, and 421D are S-shaped and are individually symmetrical. The bisector of each spline divides the spline equally into convex and a concave segments which form the S-shaped curve. Alternate bisectors a, b, and c can be drawn from the center of each spline through the greatest concavity the opposite spline.
The greatest depth of each spline can be defined as segments of a, b, and c. These depths can vary and, furthermore, be calculated as a percentage of the length of a, b, and c. The greatest depths of splines 421A, indicated with demarcated line segments 437A, is 5% of the length of a. The greatest depth 421B, 421C, and 421D can be similarly indicated. The greatest convexities of splines 421A, 421B, 421C, and 421D are mirror images of the greatest concavities of the same splines. The depth and height of each spline can vary; however, the cross sectional diameter of the core portion 426 should generally not be narrower than half or fifty percent of the cross sectional diameter of the shank of the instrument.
Alternatives
A number of implementations of the invention have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the invention. For example, in other implementations, similar instruments can include 5 or 6 flutes. The shanks and/or metal blanks from which these instruments can be fabricated and have slightly larger diameters providing enough material to facilitate the increased number of flutes. The flutes, therefore, would require fewer spirals per unit length. Instruments of increasing size, or diameter, become increasingly less flexible. Implementing more flutes and/or cutting the flutes deeper into the metal blanks during manufacture can facilitate compensation for the decrease in flexibility. In addition, wider and deeper spaces also provide greater opportunity to haul out debris from the apex to the coronal aspect of the tooth. Accordingly, other embodiments are within the scope of the following claims.
This application claims the benefit of priority Under 35 U.S.C. §119(e)(1) of U.S. Provisional Application Ser. No. 60/669,409, having attorney docket no. 15513-005P01, filed Apr. 8, 2005, entitled “Swaggering Endodontic Instruments”. This application is a continuation-in-part and claims the benefit of priority under 35 U.S.C. Section 120 of U.S. application Ser. No. 10/838,399, filed on May 3, 2004, which claims priority to U.S. Provisional Applications Ser. No. 60/467,472, filed May 1, 2003, and Ser. No. 60/477,688, filed Jun. 10, 2003, and is a continuation-in-part of U.S. application Ser. No. 10/764,337, filed Ja. 22, 2004. The disclosure of each prior application is considered part of and is incorporated by reference in the disclosure of this application.
| Number | Date | Country | |
|---|---|---|---|
| 60669409 | Apr 2005 | US | |
| 60467472 | May 2003 | US | |
| 60477688 | Jun 2003 | US |
| Number | Date | Country | |
|---|---|---|---|
| Parent | 10838399 | May 2004 | US |
| Child | 11226059 | Sep 2005 | US |
| Parent | 10764337 | Jan 2004 | US |
| Child | 11226059 | Sep 2005 | US |