The present invention relates to a method and an appliance for measuring the currents of a frequency converter. More particularly, the invention relates to a method and an appliance for measuring the network currents, i.e. the input currents, and the motor currents, i.e. the output currents, of a frequency converter that contains a network bridge that can be connected to an AC network and a load bridge that can be connected to an AC load as well as a DC intermediate circuit between them.
Conventionally the output currents of a frequency converter, of which reasonably good performance capability of motor regulation is desired, are measured with either two or three current transformers. Samples of the output currents are taken for regulation purposes generally at the midpoint of the null vector of the output voltage, in which the harmonics content of the measuring signal is at its smallest. A drawback of this measuring method is that it is expensive, because as many as 3 transformers are needed.
The Finnish patent publication 116337 presents an appliance for measuring the output currents of a frequency converter, wherein one current sensor situated in the DC intermediate circuit is used for forming signals corresponding to the current of the DC circuit of the frequency converter as well as a measuring unit, in which the current values of the DC intermediate circuit of the frequency converter are converted into signals corresponding to the current. In addition to this, the measuring unit incorporates a memory, in which the value of the signal at the time and of the previous signal are recorded, as well as a difference element for forming a current value corresponding to each phase current of an output as a difference between consecutive signals. With the method, however, there is a limitation relating to the formation of the output voltage in that only two switch pairs are modulated during one modulation cycle.
The current on the supply network side of the frequency converter is generally measured only when the network bridge of the frequency converter is active. According to prior art, in this case the current transformers are used similarly as on the output side also, either 2 or 3 units.
The purpose of this invention is to achieve a new kind of measuring arrangement for measuring the current of a frequency converter, with which arrangement data is obtained about the instantaneous values of both the output currents and the input currents using only one current sensor. Input current data is obtained irrespective of whether an active or a passive network bridge is in use.
According to the invention the current is measured with one current sensor situated in the intermediate circuit, which current sensor is positioned in series with the capacitor filtering the DC voltage of the intermediate circuit or with the smaller measuring capacitor connected in parallel with it. The sensor can be e.g. a parallel resistor, i.e. a shunt resistor, or a transformer based on the Hall effect. The current of the capacitor can in some cases be deduced also on the basis of the measurement of the voltage of the filter capacitor without a separate current sensor.
The measurement result of the current sensor positioned according to the invention always shows a step-like change when the position of the power switch of either the network bridge or of the load bridge changes. The magnitude of the current change is the same as the instantaneous value of an input phase current or of an output phase current. The phase in question can according to the invention be deduced from the positions of the power switches before and after the change. In addition, by taking into account the fact that the rate of change of both the input current and the output current can be estimated reasonably accurately during the time that each input voltage vector or output voltage vector is effective, the instantaneous values of the currents at the desired moment in time can be calculated. Thus roughly the same situation as with conventional systems based on a number of current transformers is achieved, in which a sample of the currents is taken e.g. two times during a modulation cycle, at the start and at the midpoint of the null vector.
Use of the method according to the invention requires that the controls of the power switches of the active network bridge and of the load bridge are synchronized with each other in order for the sample of the currents to be taken in the manner desired.
The characteristic features of the solution according to the invention are described in detail in the claims below.
In the following, the invention will be described in more detail by the aid some embodiments with reference to the attached drawings, wherein
The phase switch connects the output phase to either the U+ busbar (upper position) or the U− busbar (lower position). The turning of the switch e.g. from the upper position to the lower position occurs according to
The current measuring according to this invention is implemented with one current sensor, which is positioned in series with the filter capacitor of the intermediate circuit measuring its current iC, which according to the figure is the difference between the current iL of the DC intermediate circuit of the network bridge side and the current iM of the DC intermediate circuit of the load bridge side.
The positions of phase switches of the load bridge are determined in the so-called pulse-width modulator (PWM) of the control unit. A prior art modulation method is sine-triangle modulation, which is used as an example in the description of the method according to this invention, and of which the implementation in principle and the formation of the measuring current signal iC according to the invention when using it are presented in
In sine-triangle modulation each phase voltage has its own sinusoidal reference signal (UUref, UVref, UWref), which are compared to the common triangle signal UΔM. As a result of the comparison, three position references U, V and W of the phase switches according to
The figures also show the data about the output currents in view of the current sensor situated according to the invention. For example, in the interval t1-t2, when all the phase switches are in the lower position, the current on the load bridge side of the intermediate circuit is (iM) 0. In this case the current of the current sensor is the same as the current iL on the network bridge side of the intermediate circuit. Likewise, in e.g. the interval t2-t3, when the U phase switch is in the upper position and the other phase switches are in the lower position, the current of the load bridge side of the intermediate circuit is the same as the current iU of the U phase, in which case the current of the current sensor iC=iL−iU. Table 1 presents according to the markings of
The figures also show the data about the output currents in view of the current sensor situated according to the invention. For example, in the interval t11-t12, when all the phase switches are in the lower position, the current on the network bridge side of the intermediate circuit is (iL) 0. In this case the current of the current sensor is the same as the current of the load bridge side of the intermediate circuit but negative (−iM). Likewise, in e.g. the interval t12-t13, when the R phase switch is in the upper position and the other phase switches are in the lower position, the current of the network bridge side of the intermediate circuit is the same as the current iL1 of the R phase, in which case the current of the current sensor iC=iL1−iM. Table 2 presents according to the markings of
Reconstruction of the output currents from the signal of the current sensor is based on the general nature of a three-phase system (the sum of both the input currents and the output currents is 0) and on the characteristics of a modulator based on sine-triangle comparison. A sample is taken from the current (from the iC current) of the DC intermediate circuit according to this invention in conjunction with turnings of the phase switches in the manner presented in
The turning of each phase switch of the active network bridge or of the load bridge causes a change in the current iC measured by the current sensor. According to the invention the first sample of the current to be measured is taken at the same moment as the gate control pulse of the leading IGBT ceases, e.g. at the moments of time t1 and t3 of
The magnitude and duration of vibrations disturbing the sample-taking depend on, among other things, the capacitance of the motor cable which, for its part, the length of the cable affects. Any random error in the sample-taking caused by vibrations can be eliminated by using the integrating sample-taking principle presented in
With the sample-taking principles describe above, the rate of change of the output currents is obtained twice during the switching cycle taking into account, in practice simultaneous, samples of two phase currents, on the basis of which the instantaneous value of also the third phase current can be calculated. For example, at the times t3 and t6 of
In the case of an active network bridge the sample-taking from the input currents functions similarly to the sample-taking of the output currents described above. In order for the connection between the measurement result of the current sensor and the input current or output current connected to it to function in the manner according to this invention, the modulators of the network bridge and of the load bridge must in this case be synchronized with each other such that the phase switches of only one or the other bridge turn position at a time.
di/dt=[(U−0)−U1]/LS
The rates of change of the other phase currents diV/dt and diW/dt calculated in a corresponding manner.
Since the sum of the changes of the phase currents is 0 and the mutual magnitudes of their rates of change can be calculated in the manner presented above, the current changes of the other phases in the same interval also can be calculated on the basis of the change of one measured phase current. Thus it is possible to reconstruct the instantaneous value of each phase current in advance or in retrospect at each point of change closest to the output voltage vector (times t1, t2 . . . t7 etc. in
In the case of an active network bridge, calculation of the current changes functions in a similar manner:
The conventional current measuring moment observed to be good is located at the midpoint of the null vector (=the tip of the triangle, thus e.g. approximately at the midpoint of the times t4 . . . t5 in
In heavy-duty frequency converters, in which the capacitance of the filter capacitor is very large and it comprises a number of different components connected in parallel, the current sensor can preferably be connected in series with a separate measuring capacitor that is connected in parallel with the filter capacitors. The current to be measured is in this case smaller in relation to the parallel connection of the capacitances of other storage capacitors than the actual current iC according to
When the filter capacitor of the intermediate circuit is very small, e.g. according to patent publication FI 108819, the current can be deduced according to one embodiment of the invention on the basis of measurement of the voltage of the filter capacitor without a separate current sensor, basing it on the fact that the rate of change of the voltage of the capacitor is directly comparable to the current of the capacitor.
It is obvious to the person skilled in the art that the different embodiments of the invention are not limited solely to the examples described above, but that they may be varied within the scope of the claims presented below.
Number | Date | Country | Kind |
---|---|---|---|
20061145 | Dec 2006 | FI | national |