The present disclosure relates to a DC/DC converter and more specifically to power loss reduction in a DC/DC converter.
A DC/DC converter in which the coupling type of a transformer is the same on the primary side and the secondary side has conventionally been known. Such a DC/DC converter can reduce switching loss by soft switching technique (ZVS (Zero Voltage Switching) method) but has a problem in that the soft switching technique is unable to be applied in a low output region.
As a technique that solves this problem, PTL 1 discloses a DC/DC conversion circuit including an AC/DC conversion circuit, a transformer, and a DC/AC conversion circuit, in which the coupling types of the transformer are different on the primary-side circuit and the secondary-side circuit.
PTL 1: Japanese Patent Laying-Open No. 2015-27196
Unfortunately, in the conventional technique described in PTL 1, there is a limit to a voltage ratio between the primary-side power supply and the secondary-side power supply, and the application to a power supply whose voltage fluctuates, such as a storage battery, is difficult. The present invention is therefore aimed to provide a DC/DC converter capable of reducing power loss even when voltage fluctuates.
A DC/DC converter illustrated in the present disclosure includes a transformer having a neutral point at least in a primary-side winding, a first reactor connected between the neutral point and a primary-side power supply, a first bus pair configured with a first positive line and a first negative line, a storage unit connected between the first positive line and the first negative line, a first bridge circuit connected between the first bus pair and the primary-side winding, a second bus pair configured with a second positive line and a second negative line, and a second bridge circuit connected between a secondary-side winding of the transformer and the second bus pair. A secondary-side power supply is connected to the second bus pair.
The present invention enables operation in a wider range of voltage ratio between the primary-side power supply and the secondary-side power supply, compared with conventional techniques. Accordingly, power loss can be reduced even when voltage fluctuates.
Preferred embodiments of the present invention for carrying out the present invention will be described below with reference to the drawings. In the following embodiments, an ideal state is assumed in which voltage reduction in switching elements and diodes in the circuits, wiring resistance, and inductance, parasitic capacitance, and magnetizing inductance of the transformer are negligible. The same or corresponding parts are denoted by the same reference numerals in the following drawings and a description thereof will not be repeated. The description below provides only working examples and is not intended to limit modes of the present invention to the following embodiments.
(Description of Overall Configuration)
First of all, an overall configuration of a DC/DC converter in a first embodiment will be described.
DC/DC converter 100 includes a primary-side bridge circuit 10, a secondary-side bridge circuit 20, a transformer 30, a reactor unit 40, and a controller 50. DC/DC converter 100 is connected between a direct-current primary-side power supply 60 and a direct-current secondary-side power supply 70.
In DC/DC converter 100 of the present embodiment, one end of reactor L1 is connected to a neutral point NP1 of transformer 30 having almost no effective flux linkage for zero-phase current when Clarke transformation is performed on current flowing through transformer 30, and the other end of reactor L1 is connected with primary-side power supply 60. Primary-side bridge circuit 10 and secondary-side bridge circuit 20 are connected to both ends of transformer 30, a storage unit 11 having a capacitor is connected to the buses (PL1, NL1) of primary-side bridge circuit 10, and secondary-side power supply 70 is connected to the buses (PL2, NL2) of secondary-side bridge circuit 20. DC/DC converter 100 is characterized in that it can adjust the ratio between voltage of primary-side power supply 60 and bus voltage of secondary-side bridge circuit 20 by adjusting the voltage ratio between primary-side power supply 60 and primary-side storage unit 11 by switching of primary-side bridge circuit 10.
One terminal f of reactor unit 40 is connected to the high voltage side of primary-side power supply 60. Low voltage-side terminal e of primary-side bridge circuit 10 is connected to the low voltage side of primary-side power supply 60. The other terminal n of reactor unit 40 is connected to neutral point NP1 of transformer 30.
Primary-side storage unit 11 is connected between low voltage-side terminal e and high voltage-side terminal d of primary-side bridge circuit 10. Primary-side storage unit 11 includes an energy storing element such as capacitor or battery and has the function as a voltage source.
High voltage-side terminal u of secondary-side bridge circuit 20 is connected to the high voltage side of secondary-side power supply 70. Low voltage-side terminal v of secondary-side bridge circuit 20 is connected to the low voltage side of secondary-side power supply 70.
Secondary-side storage unit 21 is connected to high voltage-side terminal u of secondary-side bridge circuit 20 and low voltage-side terminal v of secondary-side bridge circuit 20.
Secondary-side storage unit 21 includes an energy storing element such as capacitor or battery and has the function as a voltage source. Secondary-side storage unit 21 is connected to the secondary-side neutral point terminal of transformer 30 at connection point m.
Transformer 30 is a three-phase transformer, and primary-side bridge circuit 10 has a three-phase first bridge circuit 12. First bridge circuit 12 has six switching elements SW11, SW12, SW13, SW14, SW15, and SW16 and capacitors C11, C12, C13, C14, C15, and C16 connected in parallel with these switching elements, respectively. However, external capacitors C11, C12, C13, C14, C15, and C16 may be replaced by parasitic capacitances of the switching elements at equivalent positions in the circuit configuration.
In
At connection point a, the high voltage side of switching element SW11 and the low voltage side of switching element SW12 are connected. At connection point b, the high voltage side of switching element SW13 and the low voltage side of switching element SW14 are connected. At connection point c, the high voltage side of switching element SW15 and the low voltage side of switching element SW16 are connected.
Hereinafter, a set of two switches connected in series may be called a leg, and each of the switches may be called an arm, specifically, the high voltage-side switch may be called an upper arm and the low voltage-side switch may be called a lower arm with respect to the connection point.
First bridge circuit 12 is connected to the primary-side phase terminals of transformer 30 at connection point a, connection point b, and connection point c.
Secondary-side bridge circuit 20 has a three-phase second bridge circuit 22. Second bridge circuit 22 has six switching elements SW21, SW22, SW23, SW24, SW25, and SW26.
At connection point r, the high voltage side of switching element SW21 and the low voltage side of switching element SW22 are connected. At connection point s, the high voltage side of switching element SW23 and the low voltage side of switching element SW24 are connected. At connection point t, the high voltage side of switching element SW25 and the low voltage side of switching element SW26 are connected.
Second bridge circuit 22 is connected to the secondary-side phase terminals of transformer 30 at connection point r, connection point s, and connection point t.
The configuration of transformer 30 will now be described.
The configuration of transformer 30 is susceptible to other modifications in addition to the configuration shown in
When cores are magnetically coupled to each other, a symmetric configuration of a magnetic circuit as shown in
Specifically, as shown in
As shown in
As shown in
In order to suppress magnetic flux induced by zero-phase current of the primary-side terminal, a matching magnetic field may be induced on the magnetic path of a magnetic field produced in the core, or magnetic resistance may be equivalently increased by an open magnetic path to prevent magnetic flux. Both of these methods are examples of the method of preventing a magnetic field produced in the core by zero-phase current of the primary-side terminal from inducing magnetic flux, and any other configurations that achieve a similar function may be employed.
The method of cancelling magnetic flux produced by zero-phase current and the method of shifting a phase between the primary-side winding and the secondary-side winding have been long discussed commonly in the field of three-phase transformers with commercial frequency. According to the present embodiment, a circuit configuration including transformer 30, reactor unit 40, first bridge circuit 12, and second bridge circuit 22 as main components makes the most of the degree of freedom of current path of transformer 30.
When magnetic flux produced by zero-phase current is canceled, the potential of terminal n connected to neutral point NP1 of transformer 30 is the average of potentials applied to connection point a, connection point b, and connection point c connected to the primary-side phase terminals of transformer 30, because of limitation in energy.
In practice, voltage caused by the leakage inductance component is present between the terminals of transformer 30, and the magnetic flux is not always canceled completely due to error in winding. Therefore, the potential of terminal n does not always agree with the average of potentials of connection point a, connection point b, and connection point c. In the following description, it is assumed that the potential of terminal n agrees with the average of potentials applied to connection point a, connection point b, and connection point c, for the sake of simplicity, although the present invention is not limited thereto.
(Description of Operation)
The operation of the DC/DC converter will now be described. The following description is premised on an ideal state with no variation in leakage inductance.
In an ideal state with no biased magnetization of the transformer, with no variation in leakage inductance, with no individual differences among switching elements, and with no variation in wiring impedance, the switching element of each phase of first bridge circuit 12 operates with the same duty ratio.
The timings when the phase legs of first bridge circuit 12 switch the switches are shifted by ⅓ of the switching period T, and voltages Vae, Vbe, Vce applied to connection point a, connection point b, connection point c have waveforms with phases shifted by 120°.
The operation of first bridge circuit 12 as described above is called multi-phase operation or carrier phase shift operation in a multi-parallel driven chopper circuit and commonly known.
In
In a common PWM (Pulse Width Modulation) method using triangular wave carrier, the phase of triangular wave carrier for generating a switching pattern is phase-shifted by 120° to implement a similar multiphase operation.
However, when leakage inductance or the number of turns of the transformer varies, a distortion that makes three phases asymmetric occurs in current that transmits electric power on the primary side and the secondary side, in a coordinate space when phase voltages and phase currents of transformer 30 undergo αβ0 transformation. In order to correct such a distortion of current, it is necessary to adjust voltage output from first bridge circuit 12 or second bridge circuit 22 or both. In this case, it is not always necessary to phase-shift the primary-side carrier by 120° but it may be preferable to adjust the phase shift amount for correction.
As shown in
Since primary-side power supply 60 is connected to one terminal f of reactor unit 40 and neutral point NP1 of transformer 30 is connected to the other terminal n, the difference between power supply voltage Vin of primary-side power supply 60 and the average value of output voltage of first bridge circuit 12 is applied to reactor L1.
The duty ratio of each phase of first bridge circuit 12 is increased/reduced and adjusted by the same amount for all of three phases, whereby voltage applied to reactor L1 can be controlled irrespective of unbalanced voltage between phases responsible for biased magnetization of transformer 30.
In other words, current flowing through reactor L1 can be controlled by adjusting the average value of the phase duty ratios of first bridge circuit 12. That is, primary-side zero-phase current of transformer 30 connected to first bridge circuit 12 is determined by the average value of output duty ratios of the phases of first bridge circuit 12.
Ideally, zero-phase current can be controlled without causing biased magnetization only by controlling the average value of output duty ratios in first bridge circuit 12. However, when biased magnetization occurs in transformer 30 in practice for some reason, the biased magnetization phenomenon can be suppressed by changing the balance of duty ratios of the phases.
First bridge circuit 12 performs multiphase operation (carrier phase shift operation). Therefore, when the phase currents of transformer 30 flow to primary-side storage unit 11, a period of time in which current of only one of the a phase, the b phase, and the c phase flows exists at the time out of phase by 1200 during one period of switching, or a period of time in which current of only one of the a phase, the b phase, and the c phase does not flow exists at the time out of phase by 1200 during one period of switching.
Therefore, when current flowing through primary-side storage unit 11 is detected in controller 50, it is detected while the phase during one period of switching is shifted by 120°, whereby variation in phase currents of transformer 30 can be detected. That is, primary-side storage unit 11 is provided with a current detecting sensor to detect biased magnetization current of transformer 30.
As a matter of course, in addition to detection of all phase currents of the three-phase transformer, with detection points equal to or more than the number of degrees of freedom of current derived from Kirchhoffs current law, it is possible to detect biased magnetization current regardless of detection points and detection methods.
In general, since the magnetizing inductance of a transformer is extremely large, the response speed necessary for suppressing biased magnetization is sufficiently slower than the response speed of current control of reactor L1. Furthermore, when αβ0 transformation is performed on the voltage from terminal f connected to the high voltage side of primary-side power supply 60 to connection point a, connection point b, connection point c on the primary side of transformer 30, a component contributing to biased magnetization current and a component contributing to zero-phase current can be separated and considered independently.
It is the average of the phase duty ratios that affects zero-phase current, and it is a deviation of the phase duty ratios that affects biased magnetization current. Here, in current control for reactor L1, PI controller 58 performs PI control such that current of reactor L1 follows command value i0*, where current flowing through reactor L1 or zero-phase current of transformer 30 is a detected value and the average duty ratio of first bridge circuit 12 is the amount of operation. By contrast, in control of suppressing biased magnetization current, PI controllers 56, 57 perform PI control such that biased magnetization current becomes zero, where the biased magnetization current of transformer 30 is a detected value and a deviation from the average value of the phase duty ratios is the amount of operation. Accordingly, the current control for reactor L1 and the control of suppressing biased magnetization current can be considered independently.
In an ideal state free from biased magnetization, current passing through reactor L1 is divided into three and flows through the primary-side winding of transformer 30 as zero-phase current.
Zero-phase current flowing through the primary-side winding does not transmit electric power to second bridge circuit 22, and when only the zero-phase current is extracted based on the principle of superposition, primary-side bridge circuit 10 behaves as if it is a three-parallel bidirectional chopper circuit. This three-parallel bidirectional chopper circuit functions as a transformer by partially coupling the reactors of bidirectional chopper circuits connected in parallel and cancelling magnetic flux, in which the volume of the magnetic element as a whole is reduced compared with no coupling.
The power transmission amount between primary-side power supply 60 and primary-side storage unit 11 can be controlled by controlling current of reactor L1 with the duty ratio of first bridge circuit 12.
In the present embodiment, the switching waveform of second bridge circuit 22 is phase-shifted while the switching pattern of first bridge circuit 12 is kept, whereby electric power is transmitted between primary-side storage unit 11 and secondary-side storage unit 21.
(Description of Operation Effect)
The operation effect of the DC/DC converter according to the first embodiment will now be described.
In
Hereinafter, Ph.1 to Ph.8 indicate possible states (phases) of the switches of first bridge circuit 12, and PH.1 to PH.9 and PH.7-2, PH.2-3, PH.3-4, PH.4-5, PH.5-6, and PH.6-7 indicate possible states (phases) of the switches of second bridge circuit 22.
There is correlation between the applied amount of phase shift between first bridge circuit 12 and second bridge circuit 22 and the transmission power amount transmitted between first bridge circuit 12 and second bridge circuit 22 through transformer 30. Here, we discuss a method of applying a phase shift between first bridge circuit 12 and second bridge circuit 22.
In the case of first bridge circuit 12, switching by common triangular wave carrier comparison is performed as primary-side carrier. By contrast, in the case of second bridge circuit 22, switching is performed by a combination of leading carrier comparison employing leading phase shifts Ψ1, Ψ2 and lagging carrier comparison employing lagging phase shifts Φ1, Φ2.
When the phase shift amount is zero, the secondary-side carrier in
In the case of first bridge circuit 12, as is the case with PWM with the common triangular wave carrier comparison method, the primary-side triangular wave carrier shown in
The paragraph above includes the wording that the upper arm and the lower arm in one leg of primary-side bridge circuit 12 are switched at “the same timing”. However, this wording is used to emphasize the difference between the switching method in primary-side bridge circuit 12 and the switching method in secondary-side bridge circuit 22 for the sake of convenience and is not intended to exclude the applicability of dead time. It is preferable to apply a dead time as appropriate even in performing ZVT operation described later.
The position denoted by a point in
The switches in second bridge circuit 22 switch so as to mainly output a vector potential corresponding to the vector potential output by first bridge circuit 12 or an appropriate vector potential in
As for the method of determining a switching timing of second bridge circuit 22, for example, the duty ratio may be changed to control the switching timing of second bridge circuit 22 to consequently obtain the same switching pattern, rather than changing the carrier as shown in
Transformer 30 has a phase difference of 30° between the primary-side phase terminals and the secondary-side terminals. In the present embodiment, the vector potential shown in
The symbols shown in
The vector potential shown in
In the circuit in
As shown in
The symbols shown in
In operation of DC/DC converter 100, it is necessary to apply vector potentials with the same phase to transformer 30 having a phase difference of 30° between the primary-side phase terminals and the secondary-side phase terminals.
Transformer 30 has a phase difference of 30° between the primary-side phase terminals and the secondary-side phase terminals. The state in which vector potentials with the same phase are applied to the primary-side phase terminals and the secondary-side phase terminals of transformer 30 corresponds to a state in which the connection point potential of one leg in first bridge circuit 12 or second bridge circuit 22 attains a neutral point potential.
Thus, the leg of second bridge circuit 22 may have the OFF-OFF state which corresponds to the state of outputting a neutral point potential. The connection point potential of the leg in the OFF-OFF state in second bridge circuit 22 is determined by the vector potential output by first bridge circuit 12. When the switching state of first bridge circuit 12 is Ph.2, Ph.3, Ph.4, Ph.5, Ph.6, Ph.7, the switching state of second bridge circuit 22 is PH.2, PH.3, PH.4, PH.5, PH.6, PH.7 correspondingly, the phases of both ends of transformer 30 are matched, and the potential of the connection point of the leg in the OFF-OFF state is exactly the neutral point potential.
However, variation in leakage inductance, variation in coupling inductance unintended in the design stage, or a parasitic component exist in the three-phase transformer. Therefore, when the vector potential output by first bridge circuit 12 is transmitted to second bridge circuit 22 through the coupling of the transformer, the connection point potential of the leg in the OFF-OFF state is not always the neutral point potential. It is definitely possible that the connection point potential of the leg in the OFF-OFF state is shifted from the neutral point potential or the potential oscillates due to switching.
Possible approaches for suppressing the effect due to variation in transformer 30 include a method of enhancing the coupling of the three-phase transformer and separately inserting a reactor at a position corresponding to leakage inductance, a method of adjusting the switching timing of the primary-side phases, and a method of adjusting the switching timing of the secondary-side phases.
Possible methods of suppressing oscillation include a method of forcedly stopping oscillation by configuring second bridge circuit 22 as a three-level circuit, a method of inserting a resistor between connection point m and a point where the low voltage side of voltage-dividing capacitor C1 and the high voltage side of voltage-dividing capacitor C2 in the secondary-side storage unit are connected to suppress oscillation, and a method of inserting a resistor between a point where the low voltage side of voltage-dividing capacitor C1 and the high voltage side of voltage-dividing capacitor C2 in secondary-side storage unit are connected and connection point r, connection point s, or connection point t of the secondary-side phases to suppress oscillation.
In a leg in the OFF-OFF state, current responsible for a resonance phenomenon may flow through a capacitance component such as parasitic capacitance parallel to the switch, but main circuit current continuously transmitting main power of the converter does not flow. Therefore, current flows through the switches in the ON state in the remaining two legs not in the OFF-OFF state in second bridge circuit 22, whereby power transmission occurs between primary-side storage unit 11 and secondary-side storage unit 21.
(Description of Operation Effect)
The operation effect of the DC/DC converter will now be described in more detail.
The switching pattern shown in
In the DC/DC converter according to the present embodiment, in general, when the applied amount of leading phase shift increases, the power transmission amount in the regenerative direction increases, whereas when the applied amount of lagging phase shift increases, the power transmission amount in the powering direction increases.
The amount of phase shift to be applied between the primary-side carrier and the secondary-side carrier is determined with reference to the primary-side carrier. A variety of methods for determining the applied amount of phase shift for secondary-side bridge circuit 22 are possible. For example, Expressions (1) to (4) below can be defined for each of leading phase shifts Ψ1, Ψ2 and lagging phase shifts Φ1, Φ2. Here, leading variable ψ and lagging variable φ are defined, and the average value of the on duty ratio of the upper arm of first bridge circuit 12 is denoted as D. Here, the relation between the primary-side carrier and the secondary-side carrier is as shown in
When neither a leading phase shift nor a lagging phase shift is applied, first bridge circuit 12 and second bridge circuit 22 output “vector potentials in a correspondence relation” to each other. The on duty ratio of the upper arm of first bridge circuit 12 is hereinafter simply referred to as “duty ratio”.
When voltage is applied to transformer 30 by first bridge circuit 12 (Ph.2, Ph.3, Ph.4, Ph.5, Ph.6, Ph.7), the state (PH.2, PH.3, PH.4, PH.5, PH.6, PH.7) in which two legs are conducting that corresponds to each case in second bridge circuit 22 is the “vector potentials in a correspondence relation”.
When the switches in first bridge circuit 12 are all in the lower arm ON state (Ph.1) or the upper arm ON state (Ph.8), voltage is not applied to transformer 30. In this case, the switches in second bridge circuit 22 are in the OFF-OFF state in all of the legs (PH.1), are all in the upper arm ON state (PH.8), or are all in the lower arm ON state (PH.9).
In
The state of voltage ratio noted in the paragraph above is defined as a state in which voltage Vcap of primary-side storage unit 11 and voltage Vout of secondary-side storage unit 21 are balanced. In the present embodiment, transmission of power through transformer 30 occurs when the voltage of primary-side storage unit 11 is higher than the balanced state.
The circuit operation when a leading phase shift or a lagging phase shift or both are applied will now be described.
In the waveforms in
The leading phase shift and the lagging phase shift have the power transmission action in the regenerative direction and the powering direction, respectively, and cancel out each other. When the leading phase shift and the lagging phase shift are applied in the same amount, electric power merely moves back and forth between primary-side storage unit 11 and secondary-side storage unit 21, and the average transmission power amount is zero.
First bridge circuit 12 uses capacitors C11 to C16 connected in parallel to perform zero voltage transition (hereinafter referred to as ZVT) operation when the upper and lower switches are switched.
ZVT is a soft switching method well known in the DAB (Dual Active Bridge) method. The MOSFET or IGBT allowing current to flow in the forward direction is turned off, and the current is commutated to the capacitor connected in parallel in the upper/lower arm so that the capacitor is charged/discharged. Here, the connection point potential of the upper/lower arm varies in accordance with charging/discharging of the capacitor. In this way, switching of connection point potential by soft switching is achieved by switching the connection point potential to feed current to the anti-parallel diode on the opposite-side arm and turning on the MOSFET or IGBT on the opposite-side arm when current flows through the anti-parallel diode.
In the waveforms in
In the case where the same amount of electric power is transmitted, current at a moment when first bridge circuit 12 is switched changes and current suitable for ZVT increases when a lagging phase shift and a relatively smaller amount of leading phase shift are applied (
Current at a moment when first bridge circuit 12 is switched changes and current suitable for ZVT increases when a leading phase shift and a relatively smaller amount of lagging phase shift are applied (
These phenomena can be regarded as partial regenerative operation occurring during powered operation as a whole or partial powered operation occurring during regenerative operation as a whole. This produces circulating power not contributing to the amount of transmission power as a whole, which moves back and forth in the transformer 30, and part of energy of this circulating power can be used for soft switching.
By using both of the leading and lagging phase shift amounts, current in a direction suitable for performing switching by ZVT can flow through first bridge circuit 12, and switching of the switches by soft switching can be performed. Current does not flow in the second bridge circuit 22 during turning-on or turning-off, and switching of the switches can be performed by soft switching (ZCS).
In the present embodiment, even when the duty ratio of first bridge circuit 12 fluctuates, power transmission can be continued. That is, even when voltage of primary-side power supply 60 changes, power transmission to/from secondary-side power supply 70 can be continued by changing the duty ratio.
In the zigzag-Y connection type, the upper limit of boost ratio between the voltage of primary-side power supply 60 and the voltage of secondary-side power supply 70 can be represented by Expression (5) below.
In the Y-Δ connection, the upper limit of boost ratio between the voltage of primary-side power supply 60 and the voltage of secondary-side power supply 70 can be represented by Expression (6) below.
When power transmission is performed between primary-side storage unit 11 and secondary-side storage unit 21, the voltage of primary-side storage unit 11 rises. Equality holds in Expression (5) or (6) above when the phase shift amount is not superimposed on second bridge circuit 22 and power transmission is not performed between primary-side storage unit 11 and secondary-side storage unit 21.
As an operation example of the present embodiment, the operation waveform shown in
Second bridge circuit 22 has a switching state corresponding to the vector potential output by first bridge circuit 12. In general, a commutation period is provided before and after the switching state of first bridge circuit 12 is switched, and second bridge circuit 22 outputs a switching pattern corresponding to a commutation path.
At the start of commutation, ZCS turn-on is used, in which semiconductor devices turn on in a state in which no current flows. At the end of commutation, ZCS turn-off is used, in which semiconductor devices turn off in a state in which no current flows.
When ZCS turn-on allows second bridge circuit 22 to make a transition to a switching phase, the voltages of the primary-side phase terminals (connection points a, b, c) and the secondary-side phase terminals (connection points r, s, t) of transformer 30 become out of phase, so that current flows through transformer 30 in accordance with voltage across both ends.
With the switching phase of second bridge circuit 22 as a reference, the phases at both ends of the transformer are matched and balanced when the potential of the connection point in the switching target leg in first bridge circuit 12 is a neutral point. Therefore, during the period of leading phase shift, voltage is applied such that forward current of the switches flows more to the switching target leg, and current necessary for performing ZVT using soft switching increases.
When the switches in first bridge circuit 12 are switched by ZVT, the phase of voltage applied to both ends of transformer 30 changes, and the current path in the phase immediately before the switching phase naturally disappears, changing into a stable state. In this state, like the phase immediately before the switching phase, the vector potential of first bridge circuit 12 and the vector potential of second bridge circuit 22 are matched in phase and balanced.
When the current path disappears, the semiconductor device (preferably diode) turns off when the flowing current becomes zero, and ZCS turn-off is performed.
In powered operation, when the switch state of first bridge circuit 12 is Ph.2 and the switch state of second bridge circuit 22 is PH.2, the current path of first bridge circuit 12 is the overlapping of the following two current paths Ph.2(1) and Ph.2(2).
Current path Ph.2(1): (primary-side storage unit 11)→(connection point d)→(switch SW12)→(connection point a)→(transformer 30)→(connection point b)→(switch SW13)→(connection point e)→(primary-side storage unit 11)
Current path Ph.2(2): (primary-side storage unit 11)→(connection point d)→(switch SW12)→(connection point a)→(transformer 30)→(connection point c)→(switch SW15)→(connection point e)→(primary-side storage unit 11)
Current is fed to current path Ph.2(1) and current path Ph.2(2) above in parallel, whereby first bridge circuit 12 sends electric power to the secondary-side or receives electric power from the secondary-side.
In this case, current path PH.2 of second bridge circuit 22 is as follows. Current path PH.2: (secondary-side power supply 70)→(connection point v)→(switch SW23)→(connection point s)→(transformer 30)→(connection point r)→(switch SW22)→(connection point u)→(secondary-side power supply 70)
Current is fed to the above current path PH.2, whereby second bridge circuit 22 receives electric power from the primary-side or sends electric power to the primary-side.
When the switch state of first bridge circuit 12 is Ph.3 and the switch state of second bridge circuit 22 is PH.3, the current path of first bridge circuit 12 is the overlapping of the following two current paths Ph.3(1) and Ph.3(2).
Current path Ph.3(1): (primary-side storage unit 11)→(connection point d)→(switch SW12)→(connection point b)→(transformer 30)→(connection point c)→(switch SW15)→(connection point e)→(primary-side storage unit 11)
Current path Ph.3(2): (primary-side storage unit 11)→(connection point d)→(switch SW14)→(connection point a)→(transformer 30)→(connection point c)→(switch SW15)→(connection point e)→(primary-side storage unit 11)
Current is fed to current path Ph.3(1) and current path Ph.3(2) above in parallel, whereby first bridge circuit 12 sends electric power to the secondary-side or receives electric power from the secondary-side.
In this case, current path PH.3 of second bridge circuit 22 is as follows.
Current path PH.3: (secondary-side power supply 70)→(connection point v)→(switch SW25)→(connection point t)→(transformer 30)→(connection point r)→(switch SW22)→(connection point u)→(secondary-side power supply 70)
Current is fed to the above current path PH.3, whereby second bridge circuit 22 receives electric power from the primary-side or sends electric power to the primary-side.
When the switch state of first bridge circuit 12 is Ph.2 or Ph.3 and the switch state of second bridge circuit 22 is PH.2-3, current flows through the path in which current path PH.2 and current path PH.3 overlap in second bridge circuit 22, and commutation occurs from current path PH.2 to current path PH.3.
When the switch state of first bridge circuit 12 switches from Ph.2 to Ph.3, the switch SW13 conducting state changes to the SW14 conducting state.
Current path Ph.2(2) and current path Ph.3(l) are the same path.
The balance of transmission power between primary-side power supply 60 and primary-side storage unit 11 and between primary-side storage unit 11 and secondary-side storage unit 21 is automatically achieved when the switching state corresponding to a lagging phase shift extends or shrinks in accordance with the diode conducting period, if a larger amount of leading phase shift is applied.
The pattern of the switching of current paths changes in accordance with the duty ratio.
In the operation shown in
The switch is turned off at the moment when the current path disappears and current becomes zero, thereby achieving ZCS turn-off. Although it is difficult to turn off the switch exactly at the point of current zero, ZCS turn-off can be achieved practically with no problem by using the function of the antiparallel diode. For example, when synchronous rectification operation is performed in the MOSFET, the reverse current of the MOSFET is turned off (ZVS-OFF) prior to ZCS turn-off and is commutated to the anti-parallel diode, whereby zero current turn-off can be achieved by the function of the anti-parallel diode.
When the switch or the diode is cut off, the leg makes a transition to the OFF-OFF state. In a series of operations, zero current switching is established in the switching of secondary-side bridge circuit 20, zero voltage switching is established in the switching of primary-side bridge circuit 10, and soft switching operation can be established at all the time points of phase switching.
In the operation shown in
In the operation shown in
In the foregoing description, in turning-off of second bridge circuit 22, the ZCS turn-off operation is done at the point of time when current flowing through each switch becomes zero.
However, it is often difficult in practice to detect the point of time when current flowing through the switch is exactly zero and to switch the operation. It is also difficult to control such that the amount of transmission power from primary-side power supply 60 to primary-side storage unit 11 as controlled by first bridge circuit 12 is exactly balanced with the amount of transmission power from primary-side storage unit 11 to secondary-side storage unit 21, in terms of errors in a sensor or passive device, control deviation, and the like.
Preferably, current flowing through the anti-parallel diode in the forward direction before current flowing through the switch becomes zero can be used to solve the problem in turning-off of second bridge circuit 22 in which it is difficult to strictly set the timing.
First of all, with the amount of power transmitted from primary-side power supply 60 to primary-side storage unit 11 as a reference, only lagging variable φ is increased in the case of powered operation or only leading variable ψ is increased in the case of regenerative operation, and a switching pattern by which power transmission is performed from primary-side storage unit 11 to secondary-side storage unit 21 is created. In doing so, a switching pattern is defined for transmitting power that is computationally balanced with the amount of transmission power from primary-side power supply 60 to primary-side storage unit 11.
Then, leading variable ψ is increased, and the value obtained by reducing the amount of transmission power in the powering direction by a few percent to a few tens of percent (that is, the value obtained by adding transmission power in the regenerative direction in regenerative operation) in accordance with the amount of transmission power is set as a command value of the amount of transmission power from primary-side storage unit 11 to secondary-side storage unit 21.
If switching is performed in this state, the switch in second bridge circuit 22 turns off in a state in which forward current of the anti-parallel diode flows, and commutation from the switch to the diode due to ZVS occurs depending on the kind of switches. At this moment, the voltage of the connection point with transformer 30 does not change and the substantial lagging phase period prolongs. At the point of time when the flowing current becomes zero, the diode is disconnected to cause switching, resulting in ZCS operation by the anti-parallel diode.
In the foregoing description of embodiments, an ideal state free from voltage drop in switching elements and diodes in the circuit, wiring resistance, inductance, parasitic capacitance, magnetizing inductance of the transformer, and the like has been described for the sake of clarity of the spirit of the present invention. However, in the actual circuit, these are present to some extent. Various types of additional circuits for compensating for these resistance components, capacitance components, and inductance components have been known, and addition of these additional circuits to the configuration of the present invention and modification of the circuit in the equivalent range are made as appropriate.
As described above, according to the first embodiment, the operation is adapted to power supply voltage fluctuation by adjusting the duty ratio of first bridge circuit 12 in accordance with voltage fluctuation of primary-side power supply 60.
Furthermore, since the switching pattern of second bridge circuit 22 is configured by handling the leading phase shift and the lagging phase shift at the same time with reference to the switching pattern of first bridge circuit 12, soft switching can be implemented even when the power transmission amount is small, leading to reduction in switching loss.
In addition, when it is difficult in practice to strictly define the phase shift amount, a larger amount of leading phase shift is set, and commutation to the anti-parallel diode is used to perform soft switching. This approach can be employed to flexibly cope with an error in practice, leading to reduction in switching loss.
In soft switching, exciting current of the transformer also can be used. For example, when the switch of the primary-side lower arm turns on, exciting current changes such that forward current flowing through the lower arm increases. Therefore, if there is no biased magnetization and the average value of exciting current is kept to zero, exciting current can be used for soft switching. Such soft switching operation using exciting current of the transformer has already been examined in LLC circuits and the like and in practical use in some applications.
In a period of time in which a set of switches or diodes of the upper and lower arms of secondary-side bridge circuit 20 is in the OFF-OFF state, the connection point of the upper and lower arms of secondary-side bridge circuit 20 is connected only with the phase terminal of transformer 30 in the electrical circuit and electrically isolated form other wiring. In this state, at the connection point of the upper and lower arms of secondary-side bridge circuit 20, voltage may easily fluctuate with minute current flowing into the connection point or minute current flowing out of the connection point. This state may cause, for example, a resonance phenomenon due to the parasitic capacitance component of the switches or diodes of the upper and lower arms of secondary-side bridge circuit 20 and the leakage inductance component of transformer 20. Triggered by such a resonance phenomenon, the voltage of the connection point of the upper and lower arms of secondary-side bridge circuit 20 violently oscillates to cause a problem of electromagnetic radiation noise. When this problem is unacceptable in terms of EMC, for example, resistors such as resistors R21, R22, R23 in
In the first embodiment, when only a lagging phase shift is adopted, the switching element of secondary-side bridge circuit 20 merely operates in synchronization with the anti-parallel diode. In a second embodiment, the switching elements of secondary-side bridge circuit 20 are replaced by diodes.
(Description of Overall Configuration)
DC/DC converter 101 in the second embodiment includes a primary-side bridge circuit 10, a secondary-side bridge circuit 20, a transformer 30, a reactor unit 40, and a controller 50.
DC/DC converter 101 is connected between a direct-current primary-side power supply 60 and a direct-current secondary-side power supply 70.
One terminal f of reactor unit 40 is connected to the high voltage side of primary-side power supply 60. Low voltage-side terminal e of primary-side bridge circuit 10 is connected to the low voltage side of primary-side power supply 60. The other terminal n of reactor unit 40 is connected to neutral point NP1 of transformer 30.
Primary-side storage unit 11 is connected between low voltage-side terminal e and high voltage-side terminal d of primary-side bridge circuit 10. Primary-side storage unit 11 includes an energy storing element such as capacitor or battery and has the function as a voltage source.
High voltage-side terminal u of secondary-side bridge circuit 20 is connected to the high voltage side of secondary-side power supply 70. Low voltage-side terminal v of secondary-side bridge circuit 20 is connected to the low voltage side of secondary-side power supply 70.
Secondary-side storage unit 21 is connected to high voltage-side terminal u of secondary-side bridge circuit 20 and low voltage-side terminal v of secondary-side bridge circuit 20.
Secondary-side storage unit 21 includes an energy storing element such as capacitor or battery and has the function as a voltage source. Secondary-side storage unit 21 is connected to the secondary-side neutral point terminal of transformer 30 at connection point m.
Primary-side bridge circuit 10 has a first bridge circuit 12. First bridge circuit 12 has six switching elements SW11, SW12, SW13, SW14, SW15, and SW16 and capacitors C11, C12, C13, C14, C15, and C16 connected in parallel with the respective switching elements. However, external capacitors C11, C12, C13, C14, C15, C16 are not always necessary and can be substituted with parasitic capacitances of the switching elements at equivalent positions in the circuit configuration.
In
At connection point a, the high voltage side of switching element SW11 and the low voltage side of switching element SW12 are connected. At connection point b, the high voltage side of switching element SW13 and the low voltage side of switching element SW14 are connected. At connection point c, the high voltage side of switching element SW15 and the low voltage side of switching element SW16 are connected.
First bridge circuit 12 is connected to the primary-side phase terminals of transformer 30 at connection point a, connection point b, and connection point c.
In the second embodiment, secondary-side bridge circuit 20 has a second bridge circuit 122. Second bridge circuit 122 has six diodes D21, D22, D23, D24, D25, and D26.
The cathode of diode D21 and the anode of diode D22 are connected at connection point r. The cathode of diode D23 and the anode of diode D24 are connected at connection point s. The cathode of diode D25 and the anode of diode D26 are connected at connection point t.
Second bridge circuit 122 is connected to the secondary-side phase terminals of transformer 30 at connection point r, connection point s, and connection point t.
The configuration method of the three-phase transformer will now be described. Transformer 30 is configured such that zero-phase current when Clarke transformation (αβ0 transformation) is performed on phase currents on the primary side does not induce magnetic flux inside the core of the transformer, and has a phase difference between the primary side and the secondary side.
The configuration of transformer 30 is susceptible to other modifications in addition to the configuration shown in
When cores are magnetically coupled to each other, a symmetric configuration of a magnetic circuit as shown in
Specifically, when a Y-Δ configuration as shown in
As shown in
As shown in
In order to suppress magnetic flux induced by zero-phase current of the primary-side terminal, a matching magnetic field may be induced on the magnetic path of a magnetic field produced in the core, or magnetic resistance may be equivalently increased by an open magnetic path to prevent magnetic flux. Both of these methods are examples of the method of preventing a magnetic field produced in the core by zero-phase current of the primary-side terminal from inducing magnetic flux, and any other configurations that achieve a similar function may be employed.
The method of cancelling magnetic flux produced by zero-phase current and the method of shifting a phase between the primary-side winding and the secondary-side winding have been long discussed commonly in the field of three-phase transformers with commercial frequency.
For the configuration of a transformer and a peripheral auxiliary element (for example, an externally inserted reactor supplementing leakage inductance), change equivalent to the configuration in an electric circuit or a magnetic circuit or an electric/magnetic circuit combination may be made as appropriate.
When magnetic flux produced by zero-phase current is canceled, the potential of terminal n connected to neutral point NP1 of transformer 30 is the average of potentials applied to connection point a, connection point b, and connection point c connected to the primary-side phase terminals of transformer 30, because of energy limitation.
In practice, voltage caused by the leakage inductance component is present between the terminals of transformer 30, and the magnetic flux is not always canceled completely due to error in winding. Therefore, the potential of terminal n does not always agree with the average of potentials of connection point a, connection point b, and connection point c. In the following description, it is assumed that the potential of terminal n agrees with the average of potentials applied to connection point a, connection point b, and connection point c, for the sake of simplicity, although the present invention is not limited thereto.
(Description of Operation)
The operation of the DC/DC converter will now be described. The following description is premised on an ideal state with no variation in leakage inductance.
In an ideal state with no variation in leakage inductance, with no individual differences among switching elements, and with no variation in wiring impedance, the switching element of each phase of first bridge circuit 12 operates with the same duty ratio.
As shown in
The operation of first bridge circuit 12 as described above is called multiphase operation or carrier phase shift operation in a parallel-driven bidirectional chopper circuit and is similar to commonly known methods.
In
In a common PWM method using triangular wave carrier, the phase of triangular wave carrier for generating a switching pattern is phase-shifted by 1200 to implement a similar multiphase operation.
However, when leakage inductance or the number of turns of the transformer varies, an asymmetric distortion between the phases occurs in current that transmits electric power on the primary side and the secondary side, in a coordinate space when phase voltages and phase currents of transformer 30 undergo αβ0 transformation. This current distortion is produced by the difference between the primary-side voltage and the secondary-side voltage, and in order to correct this, it is necessary to adjust voltage output by first bridge circuit 12 or second bridge circuit 122 or both. In this case, it is not always necessary to phase-shift exactly by 1200 and it is possible to adjust the amount of phase shift for correction.
As shown in
Since primary-side power supply 60 is connected to one terminal f of reactor unit 40 and neutral point NP1 of transformer 30 is connected to the other terminal n, the difference between power supply voltage Vin of primary-side power supply 60 and the average value of output voltage of first bridge circuit 12 is applied to reactor L1.
The duty ratio of each phase of first bridge circuit 12 is increased/reduced and adjusted by the same amount for all of three phases, whereby voltage applied to reactor L1 can be controlled irrespective of unbalanced voltage between phases responsible for biased magnetization of transformer 30.
In other words, current flowing through reactor L1 can be controlled by adjusting the average value of the phase duty ratios of first bridge circuit 12. Primary-side zero-phase current of transformer 30 connected to first bridge circuit 12 is determined by the average value of output duty ratios of the phases of first bridge circuit 12.
Ideally, first bridge circuit 12 can control zero-phase current only by controlling the average value of output duty ratios. However, when biased magnetization occurs in transformer 30, the biased magnetization phenomenon can be suppressed by changing the balance of duty ratios of the phases.
First bridge circuit 12 performs multiphase operation (carrier phase shift operation). Therefore, when the phase currents of transformer 30 flow to primary-side storage unit 11, a period of time in which current of only one of the a phase, the b phase, and the c phase flows exists at the time out of phase by 120° during one period of switching, or a period of time in which current of only one of the a phase, the b phase, and the c phase does not flow exists at the time out of phase by 1200 during one period of switching.
Therefore, when current flowing through primary-side storage unit 11 is detected in controller 50, it is detected while the phase during one period of switching is shifted by 1200, whereby variation in phase currents of transformer 30 can be detected. That is, primary-side storage unit 11 is provided with a current detecting sensor to detect biased magnetization current of transformer 30.
As a matter of course, it is also possible to detect biased magnetization current by detecting all of the phase currents of the three-phase transformer.
In general, since the magnetizing inductance of a transformer is extremely large, the response speed necessary for suppressing biased magnetization is sufficiently slower than the response speed of current control of reactor L1. Furthermore, when αβ0 transformation is performed in the range from terminal f connected to the high voltage side of primary-side power supply 60 to primary-side connection point a, connection point b, and connection point c of transformer 30, biased magnetization current and zero-phase current can be separated and considered independently (
Here, in current control for reactor L1, PI control is performed such that current of reactor L1 follows a command value, where current flowing through reactor L1 or zero-phase current of transformer 30 is a detected value and the average duty ratio of first bridge circuit 12 is the amount of operation. By contrast, in control of suppressing biased magnetization current, PI control is performed such that biased magnetization current becomes zero, where biased magnetization current is a detected value and a deviation from the average value of the phase duty ratios is the amount of operation. Accordingly, the current control for reactor L1 and the control of suppressing biased magnetization current can be considered independently.
In an ideal state free from biased magnetization, current passing through reactor L1 is divided equally into three and flows through the primary-side winding of transformer 30 as zero-phase current. However, in actuality, since biased magnetization current flows through the three-phase transformer, current of reactor L1 is not divided into exactly three equal parts.
The zero-phase current flowing through the primary-side winding does not transmit electric power to second bridge circuit 122. When only the zero-phase current is extracted based on the principle of superposition, primary-side bridge circuit 10 behaves as if it is a three-parallel bidirectional chopper circuit. This three-parallel bidirectional chopper circuit functions as a transformer by partially coupling the reactors of bidirectional chopper circuits connected in parallel and cancelling magnetic flux, in which the volume of the magnetic element as a whole is reduced compared with no coupling.
The power transmission amount between primary-side power supply 60 and primary-side storage unit 11 can be controlled by controlling current of reactor L1 by the duty ratio of first bridge circuit 12.
First bridge circuit 12 can perform soft switching by using exciting current flowing through the transformer 30 and the phase currents.
In the present embodiment, the switching pattern of first bridge circuit 12 is kept whereby the voltage of primary-side storage unit 11 goes up and down. The voltage of primary-side storage unit 11 goes up and down whereby the amount of electric power flowing from first bridge circuit 12 to second bridge circuit 122 through transformer 30 goes up and down. Therefore, electric power can be sequentially transmitted from primary-side power supply 60 to secondary-side power supply 70.
(Description of Operation Effect)
The operation effect of the DC/DC converter according to the second embodiment will now be described.
First bridge circuit 12 performs normal switching by triangular wave carrier. By contrast, the diodes of second bridge circuit 122 are conducting with a phase shift in the lagging direction.
In the present embodiment, transformer 30 generates a phase difference of 30° between the primary-side phase terminals and the secondary-side phase terminals, first bridge circuit 12 outputs a vector potential shown in
The symbols shown in
The vector potential shown in
In the circuit in
In the circuit in
In operation of DC/DC converter 101, it is necessary to apply a vector potential with the same phase to transformer 30 having a phase difference of 30° between the primary-side phase terminals and the secondary-side phase terminals.
Transformer 30 has a phase difference of 30° between the primary-side phase terminals and the secondary-side phase terminals. The state in which a vector potential with the same phase is applied to the primary-side phase terminals and the secondary-side phase terminals of transformer 30 corresponds to a state in which the connection point potential of one leg of first bridge circuit 12 or second bridge circuit 122 attains a neutral point potential.
Thus, the leg of second bridge circuit 122 has the OFF-OFF state which corresponds to the state of outputting a neutral point potential. The connection point potential of the leg in the OFF-OFF state in second bridge circuit 122 is determined by the vector potential output by first bridge circuit 12. When the switching state of first bridge circuit 12 is Ph.2, Ph.3, Ph.4, Ph.5, Ph.6, Ph.7, if the switching state of second bridge circuit 122 is PH.2, PH.3, PH.4, PH.5, PH.6, PH.7 correspondingly, the phases of both ends of transformer 30 are matched, and the connection point of the leg in the OFF-OFF state attains a neutral point potential.
However, variation in leakage inductance and unintended coupling inductance, and a parasitic component exist in the three-phase transformer. Therefore, the vector potential output by first bridge circuit 12 is not always transmitted as it is to second bridge circuit 122, and the connection point potential of the leg in the OFF-OFF state is not always a neutral point potential. It is definitely possible that the potential of the leg in the OFF-OFF state is shifted from the neutral point potential or the potential oscillates due to switching.
Possible approaches for suppressing the effect due to variation in transformer 30 include a method of enhancing the coupling of the three-phase transformer and separately inserting a reactor at a position corresponding to leakage inductance and a method of adjusting the amount of each phase shift between the secondary-side phases.
Current does not flow in the leg in the OFF-OFF state. Therefore, current flows through the switches in the ON state in the remaining two legs not in the OFF-OFF state in second bridge circuit 122, whereby power transmission occurs between primary-side storage unit 11 and secondary-side storage unit 21.
(Description of Operation Effect)
The operation effect of the DC/DC converter will now be described in more detail.
The amount of phase shift to be applied between the primary-side carrier and the secondary-side carrier is determined with reference to the primary-side carrier. A variety of methods for determining the applied amount of phase shift for secondary-side bridge circuit 22 are possible. For example, the lagging phase shift amount is defined as Expression (7) to (8) below. Here, lagging variable q is defined, and the average value of the on duty ratio of the upper arm of first bridge circuit 12 is denoted as D. Then, the relation between the primary-side carrier and the secondary-side carrier is as shown in
When voltage is applied to transformer 30 by first bridge circuit 12 (Ph.2, Ph.3, Ph.4, Ph.5, Ph.6, Ph.7), the state (PH.2, PH.3, PH.4, PH.5, PH.6, PH.7) in which two legs are conducting that corresponds to each case in second bridge circuit 122 is the “vector potentials in a correspondence relation”.
When all of three legs of first bridge circuit 12 are in the upper arm ON state or the lower arm ON state (Ph.1, Ph.8), voltage is not applied to transformer 30. In this case, the diodes of second bridge circuit 122 enter the OFF-OFF state (PH.1) in all of the legs.
In
These states with no power transmission are defined as a state in which the voltage of primary-side storage unit 11 and the voltage of secondary-side storage unit 21 are balanced. In the present embodiment, power transmission occurs through transformer 30 when the DC/DC converter operates in a state in which the voltage of primary-side storage unit 11 is higher than the balanced state.
In the zigzag-Y connection type, the upper limit of boost ratio between the voltage of primary-side power supply 60 and the voltage of secondary-side power supply 70 can be represented by Expression (9) below.
In the Y-Δ connection, the upper limit of boost ratio between the voltage of primary-side power supply 60 and the voltage of secondary-side power supply 70 can be represented by Expression (10) below.
When power transmission is performed between primary-side storage unit 11 and secondary-side storage unit 21, the voltage of primary-side storage unit 11 rises. Therefore, equality holds in the expression above when power transmission is not performed between primary-side storage unit 11 and secondary-side storage unit 21.
The operation in the case where power transmission is performed will now be described.
In
First bridge circuit 12 performs ZVT operation when switching the upper and lower switches, for example, by using capacitors connected in parallel with the switches.
Of the operation waveforms with no transmission power, the waveform with the on duty ratio of the upper arm of 50% is shown in
In the present embodiment, even when the duty ratio of first bridge circuit 12 varies, power transmission can be continued. That is, even when voltage of primary-side power supply 60 changes, power transmission to/from secondary-side power supply 70 can be continued by changing the duty ratio.
Second bridge circuit 122 has a switching state corresponding to the vector potential output by first bridge circuit 12. In general, a commutation period exists after the switching state of first bridge circuit 12 is switched, and second bridge circuit 122 outputs a switching pattern corresponding to a commutation path.
When the diodes are conducting and second bridge circuit 122 makes a transition to a commutation period, the voltages of the primary-side phase terminals and the secondary-side phase terminals of transformer 30 become out of phase, so that current flows through transformer 30 in accordance with voltage across both ends.
When the switches in first bridge circuit 12 are switched by ZVT, the phase of voltage applied to both ends of transformer 30 changes, and the commutation path naturally disappears. Then, the state changes to a stable state in which the vector potential of first bridge circuit 12 and the vector potential of second bridge circuit 122 are in the same phase, in the same manner as before the transition to the switching phase.
In the foregoing description of embodiments, an ideal state free from voltage drop in switching elements and diodes in the circuit, wiring resistance, inductance, parasitic capacitance, magnetizing inductance of the transformer, and the like has been described for the sake of clarity of the spirit of the present invention. However, they are present to some extent in the actual circuit. Various types of additional circuits for compensating for these resistance components, capacitance components, and inductance components have been known, and addition of these additional circuits to the configuration of the present invention and modification of the circuit in the equivalent range are made as appropriate.
As described above, according to the second embodiment, the operation is adapted to power supply voltage fluctuation by adjusting the duty ratio of first bridge circuit 12 in accordance with voltage fluctuation of primary-side power supply 60.
In soft switching, exciting current of the transformer also can be used. For example, when the switch of the primary-side lower arm turns on, exciting current changes such that forward current flowing through the switch in the lower arm increases. Therefore, if there is no biased magnetization and the average value of exciting current is kept to zero, exciting current can be used for soft switching. Such soft switching operation using exciting current of the transformer has already been examined in LLC circuits and the like and in practical use in some applications.
By using exciting current of the transformer, current necessary for soft switching of first bridge circuit 12 can be increased, and it is also possible to make a setting such that soft switching operation is performed in the entire range of rated current.
Lastly, referring to the drawings again, the present first and second embodiments will be summarized.
DC/DC converter 100 shown in
In such a configuration, the voltage-time product applied to reactor L1 can be reduced using the winding on the primary side of transformer 30, thereby reducing the core volume and the number of turns of reactor L1 through which current of the primary-side power supply (assuming low voltage and large current) flows.
Preferably, first bridge circuit 12 includes a first leg connected between first positive line PL1 and first negative line NL1. The first leg includes first switching element SW11 and second switching element SW12 connected in series between first positive line PL1 and first negative line NL1. The DC/DC converter further includes controller 50 that controls the switching duty ratio of first switching element SW11 and second switching element SW12. Controller 50 determines the switching duty ratio in accordance with change in voltage Vin of primary-side power supply 60. Preferably, controller 50 determines the switching duty ratio in accordance with the ratio between voltage Vin of primary-side power supply 60 and voltage Vcap of storage unit 11.
Preferably, first bridge circuit 12 includes a first leg, a second leg, and a third leg connected in parallel between first positive line PL1 and first negative line NL1. The first leg includes first switching element SW11 and second switching element SW12 connected in series between first positive line PL1 and first negative line NL1. The second leg includes third switching element SW13 and fourth switching element SW14 connected in series between first positive line PL1 and first negative line NL1. The third leg includes fifth switching element SW15 and sixth switching element SW16 connected in series between first positive line PL1 and first negative line NL1. DC/DC converter 100 further includes controller 50 that controls the switching duty ratio of first to sixth switching elements SW11 to SW16. Controller 50 determines the switching duty ratio in accordance with change in voltage Vin of primary-side power supply 60. Preferably, controller 50 determines the switching duty ratio in accordance with the ratio between voltage Vin of primary-side power supply 60 and voltage Vcap of storage unit 11.
For example, controller 50 determines the switching duty ratio of first to sixth switching elements SW11 to SW16 such that when voltage Vin of primary-side power supply 60 lowers, voltage Vcap of the primary-side bus pair is suppressed from lowering and becomes stable in the vicinity of a target voltage. Conversely, controller 50 determines the switching duty ratio of first to sixth switching elements SW11 to SW16 such that when voltage Vin of primary-side power supply 60 rises, voltage Vcap of the primary-side bus pair is suppressed from rising and becomes stable in the vicinity of a target voltage. With the control as described above, in a dual active bridge circuit in which the ratio between voltage of the primary-side bus pair and voltage of the secondary-side bus pair significantly affects the operation and efficiency, DC/DC conversion operation can be performed while the ratio between voltage of the primary-side bus pair and voltage of the secondary-side bus pair is kept well even when the ratio between voltage of primary-side power supply 60 and voltage of secondary-side power supply 70 changes, thereby achieving resistance to fluctuation in power supply voltage.
Preferably, transformer 30 has a phase difference between primary-side input/output and secondary-side input/output. With the provision of a phase difference, different currents flow through the semiconductor switches of primary-side first bridge circuit 12 and secondary-side second bridge circuit 22 and can be used for soft switching operation.
More preferably, as shown in
As shown in
With such a configuration in
Preferably, as shown in
Preferably, as shown in
Such a configuration can suppress the effect of variation in leakage inductance of transformer 30 on the circuit operation.
More preferably, controller 50 of DC/DC converter 100 performs switching control of the switching elements in first bridge circuit 12 and second bridge circuit 22 such that ZCS turn-on is performed in second bridge circuit 22.
In this way, ZCS turn-on is performed to achieve soft switching of the switching elements in the secondary-side circuit, thereby reducing switching loss of DC/DC converter 100.
Preferably, controller 50 of DC/DC converter 100 performs switching control of the switching elements in first bridge circuit 12 and second bridge circuit 22 such that the ON/OFF switching of the upper and lower arms of first bridge circuit 12 is performed by zero voltage transition (ZVT) operation, using external capacitors C11 to C16 connected in parallel with switching elements SW12 to SW16 of first bridge circuit 12.
In this way, soft switching of the switching elements in the primary-side circuit is performed by ZVT operation, thereby reducing switching loss of DC/DC converter 100.
Preferably, as shown in
In this configuration, the switching elements in the secondary-side circuit can be reduced, thereby reducing the cost of DC/DC converter 101.
More preferably, controller 50 of DC/DC converter 101 performs switching control of the switching elements in first bridge circuit 12 and second bridge circuit 22 such that the ON/OFF switching of the upper and lower arms of first bridge circuit 12 is performed by zero voltage transition operation, using external capacitors connected in parallel with the switching elements of first bridge circuit 12.
In this way, soft switching of the switching elements in the primary-side circuit is performed by ZVT operation, thereby reducing switching loss of DC/DC converter 101.
In DC/DC converter 101, soft switching operation can be implemented by using exciting current of transformer 30 even when there is no or little power transmission from the primary-side power supply to the secondary-side power supply. In particular, soft switching can be achieved even when the transmission power is small and in the absence of auxiliary operation by the secondary-side circuit.
In a period of time in which a set of switches or diodes of the upper and lower arms of secondary-side bridge circuit 20 is in the OFF-OFF state, the connection point of the upper and lower arms of secondary-side bridge circuit 20 is connected only with each phase terminal of transformer 30 in the electrical circuit and electrically isolated form other wiring. In this state, at the connection point of the upper and lower arms of secondary-side bridge circuit 20, voltage may easily fluctuate with minute current flowing into the connection point or minute current flowing out of the connection point. This state may cause, for example, a resonance phenomenon due to a parasitic capacitance component of the switches or diodes of the upper and lower arms of secondary-side bridge circuit 20 and a leakage inductance component of transformer 20. Triggered by such a resonance phenomenon, the voltage of the connection point of the upper and lower arms of secondary-side bridge circuit 20 violently oscillates to cause a problem of electromagnetic radiation noise. When this problem is unacceptable in terms of EMC, for example, resistors such as R21, R22, R23 in
In a third embodiment, a control method to expand a soft switching operable region is described.
(Description of Overall Configuration)
The power conversion device according to the third embodiment includes the circuit configuration of DC/DC converter 100 shown in
An overall configuration of the DC/DC converter in the third embodiment will be described.
DC/DC converter 100 includes a primary-side bridge circuit 10, a secondary-side bridge circuit 20, a transformer 30, a reactor unit 40, and a controller 50. DC/DC converter 100 is connected between a direct-current primary-side power supply 60 and a direct-current secondary-side power supply 70.
In DC/DC converter 100 of the present embodiment, one end of reactor L1 is connected to neutral point NP1 of transformer 30 having almost no effective flux linkage for zero-phase current when Clarke transformation is performed on current flowing through transformer 30, and the other end of reactor L1 is connected with primary-side power supply 60. Primary-side bridge circuit 10 and secondary-side bridge circuit 20 are connected to both ends of transformer 30, a storage unit 11 having a capacitor is connected to the buses (PL, NL1) of primary-side bridge circuit 10, and secondary-side power supply 70 is connected to the buses (PL2, NL2) of secondary-side bridge circuit 20. DC/DC converter 100 is characterized in that it can adjust the ratio between voltage of primary-side power supply 60 and bus voltage of secondary-side bridge circuit 20 by adjusting the ratio in voltage between primary-side power supply 60 and primary-side storage unit 11 by switching of primary-side bridge circuit 10.
One terminal f of reactor unit 40 is connected to the high voltage side of primary-side power supply 60. Low voltage-side terminal e of primary-side bridge circuit 10 is connected to the low voltage side of primary-side power supply 60. The other terminal n of reactor unit 40 is connected to neutral point NP1 of transformer 30.
Primary-side storage unit 11 is connected between low voltage-side terminal e and high voltage-side terminal d of primary-side bridge circuit 10. Primary-side storage unit 11 includes an energy storing element such as capacitor or battery and has the function as a voltage source.
High voltage-side terminal u of secondary-side bridge circuit 20 is connected to the high voltage side of secondary-side power supply 70. Low voltage-side terminal v of secondary-side bridge circuit 20 is connected to the low voltage side of secondary-side power supply 70.
Secondary-side storage unit 21 is connected to high voltage-side terminal u of secondary-side bridge circuit 20 and low voltage-side terminal v of secondary-side bridge circuit 20.
Secondary-side storage unit 21 includes an energy storing element such as capacitor or battery and has the function as a voltage source. Secondary-side storage unit 21 is connected to the secondary-side neutral point terminal of transformer 30 at connection point m.
Transformer 30 is a three-phase transformer, and primary-side bridge circuit 10 has a three-phase first bridge circuit 12. First bridge circuit 12 has six switching elements SW11, SW12, SW13, SW14, SW15, and SW16 and capacitors C11, C12, C13, C14, C15, and C16 connected in parallel with these switching elements. However, external capacitors C11, C12, C13, C14, C15, and C16 may be replaced by parasitic capacitances of the switching elements at equivalent positions in the circuit configuration.
In
At connection point a, the high voltage side of switching element SW11 and the low voltage side of switching element SW12 are connected. At connection point b, the high voltage side of switching element SW13 and the low voltage side of switching element SW14 are connected. At connection point c, the high voltage side of switching element SW15 and the low voltage side of switching element SW16 are connected.
Hereinafter, a set of two switches connected in series may be called a leg, each of the switches may be called an arm, specifically, the high voltage-side switch may be called an upper arm and the low voltage-side switch may be called a lower arm with respect to the connection point.
First bridge circuit 12 is connected to the primary-side phase terminals of transformer 30 at connection point a, connection point b, and connection point c.
Secondary-side bridge circuit 20 has a three-phase second bridge circuit 22. Second bridge circuit 22 has six switching elements SW21, SW22, SW23, SW24, SW25, and SW26.
At connection point r, the high voltage side of switching element SW21 and the low voltage side of switching element SW22 are connected. At connection point s, the high voltage side of switching element SW23 and the low voltage side of switching element SW24 are connected. At connection point t, the high voltage side of switching element SW25 and the low voltage side of switching element SW26 are connected.
Second bridge circuit 22 is connected to the secondary-side phase terminals of transformer 30 at connection point r, connection point s, and connection point t.
The configuration method of transformer 30 will now be described.
The configuration of transformer 30 is susceptible to other modifications in addition to the configuration shown in
When cores are magnetically coupled to each other, a symmetric configuration of a magnetic circuit as shown in
Specifically, as shown in
As shown in
As shown in
In order to suppress magnetic flux induced by zero-phase current of the primary-side terminal, a matching magnetic field may be induced on the magnetic path of a magnetic field produced in the core, or magnetic resistance may be equivalently increased by an open magnetic path to prevent magnetic flux. Both of these methods are examples of the method of preventing a magnetic field produced in the core by zero-phase current of the primary-side terminal from inducing magnetic flux, and any other configurations that achieve a similar function may be employed.
The method of cancelling magnetic flux produced by zero-phase current and the method of shifting a phase between the primary-side winding and the secondary-side winding have been long discussed commonly in the field of three-phase transformers with commercial frequency. According to the present embodiment, a circuit configuration including transformer 30, reactor unit 40, first bridge circuit 12, and second bridge circuit 22 as main components makes the most of the degree of freedom of current path of transformer 30.
When magnetic flux produced by zero-phase current is canceled, the potential of terminal n connected to neutral point NP1 of transformer 30 is the average of potentials applied to connection point a, connection point b, and connection point c connected to the primary-side phase terminals of transformer 30, because of limitation in energy.
In practice, voltage caused by the leakage inductance component is present between the terminals of transformer 30, and the magnetic flux is not always canceled completely due to error in winding. Therefore, the potential of terminal n does not always agree with the average of potentials of connection point a, connection point b, and connection point c. In the following description, it is assumed that the potential of terminal n agrees with the average of potentials applied to connection point a, connection point b, and connection point c, for the sake of simplicity, although the present invention is not limited thereto.
(Description of Operation)
The operation of the DC/DC converter will now be described. The following description is premised on an ideal state with no variation in leakage inductance.
In an ideal state with no biased magnetization of the transformer, with no variation in leakage inductance, with no individual differences among switching elements, and with no variation in wiring impedance, the switching element of each phase of first bridge circuit 12 operates with the same duty ratio.
The timings when the phase legs of first bridge circuit 12 switch the switches are shifted by ⅓ of the switching period T, and voltages Vae, Vbe, Vce applied to connection point a, connection point b, connection point c have waveforms with phases shifted by 120°.
The operation of first bridge circuit 12 as described above is called multi-phase operation or carrier phase shift operation in a multi-parallel driven chopper circuit and commonly known.
In
In a common PWM (Pulse Width Modulation) method using triangular wave carrier, the phase of triangular wave carrier for generating a switching pattern is phase-shifted by 1200 to implement a similar multiphase operation.
However, when leakage inductance or the number of turns of the transformer varies, a distortion that makes three phases asymmetric occurs in current that transmits electric power on the primary side and the secondary side, in a coordinate space when the phase voltages and the phase currents of transformer 30 undergo αβ0 transformation. In order to correct such a distortion of current, it is necessary to adjust voltage output from first bridge circuit 12 or second bridge circuit 22 or both. In this case, it is not always necessary to phase-shift the primary-side carrier by 120° but it may be preferable to adjust the phase shift amount for correction.
As shown in
Since primary-side power supply 60 is connected to one terminal f of reactor unit 40 and neutral point NP1 of transformer 30 is connected to the other terminal n, the difference between power supply voltage Vin of primary-side power supply 60 and the average value of output voltage of first bridge circuit 12 is applied to reactor L1.
The duty ratio of each phase of first bridge circuit 12 is increased/reduced and adjusted by the same amount for all of three phases, whereby voltage applied to reactor L1 can be controlled irrespective of unbalanced voltage between phases responsible for biased magnetization of transformer 30.
In other words, current flowing through reactor L1 can be controlled by adjusting the average value of the phase duty ratios of first bridge circuit 12. That is, primary-side zero-phase current of transformer 30 connected to first bridge circuit 12 is determined by the average value of output duty ratios of the phases of first bridge circuit 12.
Ideally, zero-phase current can be controlled without causing biased magnetization only by controlling the average value of output duty ratios in first bridge circuit 12. However, when biased magnetization occurs in transformer 30 in practice for some reason, the biased magnetization phenomenon can be suppressed by changing the balance of duty ratios of the phases.
First bridge circuit 12 performs multiphase operation (carrier phase shift operation). Therefore, when the phase currents of transformer 30 flow to primary-side storage unit 11, a period of time in which current of only one of the a phase, the b phase, and the c phase flows exists at the time out of phase by 1200 during one period of switching, or a period of time in which current of only one of the a phase, the b phase, and the c phase does not flow exists at the time out of phase by 1200 during one period of switching.
Therefore, when current flowing through primary-side storage unit 11 is detected in controller 50, it is detected while the phase during one period of switching is shifted by 1200, whereby variation in phase currents of transformer 30 can be detected. That is, primary-side storage unit 11 is provided with a current detecting sensor to detect biased magnetization current of transformer 30.
As a matter of course, in addition to detection of all phase currents of the three-phase transformer, with detection points equal to or more than the number of degrees of freedom of current derived from Kirchhoffs current law, it is possible to detect biased magnetization current regardless of detection points and detection methods.
In general, since the magnetizing inductance of a transformer is extremely large, the response speed necessary for suppressing biased magnetization is sufficiently slower than the response speed of current control of reactor L1. Furthermore, when αβ0 transformation is performed on voltage from terminal f connected to the high voltage side of primary-side power supply 60 to connection point a, connection point b, connection point c on the primary side of transformer 30, a component contributing to biased magnetization current and a component contributing to zero-phase current can be separated and considered independently.
It is the average of the phase duty ratios that affects zero-phase current, and it is a deviation of the phase duty ratios that affects biased magnetization current Here, in current control for reactor L1, PI controller 58 performs PI control such that current of reactor L1 follows command value i0*, where current flowing through reactor L1 or zero-phase current of transformer 30 is a detected value and the average duty ratio of first bridge circuit 12 is the amount of operation. By contrast, in control of suppressing biased magnetization current, PI controllers 56, 57 perform PI control such that biased magnetization current becomes zero, where the biased magnetization current of transformer 30 is a detected value and a deviation from the average value of the phase duty ratios is the amount of operation. Accordingly, the current control for reactor L1 and the control of suppressing biased magnetization current can be considered independently.
In an ideal state free from biased magnetization, current passing through reactor L1 is divided into three and flows through the primary-side winding of transformer 30 as zero-phase current.
The zero-phase current flowing through the primary-side winding does not transmit electric power to second bridge circuit 22, and when only the zero-phase current is extracted based on the principle of superposition, primary-side bridge circuit 10 behaves as if it is a three-parallel bidirectional chopper circuit. This three-parallel bidirectional chopper circuit functions as a transformer by partially coupling the reactors of bidirectional chopper circuits connected in parallel and cancelling magnetic flux, in which the volume of the magnetic element as a whole is reduced compared with no coupling.
The power transmission amount between primary-side power supply 60 and primary-side storage unit 11 can be controlled by controlling current of reactor L1 with the duty ratio of first bridge circuit 12.
(Description of Operation)
The power conversion device according to the third embodiment expands a soft switching operable region by instantaneously switching the on state of a set of switches of the upper and lower arms in secondary-side bridge circuit 20 between the upper and lower sides, and in doing so, controlling such that current flowing through the switching target leg is zero or close-to-zero current.
The power conversion device according to the first embodiment is characterized by having an operation mode in which controller 50 allows the switches in primary-side bridge circuit 10 and secondary-side bridge circuit 20 to operate in different orders in accordance with the voltage ratio between primary-side power supply 60 and storage unit 110 such as an intermediate capacitor, and in that all the operation modes have a period of time in the OFF-OFF state in which a set of switches of the upper and lower arms in secondary-side bridge circuit 20 simultaneously turns OFF.
When the on state of a set of switches of the upper and lower arms in secondary-side bridge circuit 20 is switched between the upper and lower sides, the power conversion device according to the first embodiment intentionally creates a period of time in which a set of switches in the upper and lower arms enters the OFF-OFF state between a period of time in which one of a set of switches of the upper and lower arms is in the on state and a period of time in which the other switch of a set of switches of the upper and lower arms is in the on state, and this is used to perform soft switching.
Accordingly, when the on state of a set of switches in the upper and lower arms in secondary-side bridge circuit 20 is switched between the upper and lower sides, a period of time in the OFF-OFF state need to exist during the switching operation of the on state of a set of switches in the upper and lower arms between the upper and lower sides. In the operation according to the first embodiment of DC/DC converter 100, a period of time in which the secondary-side leg is in the OFF-OFF state exists. By contrast, the operation according to the third embodiment of DC/DC converter 100 is characterized by instantaneous switching operation when the on state of a set of switches in the upper and lower arms of secondary-side bridge circuit 20 is switched between the upper and lower sides.
As used herein instantaneous switching operation refers to a state in which there is no OFF-OFF period excluding dead time and the state of the switches is switched instantaneously like the switching operation of a common bidirectional chopper circuit or a full bridge inverter circuit. Furthermore, the instantaneous switching operation in the third embodiment is performed at a point of time when current flowing from each phase terminal of transformer 30 connected to the connection point of the upper and lower arms to be switched is zero or close to zero. In order to implement this, controller 50 controls the order and timing of switching of the switches in primary-side bridge circuit 10 and secondary-side bridge circuit 20 and the bus voltage of primary-side bridge circuit 10 and secondary-side bridge circuit 20 such that current flowing through each phase terminal of transformer 30 connected to the connection point of the upper and lower arms is zero or close to zero in the instantaneous switching.
The state in which each phase current of three-phase transformer 30 connected to the connection point of the upper and lower arms of secondary-side bridge circuit 20 is zero can be represented as a point on a coordinate plane on a drawing sheet by performing coordinate transformation known as Clarke transformation/Park transformation on a vector of a set of currents flowing through each terminal of transformer 30.
The main part of operation of DC/DC converter circuit 100 can be represented by illustrating the phase currents excluding a zero-phase component from the current flowing through transformer 30, and the main part of operation of the DC/DC converter circuit can be represented by drawing the loci of the phase currents flowing through transformer 30 on a coordinate plane obtained by performing, for example, Clarke transformation/Park transformation as appropriate. The locus of current on the coordinate plane representing each phase current of DC/DC converter circuit 100 is a chart of a line that is broken at the timing when the on/off of the switch of primary-side bridge circuit 10 or secondary-side bridge circuit 20 is switched. The position on the coordinate plane of the point where the line illustrated on the coordinate plane is broken represents each phase current at the point of time of switching and serves as an important factor that determines whether soft switching on the primary side and the secondary side is successful.
As shown in
In the power conversion device according to the third embodiment, controller 50 performs instantaneous switching of the upper and lower arms of secondary-side bridge circuit 20 when a point illustrating each phase current is present on or in the vicinity of the coordinate axes at intervals of 120° indicating the directions of the phase currents of the primary-side terminal of three-phase transformer 30, on the locus illustrating each phase current of three-phase transformer 30 on the coordinate plane.
In the third embodiment, when the secondary-side leg is instantaneously switched, it is necessary to perform operation such that the upper and lower switches on the secondary side are switched at a timing when the locus of transformer current is on the axis, by controlling the timing of switching on the primary side/secondary side and bus voltage. The factors that determine the shape of locus of current mainly include leakage inductance of the transformer, coupling inductance of the transformer, the timing of switching of the primary-side and secondary-side switches, the primary-side bus voltage, and the secondary-side bus voltage. In the third embodiment, switching of the secondary-side leg by zero current is implemented by detecting the bus voltage of primary-side bridge circuit 10, the bus voltage of secondary-side bridge circuit 20, and the phase currents of transformer 30, adjusting the phase currents of transformer 30 by adjusting the timing of switching of the primary-side and secondary-side switches, which is mainly manipulable, and controlling the primary-side bus voltage or/and the secondary-side bus voltage, and controlling the loci of the phase currents of transformer 30 when viewed on the coordinate axes.
In the switching operation according to the first embodiment, when there is a period of time in the OFF-OFF state, current flowing through the leg middle point is zero in principle, because of the absence of current destination, if parasitic capacitance and off resistance are ignored. The presence of a period of time in the OFF-OFF state enables switching of the secondary-side switches by zero current. By contrast, in the third embodiment, it is difficult to strictly null the current flowing through the leg middle point at the switching timing of the secondary-side switches. Switching in a state in which current flows to some extent in the vicinity of zero is quite possible, and an allowable tolerance to some extent should be taken into consideration in practice, for example, switching at 10% or less of the maximum current during rated operation is regarded as soft switching. When flowing current is not zero in a strict sense but the upper/lower switching in the secondary-side leg is performed at a smaller current compared with the maximum current in rated operation, for example, as the result of control, the effect of reducing switching loss of the secondary-side switch can be expected.
The power conversion device according to the first embodiment fails to operate by the switching pattern as explained, mainly when the average of the lower-side on duty ratio in the primary-side bridge circuit is in the vicinity of ⅓ or ⅔. For example, the power conversion device according to the third embodiment detects a case where inequality holds in Expressions (11), (12) below using the ratio between the primary-side bus voltage and the secondary-side bus voltage and enables the operation as DC/DC converter circuit 100 performing operation according to the third embodiment.
[Expression 11]
½d0≤D0≤1−d0 (11)
[Expression 12]
d
0
≤D
0≤1−½d0 (12)
In the zigzag-Y winding, when the ratio obtained by dividing the number of turns on the primary side by the number of turns on the secondary side is n, d0 is represented by Expression (13) below.
In the Y-Δ winding, when the ratio obtained by dividing the number of turns on the primary side by the number of turns on the secondary side is n, d0 is represented by Expression (14) below.
D0 is represented by Expression (15) below.
In a fourth embodiment, a resistor for suppressing oscillation in the OFF-OFF period in the secondary-side bridge circuit is added.
The power conversion device according to the fourth embodiment includes, in addition to the configuration of DC/DC converter circuit 100 or DC/DC converter 101 illustrated in the first embodiment or the second embodiment, resistors R21, R22, R23 connecting a neutral point that divides the positive line of secondary-side bridge circuit 20 or the negative line of secondary-side bridge circuit 20 or the bus voltage of secondary-side bridge circuit 20 with the connection point of the upper and lower arms of each phase of secondary-side bridge circuit 20 (
In the power conversion device according to the first embodiment or the second embodiment, in a period of time in which a set of switches or diodes of the upper and lower arms of secondary-side bridge circuit 20 is in the OFF-OFF state, the upper and lower arm connection point in the secondary-side bridge circuit 20 is connected only with each phase terminal of transformer 30 in the electrical circuit and is electrically isolated from other wiring. In this state, at the connection point of the upper and lower arms of secondary-side bridge circuit 20, voltage may easily fluctuate with minute current flowing into the connection point or minute current flowing out of the connection point. This state may cause, for example, a resonance phenomenon due to a parasitic capacitance component of the switches or diodes of the upper and lower arms of secondary-side bridge circuit 20 and a leakage inductance component of transformer 20. Triggered by such a resonance phenomenon, the voltage of the connection point of the upper and lower arms of secondary-side bridge circuit 20 violently oscillates to cause a problem of electromagnetic radiation noise. When this problem is unacceptable in terms of EMC, the resistors as described above are added to DC/DC converter circuit 100 according to the first embodiment or DC/DC converter circuit 101 according to the second embodiment to suppress oscillation of voltage. When resistors are added, the addition of resistors causes loss. Therefore, the resistance is judged based on the range in which the oscillation phenomenon or other problems are acceptable, and it is preferable to set a resistance as large as possible.
The embodiments disclosed here should be understood as being illustrative in all respects and should not be construed as being limitative. Embodiments disclosed here should be understood as being illustrative rather than being limitative in all respects. The scope of the present invention is shown not in the foregoing description but in the claims, and it is intended that all modifications that come within the meaning and range of equivalence to the claims are embraced here.
10 primary-side bridge circuit, 11, 21 storage unit, 12 first bridge circuit, 20 secondary-side bridge circuit, 22, 122 second bridge circuit, 30 transformer, 40 reactor unit, 50 controller, 51, 53 subtractor, 54, 55 sensor, 56 to 58 PI controller, 61 PWM controller, 59, 62 dq0-abc transformer, 60, 70 power supply, 66 to 68 voltage-current converter, 100, 101 converter, 301 first winding, 301-1 first winding portion, 301-2 second winding portion, 302 second winding, 302-1 third winding portion, 302-2 fourth winding portion, 303 third winding, 303-1 fifth winding portion, 303-2 sixth winding portion, 304 fourth winding, 305 fifth winding, 306 sixth winding, 321 first core, 322 second core, 323 third core, C1, C2, C1 to C16 capacitor, D21 to D26 diode, L1, La, Lb, Lc reactor, NL1 first negative line, NL2 second negative line, NP1 neutral point, PL1 first positive line, PL2 second positive line, SW11 to SW16, SW21 to SW26 switching element.
Number | Date | Country | Kind |
---|---|---|---|
2017-159991 | Aug 2017 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2018/013086 | 3/29/2018 | WO | 00 |