Claims
- 1. A method of enabling communication between a access terminal of an existing gateway and a new gateway, comprising the following steps:
deciding to illuminate a dark beam; determining whether the access terminal can be serviced by the new gateway; providing resources from an existing resource provider if the access terminal can be serviced by the new gateway, or denying resources from the existing resource provider if the access terminal cannot be serviced by the new gateway; and providing the new service from the new gateway to the access terminal when the resources have been provided by the existing gateway.
- 2. The method according to claim 1, wherein the step of deciding to illuminate a dark beam comprises:
recognizing a dark beam illumination triggering event.
- 3. The method according to claim 2, wherein the step of recognizing a dark beam illumination triggering event comprises:
receiving a request from the access terminal by an existing gateway; transmitting a response from the existing gateway to the access terminal; and transmitting the request from the existing gateway to the new gateway.
- 4. The method according to claim 3, wherein the step of receiving a request from the access terminal by an existing gateway comprises:
receiving a channel request message from the access terminal by an existing gateway.
- 5. The method according to claim 4, wherein the step of receiving a channel request message from the access terminal by an existing gateway further comprises:
receiving the channel request message on a random access channel.
- 6. The method according to claim 3, wherein the step of transmitting a response from the existing gateway to the access terminal comprises:
transmitting an immediate assignment reject message from the existing gateway to the access terminal.
- 7. The method according to claim 6, wherein the step of transmitting an immediate assignment reject message from the existing gateway to the access terminal further comprises:
the immediate assignment reject message comprising a pause timer value.
- 8. The method according to claim 7, wherein the step of transmitting an immediate assignment reject message from the existing gateway to the access terminal further comprises:
transmitting an immediate assignment reject message on an access grant channel.
- 9. The method according to claim 3, wherein the step of transmitting the request from the existing gateway to the new gateway comprises:
forwarding a channel request message from the existing gateway to the new gateway.
- 10. The method according to claim 9, wherein the step of forwarding a channel request message from the existing gateway to the new gateway further comprises:
transmitting a channel request message on a first interface between the existing gateway and the new gateway.
- 11. The method according to claim 3, further comprising:
evaluating the request from the access terminal by the existing gateway.
- 12. The method according to claim 11, wherein the step of evaluating the request from the access terminal by the existing gateway comprises:
determining that the request is a channel request message; and determining whether or not the existing gateway should provide new services to the access terminal and forward the request from the access terminal to a new gateway.
- 13. The method according to claim 11, further comprising:
providing new services to the access terminal or forwarding the request from the access terminal to the new gateway if the request is either a packet service request value or an attach/routing area update request value.
- 14. The method according to claim 3, wherein the step of transmitting the request from the existing gateway to the new gateway comprises:
recognizing the requested service belongs to the new gateway based on service type in the channel request message.
- 15. The method according to claim 1, wherein the step of deciding to illuminate a dark beam comprises:
deciding to illuminate a dark beam on factors not related to any requests made by the access terminal.
- 16. The method according to claim 15, wherein the factors are selected from a group consisting of time of day, position of the access terminal, number of access terminals in the spot beam, the availability of resources, amount of time since a last request has been transmitted from the access terminal, and a certain number of access terminals have requested illumination of the dark beam.
- 17. The method according to claim 15, wherein the factors comprise:
any other factor related to the access terminal.
- 18. The method according to claim 1, wherein the step of deciding to illuminate a dark beam comprises:
deciding to illuminate the dark beam based on an algorithm that takes into account information received by one or more access terminals.
- 19. The method according to claim 18, wherein the information received by one or more access terminals is selected from the group consisting of multiple channel request messages by one or more access terminals, any combination of information received from the access terminal with information received elsewhere, any one of or combination of establishment cause values in a channel request message, any one of or combination of information elements in a channel request message, or any combination of information elements and establishment cause values.
- 20. The method according to claim 18, wherein the information received by one or more access terminals comprises:
a GPS position, call party number or SP/HPLMN ID information element contained in a channel request message.
- 21. The method according to claim 1, wherein the step of determining whether the access terminal can be serviced by the new gateway comprises:
verifying the position of the access terminal; verifying that a resource is capable of illumination; and notifying the access terminal to wait while resource verification is being processed.
- 22. The method according to claim 21, wherein the step of verifying the position of the access terminal comprises:
determining the position of the access terminal based on both a GPS position of the access terminal and a spot beam ID reported in the transmission of a channel request message.
- 23. The method according to claim 1, wherein the step of determining whether the access terminal can be serviced by the new gateway comprises:
verifying that the existing resource provider cannot provide resources.
- 24. The method according to claim 21, wherein the step of notifying the access terminal to wait while resource verification is completed, comprises:
transmitting an immediate assignment reject message to the existing gateway, from the new gateway.
- 25. The method according to claim 24, wherein the step of transmitting an immediate assignment reject message to the existing gateway, from the new gateway comprises:
the immediate assignment reject message comprising a reject cause information element with a temporary broadcast channel activation in process reject cause value.
- 26. The method according to claim 24, wherein the step of transmitting an immediate assignment reject message to the existing gateway, from the new gateway further comprises:
transmitting an immediate assignment reject message on a first interface between the existing gateway and the new gateway.
- 27. The method according to claim 21, wherein the step of the notifying the access terminal to wait while resource verification is being processed, further comprises:
transmitting an immediate assignment reject message to the access terminal, from the existing gateway.
- 28. The method according to claim 27, wherein the step of transmitting an immediate assignment reject message to the access terminal, from the existing gateway, comprises:
a reject cause information element with a temporary broadcast channel activation in process reject cause value.
- 29. The method according to claim 27, wherein the step of transmitting an immediate assignment reject message to the access terminal, from the existing gateway further comprises:
transmitting an immediate assignment reject message on an access grant channel.
- 30. The method according to claim 21, wherein the step of verifying that a resource is capable of illumination comprises:
verifying that sufficient system wide resources are available.
- 31. The method according to claim 30, wherein the step of verifying that sufficient system wide resources are available comprises:
checking frequency availability and power resources.
- 32. The method according to claim 1, wherein the step of providing resources from an existing resource provider if the access terminal can be serviced by the new gateway, or denying resources from the existing resource provider if the access terminal cannot be serviced by the new gateway comprises:
communicating with a new resource provider to allocate resources for the access terminal; transmitting verification of the allocation of resources to the new gateway; receiving verification of the allocation of resources from the new gateway; and providing resources to the access terminal from the resource provider.
- 33. The method of according to claim 32, wherein the step of communicating with a new resource provider to allocate resources for the access terminal comprises:
transmitting a message to a resource manager; and allocating the resources by the resource manager.
- 34. The method according to claim 33, wherein the step of transmitting a message to a resource manager further comprises:
transmitting the message on a second interface.
- 35. The method according to claim 34 wherein the step of allocating the resources by the resource manager comprises:
searching for, and finding an available frequency in an available resource pool.
- 36. The method according to claim 32, wherein the step of transmitting verification of the allocation of resources to the new gateway, comprises:
transmitting a message to the new gateway.
- 37. The method according to claim 36, wherein the step of transmitting an message to the new gateway further comprises:
transmitting the message using a second interface.
- 38. The method according to claim 32, wherein the step receiving verification of the allocation of resources from the new gateway comprises:
receiving an immediate assignment reject message from the new gateway.
- 39. The method according to claim 38, wherein the step of receiving an immediate assignment reject message from the new service comprises:
receiving a reject cause information element comprising a switch to new broadcast channel reject cause value and frequency identity of the temporary service providing broadcast channel reject cause value.
- 40. The method according to claim 38, wherein the step of receiving an immediate assignment reject message from the new gateway comprises:
transmitting the immediate assignment reject message on a first interface.
- 41. The method according to claim 32, wherein the step of providing resources to the access terminal from the resource provider comprises:
illuminating a service providing broadcast channel; receiving frequency information from the new gateway by the existing gateway about the service providing broadcast channel; transmitting an acknowledgment to the new gateway from the existing gateway, that the service providing broadcast channel is available; and transmitting system information about the service providing broadcast channel to the access terminal from the existing gateway.
- 42. The method according to 41, wherein the step of illuminating a service providing broadcast channel comprises:
transmitting a temporary service providing broadcast channel as the service providing broadcast channel.
- 43. The method according to claim 41, wherein the step of receiving frequency information from the new gateway by the existing gateway about the service providing broadcast channel comprises:
receiving an immediate assignment reject message from the new gateway by the existing gateway on a first interface which comprises a frequency identity information element of the service providing broadcast channel, a reject cause switch to new BCCH and a PLMN ID of the new gateway.
- 44. The method according to claim 41, wherein the step of receiving frequency information from the new gateway by the existing gateway about the service providing broadcast channel comprises:
receiving a frequency identity element of the service providing broadcast channel and a PLMN ID of the new gateway in the event the dark beam illumination triggering event is an autonomous event.
- 45. The method according to claim 41, wherein the step of transmitting system information about the service providing broadcast channel to the access terminal from the existing gateway comprises:
transmitting a system information message.
- 46. The method according to claim 45, wherein the step of transmitting a system information message comprises:
updating a concurrent broadcast control channel info list system information value with the frequency identity of the temporary service providing broadcast channel information element and a spot beam identity information element.
- 47. The method according to claim 45, wherein the step of transmitting a system information message comprises:
transmitting the system information message on an anchored broadcast channel.
- 48. The method according to claim 41, wherein the step of transmitting system information about the service providing channel to the access terminal from the existing gateway further comprises:
transmitting an immediate assignment reject message.
- 49. The method according to claim 48, wherein the step of transmitting an immediate assignment reject message comprises:
transmitting the immediate assignment reject message with a reject cause information element that comprises a frequency identity of the service providing broadcast channel reject cause value, and a switch to new service providing temporary broadcast control channel reject cause value.
- 50. The method according to claim 48, wherein the step of transmitting an immediate assignment reject message comprises:
transmitting the immediate assignment reject message using an access grant channel.
- 51. The method according to claim 1, wherein the step of providing the new service from the new gateway to the access terminal when the resources have been provided by the existing gateway comprises:
camping on a temporary service provider broadcast control channel by a access terminal; reading a system information message transmitted by the temporary service providing broadcast control channel; receiving a channel request message at the new gateway from the access terminal; transmitting an immediate assignment reject message to the access terminal; and providing access to new services to the access terminal.
- 52. The method according to claim 51, wherein the step of receiving a channel request message at the new gateway from the access terminal comprises:
the channel request message comprising an establishment cause value information element.
- 53. The method according to claim 52 wherein the establishment cause value comprises:
a packet service request establishment cause value.
- 54. The method according to claim 52 wherein the establishment cause value comprises:
an attach/routing area update request cause value.
- 55. The method according to claim 1, wherein the step of providing resources from an existing resource provider if the access terminal can be serviced by the new gateway, or denying resources from the existing resource provider if the access terminal cannot be serviced by the new gateway, comprises:
performing a local resource check by the new gateway; and receiving verification of the denial of allocation of the resources by the existing gateway from the new gateway.
- 56. The method according to claim 55, wherein the step of receiving verification of the denial of allocation of the resources by the existing gateway from the new gateway comprises:
receiving an immediate assignment rejection message by the existing gateway from the new gateway on a first interface.
- 57. The method according to claim 56, wherein the step of receiving an immediate assignment rejection message by the existing gateway from the new gateway on a first interface comprises:
the immediate assignment rejection message comprised of a reject cause information element which is comprised of a non-availability of satellite resources reject cause value.
- 58. The method according to claim 55, wherein the step of providing resources from an existing resource provider, if the access terminal can be serviced by the new gateway, or denying resources from the existing resource provider, if the access terminal cannot be serviced by the new gateway, further comprises:
transmitting an immediate assignment rejection message to the access terminal from the existing gateway, wherein the immediate assignment rejection message comprises a reject cause information element which is comprised of a non-availability of satellite resources reject cause value; and camping on an anchored broadcast control channel by the access terminal.
- 59. The method according to claim 58, wherein the step of transmitting the immediate assignment rejection message to the access terminal from the existing gateway comprises:
transmitting the immediate assignment reject message on an access grant channel.
- 60. The method according to claim 58, wherein the step of providing resources from an existing resource provider, if the access terminal can be serviced by the new gateway, or denying resources from the existing resource provider, if the access terminal cannot be serviced by the new gateway, further comprises:
selecting an idle mode by the access terminal; and waiting in idle mode until a period of time passes that corresponds to the value contained in the illumination retry timer reject cause value
- 61. A method for darkening an illuminated beam, comprising the following steps:
deciding to darken an illuminated beam by a new gateway due to certain circumstances; receiving the decision to darken the illuminated beam by the existing gateway from the new gateway; and darkening the illuminated beam.
- 62. The method according to claim 61, wherein the step of receiving the decision to darken the illuminated beam by the existing gateway from the new gateway comprises:
receiving a message from the new gateway, on a first interface between the existing gateway and the new gateway, the message containing a deactivation indication information element.
- 63. The method according to claim 61, further comprising:
transmitting a message to the new gateway, on a first interface between the existing gateway and the new gateway, the message containing a deactivation acknowledgement message.
- 64. The method according to claim 61, wherein the step of darkening the illuminated beam comprises:
stopping transmission of a temporary service providing broadcast channel from the new gateway to a satellite to an illuminated spot beam, thereby forcing a spot beam from an illuminated state to a darkened state.
- 65. The method according to claim 61, further comprising:
updating a system information message to reflect the decision to darken the illuminated beam; detecting the loss of a temporary service providing broadcast channel transmitted by new gateway, routed through a satellite; determining a frequency identity of an anchored broadcast channel transmitted by the existing gateway; and camping on the frequency of the anchored broadcast channel.
- 66. The method according to claim 65, wherein the step of updating a system information message to reflect the decision to darken the illuminated beam comprises:
updating a concurrent BCCH Info List by eliminating the ARFCN and PLMN Id information entries.
- 67. The method according to claim 65, wherein the step of determining a frequency identity of an anchored broadcast channel transmitted by the EGW comprises:
reading a concurrent broadcast control channel info list system information element contained in a system information message for a frequency identity of the anchored broadcast channel transmitted by the existing gateway, in the now defunct temporary service providing broadcast control channel.
- 68. The method according to claim 61, further comprising:
transmitting a first message to a resource manager from the new gateway the message containing the release of the ARFCN of the darkened spot beam, and receiving a second message from the resource manager, the second message containing a successful frequency deactivation acknowledgement, both the first and second message transmitted on a second interface between the resource manager and the new gateway.
- 69. The method according to claim 61, wherein the certain circumstances is selected from the group consisting of lack of power resources, lack of access terminals, expiration of an allowable illumination time period, a reallocation of frequency resources, and constraints of access terminal accessibility.
- 70. The method according to claim 1, wherein the step of recognizing a dark beam illumination triggering event comprises:
receiving a first incomplete request from the access terminal; transmitting a response from the existing gateway to the access terminal with a correcting factor; applying the correcting factor to the request transmission; receiving another incomplete request from the access terminal; re-transmitting a response from the existing gateway to the access terminal with a correcting factor; and repeating the transmission of the request by the access terminal, transmitting a response from the existing gateway with a correcting factor and applying the correction factor before and additional transmission of a request until the transmission of the request is successful or a maximum allowable number of transmissions of requests has been received by the existing gateway.
- 71. The method according to claim 70, wherein the step of transmitting a response to the access terminal comprises:
transmitting an immediate assignment reject message, comprising the correction factor.
- 72. The method according to claim 71 wherein the correction factor comprises:
a reject cause information element containing an in-correct RACH info reject cause value and a pause timer value reject cause value.
- 73. The method according to claim 70, wherein the step of receiving an incomplete request from a access terminal comprises:
receiving a channel request message from the access terminal.
- 74. The method according to claim 73, wherein the channel request message comprises:
an establishment cause information element containing an attach/routing area update establishment cause value.
- 75. The method according to claim 73, wherein the step of receiving a channel request message from the access terminal comprises:
receiving the channel request message from the access terminal on a request access channel.
- 76. The method according to claim 70, wherein the incomplete request comprises:
a channel request message that is incomplete because of fading.
- 77. The method according to claim 70, wherein the incomplete request comprises:
a channel request message that is incomplete because of timing problems.
- 78. A system for enabling communication between access terminal of an existing gateway and a new gateway, comprising:
a satellite; an access terminal, adapted to communicate with the satellite; an existing gateway, adapted to communicate with the access terminal, a new gateway, a resource manager and the satellite, and further adapted to facilitate providing new services between the access terminal and the new gateway.
- 79. The system for enabling communication between access terminal of an existing gateway and a new gateway according to claim 78, further comprising:
a first interface for communications between the new gateway and the existing gateway; a second interface for communications between the new gateway and the resource manager; a third interface for communications between the resource manager and the satellite; and a fourth interface for communications between the resource manager and the existing gateway.
- 80. The system for enabling communication between access terminal of an existing gateway and a new gateway according to claim 78, wherein the providing of new services comprises:
the existing gateway adapted to transmit information routed through the satellite to the access terminal via a first access grant channel and via an anchored broadcast channel, and further adapted to receive information routed through the satellite from the access terminal on a first request access channel that is paired with the access grant channel; and the new gateway adapted to transmit information routed through the satellite to the access terminal via a second access grant channel and via a temporary broadcast channel, and further adapted to receive information routed through the satellite from the access terminal on a second request access channel that is paired with the second access grant channel.
- 81. The system for enabling communication between access terminal of an existing gateway and a new gateway according to claim 80, wherein the temporary broadcast channel and the anchored broadcast channel transmits system information messages comprising:
a concurrent BCCH info list message; a cell bar access message; and a cell bar extension message.
- 82. The system for enabling communication between access terminal of an existing gateway and a new gateway according to claim 81, wherein the system information message concurrent BCCH info list comprises:
PLMN ID) and ARFCN system information.
- 83. The system for enabling communication between access terminal of an existing gateway and a new gateway according to claim 80, wherein the first and second request access channel transmits messages comprising:
a channel request message; and a broadcast channel activation/deactivation-indication/acknowledgement message.
- 84. The system for enabling communication between access terminal of an existing gateway and a new gateway according to claim 80, wherein the first and second access grant channel transmits messages comprising:
an immediate assignment reject message; a channel assignment message, and a channel assignment reject message.
Parent Case Info
[0001] This application claims benefit under 35 U.S.C. §119(e) from provisional patent application Serial No. 60/317,560, filed on Sep. 6, 2001, the entire contents of which are incorporated herein by reference.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60317560 |
Sep 2001 |
US |